On behalf of the Glenelg Shire Council, it is my pleasure to
present the Annual Report of the Glenelg Shire Council for
the 2007/08 financial year. This Annual Report highlights
many Council achievements during the past 12 months.
I am extremely proud to see the growth that has occurred in
our Shire. What an incredible year it has been, with so many
major projects proposed, underway or completed.
A broad range of new and existing industries and
businesses are considering a number of exciting
development initiatives for our Shire.
Important strategic planning projects included:
• Portland Bay Coastal Infrastructure Plan
• Municipal Public Health Plan
• Glenelg River Foreshore Master Plan
• Positive Ageing Strategy
• Youth Strategy
• Disability Action Plan 2006-2008
• General Local Law 2008
• Casterton Saleyards Business Plan
• Domestic Animal Management Plan
The Council is always mindful of the responsibility vested in
us to spend the Shire’s funds wisely for the maximum benefit
of the community.
The allocation of funds across the entire operations of the
Glenelg Shire requires much planning and deliberation - from
building our roads, planning for our future development,
protecting our environment, securing our economic viability
to supporting community spirit and enhancing our total way
of life. This achievement is a testament to the hard work of
our Councillors and staff.
In recent years the Council has proactively addressed many
issues and we will continue to boldly face future challenges.
Providing solutions to these challenges will be rewarding and
lead to developing important objectives and projects.
I am extremely proud to see the growth that has occurred
in our Shire. What an incredible year it has been, with so
many major projects proposed, underway or completed.
The Council looks forward to working with the Federal
and State Governments, business, industry, community
organisations, residents and volunteers in a consultative
partnership for the betterment of the whole Shire.
A broad range of new and existing industries and
businesses are considering a number of exciting
development initiatives for our Shire.
1glenelg shire annual report 07-08
2 glenelg shire annual report 07-08
On behalf of the Council and the community, I extend
my sincere thanks to all our volunteers for their efforts
during the year.
Every year we reflect on the vital contribution the many
volunteers who serve our community so well make.
Many generous people give so much of their time,
hard work and expertise to keep us safe and enrich our
community.
During my Mayoral term I have been greatly assisted by
my fellow Councillors who are dedicated to achieving
the expectations and needs of residents, businesses
and visitors in all areas of our large Shire.
I also thank Mayoress Aileen, the Council’s Chief
Executive Officer, Mr Stuart Burdack, as well as the
senior management team and staff for their considerable
support, guidance, assistance and advice throughout
the year.
I am honoured to serve as Mayor for the people of our
Shire. The role brings many pressures and challenges,
but is also very rewarding.
We commend our community’s commitment, passion
and pride in our Shire and gratefully acknowledge our
citizens’ considerable efforts.
Cr Geoff White
Mayor
This has been a year of planning for the future, working
with our community to provide relevant services and
consolidating the strong position of the Shire. The 2007/08
Annual Report outlines the activities undertaken and
outcomes achieved to meet the strategic objectives of
Glenelg Shire Council.
FINANCIAL POSITION
Throughout the year, Glenelg Shire Council consolidated its
strong financial position. In the 2007/08 financial year we
achieved:
• an operating surplus of $2.739 million
• our target of reducing loan debts to $2.4 million
• delivery of a $8.799 million capital works program which
focuses on renewing our one quarter of a billion dollars
of assets
• planning targets for new infrastructure to support our
diverse community
A number of independent reviews of the financial position of
the Council confirmed that we have a sound financial basis
for the future. The independent Strategy Plus Report again
concluded that the Glenelg Shire was the most financially
sustainable large Shire in Victoria and that our average rates
are amongst the lowest in the State.
3glenelg shire annual report 07-08
WORKING WITH THE COMMUNITY
We have focused on ensuring we are listening to, planning
with and supporting the range of valuable organisations and
groups within the community. Major projects include:
• developing the Casterton Saleyards Business Plan which
provides a blueprint for its future
• gaining broad community support of Portland Bay
Coastal Infrastructure Plan
• making significant progress on the planning of Portland’s
Children’s and Family Complex
• advocating strongly on issues regarding rail freight and
transport as we prepare for the blue gum timber harvest
• continuing support of our townships with community
planning
GOVERNANCE
The Council, together with the invaluable support from our
Audit Committee, continues to review and evaluate our
internal policies, practices and operations. This continuous
improvement program ensures that services remain relevant
and responsive to our citizens while providing good value for
money.
To reflect best practice and value, in particular we have:
• conducted major reviews of our information technology
back up and implementation strategy
• reviewed contract management and procurement
practices and guidelines
• reviewed cash handling practices and payroll operations
We have focused on ensuring we are listening to,
planning with and supporting the range of valuable
organisations and groups within the community
The Council is proactive in ensuring our citizens have input
into decision making processes. Numerous town meetings
including the Casterton Saleyards Business Plan meeting
and the Heywood Police Station Residence meeting
highlighted active citizen participation.
It is pleasing to see good attendances at our Council
meetings indicating an interest and desire to participate in
the democratic decision making process of our Council.
ECONOMIC DEVELOPMENT
Over the past 12 months, the Council has developed a
range of important and significant economic development
opportunities. We continue to work closely with industries
associated with the blue gum timber harvest and visited the
Albany region of Western Australia to review impacts of the
timber industry.
We have considerable interest from a range of businesses
connected with the timber industry seeking to commence
operations in the Shire and the Port of Portland continues to
upgrade facilities to accommodate an anticipated trebling of
woodchip exports.
The Council has continued to lobby for and work with other
levels of government with respect to planning for improved
freight task movements within our region and there is
continued interest in our Shire for a range of renewable
energy sources.
rich in history and diverse in landscape
4 glenelg shire annual report 07-08
This report also reflects on the many activities and inputs
that we have undertaken as an organisation to achieve
our goals of:
• quality engagement with our citizens
• strong teamwork
• providing accountable leadership
• being a progressive and modern organisation
With general council elections planned for November
2008, I would like to acknowledge and thank the outgoing
Councillors for their commitment to their role for the
Glenelg Shire.
I also acknowledge and thank the Glenelg Shire Council
staff for their commitment and dedication to their work.
I welcome feedback on the performance of Glenelg Shire
Council for the 2007/08 financial year.
Stuart Burdack
Chief Executive Of!cer
ORGANISATIONAL STRUCTURE
In February 2008, a restructure of our organisation was
implemented to provide four departments which include:
• Asset and Infrastructure Department - plans and
maintains our quarter of a billion dollars of infrastructure
• Community Development Department - supports and
works in partnership with the hundreds of community
organisations and groups within the Shire
• Corporate Services Department – provides governance
and operational services to our organisation
• Planning and Economic Development Department
- focuses on the important issues of land use planning
and facilitating economic development within the Shire
The Annual Report presents a record of achievements
and continued commitment from the Council to providing
responsive, relevant and cost effective services to the
citizens of the Glenelg Shire.
commitment, passion and pride
I would like to acknowledge and thank the
outgoing Councillors for their commitment to
their role for the Glenelg Shire.
5glenelg shire annual report 07-08
Population:
Area:
Number of employees:
Rateable properties:
Rate revenue:
Total revenue:
Municipal charge:
Garbage charge per rateable property:
Length of sealed local roads:
Length of unsealed local roads:
Bridges and major culverts:
19,758 (ABS LGA Pop. Stats. as at 30 June 2006)
6,212 square kilometres
199 (EFT)
13,680 (30/06/08)
$16,710m (30/06/08)
$34,385m
$Nil (30/06/08)
$141.50 (2007/08)
1,108 kilometres
1,523 kilometres
205
OUR REGION
Strategically located between Adelaide and Melbourne in
Victoria’s South West, the Glenelg Shire region services
a large hinterland including the south east of South
Australia, south west Victoria and the Wimmera Mallee.
The Glenelg Shire is an ideal location for business and
industry offering an extensive interstate and local road
network, including the Princes and Henty Highways,
and access to the national standard rail network.
The Shire’s largest city, Portland, has a deep water
international port that is a major shipping hub for the
south west of Victoria, the Wimmera Mallee and the
south east of South Australia.
Taking our name from the mighty Glenelg River which
flows from the Grampians through to Nelson on
Victoria’s Discovery Coast, the Glenelg Shire embraces
an area of approximately 6,212 square kilometres.
The majestic Glenelg River was named after British
Administrator, Lord Glenelg in the 1830s.
The natural beauty of the Shire features expansive
beaches, scenic and rugged coast, large national
parks, extensive wildlife and provides the western
access to the world renowned Great Ocean Road.
The natural beauty of the Shire
features expansive beaches, scenic
and rugged coast, large national
parks and extensive wildlife.
6 glenelg shire annual report 07-08
OUR HISTORY
The Glenelg Shire is in the traditional lands of the
indigenous Gunditjmara and Bunganditj people.
In 1800 Lieutenant James Grant was the first European
to chart of Victoria’s south western coastline. From his
ship ‘Lady Nelson’ he sighted and named Portland
Bay after the English Secretary of State, the Duke of
Portland.
Grant was followed in 1802 by the French explorer
Captain Nicholas Baudin but it was Captain Matthew
Flinders who provided suitable navigation charts.
In 1829 William Dutton established a shore based
whaling industry in Portland Bay.
Edward Henty and his brothers established Victoria’s first
permanent settlement by Europeans and turned the first
piece of soil on 6 December 1834. Primarily farmers,
the Henty family also had a share in the whale industry.
The Hentys commenced Victoria’s agricultural
development and explored far inland to establish various
thriving sheep and cattle stations. In time exploration
and settlement extended into the Heywood, Dartmoor
and Casterton areas.
The Glenelg Shire is proud to be Victoria’s birthplace
for the first permanent European settlement and is
also equally proud to be part of the traditional land of
the Gunditjmara and Bunganditj people and their rich
indigenous history.
TODAY
With a total population of over 19,750, the Glenelg Shire
includes the City of Portland, Townships of Heywood
and Casterton and many small townships and localities.
The Glenelg Shire features a diverse range of strategic
advantages including:
• considerable water reserves in deep aquifers
• ocean currents suitable for generating electricity by
wave energy
• geothermal energy reserves and reticulation system
• one of regional Victoria’s best airports, with daily
flights to and from Melbourne and aircraft
maintenance facilities
• access to the South Eastern Australia Pty. Ltd gas
pipeline carrying gas from the Port Campbell gas
fields to Adelaide
• a deep-water sea port between Adelaide and
Melbourne
• access to the standard gauge national rail network
• wind velocities suitable for generating electricity from
wind power
• access to the interstate electricity network between
South Australia and Victoria
The Glenelg Shire is proud to be Victoria’s birthplace
for the first permanent European settlement and is
also equally proud to be part of the traditional land of
the Gunditjmara and Bunganditj people and their rich
indigenous history.
7glenelg shire annual report 07-08
We have a vibrant and diverse commercial and industrial sector including:
• primary production – predominantly cattle, sheep and dairy
• significant hardwood and softwood timber plantations, predominantly pine and
blue-gums with timber processing facilities at Heywood and Portland
• Portland Aluminium - the largest aluminium smelter in the southern hemisphere
and an acknowledged world leader in environmental sustainability and best
practice operation.
• one of the deepest international ports in southern Australia, with a fast access
time from the southern sea-lanes
• Victoria’s largest commercial fishing fleet which supplies the majority of fish to the
Victorian market
• a large mariculture facility supplying abalone to national and international markets
• boutique industries – wine, gourmet food, orchards, horticulture, retail
OUR FUTURE
The Shire offers a great lifestyle combined with growing
opportunities for employment, recreation, education and
cultural activities.
The Council continues to concentrate and capitalise on
its strategic positioning as the major shipping hub for
south west Victoria. The Port of Portland is undergoing
a staged major expansion to accommodate forecast
increases in export/import activities.
We are focussed on developing opportunities for
business, community and tourism, including:
• considering various locations for a diverse range of
multi million dollar developments
• facilitating the Cape Bridgewater and Cape Nelson
sections of the Portland Wind Energy Project, one of
the largest in Victoria
ideal location for business and industry
• working with companies who are considering
establishing multi million dollar timber related
industries in the Shire including a wood chip mill at
Myamyn
• promoting development in the Portland-Heywood
industrial corridor
The Green Triangle Regional Committee and timber
plantation companies estimate the timber industry in the
region will create 1,000 direct positions and up to 1,000
downstream employment opportunities during the next
five years.
The State Government and the Council view Heywood
as a strategic location to establish pulp and wood chip
mills. Together with the State Government, we will
continue to advocate establishing timber and associated
industries in the Shire with particular focus on Heywood.
8 glenelg shire annual report 07-08
CR. BILL MCINTYREDutton Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. GEOFF WHITEFlinders Riding
Elected: 27 November 2004Retires: 29 November 2008
CR. GILBERT WILSONHenty Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. FRANK ZEIGLERFawthrop Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. TOM MUNROMitchell Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. NEIL KERRCobboboonee Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. JOY BENBOWMt. Clay Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. KAREN STEPHENSGilmore Riding
Elected: 27 November 2004
Retires: 29 November 2008
CR. ROBERT HALLIDAYGrant Riding
Elected: 27 November 2004
Retires: 29 November 2008
9glenelg shire annual report 07-08
LEGISLATIVE FRAMEWORK
Constitutional Recognition of Local Government
The Victorian Constitution recognises local government as a distinct and essential tier of government consisting of
democratically elected Councils having the functions and powers the Parliament considers are necessary to ensure
the peace, order and good government of Victoria’s 79 municipalities.
Role of Local Government in Victoria
The Victorian Local Government Act 1989 contains a Preamble that describes the place of local government in the
Australian system of local government. In addition the Act includes a Charter that describes the purpose of local
government, how it is constituted, the objectives of a Council, the role of a Council; the functions of a Council and
the powers of a Council.
Objectives of Local Government
The Act specifies that the primary objective of a Council
is to achieve the best outcomes for the local community
having regard to both the long term and cumulative
effects of decisions. In meeting this objective the
Council must have regard to:
• promote the social, economic and environmental
viability and sustainability of the municipality
• ensure that resources are used efficiently and
effectively and services are provided in accordance
with the Best Value Principles to best meet the needs
of the local community
• improve the overall quality of life of people in the local
community
• promote appropriate business and employment
opportunities
• ensure that services and facilities provided by the
Council are accessible and equitable
• ensure the equitable imposition of rates and charges
• ensure transparency and accountability in Council
decision making
The primary objective of a Council is to
achieve the best outcomes for the local
community having regard to both the long
term and cumulative effects of decisions.
Role of Council
The Act also specifies the role of Councils as:
• acting as a representative government by taking into
account the diverse needs of the local community in
decision making
• providing leadership by establishing strategic
objectives and monitoring their achievement
• maintaining the viability of the Council by ensuring
that resources are managed in a responsible and
accountable manner
• advocating the interests of the local communities to
other communities and governments
• acting as a responsible partner in government by
taking into account the needs of other communities
• fostering community cohesion and encouraging
active participation in civic life
Functions and Powers of Council
The Act also specifies that a Council has the range of
powers contained in the Act.
10 glenelg shire annual report 07-08
Electoral Representation Reviews
Every eight years, Council is required to undertake a
public review of its electoral structure to determine:
• whether the number of Councillors and the electoral
structure provides a fair and equitable representation
for the persons who are entitled to vote at a general
election of the Council
• whether the number of voters represented by each
Councillor is within 10 per cent of the average
number of voters per Councillor for the whole
municipality
The Minister for Local Government appointed the
Victorian Electoral Commission to undertake an electoral
representation review of the Glenelg Shire on the
11 July 2007. The Review was completed on the
1 October 2007 and the Minister for Local Government
accepted the VEC recommendations. In summary, the
proportional voting system will replace the preferential
voting system and the nine single member ridings will be
replaced with seven Councillors being elected from an
un-subdivided municipality. The Review outcomes will
apply to the November 2008 Council Election.
Council Function
The Council provides over 100 services to citizens of all
ages and at all stages of life throughout the Shire.
A comprehensive list of Council services is provided
on page 47 of this Annual Report. In some cases, the
services and facilities are delivered by the Council in
partnership with the Federal and Victorian Governments.
Council Electoral Structure
The Glenelg Shire is divided into nine Ridings, with an
elected Councillor representing each Riding.
The last Council election was held on the 27 November
2004 and all Councillors will retire on the 29 November
2008.
Commencing in November 2008, all Council elections
in Victoria will be held simultaneously every four years
on the last Saturday in November with each Councillor
serving a fixed four year term.
On 29 November 2008, seven Councillors will be
elected in an un-subdivided municipality whereby
proportional representation will now apply for the
first time.
The Mayor is elected annually by Councillors at the
Statutory Meeting of Council. Cr Geoff White is the
current Mayor.
A contract has been awarded to the Victorian Electoral
Commission to provide independent election services for
the 2008 Council Election to be held in November 2008.
The VEC is recognised world wide for their professional
approach to elections and their electoral management
and voting software.
professional approach to elections
On 29 November 2008, seven Councillors will be elected
in an un-subdivided municipality whereby proportional
representation will now apply for the first time.
11glenelg shire annual report 07-08
Councillors Remuneration
In 2001, the State Government specified the maximum
annual allowances that Councils can set for Mayors
and Councillors based on categories determined
according to their size and revenue base. The Glenelg
Shire Council is classified as a category one Council.
In 2007/08 Councillors were paid an allowance
of $12,000 and the Mayor received an allowance
of $36,000. Councillors were also provided with
phone/fax/printing equipment, and were able to claim
reimbursement for Council related expenses such as
travel, accommodation, car parking and out of pocket
expenses. The incumbent Mayor has full private use
of a car.
Council Meetings
Council Meetings were held on the fourth Tuesday of the
month at 7.00pm in the Council Chambers, Cliff Street,
Portland unless otherwise advertised. Special Council
Meetings were occasionally held for specific matters.
All Council and Special Council Meetings are advertised
and are generally open to the public. The Local
Government Act enables the Council to close meetings
for specified purposes. To ensure public transparency
and accountability, the Council endeavours to consider
most agenda items in the public section of Council
Meetings.
Council Meetings are conducted in accordance with the
provisions contained in the Governance Local Law and
the Council’s Meeting Procedure.
During 2007/08 12 Ordinary Council Meetings, one
Special Council Meeting and two Special Emergency
Council Meetings were held.
Nine Councillors complied with the statutory requirement
to submit pecuniary interest returns by 30 July 2008.
Councillor
Cr White
Cr Wilson
Cr Stephens
Cr Munro
Cr Kerr
Cr Halliday
Cr Zeigler
Cr McIntyre
Cr Benbow
Council Meetings
Held
15
15
15
15
15
15
15
15
15
Meetings Attended
15
15
15
11
13
14
13
14
13
Leave of Absence granted
0
0
0
4
2
1
2
1
2
Note: These figures include Special Meetings and Special Emergency Meetings
To ensure public transparency and accountability,
the Council endeavours to consider most agenda
items in the public section of Council Meetings.
12 glenelg shire annual report 07-08
Stuart Burdack Chief Executive Officer
Syd Deam Group Manager Planning and Economic Development
Adele Kenneally Group Manager Community Development
Peter Gall Group Manager Assets and Infrastructure
Trevor Hornby Group Manager Corporate Services
ORGANISATIONAL CHART
Chief Executive Officer
• Organisation Development (HR)
• Communications
• Executive Support
CorporateServices
CommunityDevelopment
Assets &Infrastructure
Planning & Economic
Development
• Finance
• Records Management
• Governance Support
• Rates/Valuations
• Customer Service
• Risk Management
• Local Laws
• Children’s Crossings
• Payroll
• Information Technology
• Cleaning
• Quality Systems
• Community Development
• Children’s & Family Services
• Recreation & Youth
• Library Services
• Aged & Disability
• Environmental Health (contract)
• Arts & Culture (including Art Collection)
• Maternal & Child Health (contract)
• Asset Management
• Contracts (including aquatic centres)
• Construction & Maintenance
• Design Services
• Parks & Gardens
• Building Services
• Waste Management & Saleyards
• Airport
• Statutory Planning
• Strategic Planning
• Tourism (VIC’s & Caravan Parks)
• Economic Development
• Business Liaison & Support
Cross Functional Project Teams
progressive, accountableteamwork, quality engagement,
13glenelg shire annual report 07-08
CHALLENGES
Our organisation is challenged by a rapidly changing
work environment and increasing expectations by our
citizens, other levels of government and organisations
- people expect fast responses to their questions and
requests.
We need to plan for and manage significant future
challenges such as:
• climate change
• an ageing community that will require greater support
• the demands of a geographically large Shire
• diverse and widely spread communities
We have important natural and cultural heritage assets to
look after and need to ensure our citizens are provided
with adequate buildings, facilities and services.
It is important that the Council functions as a high
performing organisation in order to meet these
challenges and complexities.
The Council’s employees are at the forefront of dealing
with future challenges. Our human resources are an
asset and we support our staff to develop and grow by
encouraging participation in appropriate training and
professional development opportunities and making
sound decisions.
RECOGNITION OF LONG SERVING STAFF
This year 18 employees were recognised for service
to the Shire including one employee with 25 years of
service and one with 30 years of service. The Council
acknowledges and greatly values the contribution staff
make to the organisation.
EQUAL EMPLOYMENT OPPORTUNITY
(EEO) & CHARTER OF HUMAN RIGHTS &
RESPONSIBILITIES
The Council is committed to providing a workplace
free of all forms of discrimination and harassment.
It aims for equality of opportunity for all employees and
is consistent with our policy of merit-based selection
and fairness.
This year most employees were required to participate
in workshops to emphasise their responsibilities in
relation to equal opportunity, discrimination, harassment
and bullying. Employees were also informed of their
responsibilities regarding the Charter of Human Rights
and Responsibilities Act 2006.
The Council has three trained contact officers and our
formal induction process for new employees emphasises
the importance of the policy and the commitment of the
Council to equal employment opportunity and human
rights principles.
We have important natural and
cultural heritage assets to look
after and need to ensure our
citizens are provided with adequate
buildings, facilities and services.
14 glenelg shire annual report 07-08
NEW POSITIONS WITHIN COUNCIL
Environmental Sustainability Officer
The new Environmental Sustainability Officer will provide
specialist services and advice across a broad range
of areas including climate change, biodiversity, water
management, development management, air quality,
coastal management and waste issues. Initially the role
will involve developing and implementing policies and
strategies and in future will include grant management,
on ground project management and provision of
sustainability related advice across the organisation and
to the wider community.
Cadet Building Surveyor
The Council secured partial funding for a Cadet Building
Surveyor. This new position will assist in the delivery of
statutory building regulation services across the Shire.
There is a shortage of building surveyors and building
inspectors in rural and regional areas and this role is part
of succession planning.
Senior Statutory Planner
Progress has been made towards the appointment of
an overseas candidate for the role of Senior Statutory
Planner to complement the Planning Unit. In conjunction
with the Warrnambool City Council, we are seeking
an overseas planner under the Regional Sponsored
Migration Scheme.
Cadet Planner
To help address the shortage of local government
Planners a Cadet Planner has been recruited. The
Cadet Planner will continue study for a tertiary
qualification in planning while providing planning services
under the direction of our qualified planners.
Construction and Graduate Engineers
A graduate Assistant Engineer and a replacement senior
Construction Engineer have been appointed to assist in
the delivery of a large infrastructure works program.
Economic Development and Tourism Manager
The organisational restructuring created the Planning
and Economic Development Department resulting in the
appointment of an Economic Development and Tourism
Manager. This role focuses on facilitating and promoting
economic development by attracting new business
investment and assisting existing businesses throughout
the Shire to maintain viability and sustainable growth and
to create and promote tourism opportunities.
Recreation Officer
To assist in implementing the Recreation and Open
Space Plan a second Recreation Planner has been
appointed. Council recognises the importance of
assisting the community in taking part in physical activity
to increase the health and well-being of its residents.
The main focus of the role is to work with the wider
community, encouraging participation and assisting in
gaining funding for activities.
The new Environmental Sustainability Officer will
provide specialist services and advice across a broad
range of areas including climate change, biodiversity,
water management, development management, air
quality, coastal management and waste issues.
15glenelg shire annual report 07-08
EMPLOYEES BY OCCUPATION
DESIGNATED GROUPS
Managers & Administrators
Professionals
Associated Professionals
Tradespersons & Related
Advanced Clerical & Service
Intermediate Clerical
Labourers & Related
Other
Total
2003/04 (EFT)
5
6.1
2
6
37.1
25
146.3
8.7
236.2
2004/05 (EFT)
5
10
10.7
6.2
29
25.9
120.4
11.4
218.6
2005/06 (EFT)
5
13
14
5
25.5
29.8
79.8
18.1
190.2
2006/07 (EFT)
6
11.5
15.7
4
26.9
30.1
79.4
23.8
197.4
2007/08 (EFT)
5
15
17
4
32
29.5
73.5
23
199
EMPLOYEES BY GENDER
The majority of part-time employees are in the Home Care, Home Respite, Home Maintenance, Childcare and Senior
Citizens Adult Day Activity areas. As totals fluctuate due to a range of reasons, the best measure for staff composition
is the number of Equivalent Full Time (EFT) staff.
Gender
Male
Female
Total
Full Time (EFT)
98.8
44.0
142.8
Part-time (EFT)
4.3
33.8
38.1
Casuals & Temporary
(EFT)
5.8
12.3
18.1
Total (EFT)
108.9
90.1
199.0
16 glenelg shire annual report 07-08
AUSTRALIA DAY CELEBRATIONS
Australia Day was celebrated on the 26 January 2008
with well attended celebrations in Portland, Heywood
and Casterton. Casterton hosted Australia Day
Ambassador Brian Wenzel, and Portland and Heywood
hosted acclaimed journalist and author Tony Wright.
Mr Keith Wilson OAM of Portland was awarded the
Glenelg Shire Citizen of the Year 2008 Award and
Mr Jackson Tozer of Portland was awarded the Glenelg
Shire Young Citizen of the Year 2008 Award, for their
exceptional contribution to our local community.
Six new Australian Citizens were conferred by the
Mayor at the Portland Ceremony.
AUSTRALIAN CITIZENSHIP
The Glenelg Shire Council takes pride in its new citizens.
We recognise that the decision to become an Australian
Citizen is very important to each individual. Each year
we welcome many new Citizens by hosting individual
and group ceremonies. Becoming an Australian Citizen
is an important way of showing pride in being part of
Australia’s dynamic and diverse society.
In 2007/08 the Council welcomed 35 new Citizens into
the Shire from countries including:
• Fiji
• New Zealand
• Scotland
• South Africa
• United Kingdom
• United States of America
• Zimbabwe
VOLUNTEERS WEEK
The Council values the important role volunteers play in
the Shire. We acknowledge our communities are vibrant,
active places due to the efforts of these dedicated people.
This year the Shire hosted a Volunteers Recognition
Reception in Casterton, Heywood and Portland, to
coincide with Volunteers Week from May 12 – 18.
294 volunteers from 82 different organisations attended
the functions. The events acknowledged the valuable
efforts our volunteers provide, in bringing continuous
benefits for individuals and our community.
The Sustaining Volunteerism Initiative introduced a
Volunteer’s Tree. Volunteers wrote their messages about
volunteering onto a leaf-shaped piece of paper were then
attached to the tree. The vibrant and colourful trees were
displayed in each Customer Service Centre as a tangible
demonstration of the number of volunteers in our region.
Messages from the tree were then removed and recorded
by the Sustaining Volunteerism Initiative.
ANZAC DAY COMMEMORATIONS
This year, Portland’s ANZAC Day floral display
commemorated the 90th Anniversary of the recapture of
Villers-Bretonneux by Australian troops on 25 April 1918
in WWI. The floral display has been a highlight of ANZAC
Day commemorations in Portland for 70 years.
Around 10,000 individual flowers were used to replicate the
Villers-Brettoneux logo which is proudly displayed by the
people of Villers-Bretonneux in recognition of the ANZAC
troops whose heroic actions heralded the end of the
German advance of March-April 1918 in the Somme area.
The events acknowledged the valuable
efforts our volunteers provide, in bringing
continuous benefits for individuals and
our community.
17glenelg shire annual report 07-08
RESCUE HELICOPTER
As a strong supporter of the campaign for many years,
the Council is very pleased with the State Government
announcement to fund a community based, all weather,
multi function emergency helicopter service for south
west Victoria.
This essential life saving ambulance and important
search and rescue service will greatly benefit the south
west community. A total of over 20,000 signatures were
collected during the lengthy campaign.
CHILDREN AND FAMILIES
The Council successfully achieved the following for local
children’s and family services:
• enrolments are at full capacity
• accreditation Status under the Quality Improvement
and Accreditation System for Family Day Care,
Mitchell Park Children’s Centre and Henry House Day
Care Centre
• Mitchell Park Children’s Centre celebrated 20 years of
operation
• Glenelg based Early Years Network Group formed
with the aim of strengthening local agency networks
to ensure services delivery and positive outcomes for
all children and families throughout the shire
• major building renovations and upgrades completed
to some buildings
• Portland Child & Family Complex received $140,000
funding announcement from the Department of
Planning and Community Development
• Casterton Child Care Action Group met regularly to
develop strategies to raise community awareness
and funds for the proposed Casterton Child & Family
Complex
• Dartmoor Children’s Centre is actively involved in
the Smiles 4 Miles program, promoting healthy and
hygiene through eating nutritious foods and drinking
plenty of water
• Inclusion Support program continues to build the
confidence and capacity of staff/care - providers
to include children with all abilities and cultural
backgrounds in the services program
AGED AND DISABILITY
In partnership with the Federal and State Government,
the Council provides a diverse range of aged and
disability services across the Shire. The Council delivers
the Home and Community Care (HACC) program and
identifies and works towards reducing and eliminating
gaps in service delivery within the Shire. Client
contributions are based on their ability to pay.
18 glenelg shire annual report 07-08
L.I.F.E (Life is a Fulfilling Experience)
The Council initiated a pilot program entitled L.I.F.E (Life
Is a Fulfilling Experience) for people in the community
suffering from a mental illness to increase their
participation in meaningful activities in a non-threatening
environment.
The program offers participants activities tailored to
their age and preferences. The pilot group has already
participated in music groups, woodwork and social
outings. Each activity is designed to increase access to
the community and encourage full participation.
Home & Community Care (HACC)
The program aims to increase client independence
and enables them to remain in their homes as long as
possible, reducing the pressure on hospitals and nursing
homes. The Council provides the following HACC
services:
• planned activity group
• Meals on Wheels
• home modification
• property maintenance
• respite care
• home care
In 2007/08 the HACC program achieved:
• 61,911 hours of service - over 9% increase on last
year
• assessment or reassessment of 735 clients – over
10% increase on last year
• improvements in the quality of lawn mowing and
edge trimming with purchase of new improved
equipment
• introduction of spring mowing trial resulting in
increased client satisfaction
• HACC services brochure production and distribution
to improve awareness of the HACC program
• successful bid to provide assessment services
for the entire Glenelg Shire leading to greater
collaboration with other HACC service providers, a
smooth pathway to services and a ‘one-stop shop’
for enquiries and assessment
ARTS AND CULTURE
Capital Works
We received a Regional Infrastructure Development Fund
(RIDF) Grant of $570,000 to support the implementation
of capital works in the four main performance venues
in the Shire. This grant supplements the $365,000
committed by the Council. This funding allows for
significant technical upgrades in these venues and the
improvements will be beneficial for touring productions
and numerous community events.
designed to increase access to the community
19glenelg shire annual report 07-08
Arts Program
The Arts Program continues to provide a wide variety of
high quality touring performances (41) at very reasonable
cost to audiences and a diverse array of exhibitions (13).
Standout events were ‘Possum Magic’, seen by 1200
school children, and the ‘Walk’ exhibition, which began
a national tour in Portland. We conducted a survey
of patrons in December 2007 which indicated a high
level of satisfaction with the arts program content and
delivery.
Cultural Collection
There have been a number of major developments this
year with respect to the cultural collection:
• the restored Admella plaque is now permanently on
display in the Maritime Discovery Centre alongside
the Portland lifeboat
• we received a grant from Public Records Office to
display ‘Our Shire, Our Past’ in the Casterton Town
Hall
• significant objects were donated to the cultural
collection
• we have adopted a Conservation Management Plan
for Guns and Cannon
• a volunteer group formed to assist with identifying
details in photographs from the Port of Portland
Collection
The Arts Company
We have appointed an Arts Program Coordinator at The
Arts Company. We now offer a diverse program of arts
workshops to the community on a regular basis. These
have been well received with many workshops proving to
be very popular.
LIBRARIES
Glenelg Libraries provides services across the Shire with
achievements including:
• a continuing program for local arts exhibitions
recognised for innovation and excellence in
community building and involves community artists
and works
• two travelling visits of artefacts and memorabilia
presented by State Library of Victoria –
Memories Victoria and the Travelling Treasures
Roadshow
• a new “Environment” collection incorporating
sustainability, water wise, conservation,
recycling and other titles of current environmental
concern. This collection was a cooperative purchase
with the Portland Sustainability Group and a grant
from Portland Aluminium.
• development of Internet Literacy and Reading Literacy
programs incorporating a range of activities and
events designed to increase awareness and raise
community skills level in these areas
• a continuing program of children’s events and
activities during school holidays and as part of
regular story times at all library locations
• an increase of over 1,000 members across the Shire,
with a 16.8% increase at the Heywood library.
• total loans of over 128,000 items for the year with
over 19% increase in Casterton loans
• review of Outreach Services and design of an
alternative cooperative solution which better
caters for needs of isolated communities with
decreasing populations
• increased online help available through “Your Tutor”
and “Computer Teacher” programs available from the
Libraries or from home
We conducted a survey of patrons in December
2007 which indicated a high level of satisfaction with
the arts program content and delivery.
20 glenelg shire annual report 07-08
RECREATION
The Council began action on the Recreation and Open
Space Plan by implementing 27 recommendations of the
198 scheduled over 10 years.
Major achievements included the appointment
of a second Recreation Services Officer and the
development of the Recreation e-News which enables
the Council to communicate more effectively with
community groups and organisations.
To encourage health and improved management of
clubs and organisations we presented the following new
programs:
• Have A Go Week
• Responsible Serving Of Alcohol Forums
• Strategic (Business) Planning Workshops in Portland
and Casterton
• Walk to School Day
• Funding Seminars
All planning applications for new land sub-divisions are
now assessed for open space connectivity within the
proposed subdivision and with adjoining subdivisions
and neighbourhoods.
Cycle Safe City Project
Portland Aluminium generously provided $50,000 to
assist in the completion the bicycle path link to St. Johns
Primary School in Trangmar Street, to develop a Cycle
Safe City strategy plan and to purchase bike racks for
the central business district, Portland.
The strategy will assist the Council, Schools, industry
and our community to promote the benefits of cycling,
increase cycling participation rates, improve existing
cycle tracks and routes and establish guidelines for
planning future tracks, trails and routes.
Capital Projects
Our application to the Victorian State Government for
$41,564 to fund the resurfacing of the Casterton Netball/
Tennis Courts was successful.
We completed the following projects from successful
funding applications with a total of $345,360:
• Portland Bowling Club Water Wise Project - $27,694
• Westerns Football Netball Clubrooms Extensions
- $46,666
• Alexandra Park Portland Irrigation System - $46,000
• Sandford Recreation Reserve Water Harvesting
System - $43,000
• Island Park Casterton Irrigation System - $46,000
• Heywood Recreation Reserve Irrigation System
- $46,000
• Henty Park Portland Irrigation System - $46,000
• Tyrendarra Recreation Reserve Water Harvesting
System - $44,000
21glenelg shire annual report 07-08
The Council supported the following projects from the
Minor Recreation Projects Fund with a total of $38,275
allocated:
• Portland Netball Association - erect safety fences at
ends of netball courts - $2,000
• Casterton Polocrosse Club Inc. - complete
Polocrosse pavilion - $1,950
• Portland Hockey Club - install lights at the east end
of Flinders Park - $3,325
• Portland Little Athletics Centre - rebuild and upgrade
the triple jump pit and runways - $5,000
• Glenelg Pony Club Inc. - line floor, walls and ceilings,
install windows and doors in clubrooms
- $5,000
• Sandford Football Netball Club - reseed, super and
soil oval - $1,000
• Westerns Football Netball Club - pavilion extensions
(Council commitment to Sport & Recreation Victoria)
- $5,000
• Far Western District Swimming Assoc - promote of
the Victorian Country Swimming
Championships - $5,000
• Portland Heywood Field & Game - purchase new
automatic clay target trap - $2,295
• Merino Progress Association - purchase a ride on
lawn mower - $949
• Casterton & District Netball Assoc - concreting
around Pavilion at Island Park - $1,756
• Bolwarra Hall & Recreation Reserve COM - resurface
two existing tennis courts - $5,000
Glenelg Junior Sports Trust
The Glenelg Junior Sports Trust is funded by the Council
to provide financial support for young individuals and
groups who are striving to achieve at regional, state,
national and occasionally at international level.
Financial support was provided to the following groups:
• Portland Hockey Club
• Portland Swimming Club
• Portland Secondary Collage
• Heywood Consolidated School
• Portland Calisthenics Club
• North Portland Primary School
School Holiday Program
The Council continued its working relationship with
Portland YMCA and the Casterton Old Courthouse
Community Centre in the delivery of holiday programs.
Our community was also fortunate in having Scripture
Union Family Mission (SUFM) return again for their New
Year holiday program.
provide financial support for young individuals
The strategy will assist the Council, Schools, industry and our community
to promote the benefits of cycling, increase cycling participation rates,
improve existing cycle tracks and routes and establish guidelines for
planning future tracks, trails and routes.
22 glenelg shire annual report 07-08
Pacific Hydro 2007 South West Games
The Council hosted the 25th Anniversary South West
Games and welcomed Pacific Hydro as the new games
naming sponsor.
A record 71 sporting events were registered. Of these
two were cancelled due to the equine flu, two due to
inclement weather and two due to lack of entries. The
65 events attracted 6,174 participants and approximately
6,300 spectators over the four weeks.
The economic benefit to the Shire is estimated to be
in excess of $237,000 based on Tourism Victoria’s
‘Domestic Overnight Visitor Expenditure in Victoria’ and
the Australian Bureau of Statistics ‘the Australian Bureau
of Tourism Research.’
2008 Victorian Country Swimming
Championships
The Far Western District Swimming Association
Committee hosted the State Level Championship at the
Portland Leisure and Aquatic Centre on the Australia Day
weekend.
The economic benefit to the Shire is estimated to be
in excess of $300,000 based on Tourism Victoria’s
‘Domestic Overnight Visitor Expenditure in Victoria’ and
the Australian Bureau of Statistics ‘Australian Bureau of
Tourism Research.’
South West Academy Of Sport
The Council continues its successful partnership with
the South West Academy of Sport for the third year.
The Academy creates pathways between regional and
state/national level participation for emerging regional
athletes through training and education. These services
are also provided at no charge to regional coaches with
the intent of providing a positive flow on effect to grass
roots sports.
The Council promotes an environment
where positive relationships with young
people are encouraged and supported.
23glenelg shire annual report 07-08
YOUTH
The Council promotes an environment where positive
relationships with young people are encouraged and
supported. The Council is developing a Youth Strategy
2008-2012 to encourage young people to meaningfully
engage in their community, their Council and their future.
A Project Steering Committee was formed to draft the
Youth Strategy and Action Plan and consultants engaged
to conduct research and assist in strategy development.
The strategy and plan aims to communicate Council’s
commitment to the delivery of Youth Services within the
municipality.
The Council continued to provide a range of activities
and services to support young people aged 12 to 25
inclusive, including:
FReeZA
Glenelg Shire Youth Services worked collaboratively with
Secondary Colleges within the Shire to form FReeZA
Youth Committees in Heywood, Portland and Casterton
and develop the FReeZA in Schools program. Portland
Secondary College Year 10 Personal Development class
developed a Youth Music event as one of five FReeZA
events held in 2007. The event was a resounding
success and attracted 200 young people. The FReeZA
in Schools program was also trialled at Heywood and
District Secondary College and Casterton Secondary
College.
Youth Participation And Access Program
The Our PlaYce Youth Leadership Program for 2007/08
was launched in November 2007. The Our PlaYce
Program is a joint initiative of Moyne Shire Council,
Corangamite Shire Council, Warrnambool City Council,
Glenelg Shire Council, Youth Biz Hamilton and Terang
Resources. The program has expanded to encourage
participation of young people throughout the Shire.
Stencil Art Project
Two professional Stencil Artists from Melbourne
facilitated a two-day Stencil Art Workshop in June 2008.
Twenty young emerging artists worked with the artists to
develop their skills and produce vibrant artwork which
will be displayed in an exhibition in late 2008.
Musical Equipment Grant
With a grant of $10,000 from the Department of Planning
and Community Development the Council purchased
music equipment for people less than 26 years of age to
support their skills development and participation in the
music industry.
YMCA Drill Hall Agreement
The Council entered into a cooperative licence
agreement with Portland YMCA to use the Portland Drill
Hall to deliver their youth programs while still providing
access for existing user groups.
encourage participation of young people
24 glenelg shire annual report 07-08
HEALTH
Childhood Immunisation Rates Improving
Infants up to the age of four years of age receive a range of vaccinations to protect them from childhood infectious
diseases.
These vaccinations start at birth and are administered at two, four, six, 12 and at 18 months, with the pre school
vaccinations being administered at four years of age.
In the Shire there are different vaccination providers accessible to parents and guardians including local medical
practitioners (GPs) and the Council’s Maternal and Child Health nurses.
As at 31 March 2008, the Australian Infant Immunisation Register reported the average immunisation rates within this
Shire was 92.70%. This is an excellent rate and demonstrates the commitment by parents and guardians to ensure their
children are effectively immunised.
12 – 15 months 24 -27 months 60 -63 months 72 -75 months Average for all
months months months months age groups
89.09% 94.64% 93.10% 94.00% 92.70%
As well as providing 60% of all infant immunisations the
Council coordinates the secondary school immunisation
sessions. These vaccinations are administered in years
seven, nine and 10.
This is an excellent rate and
demonstrates the commitment by
parents and guardians to ensure their
children are effectively immunised.
25glenelg shire annual report 07-08
ECONOMIC DEVELOPMENT
The Council continued to actively pursue and attract
State and Federal funding opportunities for the
Council, businesses, industries and community based
organisations.
Grant funded projects that were successfully completed
this financial year include:
Portland Bay Coastal Infrastructure Plan
The Council has adopted the Portland Bay Coastal
Infrastructure Plan. Funded through a partnership
between Regional Development Victoria, the Department
of Sustainability and Environment and the Council,
the plan provides the strategic direction to implement
positive changes to the foreshore environment.
The Council prepared the plan with extensive community
and stakeholder engagement and consultation.
Dartmoor Village Green Revitalisation Project
Funded through a partnership between Regional
Development Victoria, the Dartmoor and District
Progress Association, the Council and Portland Eco
Trust, several large cypress trees in Dartmoor’s Village
Green were transformed into magnificent carvings
- the largest being the now widely acclaimed Nursery
Rhyme Tree.
The historic watering trough and flume used to draw
water from natural springs in the early 19th Century has
been restored. The area was landscaped, revegetated
and a new BBQ installed with seating, tables and a
shade shelter.
Installation of interpretative signage completed the
revitalisation project which has improved the visual
appeal and amenities of the Village Green for locals
and visitors.
The project enhances the existing Avenue of Honour
tree carvings and helps promote Dartmoor as a unique
tourist attraction.
Merino Renewal & Walking Track Project
Funded through a partnership between Regional
Development Victoria, the Merino Progress Association,
Glenelg Hopkins Catchment Management Authority, the
Council and Portland Eco Trust, this project was officially
opened in February 2008.
It included extensive resurfacing of an 800 metre track
along the Merino Creek which follows the designated old
stock route – one of the oldest in Victoria and still in use.
Along the track there is seating and photos from the past
which highlight significant sites and emphasise areas of
interest to locals and visitors.
The Council completed Landcare activities which
included significant tree planting. The creation of the
public artwork ‘The Drovers Nightmare’ aroused the
most interest.
actively pursue and attract funding opportunities
26 glenelg shire annual report 07-08
Dartmoor Quality Water Supply
Upgrade Project
An elevated water storage standpipe to provide
appropriate pressure and security of supply to Dartmoor
in the event of power outages and fire related events is
now available. The project will reduce pumping costs
and greenhouses gases.
We facilitated the funding arrangements for Wannon
Water on behalf of Regional Development Victoria.
Grant funded projects that were in progress or being
investigated this financial year included:
Heywood Fitzroy River Precinct
Community Grant
Work continued on seeking funding for the Heywood
Fitzroy River Precinct Community project involving the
construction of a footbridge, ramps and surrounds over
the Fitzroy River to provide a pedestrian link between the
reserves on each side.
Board walks and multiuse tracks will also be built. Other
components of the project include the construction of
a ‘pioneer’ display shelter for historic log wagons, tools
and associated timber milling memorabilia dating back
to the 1860s. Landscaping, outdoor furniture and
interpretive signage will also compliment the area.
The Council looks forward to the completion of this
project in late 2008. Funding partners include Regional
Development Victoria, Promoting Heywood Committee
(which includes Wood, Wine & Roses) and the Portland
Eco Trust.
Nelson River Foreshore Master Plan
The Council is working closely with the Nelson Reserves
Committee of Management and representatives from
Regional Development Victoria on the implementation of
first stage priorities of this Plan. Portland Eco Trust has
also agreed to a partnership arrangement.
Grant Seeking
To assist in community groups seeking funding, the
Council also provided grant seeking booklets, advice,
guidance, letters of support and assistance with grant
seeking applications.
TOURISM
Record Visitations To Shire’s Accredited Visitor
Information Centres (VICs)
Enquiries and walk-in visitors to the three accredited
Visitor Information Centres totalled 115,914. This is the
highest number of visitors ever recorded through our
VICs and represents an overall increase of 8.2% for the
Discovery Coast region. This strong growth in visitation
figures was achieved in an extremely competitive
domestic tourism environment.
To assist in community groups seeking funding, the
Council also provided grant seeking booklets, advice,
guidance, letters of support and assistance with grant
seeking applications.
strong growth in visitation figures
27glenelg shire annual report 07-08
Although Nelson recorded a decline in visitation of
10%, Casterton’s figures were steady with a growth
of 1.5%, and Portland experienced unprecedented
growth of 16.2%.
Portland’s visitation resulted from a strong summer
period and importantly, a lengthening of visitation
patterns through to the traditional ‘off-peak’ season.
The winter marketing campaign registered growth of
8% during the winter months and the visit of the Ocean
Patriot Oil Rig during January / February was a catalyst
to increased daytrip visitation from neighbouring regions.
Increased awareness of both blue whale and southern
right whale watching opportunities also attracted visitors
to Portland.
Portland’s results stand out in comparison to other Great
Ocean Road VICs, where visitation trends have been
static. Nelson’s result may be affected by the increasing
repeat usage of the national park, with visitors not
necessarily using the VIC on their return visits.
New Regional Marketing Initiatives
& Achievements
Niche marketing activities included:
• implemented Winter Marketing Campaign 2007
• exhibited at Adelaide Caravan & Camping Show
• continued promotion to Trade Travel Wholesalers
program – directly marketing the Discovery Coast to
touring Probus Clubs nationally
• hosted Channel 9 Getaway program during January,
which focused national attention on Blue Whale
watching opportunities in Portland and on Discovery
Bay, Nelson and the Lower Glenelg National Park for
adventure tourism activities
• substantial Southern Right and Blue Whale watching
generated national attention
• Herald Sun winter advertising
• Destinations Magazine
• Great Southern Tourist News
• Western District Holiday News
• Portland Visitor Guide
• Discovery Coast Touring Map
• Volcanoes Discovery Trail
• increased involvement with Great Ocean Road
Marketing (GORM)- which promotes the region
into key interstate markets in partnership with
Tourism Victoria
• involvement in Tourism Australia’s new international
marketing initiative: National Landscapes – Great
Ocean Road.
• Kanawinka Geopark - the Council is a founding
municipal member of the Volcanoes Discovery Trail
committee, which as the Kanawinka Geopark Board
has just gained status for the region as Australia’s
first Global Geopark.
• continued to support the implementation of the
Lake Condah Sustainable Tourism Development Plan,
an exciting new and highly significant indigenous
tourism product.
28 glenelg shire annual report 07-08
Discovery Coast Events
Through the Discovery Coast tourism grant program,
the Council provided $40,000 of on-going support to
19 local community and tourism events and projects.
The Shire’s ‘iconic’ tourism events continue to grow with
the Casterton Kelpie Festival, Heywood’s Wood, Wine
& Roses Festival and the VIC Bream Classic Titles in
Nelson recording strong attendances. Despite inclement
weather, the Portland Bay Festival continues to cement
its place as a major tourism event for the region.
BUSINESS DEVELOPMENT
This service managed numerous enquiries and
visits from investors, delivered business events and
information and enhanced the Council’s business
communication methods. A significant majority of
enquiries were from the timber industry as a result of the
forthcoming increase in timber harvesting.
To assist potential investors the Council has
provided hospitality, detailed information packages,
presentations and key networking opportunities. We
have also provided letters of support for a number of
local businesses who sought grants and assistance
from State and Federal governments for business
development programs.
The Council continued to offer its Business Assistance
Scheme and access to the suite of services including
regular emails, invitations to business events,
notifications of legislative changes and pertinent local
statistics and information.
We look forward to continued business growth across
the Shire and will provide assistance and support to
both established and new investors.
Ocean Patriot Oil Rig
The Ocean Patriot Oil Rig berthed in the Port of
Portland in January to undertake a $13 million routine
survey, maintenance and refit. The visit had an
enormous impact on the local economy with hundreds
of contractors staying in local accommodation and
thousands of visitors flocking to Portland to see the
massive rig. The rig returned to exploration projects in
Bass Strait in February.
Committee for Portland
The Council gained State Government funding of
$25,000 to establish a Committee for Portland.
The Committee for Portland is an initiative of leading
businesses, industries, community leaders and the
Council. Its mission is to make Portland a leading
destination in Victoria to live, work and do business.
An interim Board has been established and an Executive
Officer appointed in March 2008. The Board has
developed its Charter and a governance structure. The
Committee is also incorporated under the Associations
Incorporations Act, making it an independent legal entity.
29glenelg shire annual report 07-08
Foundation membership of the Committee for Portland
was determined and there is strong community,
business and industry interest in membership.
The Committee for Portland is preparing a business
plan which will outline the key issues and projects for
the Committee during the next three years.
Blue Gum Timber
The Shire is on the cusp of unprecedented timber
industry activity. In April 2008 the Council undertook
a study tour to Albany in Western Australia to see the
progress of and impacts on the Albany region as a
result of the blue gum timber industry. The Albany
region is significantly similar to the Shire and the Study
tour identified a number of important opportunities for
the Glenelg Shire.
Significant economic growth will be generated as a
result of the blue gum harvest. Conservative estimates
by the Green Triangle Regional Plantation Committee
indicate that by 2011 an additional 941 direct jobs will
be required within the timber industry to accommodate
the harvest. It is also estimated for every one direct
job created, 0.65 indirect jobs will be created, which
equates to 600 indirect jobs within the Green Triangle
Region.
A range of businesses have expressed an interest in
relocating to the Shire to support the blue gum industry
- these include biomass fuel, transport body building
and transport haulage companies.
Economic Development & Tourism Structure
A refocusing of the Economic Development and Tourism
Department was implemented at the end of 2007.
New roles of Economic Development and Tourism
Manager, Project Development Officer, Visitor Services
Co-ordinator, Events Officer and another permanent
part-time Visitor Services Officer, have strengthened
the unit’s ability to respond effectively to the specific
business and community challenges across the shire.
ENVIRONMENTAL SUSTAINABILITY
The Council is increasing its commitment to
environmental sustainability with the appointment
of an Environmental Advisory Committee and an
Environmental Sustainability Officer. The main
focus will be to implement a strategic framework for
sustainable environmental management across the Shire
and for maximising Council, community and private
sector opportunities for partnerships in sustainable
environmental projects.
The Committee for Portland is preparing
a business plan which will outline the key
issues and projects for the Committee
during the next three years.
continued business growth across the Shire
30 glenelg shire annual report 07-08
PLANNING
The planning unit conducted the following:
• received 235 planning permit applications
• received 15 planning appeals
• initiated and completed two planning scheme
amendments
• prepared various reports to assist in the development
of the Glenelg Strategic Futures Plan
• assessed 26 timber harvesting plans
• processed 19 Liquor Licence requests from the
Department of Justice
• processed 13 Works on Waterways licences
ASSETS AND INFRASTRUCTURE
The Assets and Infrastructure Department provided
a wide range of services that are associated with the
responsible management of major assets that include
– roads, bridges and footpaths, stormwater drains,
community buildings, aquatic and recreation facilities,
parks and reserves, waste management facilities, major
plant, Portland Airport and Casterton Airstrip, as well as
a host of smaller asset groups.
In managing these assets, the Assets and Infrastructure
Unit undertakes inspections, surveys, designs,
construction and project management, as well as
the important function of customer service relating to
infrastructure enquiries.
The major projects delivered during 2007/2008 included:
Road Upgrades under the Auslink Strategic
Regional Program
• construction of Chaffeys Lane 6km west of Casterton
• construction of widening to Cape Nelson Road,
south from Portland
Other Projects
• construction of Casterton Skate Park
• construction of asphalt paths at Ploughed Fields,
Portland
• re-alignment of Condah Hotspur/Radcliffe Road
intersection
• construction of concrete footpaths in Casterton,
Heywood and Portland
• construction of Dutton Way erosion protection rock
wall
• construction of East St, Nolan St and The Esplanade,
Narrawong
• asphalting of Narrawong Footpaths
• construction of underground main drain Beavis St,
Heywood
• construction of Border Road South, Nelson
• construction of shared bicycle footpath in Trangmar
St, Portland
• construction of traffic improvement works in Nelson
CBD
• construction of Mailings Road, Portland
• construction of Public Toilets in Dartmoor
• undergrounding of Powerlines in Percy St, Portland
• construction of the Heywood Transfer Station
• delivery of second year of the Building Asset
Management Program works
responsible management of major assests
We are developing and adopting
individual asset management plans
for all key asset groups.
31glenelg shire annual report 07-08
Road and Street Maintenance
Maintenance of the Shire’s extensive road and street
network included:
• gravel road grading (approximately 2,000km)
• road resheeting (approximately 25.5km)
• sealed road rehabilitation (approximately 11.5km)
• sealed road resealing (approximately 310,000m2)
In addition, asset condition inspections are undertaken
on an annual basis to ensure that we can be pro-
active and forward plan works. Our response team
and inspectors also respond to public enquiries and
customer requests for a variety of issues ranging from
road grading, vegetation issues through to damaged
signs and footpaths.
This year they responded to more than 3,751 formal
customer requests in addition to a large number of
internal requests. Staff also responded to a number of
storm events which caused significant damage.
Asset Management
The Council has adopted an Asset Management Policy
and Strategy to effectively manage all assets under its
control and improve organisational performance. We are
developing and adopting individual asset management
plans for all key asset groups.
Building Asset Management Plan (BAMP)
The BAMP recognises the high value of Councils
building assets which represent a significant past
investment by the community and has a current
replacement value estimated at over $60million.
During 2007/08 $1.5 million was allocated to 165 work
tasks over 108 buildings. Ageing assets now have a
new life and will continue to serve the community.
Major tasks undertaken in this year’s program include:
• redevelopment of the Portland Botanical Gardens
Depot
• refurbishment works at the Portland, Heywood and
Casterton Football clubrooms and facilities
• refurbishment works at the Jaycees Pre-School
Centre
• roof replacements at the Casterton and Heywood
Civic Halls
• renovations to various toilets blocks
• internal and external cyclic painting of many buildings
• development of conservation management plans for
various heritage buildings
32 glenelg shire annual report 07-08
Road Asset Management Plan (Ramp)
The Council developed and adopted the RAMP and
established a financial and operational framework around
all Council’s activities relating to road management.
The RAMP provides financial projections to 20 years,
based on the current condition of the road assets and
the anticipated deterioration of these assets over time.
A high correlation between asset deterioration and the
value of depreciation of the asset stock is expected.
Annual programs for road maintenance, road renewal
(rehabilitation) and road upgrades (new) were prepared
to ensure that the service levels provided across
the Glenelg Shire road network are maintained in
accordance with the framework established by the
RAMP.
The RAMP complements the Road Management Plan
and sets the operational service levels of managing the
road network and the associated risks. This Plan is
currently being reviewed.
The Council also initiated a process for the protection
of its road assets from reckless damage occurring
during adjacent building works. Under this process, the
costs of repairing damage to roads, footpaths and other
Council assets within a road reserve will be recovered
from those responsible for the damage.
Waste Management
The Council provides a best practice kerbside waste
and recycling service that services all the townships in
the Shire, as well as rural and rural residential properties
on designated routes. The kerbside recycling program
recovers in excess of 1300 tonnes of recyclable
materials from homes and businesses each year and
allows them to be separated and returned for re-
manufacturing. The collection of household waste every
week ensures that public health standards in populated
areas are protected.
The recent commissioning of the Heywood Transfer
Station complements the range of waste and recycling
drop-off facilities across the Shire and will enable the
closure and eventual rehabilitation of the Heywood
Landfill.
We are continuing to investigate ways of meeting the
Victorian “Towards Zero Waste” policy and to this end,
we have worked co-operatively with the Brotherhood of
Saint Lawrence, various community groups and Future
Employment Opportunities to establish the Portland
Recycling Shop based on a community enterprise
model. This initiative will not only minimise the quantity
of hard waste going to the Portland Landfill, but also
provides valuable employment opportunities for a
number of long term unemployed people.
With the cooperation and support of Portland Aluminium,
Sustainability Victoria and the Portland, Heywood and
Casterton Football Clubs, Public Place Recycling was
established at these sporting ovals to recover a waste
stream that would previously go to landfill.
established a financial and operational framework
33glenelg shire annual report 07-08
We have undertaken investigation and design work for
the rehabilitation of the older Portland Landfill areas.
We are also considering Methane gas extraction. We
have begun design work on the development of a Best
Practice Landfill operation at the Portland site. However,
we are considering other alternative waste disposal
technologies prior to commitment to a landfill solution.
Casterton Saleyards
As a result of a Best Value Review of the Casterton
Saleyards in 2006/07, the Council completed a
Casterton Saleyards Business Plan (Phase One). The
Business Plan considered all the financial, environmental
and social issues that relate to the operation of the
Casterton Saleyards and the inevitable rationalisation
of saleyards in Victoria. The Council has committed to
continue the saleyards for at least the next three years,
subject to ongoing performance measures such as
average stock throughput.
The Casterton Saleyards provide an opportunity for local
producers to market their stock in an historic setting.
The annual weaner cattle sales at Casterton have a
reputation across Australia for the ability for buyers to
purchase large lots of premium young stock that are
well presented in the yards that have natural soft floor
material.
A maintenance plan, combined with some upgrades
to meet safety and environmental requirements are
programmed to allow this unique facility to continue to
operate for the medium term.
During 2007/2008, 11,595 head of cattle and 37,734
head of sheep were sold through these livestock
saleyards.
Quarries
The Council operates four limestone quarries across the
Shire which provides significant savings in material costs
that enables more works to be undertaken than if the
material was purchased from commercial quarries. The
Council also sells quarry material to private industry and
individuals.
Emergency Response
The Council provided equipment and recovery staff to
assist in a number of emergencies including fires and
landslides during the year.
We received funding of $116,600 from Emergency
Management Australia for a substantial upgrade of
Council’s Municipal Emergency Co-ordination Centre
(MECC) equipment and the development of a GIS
platform to provide vital and timely information during
emergencies. The funding also provided the MECC
with portable emergency back up power (generator), so
that the MECC can continue to operate during power
blackouts throughout an emergency.
safety and environmental requirements
A maintenance plan, combined with some upgrades
to meet safety and environmental requirements are
programmed to allow this unique facility to continue to
operate for the medium term.
34 glenelg shire annual report 07-08
Statutory Building Regulation
We have focussed on conducting inspections
on fire service and essential safety measures for
accommodation premises to update owners on
current requirements and assist them in meeting
safety requirements.
Building statistics for 2007/08 indicate a decrease
in building activity in the Shire. However, 2006/07 was
a boom year for building activity throughout Victoria.
While the number of permits issued overall has
decreased, we note that the number of building permits
issued for commercial activity has increased.
The level of building activity in the Glenelg Shire resulted
in a total of 376 building permits being issued with an
estimated value of $39,385,109. The approvals include
90 new house/units, 39 extensions, 71 commercial
works and 176 minor works.
RISK MANAGEMENT
The number of reported injuries for the year marginally
exceeded the injuries reported for 2006/07 but
remains consistent with previous years. The number of
WorkCover claims incurred increased with 19 claims
lodged and five of these matters resulted in standard
claims. The WorkCover premium decreased for the
seventh year in a row with the current remuneration rate
being 1.56%. This is lower than the local government
industry average and sets a new record as the lowest
rate since the creation of the Glenelg Shire in 1994.
The total number of liability or professional indemnity
Insurance claims lodged decreased with 12 matters
reported, all of which were minor and under the excess.
This contributed to a 36% reduction in the public liability
premium.
The annual Civic Mutual Plus audit on risk management
practices resulted in a slight reduction in the overall
score to 63%, partially due to a new audit structure.
The risk audit score for Council building risk
management remained consistent with a 75% score.
LOCAL LAWS
The Council reviewed the General Local Law due to
legislative changes, current issues and areas identified
for improvement. The review included an extensive
community consultation.
35glenelg shire annual report 07-08
Animal Management Plan
Following an amendment to the Domestic Animal (Feral
and Nuisance) Animals Act 1994, the Council’s first
animal management plan was endorsed in principle
by Council with further funding to be considered in
future years. As part of continuous improvement, the
Local Laws Unit will consider options for implementing
the initiatives in the Plan that do not involve additional
funding. The Plan will be reviewed annually by local laws
staff with a major review scheduled in three years.
In The Community
The Local Laws Unit was heavily involved in animal
welfare promotion with Senior Rangers coordinating
the discount animal micro chipping days in Portland,
Heywood & Dartmoor. The service was also provided
to assist the RSPCA in the Annual PAWS walk early in
2008. There are in excess of 4000 dogs and 1300 cats
registered throughout the Shire.
During 2007/08 the Council impounded over 800
roaming animals comprising 370 dogs, 100 cats, 200
cattle, 150 sheep and 10 horses which were in breach
of the local law. The Local Laws staff responded to over
380 callouts for emergency assistance after hours, with
over 250 of these relating to roaming stock at large on
Council roads. 140 infringements were issued as a result
of roaming and unregistered animals while 15 offences
were lodged against the local law and in excess of 700
parking fines were issued. Fire prevention inspections
were also conducted over the period leading up to
summer with over 550 fire notices issued to property
holders to maintain their property.
MEDIA LIAISON
Keeping its citizens informed about Council activities,
services, projects and issues is an important function
of the Council. We used a number of communication
methods to convey our messages in an easy to
understand format:
• Media releases – distributed widely throughout south
western Victoria, Ballarat and Mount Gambier and at
times at the national and state level
• Community News – quarterly 16 page publication
delivered to all residents in the Shire
• Radio and television interviews on specific topics and
issues
• Mayor on Air weekly breakfast radio interview on
Mixx FM
• Your Council Working For You – weekly column in the
Portland Observer and Casterton News
• On the Agenda – a summary of the Council’s
Ordinary Meeting agenda which is published in the
Portland Observer prior to the Council meeting
• Advertisements in selected newspapers
• Glenelg Shire website
• Answering media requests and enquiries.
All media releases, Mayor On Air interviews and
Community News issues can be found on the Council’s
website www.glenelg.vic.gov.au.
essential safety measures
Keeping its citizens informed about Council activities, services,
projects and issues is an important function of the Council.
We used a number of communication methods to convey our
messages in an easy to understand format.
36 glenelg shire annual report 07-08
ONLINE MAPPING AND AERIAL IMAGERY
A new gateway into Council’s publicly available data
bases became available in November 2007, with the
launch of an innovative new online mapping service.
The new service works on a similar principle to
Google Earth but has additional, more detailed and
comprehensive information specific to the Glenelg Shire.
The Glenelg Shire Council is leading the way in making
property related information available to the public. Only
a small number of municipalities in Australia provide this
type of information direct to the public.
The new service has a wide range of applications for
businesses, farmers, real estate agents, developers and
the public generally. Access to the state digital map
base for the Glenelg Shire is available together with a
diverse range of additional layers, high resolution aerial
imagery and contours.
There are various ways of looking up information
including the ability to zoom in to a specific property or
area via aerial photography or via the state digital map
base with precise detail and high resolution. A tool is
also available to measure distances.
Through user feed back further enhancements and
improvements to the service will be considered and
implemented where possible.
The new service can be accessed by going to Council’s
website www.glenelg.vic.gov.au and clicking on Glenelg
Online Mapping (which can be found in the listing of
Council services on the left hand-side of the page).
The site is also linked to the Department of
Sustainability’s website.
PROPERTY VALUATIONS INCREASE
A revaluation of all rateable properties as required by
the Victorian Government under the Valuation of Land
Act and the Valuation Best Practice Guidelines was
completed. The objective of state wide two yearly
revaluations is to ensure that both the Council and State
Government regularly recognise the changes that occur
in the property market, both positive and negative, and
that these changes are reflected in the level of rates or
land tax a property owner will pay.
The new valuations for the 14,905 rate assessments
in the Shire are calculated on the levels of value that
applied in the real estate market as at 1st January 2008.
The new valuations will be used to calculate rates for the
2008/09 and 2009/10 financial years.
The total value of all rateable properties in the Glenelg
Shire is $4.5 billion according to Council’s contract
valuer, Southern Cross Property Services. This is an
increase of $497 million or an average increase of 10%
on the previous valuation undertaken in 2006. This
reflects the buoyant real estate market throughout parts
of the Shire during the past two years.
detailed and comprehensive information
37glenelg shire annual report 07-08
Due to market demand, primary production and timber
plantation land had reasonable increases with the total
farm land valuation increasing by an average 18% and
the total timber plantation land valuation increasing by
an average 15%. The actual percentage increase for
individual properties varied depending upon the location
of properties.
Average valuation increases for commercial/industrial
properties in Portland (-0.2%) and outside Portland (7%);
rural residential properties (5%) and Portland residential
properties (9%) were less than the Shire average of 10%.
Valuations for major townships in the Shire also
resulted from increases in market prices with Heywood
increasing by an average 20%. Casterton’s average
valuation increased by 6%.
Increased property values do not increase the total
amount of money the Council collects in rates, it merely
redistributes the amount of rates paid between individual
properties. Some ratepayers will pay more and some
will pay less, depending on the new value of their
property relative to other properties in the Glenelg Shire.
The Council Budget determines how much it collects in
rates – not property valuations.
The Council budget adopted on Tuesday 24 June 2008
was based on an average 5% increase in total
rate revenue.
For 2008/09, it is estimated that approximately 9,572
properties will have rate decreases, 2,953 properties
will have rate increases between 1% and 5% and 2,380
properties will have rate increases greater than 5%.
The next two yearly general valuations have
commenced and will be delivered to Council prior to
31 March 2008.
An active ongoing supplementary valuation process
continues to maximise additional rate income that
helps fund additional services and projects. Significant
building, subdivision and development activity took place
in the Shire during the year.
CUSTOMER SERVICE
Council continues to place great emphasis on the level
of service that it provides its customers. We continue
to strive to meet the commitment we have made in our
Customer Service Charter.
We are a diverse Shire spread over a large geographical
area which leads to many challenges as. We aim to
meet the needs of the customers. The Council continues
to prioritise and allocate available resources where they
are most needed.
The Council aims to ensure that all customers are
satisfied with our service and that we have heard and
understood their issues. While we complete many of the
requests received, if for any reason the Council cannot
carry out requests, we strive to communicate clearly the
reasons for our decision.
Significant building, subdivision and
development activity took place in the
Shire during the year.
38 glenelg shire annual report 07-08
Good governance has a key role in ensuring that we
achieve the highest standards of integrity, transparency,
accountability.
The Council’s approach to good governance includes
policy development, community engagement in the
development of Strategic Plans, adherence to legislation
and open and transparent reporting.
We constantly monitor and progressively implement
changes resulting from federal and state legislation to
ensure statutory compliance.
CODE OF GOOD GOVERNANCE
The Council has adopted the Code of Good
Governance, which was prepared by representatives
of local government throughout Victoria. The purpose
of this Code is to establish standards and principles
for local government to ensure the highest level of
governance and community leadership.
CODE OF CONDUCT
The Code of Conduct for Councillors adopted by the
Council on 25 January 2005 was reviewed in February
2006. The Code affirms a common understanding
among Councillors with regard to their responsibilities to
comply with the rules of conduct and the expectations of
conduct when representing the Council in their dealings.
DELEGATIONS
Not all powers and functions of the Council are executed
directly by the Council. The Chief Executive Officer is
appointed by the Council for the purpose of managing
the organisation. Some of these powers are further
delegated to Senior Officers and Staff. The Council
reviewed the powers delegated by the Council and
the Chief Executive Officer during the year to update
legislative, organisational and staff changes.
AUDIT COMMITTEE
The Audit Committee has delegated responsibility for
assisting the Council in ensuring that financial and
operating procedures and systems are adequate,
that risks are identified and managed and that the
organisation complies with all laws affecting it.
The Committee has a strong focus on risk management
and completed a number of reviews during the year.
The Audit Committee consists of three Councillors and
three independent persons as voting members. The
Chief Executive Officer and Group Manager Corporate
Services are non voting members. The Audit Committee
met on four occasions during 2007/08.
39glenelg shire annual report 07-08
INFORMATION PRIVACY
The Council has committed to information privacy
principles and has adopted policies on information
privacy and health records to comply with the
requirements of the Information Privacy Act 2000 and
Health Records Act 2001. Considerable training and
work has been undertaken during the past two years by
staff throughout the organisation to ensure compliance
with the two Acts. The Council has an Information
Privacy Policy and a comprehensive privacy manual is
available to guide staff.
During 2007/08 the Council did not received any
complaints relating to information privacy directly or via
the Victorian Information Privacy Commissioner or Health
Records Commissioner. A copy of the Council policy
can be downloaded from the Glenelg Shire website
www.glenelg.vic.gov.au or obtained from the Council’s
Customer Service Centre.
WHISTLEBLOWERS PROTECTION ACT
The Whistleblowers Protection Act 2001 became law in
Victoria in January 2002.
It is designed to encourage and facilitate the disclosure
of information about improper conduct by Councillors
and Council Staff. The Act protects people who
disclose information and provides a framework for the
investigation and rectifying action.
As required by the Act, the Council has adopted a policy
and a set of procedures relating to Whistleblowers. A
copy can be downloaded from the Glenelg Shire website
www.glenelg.vic.gov.au or obtained from Council’s
Protected Disclosure Coordinator.
During 2007/08 no disclosures were made to the
Council or to the Ombudsman. Accordingly no
matters were substantiated, nor any actions taken or
recommendations made.
FREEDOM OF INFORMATION
The Freedom of Information Act 1982 provides members
of the community a legally enforceable right of access
to specified Council ‘documents’. Where possible,
and subject to legislative requirements, the Council
may provide information to potential applicants without
requiring a formal Freedom of Information Application as
part of our general commitment to openness in decision
making.
In 2007/08 four requests were made to access the
Council documents and access was granted in all four
cases. No other requests were made.
Good governance has a key role in ensuring
that we achieve the highest standards of
integrity, transparency, accountability.
40 glenelg shire annual report 07-08
VICTORIAN LOCAL GOVERNMENT INDICATORS 2007/08
The Victorian Local Government Indicators are a set of measures that the Victorian Government requires all
79 Victorian Councils to report on. The nine indicators are:
Item
1
2
3
4
5
6
7
8
9
Description
Community satisfaction rating for overall performance
generally of the Council
Community satisfaction rating for Council’s advocacy
and community representation on key local issues
Community satisfaction rating for Council’s
engagement in decision making on key local issues
Average rates and charges per assessment
Average residential rates and charges per assessment
Average operating expenditure per assessment
Average capital expenditure per assessment
Average liabilities per assessment
Operating result per assessment
Result
2005/06
57
58
54
$1,057.15
$618.03
$2,160.58
$619.29
$926.72
$267.68
Result
2006/07
56
58
53
$1,154.84
$666.81
$2,199.96
$653.50
$946.29
$361.24
Result
2007/08
60
58
57
$1,222.00
$697.00
$2,364.00
$643.00
$924.00
$200.00
The positive outcomes from the ‘Best
Value Reviews’ completed to date include
efficiencies, improved business practices
and enhanced service delivery.
41glenelg shire annual report 07-08
BEST VALUE VICTORIA ANNUAL REPORT
The positive outcomes from the ‘Best Value Reviews’
completed to date include efficiencies, improved
business practices and enhanced service delivery.
The Council recognises the importance of community
consultation and feedback as part of the Best Value
program, and various methods for obtaining feedback
have been used since the inception of Best Value.
Consultation is a valuable link between the Council and
the community and has included community workshops,
customer surveys and advertising in local media.
A copy of the full report for each completed Service
Review is available from Shire Customer Service
Centres.
Service Reviews Completed During 2007/08:
• Environmental Health
• Meals on Wheels
• Maternal and Child Health
• Records Management
The Reviews were completed during the year and
presented to Council.
Service Reviews Previously Completed:
• Aquatic Based Leisure Facilities
• Building Services
• Environmental Health
• Records Management
• Local Laws
• Parks & Gardens
• Tourism
• Cleaning Services
• Maternal & Child Health
• Road Works
• Statutory Planning
• Rates and Valuations
• Airport Management
• Children’s Services
• Engineering Design
• Home & Community Care
• Recreation Services
• Meals on Wheels
• Caravan Parks
• Council Quarries
• Casterton Saleyards
42 glenelg shire annual report 07-08
LOCAL GOVERNMENT IMPROVEMENT INCENTIVE PROGRAM STATEMENT 2007/08
Glenelg Shire Council
Certification by Chief Executive Officer
Glenelg Shire Council has complied with the requirements of the Local Government Improvement Incentive Program.
Glenelg Shire Council has complied with the requirements of the National Competition Policy (NCP) for the period
1 July 2007 to 30 June 2008, in accordance with the requirements outlined in National Competition Policy and
Local Government – A Revised Statement of Victorian Government Policy (January 2002) as set out below:
A. Trade Practices Compliance
State whether the Council is compliant or non-compliant. If non-compliant,
justify or cite actions to redress.
B. Local Laws Compliance
State whether the Council is compliant or non-compliant. List any local laws
made or remade during 2007-08 which impose a restriction on competition:
C. Competitive Neutrality Compliance
State whether the Council is compliant or non-compliant for all significant
businesses. List any significant businesses that are non-compliant:
Compliant
Compliant
Compliant
I certify that:
a) this statement has been prepared in accordance with the 2007-08 National Competition Policy guidelines
issued in May 2008 for reporting on National Competition Policy in accordance with National Competition Policy
and Local Government – A Revised Statement of Victorian Government Policy (January 2002); and
b) this statement presents fairly the Council’s implementation of the National Competition Policy.
Signed:
Stuart Burdack
CHIEF EXECUTIVE OFFICER
Date: 30 June 2008
43glenelg shire annual report 07-08
INFORMATION AVAILABLE FOR
PUBLIC INSPECTION
(As required by Part 5, Clause 11 of the Local Government
(General) Regulations 2004)
The following information is available for public inspection
at the Glenelg Shire Council, Municipal Offices, Cliff
Street, Portland:
(a) details of current allowances fixed for the Mayor, Lord
Mayor (if any)and Councillors under section 74 or 74A of
the Act;
(b) details of senior officers’ total salary packages for
the current financial year and the previous year including
the gross salary, the amount of the Council or employer
contribution to superannuation, the value of any motor
vehicle provided by the Council and the total value
of any other benefits and allowances provided by the
Council;
(c) details of overseas or interstate travel (with the
exception of interstate travel by land for less than three
days) undertaken in an official capacity by Councillors or
any member of Council staff in the previous 12 months,
including the names of the Councillors or members of
Council staff and the date, destination, purpose and total
cost of the overseas or interstate travel;
(d) names of Council officers who were required to
submit a return of interest during the financial year and
the dates the returns were submitted;
(e) names of Councillors who submitted returns of
interest during the financial year and the dates the
returns were submitted;
(f) agendas for and minutes of ordinary and special
meetings held in the previous 12 months kept under
section 93 of the Act except if the minutes relate to parts
of meetings which have been closed to members of the
public under section 89 of the Act;
(g) a list of all special committees established by
Council and the purpose for which each committee was
established;
(h) a list of all special committees established by the
Council which were abolished or ceased to function
during the financial year;
(i) minutes of meetings of special committees
established under section 86 of the Act and held in the
previous 12 months except if the minutes relate to parts
of meetings which have been closed to members of the
public under section 89 of the Act;
( j) a register of delegations kept under sections 87, 88
and 98 of the Act, including the date on which the last
review under section 98(6) of the Act took place;
(k) submissions received in accordance with section
223 of the Act during the previous 12 months;
(l) agreements to establish regional libraries under
section 196 of the Act;
44 glenelg shire annual report 07-08
(m) details of all property, finance and operating
leases involving land, buildings, plant, computer
equipment or vehicles entered into by the as lessor or
lessee, including the name of the other party to the
lease and the terms and the value of the lease;
(n) a register of authorised officers appointed under
section 224 of the Act;
(o) a list of donations and grants made by the Council
during the financial year, including the names of
persons or bodies which have received a donation or
grant and the amount of each donation or grant;
(p) a list of the names of the organisations of which
the Council was a member during the financial year
and details of all membership fees and other amounts
and services provided during that year to each
organisation by the Council;
(q) a list of contracts valued at $100 000 or more
which the Council entered into during the financial
year without first engaging in a competitive process
and which are not contracts referred to in section
186(5) of the Act.
RECREATION GRANTS
Portland Bowling Club $27,694
Casterton Secondary College $6,350
South West Academy of Sport $6,000
Far Western District Swimming Association $5,000
Glenelg Pony Club Incorporation $5,000
Portland Little Athletics Centre $5,000
Portland Surf Life Saving Club Incorporation $3,530
Portland Soccer Sports & Recreation Club $2,650
South Coast Drags Assocociation Incorporation $2,500
Portland Heywood Field & Game $2,295
Heywood Pony Club $2,000
Portland Netball Association $2,000
Casterton Polocrosse Club Incorporation $1,950
Casterton & District Netball Association $1,756
South West Sports Assembly $1,100
Sandford Football & Netball Club $1,000
Portland Secondary College $300
45glenelg shire annual report 07-08
TOURISM GRANTS
Promoting Heywood & District Committee Incorporation $8,370
Portland Tourist Association Incorporation $5,500
Casterton Kelpie Association Incorporation $5,000
Heywood Wood Wine & Roses Festival $5,000
Casterton Business & Tourism Association Incorporation $4,000
Casterton & District Historical Society Incorporation $3,000
South Coast Drag Racing Association Incorporation $3,000
Southern 500 Speedway Club Incorporation $2,700
Nelson Tourist Association Incorporation $2,200
Tyrendarra P & A Society Incorporation $2,000
Karnkendi Campside Incorporation $1,940
Dartmoor & District Progress Association $1,250
Digby Hall Committee $1,090
Casterton Motor Enthusiasts Club Incorporation $1,000
Portland Dahlia Festival $1,000
Dartmoor Football & Netball Club $850
Lions Club of Portland Incorporation $200
PUBLIC HALL GRANTS
Bolwarra Hall & Recreation Reserve $6,000
Dartmoor & District Memorial Hall $4,106
Strathdownie Memorial Hall & Recreation Reserve $4,000
Mechanics Hall Narrawong $1,606
Bahgallah Memorial Hall Incorporation $1,533
Drumborg Hall & Recreation Reserve Incorporation $1,000
Hotspur Hall $825
Homerton Hall & Recreation Reserve Incorporation $814
Condah Mechanics Institute & Recreation Reserve $393
ARTS GRANTS
Music Glenelg $3,000
Aspire: A pathway to mental health $900
Anglican Mission District of Lower Glenelg $550
Bahgallah Memorial Hall Incorporation $500
Brenton Sharp $500
Josh Rawiri $500
The Arts Company Incorporation $500
BUSINESS ASSISTANCE SCHEME
Wotta Hide $438
Portland French Hot Bread $417
Drew Gleeson Legal $358
The Oasis Café & Juice Bar $357
SES SUBSIDIES
Dartmoor SES $10,460
Heywood SES $10,460
Portland SES $10,460
SPONSORSHIPS
South West Sports Assembly $16,500
Portland Callisthenics Club $300
Heywood Consolidated School $150
46 glenelg shire annual report 07-08
COMMUNITY GRANTS
Portland North Primary School $1,600
Australian Breast Feeding Association Portland Group $1,200
Casterton & District Historical Society Inc. $1,000
Casterton New Public Cemetery $1,000
Casterton RSL Sub Branch $1,000
Casterton Winter Christmas Dinner Committee $1,000
Sandford Recreation Reserve $1,000
Portland Secondary College $800
Heywood Kindergarten Inc. $760
Heywood Secondary College $735
Henty Group of CWA Vic. $600
St John’s Lutheran Primary School $560
Nelson Progress Association Incorporation $500
Portland Citizens Brass Band $500
Koori Kids; NAIDOC Week School Initiative Competitions $495
3RPC Inc. $428
Portland Primary School - Healthy Breakfast $368
Portland RSL Sub Branch $350
Narrawong District Primary School $158
Merino Consolidated School $141
Victorian Safe Communities Network Incorporated $55
CONTRIBUTIONS AND DONATIONS
Corangamite Shire $11,000
Moyne Shire $11,000
Warrnambool City Council $4,400
Great South Coast $4,000
Mildura City Council $3,550
Colac Otway Shire; Regional Trails Masterplan Contribution $3,300
Dartmoor & District Progress Association $2,718
Nelson Reserve Committee of Management Incorporation $2,296
Casterton Business & Tourism Association Incorporation $2,200
Promoting Heywood & District Committee $2,200
Shire of Corangamite $2,200
Portland Tourist Association Incorporation $1,100
Condah Mechanics Institute & Recreation Reserve $175
donations and contributions to the Shire
47glenelg shire annual report 07-08
Council provides over 100 services to people of all ages
and stages of life around the Shire.
Home and Community Care & Aged &
Disability Services
• Planned activity groups for seniors
• Delivered meal services
• Home & Personal Care Services
• Senior Citizen Centres
• Respite Care
• Property maintenance
Libraries
• Books, CDs, videos, DVDs, magazines &
newspapers to borrow and browse
• Internet and photocopying
• Online resources
• Preschool story time
• School holiday activities
• Internet and computer classes
• Spaces to read, relax and study
• Community meeting rooms
• IT training
• Travelling Library
Planning & Building
• Planning – Statutory & Strategic
• Heritage Advisor
• Building Services
Economic Development & Business Support
• Business support & advice
• Business Assistance Scheme
• Business visits
• Marketing of municipality
• Business & community liaison
• Assistance to new industries
• Major project facilitation
• Grants admin, assistance, management
• Foreshore development
• Provision of caravan parks
Infrastructure
• Maintenance & upkeep on 211 Shire buildings
• Maintenance on 2,500kms of local roads and bridges
• Grading of 1,523kms unsealed or gravel roads
• Car parks
• Contract management
• Major project construction management
• Emergency management & planning
• Street lighting
• Engineering design
• Cleaning the Shire’s public BBQs & toilets
• Maintenance Portland airport
• Street sweeping in main shopping areas
• Footpath provision and maintenance
• Kerb & channel provision
• Storm water pit maintenance
• Sign replacement & maintenance Shire wide
• Casterton sale yards
• Provision of swimming pools
• Recreational boating & parking facilities – boat ramps
Council provides over 100 services
to people of all ages and stages of
life around the Shire.
48 glenelg shire annual report 07-08
Waste & Recycling
• Collection and disposal of general household
garbage
• Recycling service
• Transfer stations and landfill sites for disposal
and recycling services
Public Health
• Immunisation programs
• Assessment of businesses to ensure compliance
with Food Act 1984
• Registration of premises, food safety programs, food
complaints, temporary events, safety standards,
labelling requirements
• Registration and assessment of other premises such
as accommodation & caravan parks, beauty salons,
hairdressers and body piercing parlours to ensure
correct hygiene & safe practices
• Monitoring for noise, smells & smoke, pest control
• Preventing the spread of infectious diseases
• Advice including pests with a potential health impact
• Approving individual domestic septic systems in
unsewered areas
• Monitoring compliance with tobacco laws, including
tobacco sale & smoking in public places
Local Laws
• Parking
• Animal registration and control
• School Crossing Supervisors
• Fire restriction enforcement
• Impounding stock on roads & enforcement of
state legislation
• Monitoring the keeping of domestic animals on
private property
Children’s Services
• Family Day Care
• Long Day Care Services
• Maternal & Child Health
• Inclusion Support Facilitator – supports staff who
care for children with additional needs
• Dartmoor Preschool & Occasional Care
• In-Home Care
Youth Services
• Support of youth music & leadership programs
• Glenelg National Youth Week
• Community orientated youth, children and family
events & activities
• Youth Action Groups
• Youth Mentoring Project/Program
• Youth referral services
• Linkages to local, regional and federal networks
and developments
• Counselling services
• Drug & alcohol services
• Skate parks
• Youth orientated festivals & events
• Youth based advisory councils
49glenelg shire annual report 07-08
Arts & Culture
• Support for projects and events initiated by the local
community
• Management of the Shire’s Cultural Collection
• History House & Maritime Discovery Centre
– Cultural Collection displays
• Coordination of an Arts Program
Parks & Gardens
• Parks and gardens maintained including mowing
of 11 recreation reserves and playing fields
• Portland Botanic Gardens
• Maintain all public municipal areas in the Shire
Community
• Australia Day celebrations in Casterton, Heywood
and Portland
• Volunteer functions
• Senior Citizens Week celebration
• Recognition of special birthdays and anniversaries
• Community meetings
• Community grants
• Citizenship ceremonies
• Community directories
Advocacy
• Seek to secure federal and state grants for the
Shire and community groups
• Advocate on a diverse range of issues on behalf
of the community, Council and the region
Rural Access
• Supports the community to plan and develop
strategies which will increase community participation
for people with a disability. Projects include:
- Physical access
- Health and wellbeing
- Business and tourism
- Recreation and leisure
- Education and training
- Information provision
Recreation
• Provision and development of sporting grounds
around the Shire
• Club development and administrative advice to all
sporting organisations
• Development of playgrounds
• Provide financial assistance to sporting and hall
groups through grants
• Provide advocacy and assistance for club projects
• Fund school holiday programs
• Home of the South West Games
Tourism
• Tourism information and advice through the Visitor
Information Centres in Portland, Casterton & Nelson
• Promotion of the region
supporting the community to plan and develop
Council provides over 100 services to people
of all ages and stages of life around the Shire.
50 glenelg shire annual report 07-08
PORTLAND MUNICIPAL OFFICES
Office Hours: Monday to Friday 8.30am to 5.00pm
(except public holidays)
Location: Cliff Street, Portland, Victoria
Postal: Glenelg Shire Council
PO Box 152
Portland Victoria 3305
Telephone: (03) 5522 2200
Facsimile: (03) 5522 2290
Email: [email protected]
Internet site: www.glenelg.vic.gov.au
CASTERTON CUSTOMER SERVICE CENTRE
Office Hours: Monday to Friday 9.00am to 5.00pm
(except public holidays)
Location: 67 Henty Street, Casterton, Victoria
Telephone: (03) 5554 2444
Facsimile: (03) 5581 2216
HEYWOOD CUSTOMER SERVICE CENTRE
Office Hours: Monday to Friday 9.00am to 5.00pm
(except public holidays)
Location: 77 Edgar Street, Heywood, Victoria
Telephone: (03) 5527 0666
Facsimile: (03) 5527 1099
glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual report glenelg shire annual report
glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual report glenelg shire annual report
glenelg shire annual report glenelg shirglenelg shire annual report glenelg shire annual report glenelg shire glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual repoannual report glenelg shire annual report glenelg shire annual reportannual report glenelg shire annual report glenelg shire annual report
glenelg shire annual report glenelg shirglenelg shire annual report glenelg shire annual report glenelg shire glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual repoannual report glenelg shire annual report glenelg shire annual reportannual report glenelg shire annual report glenelg shire annual report
51glenelg shire annual report 07-08
Understanding the Audited Financial Statements 52
Financial Indicators & Sustainability 54
Standard Statements 55
Standard Income Statement 56
Standard Balance Sheet 58
Standard Cash Flow Statement 60
Standard Capital Works Statement 62
Notes to Standard Statements 64
Certification of the Standard Statements 65
Financial Statements 66
Performance Statements 105
glenelg shire annual report glenelg shire annual report glenelg shire glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual report glenelg shire annual reportannual report glenelg shire annual report glenelg shire annual report
glenelg shire annual report glenelg shire annual report glenelg shire glenelg shire annual report glenelg shire annual report glenelg shire
annual report glenelg shire annual report glenelg shire annual reportannual report glenelg shire annual report glenelg shire annual report
52 glenelg shire annual report 07-08
The Financial Statements are prepared by Council to
meet the requirements of the Local Government Act
1989, Local Government (Finance and Reporting)
Regulations 2004 and Australian Accounting Standards.
The Financial Statements format is based on the Model
Financial Statements which was developed by the
Department for Victorian Communities.
The statements are audited by the Auditor General’s
agent before being approved in principle by the Council.
The Financial Statements are then forwarded to the
Auditor General for final approval. For 2007/2008 Council
has received a clear audit of its Financial Statements.
The Financial Statements consist of four key financial
reports with explanatory notes supporting the reports.
The four reports include:
1. Income Statement
2. Balance Sheet
3. Statement of Changes in Equity
4. Cash Flow Statement
1. Income Statement
The Income Statement measures Council’s performance
over the financial year and shows if a surplus or deficit
has been made in relation to service provision.
The statement includes all sources of revenue, less
all operating expenses incurred in providing Council
works and services to residents, businesses, industries
and visitors. Expenses include the item depreciation,
which is the estimated value of assets used during the
year in providing Council assets and services. Costs
associated with capital expenditure are excluded from
this statement, but are depreciated as they are used.
When the net result for the reporting period is a
surplus, this would indicate that revenue is greater than
expenses. If the net result is a deficit, revenue would
be less than expenses. For the year end 30th June
2008, Council made a surplus of $2.739 million which
is compared to the budgeted surplus of $3.377 million.
This surplus includes cash and non cash items.
2. Balance Sheet
The Balance Sheet indicates Council’s financial position
at a point in time (being 30 June 2008). It summarises
the assets that Council owns and the liabilities that it
owes against these assets. Assets and Liabilities are
listed into current and non-current categories. Current
includes those assets which could be converted to
cash within the next 12 months or liabilities which are
expected to be paid within the next 12 months.
The Balance Sheet indicates that Council is in a sound
financial position as at 30 June 2008 with a Working
Capital Ratio of 289% (i.e. Council has $2.89 of current
assets for every $1.00 of current liabilities).
The bottom line to this Statement is “Net Assets”,
and represents the net accumulated financial worth
of Council (i.e. the difference between the value of
Total Assets and Total Liabilities). As at 30 June 2008,
Council’s Net Assets was $274,400 million. In relation
to Infrastructure assets, it is important to note that many
of these assets will never be sold or converted into
cash but is included to enable better management of
Council’s assets.
3. Statement of Changes in Equity
The Statement of Changes in Equity summarises the
change in Council’s net worth or equity. Council’s net
worth can only change from a “Surplus” or “Deficit” from
the Income Statement, adjustments made directly to
retained earnings or from a revaluation of Council’s
non-current assets.
understanding the audited financial statements
53glenelg shire annual report 07-08
4. Cash Flow Statement
The Cash Flow Statement summarises Council’s cash
receipts and cash payments for the financial year,
and shows the net cash movement in cash reserves.
The net cash movement, together with the cash and
cash equivalents held at the beginning of the financial
year must balance to the cash and cash equivalents
reserves shown in the Balance Sheet as at the 30 June
each year.
The Cash Flow Statement differs from the Income
Statement by:
• Excluding non cash expenses such as depreciation
and written down value of assets sold;
• Excluding accruals taken up in the Income Statement
(eg. goods or services received but not paid for by
30th June);
• Including payments or receipts in relation to capital
items; and
• Including payments or receipts in relation to Financing
Activities such as loan principal repayments or new
loan borrowings.
The Cash Flow Statement has three sections, including:
• Cash Flows from Operating Activities – Includes
all income and expenses in relation to Council’s daily
operations. It is essential that Council has a cash
surplus in this area to ensure continued service
provision and funds available for capital works.
• Cash Flows from Investing Activities – Includes
expenditure on capital works and receipts from the
sale of Council’s assets.
• Cash Flows from Financing Activities – Includes loan
principal repayments, interest and other finance
charges and any receipts from new loan borrowings.
In the Cash Flow Statement for the year ended
30th June 2008, Council had a net increase in cash
reserves of $0.772 resulting in total cash reserves of
$12.309 million.
Although total cash reserves are $12.309 million,
Council has imposed restrictions on cash and
investments of $4.071 million to cover statutory and
discretionary reserves; and employee entitlements and
$1.216 million in Government Grants received for future
works. The balance of $7.022 million cash is required to
fund un-completed Capital works and finance working
capital requirements.
Notes to the Financial Statements
The Notes to the Financial Statements provide further
information in relation to the rules and assumptions
used to prepare the Financial Statements. It also gives
additional information regarding specific items within the
Statements, or advises the reader if there have been any
changes to Accounting Standards, Policy or Legislation
which may impact how the Statements are prepared.
In each of the Financial Statements, there is a “Note”
column which indicates what note to refer to for
additional information.
54 glenelg shire annual report 07-08
During the 2007/2008 budget process, Glenelg Shire
Council used financial indicators to determine the
financial sustainability of the Council. The indicators
included:
• Council’s ability to meet its current commitments,
• Maintenance of adequate cash reserves,
• Minimising outstanding debtors and greater debt
recovery, and
• Debt management and reduction.
The following charts illustrate Council’s performance in
relation to these financial indicators.
financial indicators & sustainability
Cash and Investments at 30 June
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
$'0
00
2001/
2002
2002/
2003
2003/
2004
2004/
2005
2005/
2006
2006/
2007
2007/
2008
Debt Outstanding at 30 June
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
2001/ 2002 2002/2003 2003/2004 2004/2005 2005/2006 2006/2007 2007/2008
$'0
00
0%
10%
20%
30%
40%
50%
60%
70%
Debt Outstanding at 30 June
% of Debt Outstanding to Rate Income
General Debtors Outstanding at 30 June
-
500
1,000
1,500
2,000
2,500
3,000
3,500
$'0
00
2001/
2002
2002/
2003
2003/
2004
2004/
2005
2005/
2006
2006/
2007
2007/
2008
Rates Outstanding at 30 June
-
100
200
300
400
500
600
700
800
900
$'0
00
2001/
2002
2002/
2003
2003/
2004
2004/
2005
2005/
2006
2006/
2007
2007/
2008
(to access Council’s ability to meet current commitments)
0%
50%
100%
150%
200%
250%
300%
350%
Working Capital Ratio
2001/2002
2002/2003
2003/2004
2004/2005
2005/2006
2006/2007
2007/2008
The Working Capital Ratio assesses Council’s ability to meet
its financial commitments over the next twelve months. This
ratio has improved since 2001/2002 and is currently 289% at
30 June 2008.
The level of cash and cash equivalents has increased
significantly since 2001/02. The objective has been to improve
this result allowing Council to meet its future cash commitments
whilst maintaining a strong liquid position throughout the year.
Outstanding rates are extremely low in comparison to rates
raised per year. In 2002/03, the result included unpaid rates
from a large ratepayer for one instalment.
Council’s general debtors fluctuate each year depending on
the level of accruals for revenue due for large projects at 30
June. Debts are strictly managed to ensure that Council’s risks
in this area are minimised.
In accordance with Council’s objectives, Council’s debt levels
are reducing. Council has factored $300,000 of borrowings
into the 2008/09 Budget as part of the funding strategy for the
Portland Child & Family Complex.
55glenelg shire annual report 07-08
CONTENTS
Standard Statements Page
Standard Income Statement 56
Standard Income Statement
- Variance Explanation Report 57
Standard Balance Sheet 58
Standard Balance Sheet
- Variance Explanation Report 59
Standard Cash Flow Statement 60
Standard Cash Flow Statement
- Variance Explanation Report 61
Standard Capital Works Statement 62
Standard Capital Works Statement
- Variance Explanation Report 63
Notes to the Standard Statements 64
Certification of the Standard Statements 65
standard statements
INTRODUCTION
The Annual Report shows the actual
results for the year.
The following four Standard Statements
and explanatory notes for the Annual
Report (the Comparison Report) form
a special purpose financial report
prepared specifically to meet the
requirements of the Local Government
(Democratic Reform) Act 2003 relating to
Standard Statements.
The Standard Statements in this report
each provide information in relation
to an aspect of Council’s financial
management. They should be read in
conjunction with one another to obtain
an overall understanding of Council’s
financial position and management.
The Standard Statements of Income
Statement, Balance Sheet, Cash Flows
and Capital Works for the Annual Report
are consistent with the Budget and are
prepared on bases consistent with the
Financial Statements.
This report is a summary of the
information found in the Budget and the
Financial Report and as such cannot
be expected to provide as full an
understanding of financial performance
as the complete reports from which it
is derived. The Budget and Financial
Report together with their detailed notes
should be examined for further detailed
information.
56 glenelg shire annual report 07-08
Note Budget Actual 2008 2008 $’000 $’000 $’000 %
Revenues
Revenue from ordinary activities
Revenue from operating activities
Rate Income 15,630 15,659 29 0.2
User Fees and Charges 4,338 4,385 47 1.1
Operating Grants and Subsidies 7,736 8,222 486 6.3
Investment Income 1 448 835 387 86.3
Other Income 2 2,076 2,675 599 28.8
Revenue from outside the operating activities
Capital Grants, Subsidies and Contributions 3 4,179 2,555 (1,624) (38.9)
Total Revenue 34,407 34,331 (76) (0.2)
Expenses
Expenses from ordinary activities
Employee Expenses 12,002 12,285 283 2.4
Contract Expenses 4 8,058 9,122 1,064 13.2
Material Expenses 3,041 3,276 235 7.7
Finance Fees and Interest 230 230 0 0.0
Other Expenses 2,500 2,486 (14) (0.6)
Depreciation and Amortisation 6,025 6,461 436 7.2
Internal Cost Allocations Capitalised 5 (1,285) (1,516) (231) 18.0
Total Expenses 30,571 32,344 1,773 5.8
Net Gain (Loss) on Disposal of Assets 6 (459) 68 527 (114.9)
Recognition of Previously Unrecognised Non-Current Assets 7 - 380 380 100.0
Share of net profits (losses) of associates and joint ventures accounted for by the equity method - - - -
Assets Written Off 8 - (106) (106) 100.0
(Increment) Decrement in Fair Values of
Investment Properties - 409 409 -
Net result for the reporting period 3,377 2,739 (638) (18.9)
standard income statementfor the year ended 30 june 2008
Variances
57glenelg shire annual report 07-08
standard income statementVARIANCE EXPLANATION REPORT
Note Item Explanation
1 Investment Income Investment income received was greater than budget due to
the increased cash reserves throughout the year and the
timing of cash flows.
2 Other Income Increased income primarily due to additional Vic Roads
income for maintenance works.
3 Capital Grants, Subsidies Lower income realised due to the grant for the Portland Family
and Contributions and Children’s Services Complex not being received due to
the delay in the commencement of the Project and lower than
anticipated capital road funding.
4 Contract Expenses Additional expenditure in the areas of waste management;
aquatic centres; limestone quarry and special projects relating
to the receipt of ‘one off’ Government Grants including some
projects that were undertaken on behalf of Community Groups.
5 Internal Cost Allocations Capitalised The level of internal plant hire, gravel resources and salary
oncosts used on capital works was greater than original
estimates.
6 Net Gain (Loss) on Disposal of Assets This represents net gain on the disposal of plant & equipment.
The budgeted net loss related to the sale of a Council
property which did not occur.
7 Recognition of Previously Unrecognised Represents Assets not previously recognised, resulting from
Non-Current Assets a review of the value of Council’s Asset base.
8 Assets Written Off During 2007/2008, adjustments were made for asset
write-offs. No provision in the budget was made for this
adjustment.
The Standard Income Statement for the Annual Report indicates the results during the year in terms of revenue, expenditure and other adjustments from all activities. The Income Statement requires revenues to be separately disclosed where the item is of such a size, nature or incidence that its disclosure is relevant in explaining the performance of the Council.
58 glenelg shire annual report 07-08
Note Budget Actual 2008 2008 $’000 $’000 $’000 %
Assets
Current assets
Cash and Cash Equivalents 9 6,704 12,309 5,605 83.6
Trade and Other Receivables 10 2,294 1,862 (432) (18.8)
Inventory 11 214 193 (21) (9.9)
Prepayments 12 248 649 401 161.5
Other 13 256 195 (61) (23.7)
Total current assets 9,716 15,208 5,492 56.5
Non-current assets
Trade and Other Receivables 14 5 13 8 164.3
Investments in Associates 13 13 0 0.9
Investment Properties 15 1,644 2,168 524 31.8
Land 15 19,769 20,466 697 3.5
Buildings 15 31,612 33,560 1,948 6.2
Infrastructure - Roads 16 124,331 130,943 6,612 5.3
Infrastructure - Other 16 59,631 70,911 11,280 18.9
Other Structures 3,431 3,461 30 0.9
Plant and Equipment 4,742 4,775 33 0.7
Furniture and Fittings 17 447 376 (71) (15.8)
Heritage 3,148 3,152 4 0.1
Works in Progress 18 11,215 2,000 (9,215) (82.2)
Total non-current assets 259,988 271,838 11,850 4.6
Total Assets 269,704 287,046 17,342 6.4
Liabilities
Current liabilities
Trade and Other Payables 19 1,576 2,348 772 49.0
Interest-bearing Loans and Borrowings 600 579 (21) (3.5)
Provisions 20 1,779 2,338 559 31.4
Total current liabilities 3,955 5,265 1,310 33.1
Non-current liabilities
Interest-bearing Loans and Borrowings 21 2,108 1,829 (279) (13.2)
Provisions 22 5,160 5,552 392 7.6
Total non-current liabilities 7,268 7,381 113 1.6
Total Liabilities 11,223 12,646 1,423 12.7
Net Assets 258,481 274,400 15,919 6.2
Represented by:
Accumulated Surplus 129,032 128,565 (467) (0.4)
Asset Revaluation Reserve 23 129,449 145,835 16,386 12.7
Equity 258,481 274,400 15,919 6.2
standard balance sheetfor the year ended 30 june 2008
Variances
59glenelg shire annual report 07-08
Note Item Explanation
9 Cash and Cash Equivalents The closing cash position is higher than budget due to delayed
expenditure for capital and other projects during 2007/2008.
10 Trade and Other Receivables Current receivables are lower than budget as it was not necessary
to raise accounts in June for capital and other projects that had
been projected.
11 Inventory Inventory was lower than budget due to the lower that budgeted level
of fuel and gravel & limestone stock piles.
12 Prepayments Council processed an insurance payment for the 2008/09 financial year.
13 Other Other current assets were lower than expected due to reduced revenue
accruals for 2007/2008.
14 Trade and Other Receivables This item has increased as a result of a new Council loan to a
community group.
15 Investment Properties; Land Increased value due to revaluation of these Asset Classes.
and Buildings
16 Infrastructure - Roads and Other Increased value due to revaluation of these Asset Classes.
17 Furniture and Fittings Decreased value due to depreciation charge greater than budgeted.
18 Works in Progress The budget represents the movement in total assets, and is not
distributed over the asset classes. The actual asset adjustments have
been distributed to the correct asset class as at 30 June 2008.
19 Current Trade and Other Payables Current trade and other payables are higher than budget due to higher
expenditure accruals for payroll; capital and other projects.
20 Current Provisions Increase in employee entitlements and the gravel pit restoration
provisions.
21 Interest-bearing Loans and Borrowings Correct classification to non-current liability.
22 Non-current Provisions Increase in employee entitlements and landfill rehabilitation provisions.
23 Asset Revaluation Reserve The increase relates to the re-valuation of the majority of the Council’s
Asset Classes and the budget was set before any asset revaluation
adjustments were known .
The Standard Balance Sheet for the Annual Report shows the closing position of Council’s assets, liabilities and equity. The information in the Balance Sheet assists users in the assessment of the Council’s ability to meet financial commitments as they fall due including the servicing of borrowings, and retention of the net asset position.
standard balance sheetVARIANCE EXPLANATION REPORT
60 glenelg shire annual report 07-08
Budget Actual
Inflows/ Inflows/
(Outflows) (Outflows)
2008 2008
$’000 $’000 $’000 %
Cash flows from operating activities
Payments
Employee Costs (12,002) (12,220) (218) 1.8
Contract Costs 24 (8,059) (9,295) (1,236) 15.3
Material Costs (3,041) (3,276) (235) 7.7
Other Expenses 25 (2,499) (1,959) 540 (21.6)
Less Expenses Allocated to Investing Activities 26 1,285 1,516 231 18.0
GST on Payments 27 (1,500) (2,130) (630) 42.0
Total Payments (25,816) (27,364) (1,548) 6.0
Receipts
Rate Receipts 15,630 15,643 13 0.1
User Fees and Charges 28 4,338 6,572 2,234 51.5
Interest 29 448 835 387 86.3
Government Grants - Operating 7,736 7,822 86 1.1
Government Grants - Capital 30 4,178 2,210 (1,968) (47.1)
Other Receipts 2,076 2,275 199 9.6
GST on Receipts 31 600 699 99 16.5
Net GST Refunded 32 900 1,431 531 59.1
Total Receipts 35,907 37,487 1,580 4.4
Net cash provided by operating activities 10,090 10,123 33 0.3
Cash flows from investing activities
Payments for
Property, Plant and Equipment 33 (14,330) (8,772) 5,558 (38.8)
Proceeds from
Land and Building Sales 34 509 - (509) (100.0)
Plant and Equipment Sales 35 331 195 (136) (41.0)
840 195 (645) (76.7)
Net cash used in investing activities (13,490) (8,577) 4,913 (36.4)
Cash flows from financing activities
Repayment of Borrowings (545) (545) (0) 0.0
Proceeds from Borrowings 36 300 - (300) (100.0)
Interest and other Finance Charges (230) (230) (0) 0.0
Net cash provided by (used in) financing activities (475) (775) (300) 63.2
Net increase (decrease) in cash and cash equivalents 37 (3,875) 771 4,646 (119.9)
Cash and cash equivalents at the beginning of the year 10,579 11,537 958 9.1
Cash and cash equivalents at the end of the year 6,704 12,309 5,605 83.6
standard cash flow statementfor the year ended 30 june 2008
Variances
61glenelg shire annual report 07-08
standard cash flow statementVARIANCE EXPLANATION REPORT
Note Item Explanation
24 Contract Costs Additional expenditure in the areas of waste management; aquatic
centres; limestone quarry and special projects relating to the receipt
of ‘one off’ Government Grants including some projects that were
undertaken on behalf of Community Groups.
25 Other Expenses Other expenses are less due to lower than budgeted expenditure and
the re-classification of some expenditure items.
26 Less Expenses Allocated to The level of internal plant hire, gravel resources and salary oncosts used
Investing Activities on capital works was greater than original estimates.
27 GST on Payments Higher than budgeted GST payments due to additional expenditure.
28 User Fees and Charges Higher than budget due to a decrease in debtor receivables.
29 Interest Investment income received was greater than budget due to the
increased cash reserves through out the year and the timing of cash flows.
30 Government Grants - Capital Lower cash realised due to the grant for the Portland Family and
Children’s Services Complex not being received due to the delay in the
commencement of the project and lower than anticipated capital
road funding.
31 GST on Receipts and Net GST The original budget was based on historical figures and higher than
and Refunded budgeted GST payments on expenditure.
32
33 Payments for Property, Plant and Capital expenditure not incurred relates to buildings, local road projects,
Equipment parks and gardens and plant and equipment.
34 Land and Building Sales Council has not completed its land and building sales as stated in the
budget, due to the deferral of the construction of the Portland Children’s
and Family Services Complex.
35 Plant and Equipment Sales Plant & Motor Vehicle sales were not completed and are offset by
capital expenditure savings for plant purchases.
36 Proceeds from Borrowings Council has not taken up the budgeted loan due to the deferral of the
construction of the Portland Children’s and Family Services Complex.
37 Net increase (decrease) in cash held The net variance resulted from the combination of variances
24 to 37 above.
38 Cash and cash equivalents at the The opening cash position is higher than budget due to delayed
beginning of the year expenditure for capital and other projects during 2006/2007.
The Standard Cash Flow Statement for the Annual Report shows what has happened during the year in terms of cash. It explains what cash movements have resulted in the difference in the cash balance at the beginning and the end of the year. The net cash flows from operating activities shows how much cash remains, after paying for the provision of services to the community, which may include things such as capital works. The information in the Standard Cash Flow Statement assists users in the assessment of the ability to generate cash flows, meet financial commitments as they fall due including the servicing of borrowings, fund changes in the scope or nature of activities and obtain external finance.
62 glenelg shire annual report 07-08
Budget Actual
2008 2008
$’000 $’000 $’000 %
Capital Works
Bridges and Major Culverts (8) (4) 4 (48.7)
Buildings 39 (3,296) (992) 2,304 (69.9)
Drainage 40 (100) (73) 27 (27.4)
Local Roads; Kerb and Channel and Footpaths 41 (8,016) (5,841) 2,175 (27.1)
Other Works 42 (558) (230) 328 (58.7)
Public Open Space and Urban Design 43 (836) (652) 184 (22.0)
Plant and Equipment 44 (1,010) (493) 517 (51.2)
Swimming Pools (365) (375) (10) 2.7
Waste Management (141) (124) 17 (12.3)
Total Capital Works (14,330) (8,785) 5,545 (38.7)
Capital Works represented by:
New Assets 45 (4,113) (1,898) 2,215 (53.9)
Upgrade Assets 46 (4,916) (3,469) 1,447 (29.4)
Asset Renewals 47 (5,301) (3,418) 1,883 (35.5)
Total Capital Funding (14,330) (8,785) 5,545 (38.7)
Capital Funding
Capital Grants/Contributions 48 4,178 2,555 (1,623) (38.8)
Asset Sales 49 840 195 (645) (76.7)
Loan Borrowings 50 300 - (300) (100.0)
Council Contribution 51 9,012 6,034 (2,978) (33.0)
Total Capital Funding 14,330 8,785 (5,545) (38.7)
standard capital works statementfor the year ended 30 june 2008
Variances
63glenelg shire annual report 07-08
standard capital works statementVARIANCE EXPLANATION REPORT
Note Item Explanation
39 Buildings Capital expenditure on buildings was less than budget primarily due
to the Portland Children’s and Family Services Complex not being
completed. This has been re-budgeted in the 2008/2009 financial year.
40 Drainage Drainage expenditure is lower than budget due to delays in projects,
which have been carried forward to 2008/2009.
41 Local Roads; Kerb and Channel Expenditure on various projects is lower than budget due to delays in
and Footpaths projects, which have been carried forward to 2008/2009.
42 Other Works Expenditure on various projects is lower than budget due to delays in
projects, which have been carried forward to 2008/2009.
43 Public Open Space and Urban Design Expenditure on various projects is lower than budget due to delays in
projects, which have been carried forward to 2008/2009.
44 Plant and Equipment Plant & motor vehicle purchases were not completed and will be
carried forward to the 2008/2009 financial year.
45 New Assets The major reason for less expenditure than budget relates primarily to
the delay in the construction of Portland Children’s and Family Services
Complex. This has been re-budgeted in the 2008/2009 financial year.
46 Upgrade Assets Expenditure for asset upgrades is lower than the budget due to the
delays in various Projects.
47 Asset Renewals Expenditure for asset renewals is lower than the budget due to the
delays in various Projects.
48 Capital Grants/Contributions Lower income realised due to the grant for the Portland Family and
Children’s Services Complex not being received due to the delay in
the commencement of the project and lower than anticipated capital
road funding.
49 Asset Sales Property and Plant & Motor Vehicle sales were not achieved in
accordance within the budget period.
50 Loan Borrowings Council has not taken up the budgeted loan due to the deferral of the
construction of the Portland Children’s and Family Services Complex.
51 Council Contribution Council’s contribution to the Capital program is lower due to the delay
in the delivery of various projects.
The Standard Capital Works Statement for the Annual Report shows the expenditure on various capital projects. The information in the Capital Works Statement assists users in the assessment of the Council’s ability to complete a wide range of capital works within the financial year stipulated and within budget constraints.
64 glenelg shire annual report 07-08
1 Basis of preparation of Standard Statements
Council is required to prepare and include audited Standard Statements within its Annual Report.
These statements and supporting notes form a special purpose financial report prepared to meet the
requirements of the Local Government Act 1989 and Local Government (Finance and Reporting)
Regulations 2004.
The Standard Statements have been prepared on accounting bases consistent with those used for the
General Purpose Financial Statements and the Budget. The results reported in these statements are consistent
with those reported in the General Purpose Financial Statements.
The Standard Statements are not a substitute for the General Purpose Financial Statements, which are included
on pages 55 to 65 of the Annual Report. They have not been prepared in accordance with all Australian
Accounting Standards or other authoritative professional pronouncements.
The Standard Statements compare Council’s financial plan, expressed through its Budget, with actual
performance. The Local Government Act 1989 requires explanation of any material variances. The Council has
adopted a materiality threshold of $500,000 variance or where the percentage is greater than ten per cent.
Explanations have not been provided for variations below the materiality threshold unless the variance is
considered to be material because of its nature.
The Budget figures included in the Statements are those adopted by Council on 24 July 2007. The Budget
was based on assumptions that were relevant at the time of adoption of the Budget. The Council set guidelines
and parameters for revenue and expense targets in this Budget in order to meet the Council Plan and financial
performance targets for both the short and long term. The Budget did not reflect any changes to equity resulting
from asset revaluations, as their impacts were not considered predictable.
Detailed information on the actual financial results are contained in the General Purpose Financial Statements
on pages 66 to 104. The detailed Budget can be obtained by contacting Council or through the Council’s
website. The Standard Statements must be read with reference to these documents.
notes to the standard statements
65glenelg shire annual report 07-08
In my opinion the accompanying standard statements have been prepared on accounting bases consistent
with the financial statements and in accordance with the Local Government Act 1989 and the Local Government
(Finance and Reporting) Regulations 2004.
Linda MacRae
PRINCIPAL ACCOUNTING OFFICER
Date: September 11, 2008
In our opinion the accompanying standard statements have been prepared on accounting bases consistent
with the financial statements and in accordance with the Local Government Act 1989 and the Local Government
(Finance and Reporting) Regulations 2004.
As at the date of signing, we are not aware of any circumstances which would render any particulars in the standard
statements to be misleading or inaccurate.
We have been authorised by the Council on 9 September 2008 to certify the standard statements in their final form.
Geoff White
COUNCILLOR
Date: September 11, 2008
Gilbert WilsonCOUNCILLOR
Date: September 11, 2008
Stuart BurdackCHIEF EXECUTIVE OFFICER
Date: September 11, 2008
certification of the standard statements
66 glenelg shire annual report 07-08
Financial Statements
Income Statement 67
Balance Sheet 68
Statement of Changes in Equity 69
Cash Flow Statement 70
Notes to Financial Statements
Introduction 71
Note 1 Significant accounting policies 71
Note 2 Change in Accounting Policy 78
Note 3 Rate Income 79
Note 4 User Fees and Charges 79
Note 5 Operating Grants and Subsidies 79
Note 6 Other Income 80
Note 7 Capital Grants, Subsidies and
Contributions 81
Note 8 Employee Expenses 81
Note 9 Contract Expenses 81
Note 10 Material Expenses 81
Note 11 Finance Fees and Interest 81
Note 12 Other Expenses 81
Note 13 Depreciation and Amortisation 82
Note 14 Internal Cost Allocations (Capitalised) 82
Note 15 Net Gain (Loss) on Disposal of Assets 82
Note 16 Recognition of Previously
Unrecognised Non-Current Assets 82
Note 17 Investments in Associates 82
Note 18 Cash and Cash Equivalents 83
Note 19 Trade and Other Receivables 83
Note 20 Investment Properties 83
Note 21 Land 84
Note 22 Buildings 84
Note 23 Infrastructure - Roads 84
Note 24 Infrastructure - Other 84
General Purpose Financial Statements
table of contents
Note 25 Other Structures 84
Note 26 Plant and Equipment 85
Note 27 Furniture and Fittings 85
Note 28 Heritage 85
Note 29 Works in Progress 85
Note 30 Fixed Asset Movements 86
Note 31 Trade and Other Payables 87
Note 32 Interest-bearing Loans and Borrowings 87
Note 33 Provisions 88
Note 34 Reserves 89
Note 35 Adjustments directly to Equity 89
Note 36 Reconciliation of result from ordinary
activities with net cash from operations 90
Note 37 Commitments for Expenditure 91
Note 38 Contingent Liabilities and Contingent
Assets 91
Note 39 Superannuation 91
Note 40 Financial Instruments 93
Note 41 Related Party Transactions 97
Note 42 Revenues, Expenses and Assets
by Function/Activity 99
Note 43 Financial Ratios 100
Certification of the Financial Report 102
Auditor-General’s Report on Financial Report 103
67glenelg shire annual report 07-08
Note 2008 2007 $’000 $’000
Revenues
Revenue from ordinary activities
Rate Income 3 15,659 14,929
User Fees and Charges 4 4,385 4,142
Operating Grants and Subsidies 5 8,222 7,781
Investment Income 835 629
Other Income 6 2,675 2,005
Capital Grants, Subsidies and Contributions 7 2,555 4,539
Total Revenue 34,331 34,025
Expenses
Expenses from ordinary activities
Employee Expenses 8 12,285 10,925
Contract Expenses 9 9,122 7,848
Material Expenses 10 3,276 3,087
Finance Fees and Interest 11 230 274
Other Expenses 12 2,486 2,551
Depreciation and Amortisation 13 6,461 6,274
Internal Cost Allocations Capitalised 14 (1,516) (1,406)
Total Expenses 32,344 29,553
Net Gain (Loss) on Disposal of Assets 15 68 186
Recognition of Previously Unrecognised Non-Current Assets 16 380 359
Share of net profits (losses) of associates and joint ventures
accounted for by the equity method 17 - -
Assets Written Off (106) (142)
Increment (Decrement) in Fair Values of Investment Properties 409 -
Surplus (Deficit) for the reporting period 2,739 4,876
The above statement should be read with the accompanying notes.
income statementfor the year ended 30 june 2008
68 glenelg shire annual report 07-08
Note 2008 2007
$’000 $’000
Assets
Current assets Cash and Cash Equivalents 18 12,309 11,537 Trade and Other Receivables 19 1,862 3,232 Inventory 193 106 Prepayments 649 273 Other 195 315
Total current assets 15,208 15,463
Non-current assets Trade and Other Receivables 19 13 3 Investments in Associates 17 13 13 Investment Properties 20 2,168 1,743 Land 21 20,466 19,763 Buildings 22 33,560 31,227 Infrastructure - Roads 23 130,943 127,653 Infrastructure - Other 24 70,911 59,282 Other Structures 25 3,461 3,566 Plant and Equipment 26 4,775 5,093 Furniture and Fittings 27 376 470 Heritage 28 3,152 3,152 Works in Progress 29 2,000 845
Total non-current assets 271,838 252,810
Total Assets 287,046 268,273
Liabilities
Current liabilities Trade and Other Payables 31 2,348 2,372 Interest-bearing Loans and Borrowings 32 579 545 Provisions 33 2,338 2,244
Total current liabilities 5,265 5,161
Non-current liabilities Interest-bearing Loans and Borrowings 32 1,829 2,408 Provisions 33 5,552 5,204
Total non-current liabilities 7,381 7,612
Total Liabilities 12,646 12,773
Net Assets 274,400 255,500 Represented by: Accumulated Surplus 128,565 125,826 Asset Revaluation Reserve 34 145,835 129,674
Equity 274,400 255,500
The above statement should be read with the accompanying notes.
balance sheetas at 30 june 2008
69glenelg shire annual report 07-08
statement of changes in equityfor the year ended 30 june 2008
AssetRevaluation
Reserve2007
$’000
129,449
-
225
129,674
AssetRevaluation
Reserve2008
$’000
129,674
-
16,161
145,835
AccumulatedSurplus
2007 $’000
120,950
4,876
-
125,826
AccumulatedSurplus
2008 $’000
125,826
2,739
-
128,565
Total2007
$’000
250,399
4,876
225
255,500
Total 2008
$’000
255,500
2,739
16,161
274,400
Notes
34
Balance at beginning of
the financial year
Surplus (deficit)
for the year
Net asset revaluation
increment(decrement)
Balance at end
of the financial year
The above statement should be read with the accompanying notes.
70 glenelg shire annual report 07-08
Inflows/ Inflows/ (Outflows) (Outflows) 2008 2007 Notes $’000 $’000
Cash flows from operating activities
Payments
Employee Costs (12,220) (10,794)
Contract Costs (9,295) (7,202)
Material Costs (3,276) (3,087)
Other Expenses (1,959) (2,021)
Less Expenses Allocated to Investing Activities 1,516 1,406
GST on Payments (2,130) (1,646)
Total Payments (27,364) (23,344)
Receipts
Rate Receipts 15,643 14,669
User Fees and Charges 6,572 3,935
Interest 835 629
Government Grants - Operating 7,822 7,381
Government Grants - Capital 2,210 5,421
Other Receipts 2,275 1,934
GST on Receipts 699 702
Net GST Refunded 1,431 944
Total Receipts 37,487 35,615
Net cash provided by operating activities 36 10,123 12,271
Cash flows from investing activities
Payments for
Property, Plant and Equipment (8,772) (8,821)
Proceeds
Land and Building Sales - -
Plant and Equipment Sales 15 195 432
195 432
Net cash used in investing activities (8,577) (8,389)
Cash flows from financing activities
Repayment of Borrowings (545) (888)
Interest and other Finance Charges 11 (230) (274)
Net cash provided by (used in) financing activities (775) (1,162)
Net increase (decrease) in cash and cash equivalents 771 2,720
Cash and cash equivalents at the beginning of the year 11,537 8,817
Cash and cash equivalents at the end of the year 18 12,309 11,537
Financing Arrangements 32
Restrictions on Cash Assets 18
cash flow statementfor the year ended 30 june 2008
The above statement should be read with the accompanying notes.
71glenelg shire annual report 07-08
Introduction (a) The Glenelg Shire Council was established by an Order of the Governor in Council on 23 September 1994 and is a body corporate. (b) The purpose of the Council is to: - provide for the peace, order and good government of its municipal district; - to promote the social, economic and environmental viability and sustainability of the municipal district; - to ensure that resources are used efficiently and effectively and services are provided in accordance with the Best Value Principles to best meet the needs of the local community; - to improve the overall quality of life of people in the local community; - to promote appropriate business and employment opportunities; - to ensure that services and facilities provided by the Council are accessible and equitable; - to ensure the equitable imposition of rates and charges; and - to ensure transparency and accountability in Council decision making. This financial report is a general purpose financial report that consists of an Income Statement, Balance Sheet, Statement of Changes in Equity, Cash Flow Statement, and notes accompanying these financial statements. The general purpose financial report complies with Australian Accounting Standards, other authoritative pronouncements of the Australian Accounting Standards Board, the Local Government Act 1989, and the Local Government (Finance and Reporting) Regulations 2004. The Council is an entity to which AAS 27 “Financial Reporting by Local Governments” applies and the entity has applied a requirement in that Standard that overrides the requirements in an Australian equivalent to IFRS. Except to the extent that these special provisions require, this financial report complies with the Australian equivalents to IFRS (AIFRS). The Council has elected not to restate comparative information of financial instruments within the scope of AASB132 “Financial Instruments Disclosure and Presentation” and AASB139 “Financial Instruments Recognition and Measurement”, as permitted on the first time adoption of AIFRS.
Note 1 Significant accounting policies (a) Basis of accounting
This financial report has been prepared on the accrual and going concern basis. This financial report has been prepared under the historical cost convention, except where specifically stated in notes 1(f), 1(h), and 1(j). Unless otherwise stated, all accounting policies are consistent with those applied in the prior year. Where appropriate, comparative figures have been amended to accord with current presentation, and disclosure has been made of any material changes to comparatives. All entities controlled by Council that have material assets or liabilities, such as Special Committees of Management, have been included in this financial report. All transactions between these entities and the Council have been eliminated in full.
notes to the financial reportfor the year ended 30 june 2008
72 glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.)
(b) Revenue recognition
Rates, grants and contributions Rates, grants and contributions (including developer contributions) are recognised as revenues when the Council obtains control over the assets comprising these receipts. Control over assets acquired from rates is obtained at the commencement of the rating year as it is an enforceable debt linked to the rateable property or, where earlier, upon receipt of the rates. A provision for doubtful debts on rates has not been established as unpaid rates represents a charge against the rateable property that will be recovered when the property is next sold. Control over granted assets is normally obtained upon their receipt (or acquittal) or upon earlier notification that a grant has been secured, and are valued at their fair value at the date of transfer. Income is recognised when the Council obtains control of the contribution or the right to receive the contribution. It is probable that the economic benefits comprising the contribution will flow to the Council and the amount of the contribution can be measured reliably. Where grants or contributions recognised as revenues during the financial year were obtained on condition that they be expended in a particular manner or used over a particular period and those conditions were undischarged at balance date, the unused grant or contribution is disclosed in note 5. The note also discloses the amount of unused grant or contribution from prior years that was expended on Council’s operations during the current year. A liability is recognised in respect of revenue that is reciprocal in nature to the extent that the requisite service has not been provided at balance date.
User charges, fees and fines User charges, fees and fines (including parking fees and fines) are recognised as revenue when the service has been provided, the payment is received, or when the penalty has been applied, whichever first occurs.
A provision for doubtful debts is recognised when collection in full is no longer probable.
Sale of property, infrastructure, plant and equipment
The profit or loss on sale of an asset is determined when control of the asset has irrevocably passed to the buyer.
Interest and rents
Interest and rents are recognised as revenue on a proportional basis when the payment is due, the value of the payment is notified, or the payment is received, whichever first occurs.
notes to the financial reportfor the year ended 30 june 2008
73glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.)
(c) Depreciation and amortisation of non-current assets Buildings, infrastructure, plant and equipment, and other assets having limited useful lives are systematically depreciated over their useful lives to the Council in a manner which reflects consumption of the service potential embodied in those assets. Estimates of remaining useful lives and residual values are made on a regular basis with major asset classes reassessed annually. Depreciation rates and methods are reviewed annually. Where infrastructure assets have separate identifiable components that are subject to regular replacement, these components are assigned distinct useful lives and/or residual values and a separate depreciation rate is determined for each component. Straight line depreciation is charged based on the residual useful life as determined each year. Road earthworks are not depreciated. Due to the appreciating nature of heritage assets, no depreciation is charged in relation to these items. Major depreciation periods used are listed below and are consistent with the prior year unless otherwise stated: Period Buildings Buildings 50 to 100 years Plant and equipment Plant and equipment 5 to 10 years Furniture and fittings 5 to 20 years Infrastructure Roads 15 to 50 years Other structures 10 to 100 years (d) Repairs and maintenance Routine maintenance, repair costs, and minor renewal costs are expensed as incurred. Where the repair relates to the replacement of a component of an asset and the cost exceeds the capitalisation threshold the cost is capitalised and depreciated. The carrying value of the replaced asset is expensed. (e) Borrowing costs Borrowing costs are recognised as an expense in the period in which they are incurred, except where they are capitalised as part of a qualifying asset constructed by Council. Except where specific borrowings are obtained for the purpose of specific asset acquisition, the weighted average interest rate applicable to borrowings at balance date, excluding borrowings associated with superannuation, is used to determine the borrowing costs to be capitalised. Borrowing costs include interest on bank overdrafts, and interest on borrowings.
notes to the financial reportfor the year ended 30 june 2008
74 glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.)
(f) Recognition and measurement of assets Acquisition The purchase method of accounting is used for all acquisitions of assets, being the fair value of assets provided as consideration at the date of acquisition plus any incidental costs attributable to the acquisition. Fair value is the amount for which the asset could be exchanged between knowledgeable willing parties in an arm’s length transaction. Where assets are constructed by Council, cost includes all materials used in construction, direct labour, and an appropriate share of directly attributable variable and fixed overheads. The following classes of assets have been recognised in note 30. In accordance with Council’s policy, the threshold limits detailed below have applied when recognising assets within an applicable asset class and unless otherwise stated are consistent with the prior year. Threshold Limit Class of asset Land and buildings Land 1,000 Buildings 1,000 Heritage assets Heritage assets 1,000 Plant and equipment Plant and equipment 1,000 Furniture and fittings 1,000 Infrastructure Roads 10,000 Other Infrastructure 10,000 Other structures 10,000 Revaluation Subsequent to the initial recognition of assets, non-current physical assets, other than plant & equipment, other structures and furniture & fittings, are measured at their fair value, being the amount for which the assets could be exchanged between knowledgeable willing parties in an arms length transaction. At balance date, the Council reviewed the carrying value of the individual classes of assets measured at fair value to ensure that each asset materially approximated its fair value. Where the carrying value materially differed from the fair value at balance date the class of asset was revalued. In addition, Council undertakes a formal revaluation of land, buildings, and infrastructure assets on a regular basis ranging from 3 to 5 years. The valuation is performed either by experienced council officers or independent experts. Where the assets are revalued, the revaluation increments are credited directly to the asset revaluation reserve except to the extent that an increment reverses a prior year decrement for that class of asset that had been recognised as an expense in which case the increment is recognised as revenue up to the amount of the expense. Revaluation decrements are recognised as an expense except where prior increments are included in the asset revaluation reserve for that class of asset in which case the decrement is taken to the reserve to the extent of the remaining increments. Within the same class of assets, revaluation increments and decrements within the year are offset.
notes to the financial reportfor the year ended 30 june 2008
75glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.)
(f) Recognition and measurement of assets (cont.)
Land under roads The Council has elected not to recognise land under roads as an asset in accordance with AASB 1045 Land under Roads, which extends the requirement to recognise and measure land under roads as an asset of Council until 30 June 2008.
(g) Cash and cash equivalents For the purposes of the statement of cash flows, cash and cash equivalents include cash on hand, deposits at call, and other highly liquid investments with original maturities of three months or less, net of outstanding bank overdrafts. (h) Other financial assets Managed funds are valued at fair value, being market value, at balance date. Any unrealised gains and losses on holdings at balance date are recognised as either a revenue or expense. (i) Investments Investments, other than investments in associates, are measured at cost. ( j) Accounting for investments in associates Council’s investment in associates is accounted for by the equity method as the Council has the ability to influence rather than control the operations of the entities. The investment is initially recorded at the cost of acquisition and adjusted thereaft er for post-acquisition changes in the Council’s share of the net assets of the entities. The Council’s share of the financial result of the entities is recognised in the income statement. (k) Tender deposits Amounts received as tender deposits and retention amounts controlled by Council are recognised as payables (trust funds) until they are returned or forfeited (refer to note 31). (l) Employee benefits Wages and salaries Liabilities for wages and salaries and rostered days off are recognised and are measured as the amount unpaid at balance date and include appropriate oncosts such as work cover charges.
Annual leave Annual leave entitlements are accrued on a pro rata basis in respect of services provided by employees up to balance date. Annual leave expected to be paid within 12 months is measured at nominal value based on the amount, including appropriate oncosts, expected to be paid when settled. Annual leave expected to be paid later than one year has been measured at the present value of the estimated future cash outflows to be made for these accrued entitlements. Commonwealth bond rates are used for discounting future cash flows.
notes to the financial reportfor the year ended 30 june 2008
76 glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.) (l) Employee benefits (cont.)
Long service leave Long service leave entitlements payable are assessed at balance date having regard to expected employee remuneration rates on settlement, employment related oncosts and other factors including accumulated years of employment, on settlement, and experience of employee departure per year of service. Long service leave expected to be paid within 12 months is measured at nominal value based on the amount expected to be paid when settled. Long service leave expected to be paid later than one year has been measured at the present value of the estimated future cash outflows to be made for these accrued entitlements. Commonwealth bond rates are used for discounting future cash flows. Classification of Employee Benefits An employee benefit liability is classified as a current liability if the Council does not have an unconditional right to defer settlement of the liability for at least 12 months after the end of the period. This would include all annual leave and unconditional long service leave entitlements.
Superannuation A liability is recognised in respect of Council’s present obligation to meet the unfunded obligations of defined benefit superannuation schemes to which its employees are members. The liability is defined as the Council’s share of the scheme’s unfunded position, being the difference between the present value of employees’ accrued benefits and the net market value of the scheme’s assets at balance date. The liability also includes applicable contributions tax of 17.65%. The superannuation expense for the reporting year is the amount of the statutory contribution the Council makes to the superannuation plan which provides benefits to its employees together with any movements (favourable/unfavourable) in the position of any defined benefits schemes. Details of these arrangements are detailed in note 39.
Retirement gratuities Retirement gratuities were provided to certain employees who joined the Council prior to December 1994. The liability represents a set proportion of accumulated sick leave that is payable on retirement. At balance date, the liability is measured at the present value of estimated future cash flows to be made for this entitlement. (m) Leases Operating leases Lease payments for operating leases are recognised as an expense in the years in which they are incurred as this reflects the pattern of benefits derived by the Council. (n) Allocation between current and non-current In the determination of whether an asset or liability is current or non-current, consideration is given to the time when each asset or liability is expected to be settled. The asset or liability is classified as current if it is expected to be settled within the next twelve months, being the Council’s operational cycle, or if the Council does not have an unconditional right to defer settlement of a liability for at least twelve months after the reporting date.
notes to the financial reportfor the year ended 30 june 2008
77glenelg shire annual report 07-08
Note 1 Significant accounting policies (cont.)
(o) Agreements equally proportionately unperformed The Council does not recognise assets and liabilities arising from agreements that are equally proportionately unperformed in the balance sheet. Such agreements are recognised on an ‘as incurred’ basis. (p) Web site costs Costs in relation to websites are charged as an expense in the period in which they are incurred. (q) Impairment of assets
At each reporting date, the Council reviews the carrying value of its assets to determine whether there is any indication that these assets have been impaired. If such an indication exists, the recoverable amount of the asset, being the higher of the asset’s fair value less costs to sell and value in use, is compared to the assets carrying value. Any excess of the assets carrying value over its recoverable amount is expensed to the income statement.
(r) Joint ventures Glenelg Primary Care Partnerships The Council recognises its interest in the Glenelg Primary Care Partnership by recording an investment in its financial statements at a value based on the Council’s underlying interest in the net assets of the Partnership as disclosed in the unaudited annual financial statements of the partnership. Annual adjustments are credited/debited to the balance sheet in line with equity accounting principles.
(s) Rounding Unless otherwise stated, amounts in the financial report have been rounded to the nearest thousand dollars. (t) Non-current assets held for sale
A non-current asset held for sale is measured at the lower of its carrying amount and fair value less costs to sell. (u) Investment property
Investment property, comprising freehold office complexes, is held to generate long-term rental yields. All tenant leases are on arms length basis. Investment property is measured initially at cost, including transaction costs. After initial recognition, investment property is carried at fair value, determined annually by independent valuers. Changes to fair value are recorded in the income statement. (v) Inventories
Inventories held for distribution are measured at cost adjusted when applicable for any loss of service potential. Other inventories are measured at the lower of cost and net realisable value. (w) Financial guarantees
Financial guarantee contracts are recognised as a liability at the time the guarantee is issued. The liability is initially measured at fair value, and if there is material increase in the likelihood that the guarantee may have to be exercised, at the higher of the amount determined in accordance with AASB 137 Provisions, Contingent Liabilities and Contingent Assets and the amount initially recognised less cumulative amortisation, where appropriate. In the determination of fair value, consideration is given to factors including the probability of default by the guaranteed party and the likely loss to Council in the event of default.
notes to the financial reportfor the year ended 30 june 2008
78 glenelg shire annual report 07-08
Note 2 Change in Accounting Policy The following Australian Accounting Standards have been issued or amended and are applicable to the Council but are not yet effective. They have not been adopted in preparation of the financial statements at reporting date.
AASB amendment
AASB 2006-3Amendments to AustralianAccounting Standards
AASB 1004 Contributions
AASB 1051Land Under Roads
AASB 1052Disaggregated Disclosures
AASB 2007-9Amendments to Australian Accounting Standards arisingfrom the Review of AASs 27, 29 and 31
Standards affected
AAS 27 Financial Reportingby Local Governments AASB 1045 Land Under Roads:Amendments to AAS27A, AAS 29A andAAS 31A AAS 27 Financial Reportingby Local Governments AAS 27 Financial Reportingby Local Governments AAS 27 Financial Reportingby Local Governments AAS 27 Financial Reportingby Local Governments Amendments to: AASB 3, AASB 5, AASB 8, AASB 101, AASB 114, AASB 116, AASB 127, AASB 137
Outline of amendment
From the beginning of the reporting period to which this Standard is first applied, until the end of the first reporting period ending on or after 31 December 2007, transitional provisions shall apply. Under those provisions, local governments, while encouraged to apply the full provisions of this Standard, may elect instead not to recognise land under roads as an asset in the balance sheet.
As this Standard broadly reproduces the requirements relating to contributions contained in AAS 27, there will be no direct impact on the financial report.
In respect to land under roads acquired before 30 June 2008: allows a Council to elect to recognise or not to recognisean asset; requires any adjustment upon recognition to be made against accumulated surplus; requires a Council to disclose its accounting policy; allows a Council to elect to adopt the fair value or a previous revaluation; requires any above elections to be made effective as at 1 July 2008. Requires that land under roads acquired after 30 June 2008 is accounted for in accordance with AASB 116. The impact of any changes that may be required cannot be reliably estimated and is not disclosed in the financial report.
As this Standard broadly reproduces the requirements relating to disaggregated disclosures contained in AAS 27, there will be no direct impact on the financial report.
As this Standard broadly reproduces the requirements relating to certain relevant requirements contained in AAS 27, there will be no direct impact on the financial report.
Application date of
Standard
October 2006
1 July 2008
1 July 2008
1 July 2008
1 July 2008
Application date for Council
1 July 2008
1 July 2008
1 July 2008
1 July 2008
1 July 2008
notes to the financial reportfor the year ended 30 june 2008
79glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
2008 2007 $’000 $’000 Note 3 Rate Income Council uses Capital Improved Value as the basis of valuation of all properties within the municipal district. The valuation base used to calculate general rates for 2007/2008 was $4,125 million (2006/2007 $4,104 million). Residential 4,103 3,880 Industrial - Agreement 4,057 3,901 Commercial 1,047 1,001 Farm/Rural 4,690 4,550 Timber Developed 1,746 1,582 Cultural and Recreation 16 15 15,659 14,929 The date of the last general revaluation of land for rating purposes within the municipal district was 1 January 2006, and the valuation first applied to the rating period commencing 1 July 2006. The date of the next general revaluation of land for rating purposes within the municipal district is 1 January 2008, and the valuation will be first applied in the rating year commencing 1 July 2008. Note 4 User Fees and Charges Animal Registration Fees 79 77 Application/Licence/Permit Fees 416 367 Parking Fines 11 16 State Government Levy 10 16 Public Open Space Levy 40 128 Other Fines 36 28 Garbage Fees 1,052 987 Property Lease/Rental Fees 135 131 Service Fees 2,505 2,306 Booking Fees 14 17 Other Fees and Charges 87 69 4,385 4,142 Note 5 Operating Grants and Subsidies Victorian Grants Commission - General Purpose 2,960 2,850 Victorian Grants Commission - Local Roads 2,499 2,401 Operating Subsidy Income 461 387 Operating Grant/Subsidy Income - Other 2,302 2,143 8,222 7,781
80 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 5 Operating Grants and Subsidies (cont.)
Conditions on Grants (a) Grants recognised as revenue during the year that were obtained on condition that they be expended in a specified manner that had not occurred at balance date were: Coastal Spaces Landscape Study 20 - Youth Services - Music Grant 10 - Cultural Strategy 31 - Health Promotion 56 - Library 10 - Arts & Cultural 240 - Road Furniture 37 - Aged Care 41 - Roads to Recovery - Supplementary Program (Capital) - 1,005 Local Infrastructure Works Program - Water Saving Projects (Capital) - 300 Auslink Funding - Westlakes Road and Cape Nelson Road ( Capital - 490 Portland Bay Coast Infrastructure Plan - 65 Great South West Walk Arts Project - 48 445 1,908 (b) Grants which were recognised as revenue in prior years and were expended during the current year in the manner specified by the grantor were: Roads to Recovery - Supplementary Program (Capital) 661 427 Glenelg Strategic Futures Plan - 33 Great South West Walk Arts Project 48 21 Local Infrastructure Works Program - Water Saving Projects (Capital) 300 - Waste Water Management Plan - 12 Auslink Funding - Westlakes Road & Cape Nelson Road (Capital) 490 - Portland Bay Coast Infrastructure Plan 65 - 1,564 493 (c) Grants which were recognised as revenue in prior years and were unexpended in the manned specified by the grantor, in addition to those specified in (a) above, were: Roads to Recovery - Supplementary Program (Capital) 344 - Portland Family and Children’s Services Complex 427 - 771 - Note 6 Other Income Cash Sponsorships 5 - Cash Contributions - Operating 238 21 Reimbursement - Insurance Claims - 1 Reimbursement - Work Cover 93 90 Reimbursement - Debt and Legal Costs 103 82 Reimbursement - VIC Roads 1,363 1,073 Reimbursement - Private Works 445 396 Other Income 429 342 2,676 2,005
2008 2007 $’000 $’000
81glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 7 Capital Grants, Subsidies and Contributions Capital Grants and Subsidies 2,120 4,534 Special Charge Scheme Contributions - - Cash Contributions - Capital 435 5 2,555 4,539 Note 8 Employee Expenses Wages and Salaries 10,690 9,361 Salary Superannuation 907 829 Salary Other Expenses 1,309 1,251 Salary Expenses Capitalised (621) (516) 12,285 10,925 Note 9 Contract Expenses Consultant Expenses 855 897 Operating Lease Expenses 146 170 Software Licence Expenses 280 299 Contract Expenses 7,224 6,283 Contract Labour Expenses 617 199 9,122 7,848 Note 10 Material Expenses Material Expenses - General 1,410 1,496 Material Expenses - Gravel/Limestone 21 25 Utility Expenses 816 663 Stationary Expenses 124 153 Other Material Expenses 905 750 3,276 3,087 Note 11 Finance Fees and Interest Finance Fees and Charges 51 50 Interest Expenses 179 224 230 274 Note 12 Other Expenses Insurance 572 659 Advertising 305 284 Seminars and Training Course Fees 195 140 Travel and Accommodation 99 132 Communication Expenses 281 235 Statutory Expenses 209 195 Councillor Allowances 132 132 Auditor Remuneration 36 29 Bad Debts 12 6 Contributions and Donations 367 317 Landfill Provision Rehabilitation Adjustment - 133 Landfill Provision Finance Expense 221 243 Other 57 46 2,486 2,551
2008 2007 $’000 $’000
82 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 13 Depreciation and Amortisation Buildings 972 986 Infrastructure - Roads 2,646 2,607 Infrastructure - Other 1,382 1,306 Other Structures 115 109 Plant and Equipment 1,220 1,154 Furniture and Fittings 126 112 6,461 6,274 Note 14 Internal Cost Allocations (Capitalised) Vehicle and Machinery Allocations (947) (866) Staff Allocations (191) (276) Other Internal Cost Allocations (378) (264) (1,516) (1,406) Note 15 Net Gain (Loss) on Disposal of Assets Plant and equipment Proceeds from Sale of Assets 195 432 Written Down Value of Assets Sold (127) (246) Gain (Loss) on Sale of Plant and Equipment 68 186 Summary Proceeds from Sale of Assets 195 432 Written Down Value of Assets Sold (127) (246) Net Gain (Loss) on Disposal of Assets 68 186 Note 16 Recognition of Previously Unrecognised Non-Current Assets Land 11 1 Infrastructure - Roads 128 111 Infrastructure - Other 232 243 Heritage Assets - 4 Buildings 2 - Other Structures 7 - 380 359 Note 17 Investment in Associates Investments in associates accounted for by the equity method are: - Glenelg Primary Care Partnership 13 13 13 13 Represents Glenelg Shire Council contributing share of the net assets of the unaudited financial statements of the above associates for the financial year ended 30 June 2008. The services are established under joint agreements between participating councils who contribute on a cost sharing formula basis.
2008 2007 $’000 $’000
83glenelg shire annual report 07-08
Note 18 Cash and Cash Equivalents Cash at Bank and On Hand 4,505 2,933 Term Deposits 7,804 8,604 Balance per Statement of Cash Flows 12,309 11,537 (a) Council has imposed the following restrictions on Cash at Bank: Cash - Restricted (Car Parking) 17 76 Cash - Restricted (Public Open Space Levy) 168 128 Cash - Restricted (Annual Leave) 1,355 1,121 Cash - Restricted (Pits Restoration) 540 510 2,080 1,835 (b) Term deposits carry the following restrictions imposed by regulations or other externally imposed restrictions: Investments - Committee Deposits * 187 174 Investments - Long Service Leave ** 1,800 1,600 Investments - MAP Shares 4 4
1,991 1,778 * Deposits held on behalf of various committees comprising Kurrajong elderly citizens fundraising, youth and Heritage advisory board deposits. ** These monies are required by legislation to fund employee long service leave entitlements. Note 19 Trade and Other Receivables Current Receivables - Rates 267 238 Receivables - Special Schemes 18 28 Receivables - General 1,168 2,634 Less Provision for Doubtful Debts (20) (11) Net GST receivable 429 343 1,862 3,232 Non-current Loans - Unsecured (Sporting and Community Groups) 13 3
13 3
Total 1,875 3,235 Note 20 Investment Properties Investment Property - Land 1,888 1,174 Investment Property - Buildings 280 569
2,168 1,743 Valuation of investment property has been determined in accordance with an independent valuation by Southern Cross Property Services (Shane Irwin, AAPI) who has recent experience in the location and category of the property being valued.
notes to the financial reportfor the year ended 30 june 2008
2008 2007 $’000 $’000
84 glenelg shire annual report 07-08
Note 21 Land Freehold Land at Fair Value 20,452 17,113 Freehold Land at Cost 14 2,650 20,466 19,763 Freehold land was valued at fair market value based on existing use in June 2008, by Southern Cross Property Services (Shane Irwin, AAPI). Note 22 Buildings Buildings at Fair Value 77,740 66,885 Buildings at Cost 119 1,236 Less Accumulated Depreciation (44,299) (36,894) 33,560 31,227 Buildings were valued at depreciated replacement cost at June 2008, by Southern Cross Property Services (Shane Irwin, AAPI). Note 23 Infrastructure - Roads Infrastructure - Roads at Fair Value 196,053 159,267 Infrastructure - Roads at Cost 1,593 6,011 Less Accumulated Depreciation (66,703) (37,625) 130,943 127,653 Infrastructure - Roads were valued at their depreciated replacement cost at June 2008 by Glenelg Shire Council staff including Peter Gall, B.Eng and Stuart Ferrier, B.Eng. Note 24 Infrastructure - Other Infrastructure - Other at Fair Value 112,521 93,091 Infrastructure - Other at Cost 3,104 1,405 Less Accumulated Depreciation (44,714) (35,214) 70,911 59,282 Infrastructure - Other was valued at their depreciated replacement cost at June 2008 by Glenelg Shire Council staff including Peter Gall, B.Eng and Stuart Ferrier, B.Eng. Infrastructure - Other includes bridges, drains, war memorials, historical markers and various other minor structures controlled by the Council. Note 25 Other Structures Other Structures at Cost 5,864 5,856 Less Accumulated Depreciation (2,403) (2,290) 3,461 3,566
notes to the financial reportfor the year ended 30 june 2008
2008 2007 $’000 $’000
85glenelg shire annual report 07-08
Note 26 Plant and Equipment Plant and Equipment at Cost 11,285 10,501 Less Accumulated Depreciation (6,510) (5,408) 4,775 5,093 Note 27 Furniture and Fittings Furniture and Fittings at Cost 1,557 1,538 Less Accumulated Depreciation (1,181) (1,068) 376 470 Note 28 Heritage Heritage Assets at Valuation 2,597 2,597 Heritage Assets at Cost 555 555 3,152 3,152 Heritage assets have been valued at either current cost or market value, depending on the nature of the asset. This asset class is non-depreciating. Heritage assets were valued in June 2005 by Leonard Joel Valuers. Note 29 Works in Progress Works in Progress at Cost (Various Projects under Construction) 2,000 845 2,000 845
notes to the financial reportfor the year ended 30 june 2008
2008 2007 $’000 $’000
86 glenelg shire annual report 07-08
Note 30 Fixed Asset Movements 2008 Land Buildings Infrastructure Infrastructure Other -Roads - Other Structures Balance at beginning of financial year: 19,763 31,226 127,654 59,282 3,566 Acquisition of assets - 608 4,337 1,578 7 Recognition of assets 12 1 128 231 7 Reclassifications and write-off of assets - (24) (24) (54) (4) Revaluation increments/(decrements) (note 34) 692 2,720 1,494 11,255 - Depreciation (note 13) - (972) (2,646) (1,382) (115) WDV of disposals (note 15) - - - - - Impairment losses recognised in Income Statement - - - - -
Balance at end of financial year 20,467 33,559 130,943 70,910 3,461
Plant Furniture Heritage Works Total and and Assets in $’000 Equipment Fittings Progress Balance at beginning of financial year: 5,092 470 3,152 845 251,050 Acquisition of assets 1,030 32 - 14 7,606 Recognition of assets - - - - 379 Reclassifications and write-off of assets - - - 1,141 1,035 Revaluation increments/(decrements) (note 34) - - - - 16,161 Depreciation (note 13) (1,220) (126) - - (6,461) WDV of disposals (note 15) (127) - - - (127) Impairment losses recognised in Income Statement - - - - -
Balance at end of financial year 4,775 376 3,152 2,000 269,642
2007 Land Buildings Infrastructure Infrastructure Other -Roads - Other Structures Balance at beginning of financial year: 19,768 31,612 124,331 59,631 3,431 Acquisition of assets - 641 5,900 727 19 Recognition of assets 1 - 111 243 - Reclassifications and write-off of assets (6) (41) (81) (13) (0) Revaluation increments/(decrements) (note 34) - - - - 225 Depreciation (note 13) - (986) (2,607) (1,306) (109) WDV of disposals (note 15) - - - - - Impairment losses recognised in Income Statement - - - - -
Balance at end of financial year 19,763 31,226 127,654 59,282 3,566
Plant Furniture Heritage Works Total and and Assets in $’000 Equipment Fittings Progress Balance at beginning of financial year: 4,742 447 3,148 1,297 248,407 Acquisition of assets 1,750 135 - 845 10,018 Recognition of assets - - 4 - 359 Reclassifications and write-off of assets - - - (1,297) (1,438) Revaluation Increments - - - - 225 Depreciation (note 13) (1,154) (112) - - (6,274) WDV of disposals (note 15) (246) - - - (246) Impairment losses recognised in Income Statement - - - - -
5,092 470 3,152 845 251,051
(a) Impairment Losses Impairment losses are recognised in the Income Statement under Other Expeneses. Reversals of impairment losses are recognised in the Income Statement under Other Revenue.
notes to the financial reportfor the year ended 30 june 2008
87glenelg shire annual report 07-08
2008 2007
$’000 $’000
Note 31 Trade and Other Payables
Creditors - General 98 69
Creditors - Goods Received Not Invoiced 1,714 1,631
Creditors - Refundable Deposits 311 367
Creditors - Interest Accrual 46 56
Creditors - Other 2 25
Net GST payable 177 224
2,348 2,372
Note 32 Interest-bearing Loans and Borrowings
Current Borrowings - Secured 579 545
Non-Current Borrowings - Secured 1,829 2,408
2,408 2,953
The bank loans are secured over the rates of the Council.
The maturity profile for Council’s borrowings is:
Not later than one year 579 545
Later than one year and not later than five years 1,742 2,096
Later than five years 87 312
2,408 2,953
Aggregate carrying amount of interest-bearing loans and borrowings:
Current 579 545
Non-Current 1,829 2,408
2,408 2,953
Financing Arrangements
Unrestricted access was available at balance date to the following lines of credit:
Bank overdraft 4,000 4,000
Bank loan facilities 2,408 2,953
6,408 6,953
Facilities used at balance date:
Bank loan facilities 2,408 2,953
Facilities available at balance date 4,000 4,000
The bank overdraft facilities may be drawn at any time and may be terminated by the bank without notice.
Interest rates on loan facilities are fixed. Interest rates on overdraft facilities are variable.
notes to the financial reportfor the year ended 30 june 2008
88 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 33 Provisions Long Annual Service Landfill Other Total Leave Leave Restoration $’000
2008
Balance at beginning of the year 1,121 1,328 4,429 570 7,448
Additional provisions 944 282 221 35 1,482
Amounts used (769) (265) - (6) (1,040)
Balance at the end of the year 1,296 1,345 4,650 599 7,890
2007
Balance at beginning of the year 1,090 1,200 4,053 596 6,939
Additional provisions 770 335 376 63 1,544
Amounts used (739) (207) 0 (89) (1,035)
Balance at the end of the year 1,121 1,328 4,429 570 7,448
2008 2007 $’000 $’000
Current
Provision Gravel (Limestone) Pit Restoration 540 510
Employee Benefits 1,798 1,734
2,338 2,244
Non-current
Employee Benefits 902 775
Provision Landfill Rehabilitation and Aftercare 4,650 4,429
5,552 5,204
Total 7,890 7,448
Employee benefits
The aggregate employee benefit liability consists of:
Current
Annual Leave 777 687
Employee Gratuity Scheme 18 24
Long Service Leave 1,003 1,023
1,798 1,734
Non-current
Annual Leave 518 434
Employee Gratuity Scheme 41 36
Long Service Leave 342 305
901 775
Total 2,699 2,509
Aggregate carrying amount of employee benefits:
Current 1,798 1,734
Non-Current 901 775
2,699 2,509
Total Actual Employees 329 329
Total Equivalent Full Time Staff Numbers 199 197
89glenelg shire annual report 07-08
Note 34 Reserves Asset revaluation reserve Land Buildings Infrastructure Infrastructure Roads Other 2008 $’000 $’000 $’000 $’000
Balance at beginning of reporting period 15,273 22,989 66,724 23,855
Increment (decrement) 692 2,720 1,494 11,255
Balance at end of reporting period 15,965 25,709 68,218 35,110
Plant & Furniture Heritage Total Equipment & Fittings Assets 2008 $’000 $’000 $’000 $’000
Balance at beginning of reporting period 456 365 12 129,674
Increment (decrement) - - - 16,161
Balance at end of reporting period 456 365 12 145,835
Asset revaluation reserve Land Buildings Infrastructure Infrastructure Roads Other 2007 $’000 $’000 $’000 $’000
Balance at beginning of reporting period 15,273 22,989 66,724 23,630
Increment (decrement) - - - 225
Balance at end of reporting period 15,273 22,989 66,724 23,855
Plant & Furniture Heritage Total Equipment & Fittings Assets 2007 $’000 $’000 $’000 $’000
Balance at beginning of reporting period 456 365 12 129,449
Increment (decrement) - - - 225
Balance at end of reporting period 456 365 12 129,674
Note 35 Adjustments directly to equity
There were no Adjustments directly to Equity
notes to the financial reportfor the year ended 30 june 2008
90 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 36 Reconciliation of result from ordinary activities with net cash from operations 2008 2007 $’000 $’000
Result from Ordinary Activities 2,739 4,876
Items not involving cash:
Depreciation and amortisation 6,462 6,274
Asset recognition (380) (359)
Assets written off 106 142
(Increment) Decrement in fair values of investment properties (409) -
5,779 6,057
Investing activities:
(Profit)/loss on disposal of fixed assets (67) (186)
Financing activities
Interest and other Finance Charges 230 274
Change in assets and liabilities:
(Increase)/decrease in current trade and other receivables 1,372 (938)
(Increase)/decrease in non current trade and other receivables (10) 2
(Increase)/decrease in other operating assets (341) 882
Increase/(decrease) in trade and other payables (23) 795
Increase/(decrease) in other liabilities - -
Increase/(decrease) in provisions 444 509
Increase/(decrease) in equity - -
1,442 1,250
Net cash inflow/(outflow) from operating activities 10,123 12,271
91glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 39 Superannuation
Council makes employer superannuation contributions in respect of its employees to the Local Authorities Superannuation Fund (the Fund). Obligations for contributions are recognised as an expense in profit or loss when they are due. The Fund has two categories of membership, each of which is funded differently. The Fund’s accumulation category, Vision Super Saver, receives both employer and employee contributions on a progressive basis. Employer contributions are normally based on a fixed percentage of employee earnings (9% required under Superannuation Guarantee Legislation). No further liability accrues to the employer as the superannuation benefits accruing to employees are represented by their share of the net assets of the Fund. From 1 July 2008, employers are required to pay superannuation contributions based on Ordinary Time Earnings (OTE) which may put upward pressure on contribution levels. The Fund’s Defined Benefit Plan is a multi-employer sponsored plan. As the Fund’s assets and liabilities are pooled and are not allocated by employer, the Actuary is unable to reliably allocate benefit liabilities, assets and costs between employers. As provided under Paragraph 32 (b) of AASB 119, Council does not use defined benefit accounting for these contributions. Council makes employer contributions to the defined benefit category of the Fund at rates determined by the Trustee on the advice of the Fund’s Actuary. On the basis of the results of the most recent full actuarial investigation conducted by the Fund’s Actuary as at 31st December, 2005 the Trustee has determined that the current funding arrangements are adequate for the expected Defined Benefit Plan liabilities. Council makes the following contributions. - 9.25% of members’ salaries (same as previous year); - the difference between resignation and retrenchment benefits paid to any retrenched employees, plus contribution tax (same as previous year);
Note 37 Commitments for Expenditure Capital Commitments Total capital expenditure contracted for at the reporting date, but not recognised in the financial statements as liabilities: Not later than one year 187 241 Operating Leases At the reporting date, the Council had the following obligations under non-cancellable operating leases for the lease of equipment and land and buildings for use within Council’s activities (these obligations are not recognised as liabilities): Not later than one year 157 135 Later than one year and not later than five years 111 91 Later than five years 117 79
385 305 Note 38 Contingent Liabilities and Contingent Assets The Council has provided guarantees in respect of loans and overdrafts. The details and extent of the Council’s exposure at the reporting date is as follows: Heywood Football Netball Club Bank Loan 21 18
21 18 Council currently has no contingent assets.
92 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 39 Superannuation (cont.)
The Fund’s liability for accrued benefits was determined in the 30 June 2007 actuarial review pursuant to the requirements of Australian Accounting Standard AAS25 as follows: 30-Jun-07 $’000
Net Market Value of Assets 4,102,154
Accrued Benefits (per accounting standards) 3,923,436
Difference between Assets and Accrued Benefits 178,718
Vested Benefits 3,572,589 The Accrued Benefits liability has been determined by the Actuary at 30 June 2007 outside of the full actuarial review which is normally undertaken every three years and most recently performed as at 31 December 2007. This liability is calculated to satisfy the requirements of AAS 25 and is not reflected in the audited financial statements of the Fund at 30 June 2007. The financial assumptions used to calculate the Accrued Benefits for the defined benefit category of the Fund were:
Net Investment Return 8.0% p.a.
Salary Inflation 5.5% p.a.
Price Inflation 3.0% p.a. Details of contributions to superannuation funds during the year and amounts payable at 30 June 2008 are as follows: 2008 2007 $’000 $’000 Employer contributions to Local Authorities Superannuation Fund (Vision Super) - Accumulation Funds 621 589
Employer contributions to Local Authorities Superannuation Fund (Vision Super) - Defined Benefit Plans 278 229 Due to a provision in Council’s prior Enterprise Bargaining agreement, new employees had the option of selecting a superannuation fund rather than Local Authorities Superannuation Fund (the Fund). Council has made employer superannuation contributions to the following funds.
2008 2007 $’000 $’000
Employer contributions to AMP - Flexible Lifetime Super 4 4
Employer contributions to Rest Superannuation 4 4
Employer contributions to First Quest Retirement Service - 3
93glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note Accounting Policy
18 Cash on hand and at bank are valued at face value. Interest is recognised as it accrues.
Investments and Bills are valued at face value.
Investments are held to maximise interest returns of surplus cash.
Interest revenues are recognised as they accrue.
19 Footpath, kerb and channel debtors are
carried at nominal amounts due plus interest. Footpath, kerb and channel debts are a charge attached to the rateable property and are recoverable on sale, therefore, no provision for doubtful debts is made. Interest rates are reviewed annually.
19 Receivables are carried at nominal amounts due less any provision for doubtful debts. A provision for doubtful debts is recognised when collection in full is no longer probable. Collectibility of overdue accounts is assessed on an ongoing basis.
19 These loans are carried at the principal
amounts outstanding. Interest is recognised as it accrues.
0 Liabilities are recognised for amounts to be paid in the future for goods and services provided to Council as at balance date whether or not invoices have been received.
32 Loans are carried at their principal amounts, which represent the present value of future cash flows associated with servicing the debt. Interest is accrued over the period it becomes due and recognised as part of payables.
32 Overdrafts are recognised at the principal amount. Interest is charged as an expense
as it accrues.
Terms and Conditions
On call deposits returned a floating interest rate of 5.4% to 7.15% (4.9% to 5.4% in 2006/2007). The interest rate at balance date was 7.15% (5.4% in 2006/2007).
Funds returned fixed interest rate of between 6.58% (6.16% in 2006/2007), and 8.39% (6.71% in 2006/2007) net of fees.
Footpath, kerb and channel debts are payable by one lump sum or by four instalments per year for up to five years. Interest rate charged for instalment debtors is 12% (12% in 2006/2007).
General debtors are unsecured and interest free. Credit terms are generally based on 30 days.
Loans to community organisations are unsecured. Loans are payable by instalment (ie. monthly or 3 monthly). Interest returns between 6.00% and 10.65%.
General Creditors are unsecured, not subject to interest charges and are normally settled within 30 days of invoice receipt.
Borrowings are secured by way of mortgages over the general rates of the Council. Interest rates for loans are in the range of 5.875% to 7.40%. (Range was 5.875% to 7.40% in 2006/2007).
The overdraft is subject to annual review. It is secured by a mortgage over Council’s general rates and is repayable on demand. Interest rates on utilised overdraft was 9.15% to 10.65% during 2007/2008 (9.15% in 2006/2007). The interest rate as at balance 10.65% (9.15% in 2006/2007).
Recognised Financial Instruments
Financial Assets
Cash and Cash Equivalents
Trade and Other Receivables
Footpath, Kerb and Channel Debtors
General Debtors and Infringement Debtors
Loans to Community Organisations
Financial Liabilities
Trade and Other Payables
Interest Bearing Loans and Borrowings
Bank overdraft
Note 40 Financial Instruments
(a) Accounting Policy, Terms and Conditions
94 glenelg shire annual report 07-08
Note 40 Financial Instruments (cont.) (b) Interest Rate Risk The exposure to interest rate risk and the effective interest rates of financial assets and financial liabilities, both recognised and unrecognised, at balance date are as follows:
2008 Floating 1 year Over 1 More than Non-interest Total Interest or less to 5 years 5 years bearing rate
$’000 $’000 $’000 $’000 $’000 $’000
Financial assets Cash and cash equivalents - Note 18 12,309 - - - - 12,309 Trade and other receivables - Note 19 - 18 - - 1,578 1,596
Total financial assets 12,309 18 - - 1,578 13,905 Weighted average interest rate 7.94% 7.55% Financial liabilities Trade and other payables - Note 31 - - - - 2,348 2,348 Interest-bearing loans and borrowings - Note 32 - 579 1,742 87 - 2,408
Total financial liabilities - 579 1,742 87 2,348 4,756 Weighted average interest rate 10.65% 6.30% 6.46% 6.26% Net financial assets (liabilities) 12,309 (561) (1,742) (87) (770) 9,149
2007 Floating 1 year Over 1 More than Non-interest Total Interest or less to 5 years 5 years bearing rate
$’000 $’000 $’000 $’000 $’000 $’000
Financial assets Cash and cash equivalents 11,537 - - - - 11,537 Other financial assets - - - - - - Trade and other receivables - 28 - - 3,204 3,232
Total financial assets 11,537 28 - - 3,204 14,769 Weighted average interest rate 6.38% 11.31% Financial liabilities Trade and other payables - - - - 2,372 2,372 Interest-bearing loans and borrowings - 545 2,096 312 - 2,953
Total financial liabilities - 545 2,096 312 2,372 5,326 Weighted average interest rate 9.15% 6.30% 6.42% 6.38% Net financial assets (liabilities) 11,537 (517) (2,096) (312) 832 9,444
notes to the financial reportfor the year ended 30 june 2008
Fixed interest maturing in:
Fixed interest maturing in:
95glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 40 Financial Instruments (cont.) (c) Net Fair Values The net fair values of the above assets and liabilities are not material different to that disclosed. (d) Credit Risk The maximum exposure to credit risk at balance date in relation to each class of recognised financial asset is represented by the carrying amount of those assets as indicated in the Balance Sheet. (e) Risks and mitigation The risks associated with our main financial instruments and our policies for minimising these risks are detailed below. Market risk Market risk is the risk that the fair value or future cash flows of our financial instruments will fluctuate because of changes in market prices. The Council’s exposures to market risk are primarily through interest rate risk with only insignificant exposure to other price risks and no exposure to foreign currency risk. Components of market risk to which we are exposed are discussed below. Interest rate risk Interest rate risk refers to the risk that the value of a financial instrument or cash flows associated with the instrument will fluctuate due to changes in market interest rates. Interest rate risk arises from interest bearing financial assets and liabilities that Council uses. Non derivative interest bearing assets are predominantly short term liquid assets. Council’sinterest rate liability risk arises primarily from long term loans and borrowings at fixed rates which exposes it to fair value interest rate risk. Council’s loan borrowings are sourced from major Australian banks by a competitive process. Council’s Overdraft facility is arranged with a major Australian bank. Council manages interest rate risk on its net debt portfolio by: - ensuring access to diverse sources of funding; - reducing risks of refinancing by managing in accordance with target maturity profiles; and - setting prudential limits on interest repayments as a percentage of rate revenue.
Council manages the interest rate exposure on its net debt portfolio by appropriate budgeting strategies and obtaining approval for borrowings from the Australian Loan Council each year.
Investment of surplus funds is made with approved financial institutions under the Local Government Act 1989. Council manages interest rate risk by adopting an investment policy that ensures: - conformity with State and Federal regulations and standards, - adequate safety, - appropriate liquidity, - diversification by credit rating, financial institution and investment product, - monitoring of return on investment, - benchmarking of returns and comparison with budget.
Maturity is staggered to provide for interest rate variations and to minimise interest rate risk.
96 glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 40 Financial instruments (cont.) Credit risk Credit risk is the risk that a contracting entity will not complete its obligations under a financial instrument and cause Council to make a financial loss. Council has exposure to credit risk on all financial assets included in its balance sheet. To help manage this risk: - Council has a policy for establishing credit limits for the entities we deal with; - Council may require collateral where appropriate; and - Council only invests surplus funds with financial institutions which have a recognised credit rating specified in its investment policy. Trade and other receivables consist of a large number of customers, spread across the consumer, business and government sectors. Credit risk associated with the Council’s financial assets is minimal because the main debtor is the Victorian Government. Apart from the Victorian Government, Council does not have any significant credit risk exposure to a single customer or groups of customers. Ongoing credit evaluation is performed on the financial condition of Council’s customers and, where appropriate, an allowance for doubtful debts is raised. Council may also be subject to credit risk for transactions which are not included in the balance sheet, such as when it provides a guarantee for another party. Details of Council’s contingent liabilities are disclosed in note 38. Liquidity risk Liquidity risk includes the risk that, as a result of our operational liquidity requirements: - Council will not have sufficient funds to settle a transaction on the date; - Council will be forced to sell financial assets at a value which is less than what they are worth; or - Council may be unable to settle or recover a financial assets at all. To help reduce these risks Council: - has a liquidity policy which targets a minimum and average level of cash and cash equivalents to be maintained; - has readily accessible standby facilities and other funding arrangements in place; - has a liquidity portfolio structure that requires surplus funds to be invested within various bands of liquid instruments; - monitors budget to actual performance on a regular basis; and - set limits on borrowings relating to the percentage of loans to rate revenue and percentage of loan principal repayments to rate revenue. The Council’ss exposure to liquidity risk is deemed insignificant based on prior periods’ data and current assessment of risk. (f) Sensitivity disclosure analysis Taking into account past performance, future expectations, economic forecasts, and management’s knowledge and experience of the financial markets, the Council believes the following movements are ‘reasonably possible’ over the next 12 months (Base rates are sourced from Federal Bank of Australia): - A parallel shift of +2% and -1% in market interest rates (AUD) from year-end rates of 8%.
97glenelg shire annual report 07-08
notes to the financial reportfor the year ended 30 june 2008
Note 41 Related Party Transactions (i) Names of persons holding the position of a Responsible Person at the Glenelg Shire Council during the reporting year are:
Councillors Councillor Geoff White (Mayor 6/12/07 to current)
Councillor Gilbert Wilson(Mayor 29/11/06 to 5/12/07)
Councillor Karen Stephens
Councillor Bill McIntyre
Councillor Frank Zeigler
Councillor Joy Benbow
Councillor Neil Kerr
Councillor Robert Halliday
Councillor Tom Munro Chief Executive Officer Stuart Burdack
Note 40 Financial instruments (cont.)
(f) Sensitivity disclosure analysis
The table below discloses the impact on net operating result and equity for each category of financial instruments held by the Council at year-end, if the above movements were to occur. Interest rate risk
Market risk exposure Carrying amount subject to interest -1% 2% 100 basis points 200 basis points
Profit Equity Profit Equity
2008 $’000 $’000 $’000 $’000 $’000
Financial assets:
Cash and cash equivalents - Note 18 12,309 (123) (123) 246 246
Trade and other receivables - Note 19 1,596 (16) (16) 32 32
Financial liabilities:
Trade and other payables - Note 31 2,348 (23) (23) 47 47
Interest-bearing loans and borrowings
- Note 32 2,408 (24) (24) 48 48
98 glenelg shire annual report 07-08
(ii) Remuneration of Responsible Persons The numbers of Responsible Officers, whose total remuneration from Council and any related entities fall within the following bands: 2008 2007 No. No. $10,000 - $19,999 5 5 $20,000 - $29,999 4 4 $40,000 - $49,999 - 1 $200,000 - $210,000 1 1
10 11 $’000 $’000 Total Remuneration for the reporting year for Responsible Persons included above amounted to 343 326 (iii) No retirement benefits have been made by the Council to a Responsible Person. - - (iv) No loans have been made, guaranteed or secured by the Council to a Responsible Person during the reporting period. - - (v) Other Transactions No transactions other than remuneration payments or the reimbursement of approved expenses were entered into by Council with Responsible Persons, or Related Parties of such Responsible Persons during the reporting year. - - (vi) Senior Officers Remuneration A Senior Officer other than a Responsible Person, is an officer of Council who has management responsibilities and reports directly to the Chief Executive Officer or whose total annual remuneration exceeds $100,000. The number of senior officers other than the Responsible Persons, are shown below in their relevant income bands: 2008 2007 Income Range: No. No.
$60,000 -$70,000 1 -
$80,000 - $89,999 - -
$90,000 - $99,999 1 -
$100,000 - $109,999 1 1
$110,000 - $119,999 1 4
$120,000 - $129,999 1 -
5 5 $’000 $’000 Total Remuneration for the reporting year for Senior Officers included above, amounted to 499 557
Note 41 Related Party Transactions (cont.)
notes to the financial reportfor the year ended 30 june 2008
99glenelg shire annual report 07-08
Note 42 Revenues, Expenses and Assets by Function/Activity The Local Government Regulations require the following program based disclosures: Assets Attributed
Actual 2008 Revenues Expenses Surplus to Function $’000 $’000 $’000 $’000
Functions/Activities
Chief Executive Department 88 833 (745) 476
Community Development Department 4,079 6,391 (2,312) 6,372
Corporate Services Department 20,452 10,411 10,041 29,575
Assets and Infrastructure Department 6,477 12,291 (5,814) 243,607
Planning and Economic Development Department 679 2,417 (1,738) 7,016
Capital Revenue and Asset Disposals 3,201 106 3,307 -
Total 34,976 32,449 2,739 287,046 Assets Attributed
Actual 2007 Revenues Expenses Surplus to Function $’000 $’000 $’000 $’000
Functions/Activities
Chief Executive Department 381 2,132 (1,751) 499
Citizen Services Department 3,583 5,177 (1,594) 5,040
Corporate Services Department 18,676 9,033 9,643 27,246
Development Services Department 1,066 3,130 (2,064) 7,021
Engineering Services Department 5,781 10,082 (4,301) 228,467
Capital Revenue and Asset Disposals 5,331 388 4,943 -
Total 34,818 29,942 4,876 268,273 * Assets have been attributed to functions/activities based on the control and/or custodianship of specific assets. The activities of the Council are categorised into the following broad functions: During 2008, Council’s Departments were restructured for functional purposes Chief Executive Department Chief Executive includes Chief Executive Office, Human Resources, and Media Liaison.
Community Development Department Community Development includes such services as Home Support Services, Aged & Disability Services, Pre School Centres, Family Day Care, Child Care Centres, Environmental Health, Maternal & Child Health, Libraries, Recreation and Youth Programs, Arts and Culture and Heritage.
Corporate Services Department Corporate Services is responsible for the operation of Council’s internal services, incorporating Finance, Purchasing, Information Technology, Administration and Governance, Audit, Customer Services, Records Management, Rates & Valuations, Commercial Activities. Planning and Economic Development Department Planning and Economic Development includes Economic Development, Industry Attraction, Planning Services, Tourism & Promotions, Caravan Parks, and Tourist Information Centres.
Assets and Infrastructure Department Assets and Infrastructure is responsible for the operation of Council’s Assets and Works programs, incorporating Local Road Maintenance, Main Road Maintenance, Depot Operations, Airport Management, Design, Building Maintenance, External Works, Drainage, Fire Protection, Beaches & Foreshores, Parks & Reserves, Public Halls, Swimming pools, Cleaning, Street Cleaning, Sanitation, and Street Lighting.
notes to the financial reportfor the year ended 30 june 2008
100 glenelg shire annual report 07-08
Note 43 Financial Ratios (a) Debt servicing ratio (to identify the capacity of Council to service its outstanding debt)
Debt servicing costs Total revenue Debt servicing costs refer to the payment of interest on loan borrowings, finance lease, and bank overdraft. The ratio expresses the amount of interest paid as a percentage of Council’s total revenue.
(b) Debt commitment ratio (to identify Council’s debt redemption strategy) Debt servicing & redemption costs Rate revenue The strategy involves the payment of loan principal and interest, finance lease principal and interest. The ratio expresses the percentage of rate revenue utilised to pay interest and redeem debt principal.
(c) Revenue ratio (to identify Council’s dependence on non-rate income) Rate revenue Total revenue The level of Council’s reliance on rate revenue is determined by assessing rate revenue as a proportion of the total revenue of Council.
230 = 0.7%
274 = 0.8%
331 = 1.0%
34,711 34,384 32,213
775 = 5.0%
1,162 = 7.8%
1,405 = 10.6%
15,659 14,929 13,292
15,659 = 45.1%
14,929 = 43.4%
13,292 = 41.3%
34,711 34,384 32,213
2008$’000
2008(%)
2006(%)
2006$’000
2007(%)
2007$’000
notes to the financial reportfor the year ended 30 june 2008
101glenelg shire annual report 07-08
9,221 = 12.0%
5,249 = 6.7%
5,287 = 7.0%
76,789 78,172 75,632
15,208 = 288.9%
15,463 = 299.6%
12,686 = 299.0%
5,265 5,161 4,243
15,208 = 333.4%
15,463 = 348.4%
12,686 = 323.5%
4,562 4,438 3,921
(d) Debt Exposure Ratio (to identify Council’s exposure to debt) Total indebtedness Total realisable assets For the purposes of the calculation of financial ratios, realisable assets are those assets which can be sold and which are not subject to any restriction on realisation or use. Any liability represented by a restricted asset (notes 18 & 33) is excluded from total indebtedness. The following assets are excluded from total assets when calculating Council’s realisable assets: Land and buildings on Crown land; restricted assets; heritage assets; total infrastructure assets; and Council’s investment in associate. This ratio enables assessment of Council’s solvency and exposure to debt. Total indebtedness refers to the total liabilities of Council. Total liabilities are compared to total realisable assets which are all Council assets not subject to any restriction and are able to be realised. The ratio expresses the multiple of total liabilities for each dollar of realisable assets.
(e) Working Capital Ratio (to assess Council’s ability to meet current commitments) Current assets Current liabilities The ratio expresses the level of current assets the Council has available to meet its current liabilities.
(f) Adjusted Working Capital Ratio (to assess Council’s ability to meet current commitments) Current assets Current liabilities The ratio expresses the level of current assets the Council has available to meet its current liabilities.
Current liabilities have been reduced to reflect the long service leave that is shown as a current liability because Council does not have an unconditional right to defer settlement of the liability for at least twelve months after the reporting date, but is not likely to fall due within 12 months after the end of the period.
Note 43 Financial Ratios (cont.)
2008$’000
2008(%)
2006(%)
2006$’000
2007(%)
2007$’000
notes to the financial reportfor the year ended 30 june 2008
102 glenelg shire annual report 07-08
In my opinion, the accompanying financial statements have been prepared in accordance with the Local Government Act 1989, the Local Government (Finance and Reporting) Regulations 2004, Australian Accounting Standards, and other mandatory professional reporting requirements.
Linda MacRaePRINCIPAL ACCOUNTING OFFICER
Date: September 11, 2008
In our opinion, the accompanying financial statements present fairly the financial transactions of Glenelg Shire Council for the financial year ended 30 June 2008 and the financial position of the Council as at that date.
As at the date of signing, we are not aware of any circumstances which would render any particulars in the financial statement to be misleading or inaccurate.
We have been authorised by the Council on 9 September 2008 to certify the financial statements in their final form.
Geoff White
COUNCILLOR
Date: September 11, 2008
Gilbert WilsonCOUNCILLOR
Date: September 11, 2008
Stuart BurdackCHIEF EXECUTIVE OFFICER
Date: September 11, 2008
certification of the financial report
103glenelg shire annual report 07-08
auditor - general’s reporton the financial report
104 glenelg shire annual report 07-08
auditor - general’s reporton the financial report
105glenelg shire annual report 07-08
performance statements
INTRODUCTION
Glenelg Shire Council has prepared
and adopted a Council Plan for the
four financial years immediately
following the municipal elections held in
November 2004. During 2007, Council
has reviewed the Plan and adopted
amendments to this Plan to form a new
Council Plan for implementation from
1 July 2007 to 30 June 2009.
This Council Annual Plan for Glenelg
Shire Council presents the key activities
that the Glenelg Shire will pursue during
the 2007/08 financial year to deliver the
commitments in the Council Plan 2005
– 2009. We believe that these activities
represent significant steps towards the
achievement of the commitments and
intentions outlined in the Council Plan.
The Council Annual Plan has activities
and actions together with performance
indicators linked to objectives and goals
of the Council Plan.
We will report on our progress of these
activities through regular updates to
Council through Council meetings
and we will report on our performance
measures and targets through a detailed
Performance Statement in the Annual
Report for 2007/08.
OBJECTIVES
a Shire that achieves
sustainable growth 106
a Shire that embraces good
governance, makes sound decisions,
looks after its many assets and
property, manages its financial
and human resources, and speaks
up for the community 109
a Shire that provides value for
money services that meet residents’
needs and create a vibrant, caring,
healthy community 116
a Shire that grasps economic and
social opportunities that enable its
citizens to lead fuller lives 123
106 glenelg shire annual report 07-08
OBJECTIVE a shire that achieves sustainable growth
GOAL: We will restore public confidence in the Shire’s planning processes by:
Activity/Action
Reducing the number of
undetermined planning permit
applications by 30% by
30 June 2008.
Completing a review of heritage
sites across the Shire (excluding
Portland which is already completed),
consulting with our community about
sites recommended for protection
and preparing an amendment to the
Glenelg Planning Scheme to provide
heritage protection for appropriate
sites by 30 June 2008.
Continuing to reform planning
processes so that all participants in
the permit application process are
better informed and are provided with
more effective means of expressing
their views.
Seeking State Government and
regional local government support for
Council to establish a free advisory
service pilot project aimed at helping
planning process participants access
sound planning advice.
Reviewing planning workflow
processes with a view to making
efficiency gains.
Performance Indicator
By 30 June 2008, undetermined
planning permit applications will
be less than 90.
Glenelg Strategic Futures Plan
completed and preparation
commenced for Planning Amendment
by 30 June 2008.
Development of a communications
strategy and implementation of
this strategy to inform applicants
and citizens generally on progress
regarding the Glenelg Strategic
Futures Plan and DPO7 structure plan
by 31 December 2007.
Prepare and submit a project
brief and funding application to
the Department of Sustainability
& Environment and the Municipal
Association of Victoria by
31 December 2007.
Review workflow systems and
responsibilities and document
findings and recommendations by
31 December 2007.
Outcome
Achieved. As at 30 June 2008,
25 applications are undetermined
and waiting officer reports.
Completion of Glenelg Strategic
Futures Plan postponed to November
2008 due to lack of requisite flooding
data.
Preparation of Stage 2 of the Glenelg
Heritage Study completed. Funding
allocated to implement the study in
the 2008/09 budget.
Communications Strategy completed.
This included regular reports to
Councillors workshops and a Land
Management Plan forum held on
18 June 2008.
Achieved. In principle funding
approval for the pilot project was
provided in May 2008. This was
subsequently replaced by the June
State Government announcement to
employ 15 planners across the State
to assist local government.
Completed. Processes were reviewed
at a Departmental workshop on
6 February 2008. This resulted in
an improved workflow for planning
applications.
107glenelg shire annual report 07-08
OBJECTIVE a shire that achieves sustainable growth
GOAL: We will complete the strategic planning study known as “Glenelg Strategic Futures Plan” according to the following schedule:
OBJECTIVEOBJECTIVEOBJECTIVEOBJECTIVE
Activity/Action
Stage One – 31 August 2007
Completion of aerial photography,
digital terrain modelling, flooding
and drainage mapping and
incorporation into the Council’s
geographic information system.
Stage Two – 28 February 2008
Completion of all components of
the Glenelg Strategic Futures Plan,
which incorporates:
• Policy development within the
local planning policy framework
for Settlement and Housing,
Environment, Economic
Development, Infrastructure, and
Particular Uses and Development,
• Preparation of Scheme
Amendments to effect changes
required.
Performance Indicator
Incorporation of aerial photography
and Lidar mapping data into GIS by
31 August 2007.
Draft GSFP presented to Council,
including policy development
for Settlement and Housing,
Environment, Economic
Development, Infrastructure, and
Particular Uses and Development.
Draft Scheme Amendments to
effect the changes prepared by
30 June 2008.
Outcome
Completed. Aerial imagery and
Lidar (contour) mapping data was
progressively installed on the GIS
system.
Completion of Glenelg Strategic
Futures Plan postponed to
November 2008 due to lack of
requisite flooding data.
• Developed land management
plan tools in March 2008.
• Applied to Minister for Planning
for interim planning scheme
amendments in April 2008.
See comment above.
sustainable growth
108 glenelg shire annual report 07-08
OBJECTIVE a shire that achieves sustainable growth
GOAL: We will seek the Minister for Planning’s support to remove the requirement for the preparation of Development Plans in the Glenelg Planning Scheme:
OBJECTIVEOBJECTIVEOBJECTIVE
GOAL: We will join the Victorian Local Sustainability Accord and we will prepare an Environmental Strategic Framework which will guide our future actions to create a sustainable Shire.
Activity/Action
For those areas currently subject
of Development Plan Overlays
1, 2, 4 and 6 by preparing Structure
Plans and Local Structure Plans
as part of the Glenelg Strategic
Futures Plan and incorporating
them into the Planning Scheme
by amendment.
For the coastal area around
Dutton Way and Narrawong,
known as DPO7 by seeking funding
and government assistance for the
preparation of a Development Plan
for the area.
Performance Indicator
Draft Structure Plans and
Local Structure Plans completed
by 30 June 2008.
Completion of Brief and funding
confirmed by 31 December 2007.
Outcome
Completion of Glenelg Strategic
Futures Plan postponed to November
2008 due to lack of requisite flooding
data.
• Developed land management plan
tools in March 2008.
• Applied to Minister for Planning
for interim planning scheme
amendments in April 2008.
Planning scheme amendment
prepared and submitted in
April 2008 to address part of the
DPO7 area. Funding has been
obtained for a Coastal Engineering
and Planning Study.
Activity/Action
Develop a Sustainability Accord
Priority Statement.
Council to join the Sustainability
Accord Partnership.
Council to develop the Environmental
Strategic Framework for the Shire.
Performance Indicator
Statement adopted by Council
July 2007.
Council signed as an Accord partner
June 2007.
Council to adopt the Environmental
Strategic Framework in November
2007.
Outcome
Local Environmental Sustainability
Priority Statement adopted by
Council 24 July 2007.
Victorian Local Sustainability Accord
signed by Council at the Council
meeting 22 May 2007.
The Draft Environmental Sustainability
Framework has been prepared
for consideration by Council at its
meeting on 23 September 2008.
109glenelg shire annual report 07-08
OBJECTIVE a Shire that embraces good governance, makes sound decisions, looks after its many assets, property, manages its financial and human resources, and speaks up for the community.
GOAL: We will ensure that the impacts of prolonged drought are taken into account when the Shire establishes rating levels for 2007/2008 and 2008/2009.
Activity/Action
Deliver a responsible but considered
budget that keeps 2007/08 rate
increases below local government
industry standards.
Performance Indicator
Keep rates for 2007/08 below the
Municipal Association of Victoria cost
of living rise estimated at 5 – 6%.
Outcome
A net rate revenue increase of 4%
was adopted for 2007/08.
speaks up for the community
110 glenelg shire annual report 07-08
GOAL: We will maintain the highest standards of financial stewardship by:
Activity/Action
Present detailed monthly financial
reports to the Council.
Undertaking a range of internal
audits, in accordance with an
internal audit plan under the
supervision of an Internal Audit
Committee.
Maintaining the Shire’s sound
overall financial viability based
on moderate rating levels, low
levels of debt, surplus budgeting,
appropriate levels of retained cash,
very high levels of debt collection
and growing levels of asset
reinvestment and renewal.
Review the Rate Strategy following
the receipt of the 2008 municipal
revaluation.
The 2008 revaluation of all
rateable properties is completed
in accordance with the Valuer
General’s valuation best practice
guidelines.
Performance Indicator
Monthly Income Reports presented
to Council.
Internal audits listed in the Audit
Plan for 2007/08 completed.
Adoption of a budgeted surplus
for 2007/08.
Level of retained cash at
1 July 2007 ‘v’ level of retained
cash at 30 June 2008.
Amount of rates outstanding
as at 30 June 2008 to be < 2%
of total rates.
Submit the review to Council
for adoption with the 2008/09
Council budget.
Valuation contract dates achieved.
Receipt of Valuer General’s
verification certificates for each
stage of the revaluation.
Outcome
Completed – refer to Council Meeting
Minutes.
Confirmed by Audit Committee.
Internal audits are listed in the Glenelg
Shire Audit Plan 2005-2009 adopted
by Council. A progress report was
submitted to and adopted by the
Audit Committee at the meeting held
on 29 April 2008 (Item 9).
Completed. Budget adopted at the
Council Meeting held on 24 July
2007. Budget contained a budgeted
surplus of $3,377,125 for 2007/2008
(refer to Budgeted Standard
Operating Statement on page 50).
On target. Level of retained cash as
at the 30 June 2008 is forecast to
exceed the level as at 30 June 2007.
Actual level cannot be determined
until the completion of the 2007/08
annual financial statements and
external audit after 30 June 2008.
On target. Amount of outstanding
rates is forecast to better the
performance indicator. Actual result
cannot be determined until 30 June
2008.
Completed. Review completed and
presented to the Councillors Budget
Workshop held on 6 May 2008. No
change to existing rating differentials
for 2008/09.
Completed.
Completed. New valuations have
been received for all rateable
properties in the Glenelg Shire.
Stage 5 certification from the Valuer
General has been received.
111glenelg shire annual report 07-08
GOAL: We will reduce long term indebtedness by $545,000 in 2007/2008 and $579,000 in 2008/2009.
Activity/Action
Reduce Council loan principal
and interest payments.
Performance Indicator
Debt level as at 30 June 2008
(principal closing balance) is
$2,408,020.
Outcome
Achieved.
GOAL: Any new debt will be accompanied by a Business Plan or Economic Impact statement which justifies new borrowings.
Activity/Action
Preparation of business plan or
economic impact statements for
every new loan proposal.
Performance Indicator
Adoption of each loan proposal.
Outcome
Council has adopted a Business Plan
for the proposed Portland Family
and Childrens’ Centre (The Hub).
Budgeted loan of $300,000 not taken
up as project has not received all
necessary federal and state funding.
GOAL: We will determine the future of the Casterton Saleyards by developing a detailed understanding of the works required to enable the saleyards to operate safely and by evaluating the overall economic and social benefits which the operation of the saleyards bring to the Casterton area.
Activity/Action
Develop a Casterton Saleyards
Business Plan.
Performance Indicator
Draft business plan presented
to Council and then released
for public comment by
27 November 2007.
Public comments received and
considered at January 2008
Council meeting.
Final business plan reviewed giving
consideration to public comments
and presented to the January 2008
Council workshop.
Business plan formally considered
by Council at the February 2008
Council meeting.
Outcome
Council adopted Draft Business
Plan at Council meeting on
27 November 2007.
Community meeting 23 January in
Casterton. Submissions received
and referred to the 25 March 2008
Council meeting.
Business Plan adopted at the
Council meeting held on
25 March 2008.
Service Improvement Plan adopted
at 25 March 2008 Council Meeting
in Casterton.
112 glenelg shire annual report 07-08
GOAL: We will develop asset management strategies for the Shire’s drainage systems and parks and recreation areas so that we can invest in and renew these assets in the most cost effective way.
Activity/Action
Develop and implement a Drainage Asset Management Plan (DAMP).
Develop and implement a Parks and Recreation Reserve Asset Management Plan (PRRAMP).
Performance Indicator
Condition assessments and network mapping completed by June 2008.
Asset assessments and valuation review completed by December 2008.
Draft Drainage Asset Management Plan to Council and public for comment by March 2009.
Condition assessments and network mapping completed by June 2008.
Asset assessments and valuation review completed by December 2008.
Draft Parks and Recreation Reserve Asset Management Plan to Council and public for comment by March 2009.
Outcome
Works commenced on project in March 2008. Network mapping of 86 km of drains has been completed.
Review of asset condition and valuation is programmed for August to October 2008.
Preparation of Draft Drainage Asset Management Plan has commenced.
Parks asset mapping completed March 2008.
Asset assessments and valuation review programmed for October 2008.
Preparation of a Draft Parks and Recreation Reserve Asset Management Plan is programmed for commencement in November 2008.
speaks up for the community
113glenelg shire annual report 07-08
GOAL: We will implement the asset management strategies for buildings and transport.
Activity/Action
Implement the Building Asset Management Plan (BAMP).
Develop and implement the Transport Asset Management Plan (TAMP).
Develop an Integrated Transport Plan (ITP) bringing together all aspects of transport within the Shire into a single plan.
Performance Indicator
Establish annual maintenance programs (April annually).
Establish annual building upgrade programs
Complete draft for Council and public comment (November 2007).
Establish annual maintenance programs (April annually).
Establish annual road upgrade programs (April annually).
Complete the draft plan by July 2008 for Council and Public comment.
Complete the final plan by December 2008 for adoption by Council.
Outcome
Project successfully implemented and works substantially completed throughout 2007/08.
Annual maintenance and upgrade program completed for inclusion in the 2008/09 budget.
Transport Asset Management Plan adopted by Council 27 November 2007.
2008/09 maintenance plan completed for implementation in the 2008/09 budget.
2008/09 road upgrade program completed for implementation in the 2008/09 budget.
CBD Parking Strategy will be presented to Council in July 2008. Bicycle Strategy is currently being prepared under the guidance of the Bicycle Strategy Committee. Draft ITP will incorporate theses documents when adopted by Council.
Programmed for completion by December 2008.
114 glenelg shire annual report 07-08
GOAL: We will remain fully committed to tapping the potential of the Shire’s geothermal resources for producing clean, efficient, cost-effective energy, and we will complete a report which canvasses all options available to our community to do so.
Activity/Action
Investigate further development of
either a new bore or a new heat
source (Wannon Water).
Performance Indicator
Geothermal options report to
Council’s 27 November 2007
Council meeting.
Outcome
Geothermal Options report presented
to Councillors workshop on
11 December 2007. Meeting with
Hot Rocks Pty Ltd held in February
GOAL: We will be vigorous advocates for our community and always speak up when necessary. We will fulfil our responsibilities as democratically elected representatives of our community.
Activity/Action
We will continue to advocate
for improvements to the Princes
Highway.
We will respond to the issues of
concern to our community as they
arise with strong advocacy.
Meet with relevant government
officers and ministers to lobby for
enhanced services for families and
children across the Shire.
Advocate and lobby on behalf of the
key community issues.
Performance Indicator
Continue to implement the
Great South Coast Municipalities
advocacy strategy including press
releases, promotional campaigns
and funding submissions.
Lobby strongly on at least
three important issues through
delegations and/or submissions
throughout 2007/2008.
A minimum of three (3) meetings
to be held.
Continued membership of the
Alliance of Councils for Rail Freight
Development.
Presentation to Rail Freight Network
Review Committee on importance
of rail infrastructure to the Port on
3 October 2007.
Outcome
Council has continued to
proactively participate in the Princes
Highway Alliance Working Group.
Commitments for State & Federal
Government funding to duplicate
the highway from Waurn Ponds to
Winchelsea have been obtained.
The Alliance is now focusing on
improvements between Warrnambool
and Mount Gambier.
Council has undertaken campaigns
around the Portland Bay trawler
wharf, the Heywood Police Station
(retaining the residence), the South
West rescue helicopter and the rail
network in Victoria.
Achieved. Three meetings held -
with Regional Development Victoria -
6 February 2008, Dept of Transport &
Regional Services – 25 February 2008
and Dept of Planning & Community
Development – 7 May 2008.
Membership continues. Mildura
City Council now administers the
secretariat.
Completed. Presentation made
by Glenelg Shire Council on
3 October 2007.
115glenelg shire annual report 07-08
GOAL: We will participate in a review of the Shire’s electoral system and argue for electoral arrangements that help create informed and interested voters.
Activity/Action
Advocate Council’s position on
municipal electoral boundaries for
the Glenelg Shire to the Victorian
Electoral Commission’s review.
Performance Indicator
Submissions to be lodged with the
VEC by their specified dates.
Outcome
Completed. Submissions presented
to the Victorian Electoral Commission
and acknowledged in its preliminary
and final reports.
GOAL: We will develop a range of innovative programs which will help Council attract, train and retain skilled employees.
Activity/Action
Develop and send out a Work
Balance and Family Friendly
focused survey.
Performance Indicator
Report on results to the
Chief Executive Officer by
30 September 2007.
Outcome
Survey completed & results
evaluated. Results discussed
with Chief Executive Officer on
7 May 2008.
speaks up for the community
116 glenelg shire annual report 07-08
OBJECTIVE a Shire that provides value for money services that meet residents’ needs and create a vibrant, caring, healthy community.
GOAL: We will provide important services to the community to ensure that all citizens are catered for.
Activity/Action
We will monitor and maintain our
sealed and unsealed roads.
We will provide accessible and
valued recreation facilities.
We will provide a comprehensive
waste collection and disposal
service in the Shire.
We will deliver quality visitor
information services through
our 3 accredited Visitor
Information Centres.
We will ensure that the provision
of meals on wheels is equitable
and value for money.
Performance Indicator
Implement the Road Management
Program for 1,140km of sealed
roads and 1,480 km of unsealed
roads in the Shire.
Achieve 120,000 visits to the
Shire’s aquatic centres at Portland,
Heywood, Merino & Casterton.
Collect waste and recycling
products from over 7,300
households.
Provide excellent customer service
to over 100,000 visitors annually in
order to increase visitor length of stay
and dispersal throughout the region.
Provision of 30,000
meals on wheels.
Outcome
Program included in the 2007/08
budget and implemented.
108,000 visits recorded to 30
June 2008. Planned shutdowns
at The PLACE to undertake major
maintenance works throughout the
year may result in the target not
being achieved.
Achieved through weekly waste
collections and fortnightly collections
from 7,400 tenements.
Achieved. Approximately, 104,000
recorded visitors attended the Shires’
information centres.
30,400 meals provided to
Home & Community Care Clients
to 30 June 2008.
value for money services
117glenelg shire annual report 07-08
GOAL: We will seek Federal and State Government assistance to establish “The Portland Child and Family” complex as an integrated cluster of early childhood services from a central Portland location, and we will explore the feasibility of a similar project in Casterton.
Activity/Action
Develop and submit applications for
funding for the Portland Child and
Family Complex.
Work with the Community Liaison
Committee to submit funding
applications to philanthropic
organisations.
Prepare and implement a community
engagement strategy for the Portland
Child and Family Complex.
Develop a Business Plan for the
redevelopment of the Casterton
Kindergarten as an integrated child
and family facility.
Performance Indicator
Applications for DOTARS
and DVC funds submitted by
31 August 2007.
A minimum of three (3) applications
submitted by 31 December 2007.
Community Engagement
Strategy competed by
30 October 2007.
Draft Business Plan considered
by Council by 31 October 2007.
Outcome
Completed. Applications submitted
to both DOTARS and Dept Victorian
Communities (now Dept Planning &
Community Development).
Business Plan has been adopted by
Council and discussions commenced
with philanthropic trusts regarding
application guidelines and processes.
Completed. Community engagement
strategies completed and submitted
to Council for endorsement:
• Portland Child and Family
Complex : Council meeting
27 November 2007; and
• Casterton Child and Family
Complex: Councillors Workshop
9 October 2007.
Business Plan completed and
submitted to Council for endorsement
at Council meeting 23 October 2007.
118 glenelg shire annual report 07-08
GOAL: We will provide vital services to the community and ensure that all citizens receive relevant services in a timely, fair and efficient manner.
Activity/Action
We will provide home and
community care services to
frail aged (over 70) and people
with disabilities.
We will provide quality child care
programs and support services for
children with additional needs.
We will deliver environmental
health services to ensure the
wellbeing of the community.
We will provide equitable access
to expressions of knowledge,
creative thought and intellectual
activity through Glenelg Libraries.
Performance Indicator
Provide 10,000 hours of frail
aged services to 700 clients to
30 June 2008.
Provide care for 350 children and
their families to 30 June 2008.
Provide 1,200 immunisations
and undertake 500 inspections
to 30 June 2008.
Achieve 50% of population
registered as members, 100,000
loans and 96,000 visits to libraries
to 30 June 2008.
Outcome
Total hours of service provided
01 July 2007 – 30 June 2008:
• 742 Clients
• 25,552 hours of services
282 families and 380 children have
received this service over the past
12 months.
1,489 immunisations and 580
inspections have been completed to
30 June 2008.
Achieved. Current membership
= 11,156
Visitors (July 2007 – June 2008)
= 150,683
Loans (July 2007 – June 2008)
= 121,379
GOAL: We will prepare and adopt a Municipal Public Health Plan aimed at improving the health and well-being of the Shire’s citizens, giving particular attention to the health needs of our indigenous community.
Activity/Action
Municipal Public Health Plan
Steering Committee appointed
and Terms of Reference adopted.
Council adopts final version of
Municipal Public Health Plan.
Performance Indicator
Steering Committee appointed and
Terms of Reference endorsed by
Council by 30 November 2007.
Plan adopted by Council by
30 May 2008.
Outcome
Steering Committee and Terms of
Reference endorsed by Council
at Ordinary Council Meetings: 28
August and 27 November 2007.
Not completed. Final workshop
held 13 June 2008. Draft plan will
be completed 30 June 2008 for
adoption by Council in July 2008.
119glenelg shire annual report 07-08
GOAL: We will address disadvantage in the Glenelg Shire through the development of a social plan that: • Understands where and how disadvantage impacts on the lives of our citizens; • Draws the Government’s attention to those in our Community who need more help and; • Makes sure that our “human services” are tailored to helping those in most need.
Activity/Action
Social Plan Steering Committee
appointed and Terms of Reference
adopted.
Issues Paper, including mapping
of existing services and relevant
research presented to Council.
Performance Indicator
Steering Committee appointed and
Terms of Reference endorsed by
Council by 31 March 2008.
Issues Paper presented to
Council by 30 June 2008.
Outcome
This plan has been deferred until
completion of the Municipal Public
Health Plan, Positive Ageing Strategy
and the Youth Strategy are completed
(all due for completion by June 2009).
These plans will significantly reform
the Social Plan for the Shire.
Issues Paper not completed.
Consultant contracted to
undertake research for Issues
Paper 30 June 2008.
GOAL: We will establish an Aged Care Working Party in conjunction with aged care facility providers to develop an “Ageing in Place” plan for Glenelg Shire.
Activity/Action
Prepare a report for Council on
Aged Care in the Glenelg Shire.
Develop Terms of Reference
for Aged Care Working Party for
consideration by Council.
Present Draft Ageing In Place Plan to
Council for approval.
Performance Indicator
Report presented to Council
by 30 July 2007
Terms of Reference adopted
by Council by 31 January 2008.
Presented to Council by
30 June 2008.
Outcome
Reports on Aged Care considered
by Council at Council meeting held
on 24 July 2007.
Positive Ageing Strategy Terms of
Reference for Steering Committee
endorsed by Council at Council
meeting held on 18 December 2007.
Strategy not completed due to
extended consultation process.
Deferred to July 2008 Council
meeting. Steering Committee
endorsed and Research Report
received by Council at Council
meeting held on 26 February 2008.
120 glenelg shire annual report 07-08
GOAL: We will create an active, healthy Shire by implementing the recommendations of the Shire’s Recreation and Open Space Strategy.
Activity/Action
Develop appropriate staffing structure with the Recreation Unit.
Complete Recreation and Open Space Strategy key projects and actions for current year.
Prepare progress report for Council on implementation of Strategy.
Performance Indicator
Restructure completed and advertised by 30 September 2007.
75% of key projects and actions completed by 30 June 2008.
Report presented to Council in June 2008.
Outcome
Restructure completed. Recreation Services Officer commenced on 5 November 2007.Recreation & Youth Services Co-Coordinator Position filled August 2007.
75% of key actions and projects for 2008 completed.
Progress Report listed for presentation to July 2008 Council meeting.
value for money services
121glenelg shire annual report 07-08
GOAL: We will create an inclusive Shire by implementing the Shire’s Disability Action Plan.
Activity/Action
Undertake a review of the Glenelg
Shire Council Mobility Map and
provide input regarding accessibility
into the Car Parking Review.
Support and assist with the
organisation of events to celebrate
International Day of People with a
Disability and Mental Health Week.
Provide a Progress Report on
the implementation of the Disability
Action Plan to the December
Council Meeting.
Performance Indicator
Mobility Map reprinted by
30 December 2007
Events are well supported
and promoted.
Report completed and
submitted to December
Ordinary Council meeting.
Outcome
Mobility Map reviewed and reprinted
June 2008. Disability Advisory
Committee provided comment on
Car Park Review at meeting held
on 7 April 2008.
Following events held and well
supported:
• To celebrate Mental Health Week,
the exhibition “Feeling Blue,
Seeing Red” was launched and
shown in the DiscoverIT Centre
over the months of October and
November 2007. A calendar of
the exhibition was produced with
support from Aspire, United Way
Glenelg and Southwest Health
Care.
• ‘Wild Westerlies’ (program that
provides people with a disability
the opportunity to participate
in cultural and artistic activities)
Dance Party was held on 8
December 2007.
• “One and All Festival Beach
Party” held 3 December 2007 to
celebrate IDPD – 80 attendees.
Progress report provided to Ordinary
Council meeting on 22 January 2008.
122 glenelg shire annual report 07-08
GOAL: We will create a vibrant Shire by providing and supporting a wide range of festivals, celebrations and cultural activities, which will entertain and engage a broad cross-section of our community.
Activity/Action
Support and fund key
projects/events across the Shire.
Performance Indicator
A comprehensive schedule of events
and activities covering recreation,
tourism, cultural and special purpose
themes developed and publicly
available by 30 June 2008.
Outcome
Events calendar updated weekly and
posted on Council’s website.
GOAL: We will strengthen the community by seeking government support to identify and develop practical ways of encouraging and supporting volunteer participation across the Shire.
Activity/Action
Develop and prepare a Volunteer
Policy and Information Kit for the
Glenelg Shire Council.
Develop a list of volunteer
opportunities in the Glenelg Council
for Customer Service Staff and the
Glenelg Shire Council website.
Organise an annual event to
recognise volunteerism in the
Glenelg Shire Council.
Performance Indicator
Draft Policy and Kit to be
considered by Management
Group by December 2007.
List compiled and printed by
31 December 2007.
Annual event to be held in Portland,
Heywood and Casterton is well
promoted and attended.
Outcome
Draft Policy and Information Kit
considered by Senior Management
Team at meeting held on 24 June
2008.
List compiled and printed for
customer service staff by 30 May
2008 made available on website.
• Heywood – 12 May 2008 at
Council’s Customer Service
Centre with 63 acceptances.
Guest Speaker – Elaine Evans.
• Casterton – 12 May 2008 at the
Town Hall with 55 attendees.
Guest Speaker – Helen Bayne
• Portland – 15 May 2008 at the
Civic Hall.
Guest Speaker – Keith Wilson,
Glenelg Shire Citizen of the Year
2008. 122 acceptances.
123glenelg shire annual report 07-08
OBJECTIVE a Shire that grasps economic and social opportunities that enable its citizens to lead fuller lives.
GOAL: We will help to provide certainty for the Shire’s fishing industry by adopting a preferred position about the best arrangements for wharf facilities in Portland harbour.
Activity/Action
Complete Portland Bay Coastal
Infrastructure Plan.
Performance Indicator
Adoption by Council of PBCIP
with a consultation and
communication strategy in place
by 31 December 2007.
Outcome
Completed and adopted by
Council on 27 November 2007.
GOAL: We will boost prospects for the Shire’s tourism industry by committing to foreshore improvements and infrastructure which are a consequence of the recommendations in the Shire’s “Portland Coastal Infrastructure Plan”.
Activity/Action
Implementation of strategic actions
and recommendations identified
in the Portland Bay Coastal
Infrastructure Plan.
Performance Indicator
A budget commitment for
implementation of strategic
actions endorsed by Council
by 30 June 2008.
Outcome
Prioritised works program adopted
by Steering Committee with budget
allocation provided in the 2008/09
budget.
GOAL: We will seek the State Government’s assistance to establish a South West Timber Industry Consultative Council which will co-ordinate all of the local and regional work that will be necessary if we are to grasp the opportunities and properly manage the impacts of the timber industry on our Shire in the near future.
Activity/Action
Establish a South West Timber
Industry Consultative Council to
co-ordinate local and regional
impacts of timber industry
development.
Performance Indicator
Completion of scoping document
for the development of the timber
industry and discussions held with
funding bodies by 30 June 2008.
Outcome
Scoping paper has been developed
and discussed with Regional
Development Victoria executives
on 6 February 2008. Funding not
forthcoming at this stage.
124 glenelg shire annual report 07-08
GOAL: We will work with the Victorian State Government, through Regional Development Victoria, to optimise the planning work already completed for a pulp mill at the Heywood location, and seek to attract investor interest in that project.
Activity/Action
Promote investor opportunity for
timber value adding ventures.
Performance Indicator
Completion of a Business
Opportunity Statement for
timber industry development
and presentation to Regional
Development Victoria by
30 June 2008.
Outcome
Statement completed for discussion
with Regional Development Victoria
on 6 February 2008. A study tour
was undertaken to Albany, WA in April
2008 by a Council group consisting
of the Mayor, three Councillors and
the CEO. The study tour report was
presented to Council on 27 May
2008 and an action plan for timber
industry opportunities adopted.
GOAL: We will examine the potential to help local stakeholders establish a “Committee for Portland” as a diverse, multi-skilled organisation that can act as a unifying force to enable the Portland community to continue to grow and prosper.
Activity/Action
Liaise with Portland based
companies to explore the interest
and possible funding models and
structures for the Committee for
Portland.
Prepare funding strategy and
applications to establish the
Committee for Portland.
Pending funding availability,
establish a governance structure,
membership and work plan for the
Committee for Portland.
Performance Indicator
Establish interest and incumbent
membership for the Committee for
Portland by 30 October 2007.
Funding applications submitted
to Regional Development Victoria
and in principle commitment
from member organisations by
31 December 2007.
Terms of reference developed
together with workplan and
membership commitments by 30
June 2008.
Outcome
Inaugural board and governance
structure was established by
December 2007. Public launch
conducted 22 February 2008
with Executive Officer appointed
in May 2008.
Funding application prepared
and submitted. A $25,000 State
Government grant for the Committee
for Portland was announced on
3 October 2007 by the Minister
for Regional & Rural Development,
the Hon. Jacinta Allen.
Terms of reference and governance
structure were adopted by the Board
in December 2007.
125glenelg shire annual report 07-08
GOAL: We will finalise a Memorandum of Understanding with the Shire’s indigenous communities as a basis building for sound working relationships.
Activity/Action
CEO and Mayor to attend NAIDOC
event in Portland.
Chief Executive officer and
Group Manager Community
Development to meet with DWEC
Board to discuss MOU.
Preparation of MOU for signing.
Review Terms of Reference
and Membership of Indigenous
Consultative Committee.
Performance Indicator
Attendance at NAIDOC event.
Meeting held by
31 December 2007.
MOU prepared by
28 February 2008.
Report to Council meeting
by 30 March 2008.
Outcome
CEO, Mayor and Group Manager
Community Development attended
flag-raising and BBQ lunch for
NAIDOC Week at DWECH 9 July
2007.
Group Manager Community
Development met with the CEO
of Gunditj Mirring on 28 March
2008 to discuss Town signage and
Memorandum of Understanding.
Group Manager Community
Development met with the CEO of the
Dhauwurd Wurrung Elderly Citizens
to discuss Reconciliation Week event
and Memorandum of Understanding
on 5 May.
Not completed. New Memorandum
of Understanding currently being
developed. Process discussed and
agreed by Council and indigenous
community.
Delays in the Memorandum
of Understanding have flowed
through to this action. Constructive
discussions with the Indigenous
community around the matter are
continuing.
GOAL: We will continue to support and provide leadership for the Alliance of Councils for Rail Freight Development as it advocates for the development of a competitive, connective rail freight network for South East Australia.
Activity/Action
Make a submission to the
State Government’s Rail Freight
Network Review.
Performance Indicator
Lodge submission with the
Taskforce by 17 August 2007.
Outcome
Completed. Submission lodged
in August 2007 and receipt
acknowledged (Refer DWS 560943
& 561502).
126 glenelg shire annual report 07-08
GOAL: We will encourage specific communities to play a more active role in establishing local aspirations and priorities by conducting community planning processes at Portland, Casterton, Heywood, Narrawong/Tyrendarra, Dartmoor and Nelson in 2007/2008 and Merino, Digby, Bridgewater and Dutton Way/Maretimo in 2008/2009. We will integrate community plans into subsequent Council Plan processes.
Activity/Action
Lead and facilitate community
planning activities in the Shire’s
communities.
Performance Indicator
Advanced level of community
planning undertaken in Portland,
Casterton, Heywood, Narrawong/
Tyrendarra, Dartmoor and Nelson
by 30 June 2008.
Outcomes of community planning
process documented and referred
to Management Group and Council
for incorporation into Council
planning and budget process,
by 31 March 2008.
Outcome
Completed. Draft Plans considered
by communities for endorsement in
June 2008.
Reported to Council 22 April 2008.
Funds have been allocated in the
2008/09 budget to implement
community plans.
GOAL: We will further investigate opportunities using geothermal energy in the aquaculture sector.
Activity/Action
Continue to liaise with Regional
Development Victoria to promote
the opportunity and use of
geothermal energy for industry
and in the community.
Performance Indicator
Promotion of the geothermal
opportunity to a prospective
developer.
Outcome
Meeting held with Hot Rocks Pty Ltd
which holds the exploration licence
within the Shire. Hot Rocks Pty Ltd
has indicated it will proceed with the
exploratory work.
economic & social opportunities
127glenelg shire annual report 07-08
GOAL: We will seek to entrench the Shire as an investment location for a range of renewable energy projects.
Activity/Action
Promote Glenelg Shire as an
investment location for renewable
energy ventures.
Performance Indicator
Development of a Business
Opportunity Statement for
renewable energies and
presentation to Governments
and industry by 30 June 2008.
Outcome
Opportunities Statement prepared
and presented to Regional
Development Victoria on
6 February 2008. Also presented
on 20 February 2008 to Member
for Western Victoria, the Hon. Gail
Tierney. Constructive and ongoing
dialogue continues with Oceanlinx,
Hot Rocks Pty Ltd and biofuel
energy providers.
GOAL: We will work with young people to develop a planning framework that will engage them in community activities and increase opportunities for them to reach their potential.
Activity/Action
Develop a Youth Charter and Plan.
Continue to provide FReeZA events
for young people across the Shire.
Performance Indicator
Policy and Plan adopted by
Council by 30 June 2008.
A minimum of four (4) FReeZA
events provided over year.
Outcome
Steering Committee endorsed at
Council meeting on 22 April 2008.
Research paper considered at
Council meeting 28 May 2008.
FReeZA events held in 2007/08 at:
30 June 2007 - Hardwired Music
Festival - The Arc Stadium,
Warrnambool. Attendance: 1000
16 November 2007 - Breakfest
FReeZA Event - Foreshore, Portland.
Attendance: 550
21 January 2008: Dartmoor and
Nelson Fun Day - Bus Trip to Mount
Gambier. Attendance: 20
1 February 2008: Heywood FReeZA
Event - Community Hall, Heywood.
Attendance: 32
128glenelg shire annual report 07-08
auditor - general’s reporton the performance statements