INFORMATION ON PROPOSITION E SCHOOL FACILITIES IMPROVEMENT DISTRICT (SFID) GENERAL OBLIGATION BOND 2012

Upload: melinda-warner

Post on 08-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

Chula Vista Elementary School District Academic Performance Index

TRANSCRIPT

Page 1: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

INFORMATION ON PROPOSITION E

SCHOOL FACILITIES IMPROVEMENT DISTRICT (SFID)

GENERAL OBLIGATION BOND2012

Page 2: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Enrique S. CamarenaElementary School

Opening July 2013.

Page 3: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Chula Vista Elementary School DistrictAcademic Performance Index

2006 2007 2008 2009 2010 2011 2012700

800

900

767782

811833

848861 870

Page 4: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

SFID No.1 Boundary for CVESDThe SFID boundary will:

• Encompass31 elementary schools on most of the western portion of CVESD.

• Exclude all Mello-Roos parcels.

Page 5: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

31 SFID School Sites

Page 6: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Ultimate Goals of the SFID GO Bond Program• Improvements only at

the 31 school siteslocated within the SFID.

• Enhance educational facilities to create a safe and sustainable environment supportiveof 21st century teaching and learning.

• Install infrastructure to sustain schools for next 30 years.

• Enhance energy efficiency of facilities. • Provide wireless technology to sites.

Page 7: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Facilities Needs Assessment

• 31 of 44 school sites assessed by Architect.– 31 schools built primarily from 1938 to 1975

without Mello-Roos funds.– Remaining 13 schools built with CFD/Mello-

Roos funds since 1990 were not assessed.• Assessment includes summary cost

estimate for each site.

Page 8: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs

SchoolYear

ConstructedYear

Modernized

SFID GO BondEstimated

Improvement Cost

2013

RICE ELEMENTARY SCHOOL 1938 1996 $5,903,031CASTLE PARK ELEMENTARY SCHOOL 1952 1996 $5,052,767ROSEBANK ELEMENTARY SCHOOL 1952 1996 $4,241,000VISTA SQUARE ELEMENTARY SCHOOL 1953 1996 $3,892,330HILLTOP DRIVE ELEMENTARY SCHOOL 1943 1997 $4,167,007ALLEN ELEMENTARY SCHOOL 1947 1997 $4,140,208

Modernization in 1996 and 1997 was minimal scope and excluded the following major items: Underground Utilities; Window Replacements; Asphalt Resurfacing; Heating, Ventilation, and Air-Conditioning (HVAC) Replacements; Irrigation Upgrades; Interior Finishes; and Cafeteria/Food Services.

Page 9: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs

SchoolYear

ConstructedYear

Modernized

SFID GO BondEstimated

Improvement Cost

2015

FEASTER CHARTER SCHOOL 1950 1997 $5,377,678MONTGOMERY ELEMENTARY SCHOOL 1950 1997 $3,034,323HARBORSIDE ELEMENTARY SCHOOL 1953 1997 $4,633,558KELLOGG ELEMENTARY SCHOOL 1958 1997 $4,301,308SUNNYSIDE ELEMENTARY SCHOOL 1959 1997 $3,392,582COOK ELEMENTARY SCHOOL 1954 1999 $2,388,962PALOMAR ELEMENTARY SCHOOL 1959 1999 $1,063,663HALECREST ELEMENTARY SCHOOL 1961 1999 $1,295,723MUELLER CHARTER SCHOOL 1955 2000 $3,359,170LAUDERBACH ELEMENTARY SCHOOL 1956 2000 $3,541,449

Modernization in 1996 and 1997 was minimal scope and excluded the following major items: Underground Utilities; Window Replacements; Asphalt Resurfacing; Heating, Ventilation, and Air-Conditioning (HVAC) Replacements; Irrigation Upgrades; Interior Finishes; and Cafeteria/Food Services.

Page 10: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

SchoolYear

ConstructedYear

Modernized

SFID GO BondEstimated

Improvement Cost

2018

JUAREZ-LINCOLN ELEMENTARY SCHOOL 1970 2000 $2,102,422FINNEY ELEMENTARY SCHOOL 1961 2001 $3,043,887VALLE LINDO ELEMENTARY SCHOOL 1967 2002 $1,229,493SILVER WING ELEMENTARY SCHOOL 1968 2002 $2,059,944VALLEY VISTA ELEMENTARY SCHOOL 1969 2002 $1,152,128PARKVIEW ELEMENTARY SCHOOL 1970 2002 $1,405,804LOS ALTOS ELEMENTARY SCHOOL 1971 2002 $2,489,021ROGERS ELEMENTARY SCHOOL 1962 2003 $1,532,474LOMA VERDE ELEMENTARY SCHOOL 1964 2004 $2,829,665ROHR ELEMENTARY SCHOOL 1965 2004 $3,089,122OTAY ELEMENTARY SCHOOL 1975 2005 $1,246,342TIFFANY ELEMENTARY SCHOOL 1975 2005 $1,029,693CHULA VISTA HILLS ELEMENTARY SCHOOL 1989 -- $1,580,768CHULA VISTA LEARNING COMMUNITY CHARTER SCHOOL 2001 -- $3,111,466CLEAR VIEW ELEMENTARY SCHOOL 1991 -- $1,526,053

TOTAL (All 31 Sites) $89,213,041

Modernization from 1999 through 2005 was from 1998 Proposition JJ funds but excluded the following major items: Asphalt, Concrete, Partial Window Replacements, HVAC Replacements, and Cafeteria/Food Services.

SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs

Page 11: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Major Categories for Improvement

• Infrastructure Improvements (electrical, sewer, water and storm drains, roofs, fire alarms, electrical closets, and structural).• Energy Enhancements/Other Areas

(HVAC, window replacements,energy efficient site lighting,classroom upgrades, ADA compliance, and other upgrades).• Wireless Technology Upgrades

(wireless hardware, network cabling, and equipment).

Allen Elementary School

Page 12: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Infrastructure upgrades would include:• Relocating above-

ground electrical conduits underground.

• Electrical closets.• Sewer systems/drains.

Infrastructure Improvements

Castle ParkElementary School

Page 13: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Rosebank Elementary School(Wood Frame Single Pane Windows)

Energy Enhancements/Other Improvements(HVAC, Window Replacements, Energy Efficient Lighting, ADA Compliance, and Other Upgrades)

Page 14: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

Proposed Wireless Infrastructure

• Wireless technology minimizing cabling and allowing incorporation of a variety of mobile devices: laptops, tablets, readers, etc. (Short-term mobile devices, equipment, and fixtures will not be purchased with bond funds.)

• Workstations thatare ergonomically designed and that encourage cooperative project-based learning.

Page 15: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

SFID GO Bond Assumptions

• $90 million authorization.• 55 percent voter approval.• Three financings: 2013, 2015, and 2018.• 30-year amortization.• No Capital Appreciation Bonds (CABs).• Approximately $29 per $100,000 of assessed

valuation per year. • No assessments on CFD/Mello-Roos parcels.• No funds for salaries or pensions.

Page 16: I NFORMATION ON P ROPOSITION E S CHOOL F ACILITIES I MPROVEMENT D ISTRICT (SFID) G ENERAL O BLIGATION B OND 2012

QUESTIONS