ibm live case study: leveraging software-defined infrastructure control to densify and reduce costs...
TRANSCRIPT
www.cirba.com © Cirba Inc. 2014 All rights reserved.
IBM Case Study: Leveraging Software-Defined Infrastructure Control to Densify and Reduce Costs in Virtual Environments
Ken Christiance, Distinguished Engineer, IBM Riyaz Somani, co-founder and EVP Product Strategy, Cirba
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Self-‐Service
The Reality of the IT Landscape Today
“Rogue” IT
IT-‐Controlled Managed Infrastructure
Virtual Infrastructure
Cloud Compu:ng
Dedicated Shared
1990’s
2000’s
2010’s
Agility & Cost
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Economic Inhibitors in Private Virtual / Clouds
1. Mul>-‐Tenancy with varying requirements
2. No Demand Pipeline model
3. Complex and Rapidly Changing
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Density (Consolidation Ratio) Low High
Low
High
Cri$cal Produc$on Workloads Non-‐Cri$cal
Produc$on Workloads Batch &
Dev/Test Workloads
Cost Risk
1. Multi-tenancy - challenges
Density is Governed by Opera>onal
Policy
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Systems are the foundation of enterprise hybrid IT
Public Cloud
Private Cloud
Traditional infrastructure
existing
Enterprise Hybrid IT
new
Hybrid environments are becoming the ‘new norm’, as companies build-‐out systems of engagement, leveraging their systems of record
Shared Off-Premises
Cloud
Dedicated On-Premises
Cloud
Traditional IT Dedicated Off-Premises
Cloud
Key considerations: • Data • Open integration • Common management • Existing investments
Enterprise Applications
Cloud Enabled
Cloud Native Apps/Services
Hybrid Cloud
www.cirba.com © Cirba Inc. 2014 All rights reserved.
IBM Strategic Outsourcing Transforma$on • Emerging Technologies / Innova$on • Alignment with Strategic Business Objec$ve
By the Numbers • ~500,000 Systems Managed / ~330 Delivery Data Centers • >1,000 Global Customers
BeVer Sizing for Workload Demand • Business Focus on Efficiency • Op$miza$on for Enterprise Hybrid IT
www.cirba.com © Cirba Inc. 2014 All rights reserved.
IBM / Cirba Partnership – Better Sizing for Workload Demand
Business Objec$ves
• Hardware Cost Savings • SoZware License Cost Savings • Reduc$on of Capacity Related Incidents
Standards
• Policy / Profile Driven Approach for Workloads • SoZware Defined Infrastructure Control (Cirba)
Execu$on
• Op$mize Image Placement and Right Sizing • Op$mize Demand Management / Capacity Planning Processes • High Degree of Automa$on
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Value Proposition
SoMware Defined Infrastructure Control
Supply & Demand Analy>cs Permuta>ons & Combina>ons
-‐ 7 granted patents, 7 pending -‐
densify
Demand Management Route and Reserve
densify
$
Supply Op>miza>on Defrag & De-‐risk
Policy Defined Control
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Value Proposition
Intelligently Densifying Infrastructure Demand Management Route and Reserve
Supply Op>miza>on Defrag and De-‐risk
Policy Driven Control
SoMware Defined Infrastructure Control
Hypervisors
Resources Compute Storage Network SoZware Licenses
Cloud PlaRorms vRealize ICO
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Policy Enables Software Defined Control Production
Critical Production
IT Production
Cloud Production Batch/HPC Pre-Prod Dev/Test
Density Low Med Med Low Med High
Performance High Med Med Very High Med Low
Availability N+2 N+1 N+1 N/A N/A N/A
Compliance Rigorous Medium Mul$-‐Tenant
Low to None None None
Volatility Low Med High High Med High
Operational Cycles
Business Defined IT Defined Unbound Windowed Simulated None
Licensing Host-‐Based Host-‐Based Catalog-‐Based
Environment-‐Based Transient Developer
Edi$on
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Supply Optimization
Compute
Storage
Network
Software
Fragmented capacity Conten$on risk High DRS ac$vity S/W Inefficiency
Virtual Infrastructure ESX
VM VM
ESX
VM VM VM DRS
VM ESX
VM VM
ESX
VM VM VM DRS
VM vROps
vCenter
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Supply Op$miza$on
Supply Optimization
Policy-‐Based Analy3cs
Op$mized Density SoZware Savings
Lower Opera$onal Risk Lower Vola$lity
Defragmented Capacity
Virtual Infrastructure ESX
VM VM
ESX
VM VM VM DRS
VM ESX
VM VM
ESX
VM VM VM DRS
VM vROps
vCenter
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Cloud Orchestra$on
Demand Management
Supply Op$miza$on
Supply Optimization
Policy-‐Based Analy3cs
Self-‐Service Requests
Even Higher Density Lower Service Level Risk Compliance Enforcement Cloud Process Automa$on
New Request: Requires Windows OS SQL server Has Customer Data Needs Gold tier storage Should run on West coast
Virtual Infrastructure ESX
VM VM
ESX
VM VM VM DRS
VM ESX
VM VM
ESX
VM VM VM DRS
VM vROps
vCenter
Rou3ng API
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Cloud Orchestra$on
Demand Management
Supply Op$miza$on
Demand Management
Policy-‐Based Analy3cs
Self-‐Service Requests
Rou3ng API Enterprise-‐Wide Rou$ng True Capacity Reserva$on External/Hybrid Modeling
Enterprise Process Automa$on
Virtual Infrastructure ESX
VM VM
ESX
VM VM VM DRS
VM ESX
VM VM
ESX
VM VM VM DRS
VM vROps
vCenter
No predic$ve element No capacity reserva$ons
No future infrastructure modeling No “Re-‐Rou$ng” analysis
Enterprise App Deployments
Migra>on & Consolida>on
Exis>ng Applica>ons
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Soaking Up Stranded Capacity
0
200
400
600
800
1000
1200
12-‐Jan 19-‐Jan 26-‐Jan 2-‐Feb 9-‐Feb 16-‐Feb 23-‐Feb 2-‐Mar 9-‐Mar 16-‐Mar
VM Cap
acity
Units
Date
Stranded Capacity Over Time for Total Estate
Used Capacity Available Capacity Stranded Capacity
19-‐Feb: Added Supply (+50 Units) 30 Jan: Policy Change (+57 Units) Policy Limit
Addressable Performance Risk
Over Allocated Resources
Non-Optimal Placements
Early & Unnecessary Closing
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Customer Examples – Major FS
Volume Reduction
Analytics for qualifying, right-sizing, migrating, handling exceptions, and reserving
capacity
Next Gen Clouds (50,000 VMs)
“Legacy” Virtual Environment (20,000 VMs)
Physical Servers across Lines of Business (60,000)
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Customer Examples – Major FS
Ongoing Control
Advanced rebalancing, s/w license segmentation,
allocation optimization, capacity reservation
Density increase of 33% gives $1.5MM savings per pod
in spend avoidance. S/W license segmentation
yields another $720K per pod
2014 Savings: $45 Million
Next Gen Clouds (50,000 VMs)
$ `
“Legacy” Virtual Environment (20,000 VMs)
Physical Servers across Lines of Business (60,000)
www.cirba.com © Cirba Inc. 2014 All rights reserved.
Fortune 1000 Customer Example
* 1,267 OS instances in Par:al Environment
• Image Placement & Right-‐Sizing • Automated Capacity Control Customer Focus
• 6 weeks into deployment Scope
• 45% Density Improvement Opportunity • 40% S/W Windows DCL Reduc$on
Opportuni>es / Outcomes
• $3.2 Million+* Financial Savings Impact / Opportunity
www.cirba.com © Cirba Inc. 2014 All rights reserved.
BSWD – 4 Lessons Learned
Policy based Control
Demand Management
Workload Placement Flexible Hos$ng
Driving Efficiency