ibm platform cluster manager data center operating system april 2013

34
© 2012 IBM Corporation Platform Computing 1 IBM Platform Cluster Manager Data Center Operating System April 2013

Upload: hewitt

Post on 24-Feb-2016

28 views

Category:

Documents


0 download

DESCRIPTION

IBM Platform Cluster Manager Data Center Operating System April 2013. IBM Platform Cluster Manager – Data Center Operating System Use Cases. Datacenter Overview Optimize Datacenter Manage Datacenter from a Single Portal Meet Demand Balance Workloads Control Resources Protect Resources. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

1

IBM Platform Cluster ManagerData Center Operating SystemApril 2013

Page 2: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

2

IBM Platform Cluster Manager – Data Center Operating SystemUse Cases

Datacenter OverviewOptimize DatacenterManage Datacenter from a Single PortalMeet DemandBalance WorkloadsControl ResourcesProtect Resources

Page 3: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

3

• 14 iDataPlex servers, 16 cores, 24GB memory

• Powered on (Connected) and idle

• Running RHEL KVM

• Automatically bare-metal provisioned when discovered

Datacenter Overview

Page 4: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

4

• Packing enabled

• Overcommit enabled - Nodes have 16 CPUs, a factor of two yields 32 vCPUs(i.e., one real CPU = two vCPUs)

Page 5: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

5

• Load Balance enabled

• High Availability enabled

• Select Energy Optimization

Page 6: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

6

• Enable Energy Optimization

• Power off idle hypervisors and keep at least one hypervisor connected (running) and two hypervisors on Standby

Energy Optimization

Page 7: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

7

• Click Yes

Page 8: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

8

• View affect of the Energy Optimization Policy on the Data Center

Page 9: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

9

• The Datacenter is idle (i.e., no workload/VMs running)

• The idle hypervisors will be powered off leaving one (1) connected and two (2) on standby

Page 10: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

10

• Resources and workload (VMs) can be created and managed directly without the need for additional management portals.

• Click New to Create VMs

Data Center Portal

Page 11: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

11

• Select the RHEL pattern

• Click Instantiate

Page 12: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

12

• Specify the number of VMs and click create

Page 13: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

13

• The VM quickly provisions to Active

• Click New to create another VM

Page 14: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

14

• Select the Win2k8 pattern

Page 15: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

15

• Click Instantiate

Page 16: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

16

• Specify the number of VMs and click create

Page 17: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

17

• The VM quickly provisions to Active

• Select the Machines tab to see both VMs

Page 18: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

18

• Control and manage resources directly from the portal

• Click Power• Click Manage• Click Remote

Access and open a consol

Page 19: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

19

*********

Last login: Wed Apr 3 12:04:15 2013 from admin.ca.ibm.com[root@c445vm01 ~]#

• Remote consoles can be opened for the VMs and hypervisors hosts

Page 20: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

20

• Remote consoles can be opened for the VMs and hypervisors hosts

• Select the Hypervisor Hosts tab

Page 21: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

21

• Both VMs were started on the same hypervisor because the Packing policy is enabled

• Select the Machines tab to see the VM details

• Select the Cluster tab to create load on the system

Page 22: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

22

Meet Demand

• Click the Modify button and select the Add Machines command

Page 23: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

23

• Start and additional 100 VMs to add load to the system

Page 24: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

24

• Start and additional 100 VMs to add load to the system

• The additional 100 VMs are quickly provisioned and powered on

• Click to Refresh the view

Page 25: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

25

• Start and additional 100 VMs to add load to the system

• The additional 100 VMs are quickly provisioned and powered on

• Click to Refresh the view

Page 26: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

26

• Start and additional 100 VMs to add load to the system

• The additional 100 VMs are quickly provisioned and powered on

• Click to Refresh the view

Page 27: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

27

• Start and additional 100 VMs to add load to the system

• The VMs are powered on, registered and ready for use

• Select the Hypervisor Hosts table to see changes to their states

Page 28: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

28

Balance Workloads

• The data center went from one four hypervisors to handle the additional load

• Additional Hypervisors were started to maintain the pool of two standby

• Click the Configure button and select the Demo Load command

Page 29: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

29

• The Demo command adds load on hypervisor 03 and the CPU utilization spikes past the upper limit of 70%

Page 30: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

30

• VMs are migrated away from host 03 to balance the workload

• VMs are started on the standby host and another host is powered on to maintain the two host Standby pool

Page 31: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

31

Manage Workloads

• Put a host into Maintenance mode

• The running VMs are automatically migrated and load balanced on other hosts

• To put the host into maintenance mode, click the Actions button and select the Enter Host Maintenance command

Page 32: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

32

• The VMs running on host 03 are automatically migrated and load balanced on other hosts

• Additional host is started and put into standby mode to main the pool of two

Page 33: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

33

Protect Workloads

• Select the Configure button and select the Demo PFA command to create a PFA

• Click the Alarm icon to see the nature of the error

• The system will automatically migrate and balance the VMs on other hosts

• The automatic VM migration is a function of the High Availability policy. If a host crashes or losses power the HA policy will re-parent the VMs onto other hosts

Page 34: IBM Platform Cluster Manager Data Center  Operating System April 2013

© 2012 IBM Corporation

Platform Computing

34

IBM Platform Cluster Manager – Data Center Operating System

Manage Data Center and ResourcesOptimize Resources and PowerMeet DemandBalance WorkloadsProtect Workloads