Capabilities in projects Pioneer in supplying cables all customers

Extensive Track Record with utilities within the GCC and middle east market.

Extensive supply to all mega projects including ministry of electricity and water in Kuwait, MEW in Bahrain, Military city, SEC (LV, MV, HV, EHV), ARAMCO, SABIC, Royal Commissions, Economic cities, Major civil contractors working in mega projects such as the two holy mosques expansions.

STC & Telecordia (USA) certified Optical Fiber Facilities etc…………

Page 3: Ibrahim makki  saudi cable company

Our Products

Building Wires

THHN

Flexible Cable

LV Cables (up to 1 KV)

MV Cables (up to 36 KV)

HV Cable Systems (up to 132 KV)

EHV Cable Systems (up to 500 KV)

Overhead Transmission Line Cable Systems (up to 500 KV)

POWER CABLE

Page 4: Ibrahim makki  saudi cable company

Telecommunication & Specialty Cables

Communications Cables:

Metallic Telecommunication Cables

Optical Fiber Cables

FTTHSpecialty Cables:

Control Cables

Instrumentation Cable

Fire Resistance cable

Thermocouple cable

Signaling Cable

Foundation Field bus (FF84)

Page 6: Ibrahim makki  saudi cable company

Mobile Site Testing Facility for HV

Page 7: Ibrahim makki  saudi cable company

Global Capability

Emergency response to restore 220 kV vital Power Link in Sri Lanka (within 8 days)

Page 8: Ibrahim makki  saudi cable company

Group Capacity

0

50,000

100,000

150,000

200,000

2005 2006 2007 2008 2009 2010

SCC DK MIDAL

Page 9: Ibrahim makki  saudi cable company

926/02/2008

SCC’s Turnkey Major ExperiencesKahramaaQatar Transmission System Expansion Phase VII [66kV & 220kV].FEWAErection of 33kV Double Circuit Overhead Line & Cabling Works in Northern

Emirates.DEWASupply, Installation, Testing & Commissioning of 132kV Cable Laying Works

for Qusais East 132/11kV Substation and Associated Works.Saudi Electricity CompanyConstruction & Installation of 110kV Power & FO Cables.DEWASupply, Installation, Testing & Commissioning of 132kV Cable Laying Works

for Sports-1, Ryad & Sport-3 132/11kV Substation and Associated Works.Bahrain Water & Electricity Underground CableSaudi Electricity Company Construction & Installation of 110kV Power & FO Cables to connect al-

Nuzlah-2 S/S with Jeddah Network.

Page 10: Ibrahim makki  saudi cable company

MASS Projects………..Cont.

Project Description Contract Value 

Quantity (Route

Length-kms)Name of Client Country

Contract Start/Award

Date

Supply, Installation, Testing & Commissioning of 132/11kV Cable Laying Works for Qusais East, 132/11kV Substations and Associated Works

 AED 21,604,557 29 Dubai Electricity & Water Authority

(DEWA)

Dubai, UAE 1/3/2007

Construction of 110kV Cable to Connect Al-Newariyah Substation with Makkah Al-Mukarramah Network

 SR 34,064,598 43

SEC-WOA

Jeddah, Saudi Arabia

21-Mar-07

Construction & Installation of 110kV Power & Fiber Optic Cable to Connect Al-Nuzlah-2 Substation at with Jeddah Network

 SR 41,527,139 33.6

SEC-WOA

Jeddah, Saudi Arabia

30-Dec-07

220kV Transmission Development (2005-2009) - Phase - II - 220kV Cable Supply, Jointing & Testing (Variation Order)

SR 40,094,212.5  Electricity & Water

Authority

Bahrain 18-Aug-08

Construction & Installation of 110kV Power & Fiber Optic Cable to  Connect New Al-Nakheel Substation at Jeddah

 SR 84,891,106 14

SEC-WOA

Jeddah, Saudi Arabia

28-Sep-08

Page 11: Ibrahim makki  saudi cable company

Saudi Cable CompanyOperation Desert Light - Kuwait

Electricity Restored In Kuwait After Gulf War in 19 Days

Page 12: Ibrahim makki  saudi cable company

© Saudi Cable Group Presentation

Restoring Power to Kuwait City immediately after 1990 invasion of Kuwait

Page 13: Ibrahim makki  saudi cable company

Saudi Cable CompanyOperation Desert Light - Kuwait

Electricity restored in Kuwait after Gulf War in 19 days

I 15,900,000 300 KV 84.262 2,643 31-Mar-91 01-Apr-91 19

II 7,900,000 300 KV 101.700 1,857 05-Apr-91 24-Apr-91 20

III 1,500,000 132 KV 73.520 1,355 02-May-91 08-May-91 7

IV 2,484,000 132 KV 86.857 1,346 13-May-91 05-Jun-91 21

V 6,756,000 300 KV 132 KV

48.00 128.150 2,295 29-May-91 15-Jul-91 45

VI 2,384,874 300 KV 132 KV

37.580 86.964 1,975 03-Sep-91 19-Dec-91 107

VII 1,615,000 300 KV

132/33 KV Mainte nance - 03-Sep-91 30-Dec-91 -

VIII 2,855,320 33 KV 170.000 - 03-Sep-91 19-Dec-91 107

Additional Emergency

Repair 3,323,875 300 KV

132/33 KV NIL - 03-Sep-91 30-Dec-91 -

TOTAL 44,719,069 817.033 11,471

STARTING DATE

ENDING DATE

TOTAL DAYS

PHASE No.CONTRACT

VALUE (US$)

RATED VOLTAGE

ROUTE LENGTH

(KM)

NUMBER OF WORKS (ITEMS)

EXECUTION PERIOD

Page 14: Ibrahim makki  saudi cable company

© Saudi Cable Group Presentation

Lebanon 225 kV Transmission Route Map

Page 15: Ibrahim makki  saudi cable company

© Saudi Cable Group Presentation

Overhead 225 kV “Backbone” Transmission Line – Lebanon

Page 16: Ibrahim makki  saudi cable company

Targeted Market

Oil & Gas Power & Utilities

Petrochemicals Civil & Commercials

Page 18: Ibrahim makki  saudi cable company

A word of Appreciation

Page 19: Ibrahim makki  saudi cable company

Thank you

For further informationE-mail: sales&marketing@ saudicable .com

www.saudicable.com