Page 1: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

ICDS Systems Strengthening and Nutrition Improvement

ProjectProject Launch Workshop: New Delhi

May 9-10, 2013

State: Bihar

Page 2: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

No. of districts covered 19

No. of projects (blocks)* 281

No: of AWCs* 43292

Budget Amount

Total cost of the project (Phase 1 & 2) 350.22

Total cost of Phase 1(3 year) of project 81.84

State’s share for Phase 1 8.18

Cost of Component 1: Institutional and Systems Strengthening 53.54

Cost of Component 2: Community mobilization and behavior change communication

21.49

Cost of Component 3: Piloting Convergent Nutrition Actions 0.53

Cost of Component 4: Project Management, Technical Assistance and Monitoring & Evaluation

6.29

* No. of projects/AWCs as on Sept-2010, used for project cost estimation

In Crore

Page 3: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Preparatory Action

Page 4: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

ActionsStatus

(Put a ‘√’ or ‘X’)Expected Date

1. Has an approval of project been received from the competent authority in the State. If not, by when expected?

In process 30 June

2. Has government order been issued notifying identified 19 districts of their participation in ISSNIP? If not, by when expected?

3. Has an administrative/financial sanction been received for 10% State contribution to the project? If not, by when expected?

4. Has a specific budget head for project (EAP) been created? If not, by when expected?

मु�ख्य शी�र्ष – 2235उपमु�ख्य शी�र्ष - 02लघु� शी�र्ष - 102

5. Is the total cost of the project including 10% State contribution approved by the State Govt.? If not, by when expected?

6. Has any provision been made in the BE 2013-14 for the project? If yes, what amount? If not, by when expected?

In process

Page 5: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Actions Status (Put a

‘√’ or ‘X’)Expected Date

7. Have an administrative order been issued for establishment of the SPMU for ISSNIP? If not, by when expected?

June 30

8. Has a Project Director been nominated for ISSNIP? If yes, Name? In process Identified but not notified

9. Have the Joint Project Coordinators (JPCs) been identified and assigned for each of the following areas under ISSNIP?

- Project Management and Monitoring & Evaluation- Administration and Finance- Procurement- IEC/BCC & Training

Please share names.If not, by when expected?

June 30

10. Has an Office space been identified and provided for ISSNIP SPMU? If not, by when expected?

Within the premises of existing ICDS Directorate (3rd floor )

11. Have the SPMU office needs (equipments/furniture etc) been assessed? Please share. If not, by when expected?

June 30

Page 6: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

ActionsStatus

(Put a ‘√’ or ‘X’)

Expected Date

12. Are there any comments on the financial management and procurement manuals for the Project from the State?Please share.

13. Has a procurement plan been prepared for first 18 months of project?If not, by when expected.

June 30

14. Has the procurement plan been approved by the State Govt.? If not, by when expected?

June 30

15. Have the activities under the four project components been reviewed and identified for implementation during 2013-14? In process

Implementation plan is being developed

Page 7: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Interventions underway • State Level Training for rolling out Revised MIS is planned on 20-

22nd May, 2013 - under component 6.1 B• ‘Gram Varta ‘ A Community Mobilization initiative using

Participatory Learning and Action Approaches already piloted with SHG’s (SWASTH Project) – under component 6.2 A II

• Concept note on Social Audit prepared and the assessment process will start soon – under component 6.2 A IV

• Common Packages of Counseling aids (IPC) for the FLWs and ASHA already developed and piloted – under component 6.2 B II

• Concept already developed on Community Based Event (Bachpan Diwas) – under component 6.2 A V

• Module already developed for the DPOs and CDPOs on Management and Leadership Issues. First round of training on Leadership skills already completed – under component 6.1 C IV

• Joint Training of AWWs and ASHAs on First 1000 Days of Life – under component 6.1 D III

Page 8: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Interventions at a glance ‘Gram Varta ‘ Community Mobilization Pilot with SHG’s

Page 9: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Interventions at a glance Common Packages of Counseling aids (IPC) for the FLWs and ASHA

Page 10: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Plan for Next 3 Months• Notification for the Position of Project Director. • Meeting with the External Technical Agency contracted by

GoI for development of a detailed action plan.• Setting up of State Project Management Unit.• Design the ToRs for Consultants.• Complete the recruitment process.• SPMU Team will finalize the Implementation Plan.• Tender For Procuring Office Equipments and Furniture.

Page 11: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Issues/Challenges and Solutions for full roll-out of ISSNIP

Page 12: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

1. Delivery of Services under ISSNIP in the absence of adequate infra-structure at the grass-root level.

2. Adherence to the time frame.3. Universalisation of ICDS – a pre-requisite for successful roll

out of ISSNIP.4. Overlapping of Mission and ISSNIP districts- potential risk of

duplicacy. Limited capacity of staff to understand and differentiate between Mission and ISSNIP. Additional burden on Sevikas.

5. Development of a Baseline for all components will be time consuming. Learning’s from existing pilots in the State could serve as a Baseline.

Issues/ Challenges

Page 13: ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar

Thanks