ICHARM’S ICHARM’S ICHARM’S ICHARM’S CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING WATER WATER WATER WATER- - -RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH Md. Khairul Islam Executive Engineer, Bangladesh Water Development Board, Dhaka, Bangladesh. Date : March 2, 2016 TOKYO UNIVERSITY ASIA WATER CYCLE SYMPOSIUM 2016 ASIA WATER CYCLE SYMPOSIUM 2016 ASIA WATER CYCLE SYMPOSIUM 2016 ASIA WATER CYCLE SYMPOSIUM 2016

Upload: others

Post on 25-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

ICHARM’SICHARM’SICHARM’SICHARM’S CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING

WATERWATERWATERWATER----RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH

Md. Khairul IslamExecutive Engineer,

Bangladesh Water Development Board,

Dhaka, Bangladesh.

Date : March 2, 2016

TOKYO UNIVERSITY

ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016

Page 2: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

CONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATION

� The Organization I work for

� Challenges my organization is facing currently

regarding water-related issues

� My current activities and responsibilities

� My ambitions (expectations, prospects) for the future

for contributing to water-related issues in my country

Page 3: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB)

A statutory body under the Ministry

of Water Resources, Government of

Bangladesh.

Page 4: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB)

�Development of rivers, flood control, drainage, surface irrigation

� By Constructing dams, barrages, reservoirs, embankments, regulators

�Improvement of water flows

� By dredging, re-excavation and de-siltation of water channels.

�Protection of places of historical and public importance

� By river training and river bank protection works

�Flood forecasting and warning

� By Flood Forecasting and Warning Center

�Development of water user’s association

� By training and participating in all project phases.

Page 5: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

� Water Logging: due to absence of adequate drainage route (Beel Dakatia).

� River Pollution: mainly due to industrial effluent, domestic sewage,

encroachment

BWDB CHALLENGESBWDB CHALLENGESBWDB CHALLENGESBWDB CHALLENGES� Flood: A common phenomenon in Bangladesh

1996

� Urban Drainage Congestion: due to Backwater effect of river flooding,

Hindrance by infrastructures

� River Bank Erosion: A major impact of river flooding at the time of

recession

� Inundation: due to placement of dam or other intervention (fringe area in

the Kaptai reservoir). But often no distinction is made between flooding

and inundation.

Page 6: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES

� Improvement of water flows of Buriganga river

� By dredging, re-excavation and de-siltation of water channels.

� Buriganga river pollution around Dhaka city

� mainly due to industrial effluent, domestic sewage, encroachment.

Page 7: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Background

�Water flow declined significantly

�Water became polluted � Posing serious threat

�Does not receive flows from the feeder river

�Nearly no flow condition during dry season.

� To meet the above issues and challenges the Project has been

taken up for achieving sustainable development by water

diversion of Jamuna river.

Page 8: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

Jamuna

(Lower Brahmaputra)

New Dhaleswari

Pungli

Bangshi

Turag

Buriganga

Offtake of New Dhaleswari: 245 m3/sOfftake of New Dhaleswari: 245 m3/s

DhakaDhaka

Turag-Tongi Khal offtake: 162 m3/s

Tongi Khal: 19 m3/sTongi Khal: 19 m3/s

Buriganga: 141 m3/sBuriganga: 141 m3/s

Lakhya: 16 m3/sLakhya: 16 m3/s

BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT

Page 9: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT

� Objective of the Project

�Specific objectives: maintain dry season minimum flow for

�Improving water quality

�Meeting navigational depth

At the peripheral rivers of the Dhaka city.

� Others

� Irrigation and fisheries development.

� Improvement of overall economic, social & environmental condition.

� Unauthorized encroachment control along Buriganga River

Page 10: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Main Physical component of the project:

� Dredging/re-excavation of Rivers 162.5 km� Stop Log Sand barrier 1 no.� Flush sluice 1 no.� Training Bank 300 m� Sediment Basin 1 no.

� Project Cost: Tk. 24440.00 million

Page 11: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Challenges

�New Dhaleswari off-take been silting up regularly

�Solution: Off-take management by different structures

�Dredging may damage foundations of 22 bridges

�Solution: Re-construction and foundation treatment

�Reduction of planned dredging section

� Illegal Encroachment along the river system

Page 12: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

FUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATER----RELATED ISSUES RELATED ISSUES RELATED ISSUES RELATED ISSUES

� Water Resources Management

�Comprehensive river management development for all major rivers

�Rationalizing flood management systems

� Increasing water use efficiency in surface and ground water irrigation

� Increasing availability of surface water

�Ensuring effective stakeholders’ participations

� Institutional development and inter-institutional management

Page 13: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi

FUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATER----RELATED ISSUES RELATED ISSUES RELATED ISSUES RELATED ISSUES � Disaster Risk Reduction

�Development of a reliable long-term prediction of river bank erosion

�Reliable predictions of extreme climatic events

�Development of a community-based flood forecasting system

� Environment

� Improving connectivity between flood plains with the river systems to

revitalize water dependent eco-systems

� Waste water & water quality

�A comprehensive waste water management system

�Conducting water quality monitoring regularly and rigorously

Page 14: ICHARM’SICHARM’SCAPACITY BUILDING: CAPACITY BUILDING: …wci.t.u-tokyo.ac.jp/events/awcs2016/presen/6-2-7.pdf · Turag Buriganga Offtake of New Dhaleswari: 245 m 3/s Dhaka Turag-Tongi