ichq8, 9 & 10 the history and overview

42
1 ICH Q8, 9 & 10 the History and Overview ICH Q8, 9 & 10 the History and Overview Peter H. Gough David Begg Associates [email protected]

Upload: narendrakumar

Post on 10-Apr-2015

307 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICHQ8, 9 & 10 the History and Overview

1

ICH Q8, 9 & 10 the History and

Overview

ICH Q8, 9 & 10 the History and

Overview

Peter H. GoughDavid Begg Associates

[email protected]

Page 2: ICHQ8, 9 & 10 the History and Overview

2

History of Pharmaceutical Quality ManagementHistory of Pharmaceutical Quality Management

1960’s and before: Reliant solely on Quality Control

Focused on the Product SpecificationDefect Detection by End Product Testing

AdvantageSometimes detects defects

DisadvantagesFaults found too lateOften failsHigh Cost

Page 3: ICHQ8, 9 & 10 the History and Overview

3

History of Pharmaceutical Quality ManagementHistory of Pharmaceutical Quality Management

Early-1970’s: added Quality Assurance & GMPWritten ProceduresFocus on the Production ProcessDefect Prevention using Process Controls

AdvantagesDocumented SystemsImproved Quality

DisadvantageQuality still owned by "Quality Department"

Page 4: ICHQ8, 9 & 10 the History and Overview

4

Quality Management in Other IndustriesQuality Management in Other Industries

Since 1980’s; Total Quality conceptQuality Culture, everybody is responsible for Quality Continual ImprovementHolistic approach

AdvantagesQuality is by design and is habitual6-sigma process capability, or better

DisadvantageDifficult to achieve, taking sustained commitmentNot adopted by Pharmaceutical industry

Page 5: ICHQ8, 9 & 10 the History and Overview

5

Why had pharmaceutical quality management failed to evolve?Why had pharmaceutical quality management failed to evolve?

The Regulatory processes

Industry practiceSeparation of Development and Manufacturing worlds

The Regulatory processes

Industry practiceSeparation of Development and Manufacturing worlds

Page 6: ICHQ8, 9 & 10 the History and Overview

6

Product life-cycle circa. 2003Product life-cycle circa. 2003

Discovery Withdrawal

Development Manufacture

GMP

Time

GLP & GCP

MarketingApproval

No Integrated Quality System

Page 7: ICHQ8, 9 & 10 the History and Overview

7

Marketing AuthorisationMarketing Authorisation

Huge financial pressures on companies to obtain a Marketing Authorisation

Forced to accept specifications, etc. that are not optimal

Different Regulatory Authorities pose different demands, based on common data

Huge financial pressures on companies to obtain a Marketing Authorisation

Forced to accept specifications, etc. that are not optimal

Different Regulatory Authorities pose different demands, based on common data

Page 8: ICHQ8, 9 & 10 the History and Overview

8

Post-approval changes and improvementPost-approval changes and improvement

Regulatory Authority requirements for post-approval changes present a barrier to the improvement of manufacturing processes and controls.

Regulations are National or Regional.

Pharmaceutical manufacturing today is increasingly global

Regulatory Authority requirements for post-approval changes present a barrier to the improvement of manufacturing processes and controls.

Regulations are National or Regional.

Pharmaceutical manufacturing today is increasingly global

Page 9: ICHQ8, 9 & 10 the History and Overview

9

Post-approval change – the barrier to improvementPost-approval change – the barrier to improvement

Example:Tablet product - manufactured at 1 site; supplied to 100+ marketsChange to manufacturing process or controls:

Have to submit ca. 20 variations worldwideApproval times vary from 2 to 36 monthsHow does industry cope?

Run old and new process/controls concurrently?Build 3 years stock?Wait 3 years to implement?Be out of compliance in markets taking longer to approve?

Example:Tablet product - manufactured at 1 site; supplied to 100+ marketsChange to manufacturing process or controls:

Have to submit ca. 20 variations worldwideApproval times vary from 2 to 36 monthsHow does industry cope?

Run old and new process/controls concurrently?Build 3 years stock?Wait 3 years to implement?Be out of compliance in markets taking longer to approve?

Page 10: ICHQ8, 9 & 10 the History and Overview

10

Other Barriers to Continual ImprovementOther Barriers to Continual Improvement

Reviewers not familiar with new technology

Extended review times

GMP inspectors not familiar with new technology

Risk of inspection findings

OutcomeA large disincentive to continuous improvementPharmaceutical quality management stuck in the 1970s

Reviewers not familiar with new technology

Extended review times

GMP inspectors not familiar with new technology

Risk of inspection findings

OutcomeA large disincentive to continuous improvementPharmaceutical quality management stuck in the 1970s

Page 11: ICHQ8, 9 & 10 the History and Overview

11

A New Approach to RegulationA New Approach to Regulation

2001 - 2002

American Food and Drug Administration (FDA) suggested a new approach

Process Analytical Technology (PAT)21st Century GMP initiatives.

2001 - 2002

American Food and Drug Administration (FDA) suggested a new approach

Process Analytical Technology (PAT)21st Century GMP initiatives.

Page 12: ICHQ8, 9 & 10 the History and Overview

12

Process Analytical Technology (PAT)Process Analytical Technology (PAT)

Not just testing but a philosophy of

Control in-process rather than end-product testing

Minimises risks of poor quality

Not just testing but a philosophy of

Control in-process rather than end-product testing

Minimises risks of poor quality

Page 13: ICHQ8, 9 & 10 the History and Overview

13

PAT Approach – Quality by DesignPAT Approach – Quality by Design

Identify the parameters that are criticalto product quality

Statistically designed experiments

Measure these parameters

Control these parametersFeed backFeed forward

Identify the parameters that are criticalto product quality

Statistically designed experiments

Measure these parameters

Control these parametersFeed backFeed forward

Page 14: ICHQ8, 9 & 10 the History and Overview

14

Paradigm ShiftParadigm Shift

Current paradigm:Current paradigm:

Starting Materials

Variable

Processing parameters

Fixed

Product

Variable

Page 15: ICHQ8, 9 & 10 the History and Overview

15

Paradigm ShiftParadigm Shift

PAT paradigm:PAT paradigm:

Starting Materials

Variable

Processing parameters

Variable

Product

Fixed

Page 16: ICHQ8, 9 & 10 the History and Overview

16

ICHICH

International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals

for Human Use (ICH)

International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals

for Human Use (ICH)

Page 17: ICHQ8, 9 & 10 the History and Overview

17

ICH ParticipantsICH Participants

Q Q ualityS S afetyE E fficacyM M ultidisciplinary

Expert WorkingGroups (EWGs)

Page 18: ICHQ8, 9 & 10 the History and Overview

18

ICH GMP WorkshopICH GMP Workshop

EU, Japan and ‘observers’ joined USA to define a new paradigm at an ICH GMP Workshop in Brussels, July 2003This Workshop agreed a 5 year Vision:

Create a single, harmonised global quality standard and interpretation based on good science and risk management principles

EU, Japan and ‘observers’ joined USA to define a new paradigm at an ICH GMP Workshop in Brussels, July 2003This Workshop agreed a 5 year Vision:

Create a single, harmonised global quality standard and interpretation based on good science and risk management principles

Page 19: ICHQ8, 9 & 10 the History and Overview

19

Incremental Steps to Achieve the VisionIncremental Steps to Achieve the Vision

The GMP Workshop agreed that the Vision would be achieved by “incremental steps”

Q8 EWG, on Pharmaceutical Development, established in September 2003Q9 EWG, on Quality Risk Management, established in November 2003Q10 EWG, on Pharmaceutical Quality Systems, established in November 2005

The GMP Workshop agreed that the Vision would be achieved by “incremental steps”

Q8 EWG, on Pharmaceutical Development, established in September 2003Q9 EWG, on Quality Risk Management, established in November 2003Q10 EWG, on Pharmaceutical Quality Systems, established in November 2005

Page 20: ICHQ8, 9 & 10 the History and Overview

20

Pharmaceutical Development (Q8)Pharmaceutical Development (Q8)Old: Data transfer / variable output

New: Knowledge transfer / Consistent output

Quality Systems (Q10)Quality Systems (Q10)Old: Large variability on Q-systems

New: Consistency on Q-systems

Quality Risk Management (Q9)Quality Risk Management (Q9)Old: Unstructured approach

New: Opportunity to use a structured process

ChangedParadigm

Q8

Q9 Q

10

Achieve by Incremental StepsAchieve by Incremental Steps

Page 21: ICHQ8, 9 & 10 the History and Overview

21

Flexible Regulatory ApproachFlexible Regulatory ApproachRegulators evaluate risk, based on:

Product and process design (Q8)Measures to evaluate and manage risks (Q9)Quality system implementation (Q10)

Regulators determine risk and modify level of oversight accordingly for:

SubmissionsPost-approval change reviewGMP inspections

Result:Removal of barriers to continuous improvementEfficient use of resources by industry and regulators

Regulators evaluate risk, based on:Product and process design (Q8)Measures to evaluate and manage risks (Q9)Quality system implementation (Q10)

Regulators determine risk and modify level of oversight accordingly for:

SubmissionsPost-approval change reviewGMP inspections

Result:Removal of barriers to continuous improvementEfficient use of resources by industry and regulators

Page 22: ICHQ8, 9 & 10 the History and Overview

22

ICH Q8“Pharmaceutical Development”

ICH Q8“Pharmaceutical Development”

Page 23: ICHQ8, 9 & 10 the History and Overview

23

Q8 seeks to DeliverQ8 seeks to Deliver

Product quality and performance achieved and assured by design of effective manufacturing processes

Product specifications based on mechanistic understanding of how formulation and process factors impact product performance

An ability to affect continuous improvement and continuous "real time" assurance of quality

Product quality and performance achieved and assured by design of effective manufacturing processes

Product specifications based on mechanistic understanding of how formulation and process factors impact product performance

An ability to affect continuous improvement and continuous "real time" assurance of quality

Page 24: ICHQ8, 9 & 10 the History and Overview

24

Q8 Key ConceptsQ8 Key Concepts

Q8 is the way that PAT concepts can be integrated with the Regulatory process

Information from pharmaceutical development studies is a basis for risk management (using Q9)

Identify critical parameters, which carry the risk

This assessment helps define the ‘design space’

Q8 is the way that PAT concepts can be integrated with the Regulatory process

Information from pharmaceutical development studies is a basis for risk management (using Q9)

Identify critical parameters, which carry the risk

This assessment helps define the ‘design space’

Page 25: ICHQ8, 9 & 10 the History and Overview

25

Design SpaceDesign Space

Design space is the multidimensional combination and interaction of input variables (e.g. material attributes) and process parameters that have been demonstrated to provide assurance of quality .

Design space is the multidimensional combination and interaction of input variables (e.g. material attributes) and process parameters that have been demonstrated to provide assurance of quality .

Page 26: ICHQ8, 9 & 10 the History and Overview

26

Knowledge Space

Design SpaceDesign Space

The batch process settings are NOT registered and, hence, moving them within the Design Space is NOT a change

The batch process settings are NOT registered and, hence, moving them within the Design Space is NOT a change

Design Space

Batch process settings

Page 27: ICHQ8, 9 & 10 the History and Overview

27

Design SpaceDesign Space

Design space is the multidimensional combination and interaction of input variables (e.g. material attributes) and process parameters that have been demonstrated to provide assurance of quality .

Design space is the multidimensional combination and interaction of input variables (e.g. material attributes) and process parameters that have been demonstrated to provide assurance of quality .

Page 28: ICHQ8, 9 & 10 the History and Overview

28

n-Dimensional Design Spacen-Dimensional Design Space

% Moisture

ParticleSize

SurfaceArea

% lubricant

Interaction 1

Interaction 2

Design Space – n-D(Bulk Blend)

Batch process settings

Describing Flavour – Coffee(Flavour Space)

Sweet

Toast

Chocolate

Cinnamon

Tobacco

Peat

Page 29: ICHQ8, 9 & 10 the History and Overview

29

ICH Q8 (R1)ICH Q8 (R1)

Received Step 2 approval 1 Nov. 2007Hoped to reach Step 4 in June 2008ICH Q8 (R1) provides an annex to Q8 guideline.This annex elaborates the elements of pharmaceutical development as:

Target Product ProfileCritical Quality Attributes (CQA)Linking material attributes and process parameters to CQAs by risk assessmentDesign SpaceControl StrategyProduct lifecycle management and continual improvement

Received Step 2 approval 1 Nov. 2007Hoped to reach Step 4 in June 2008ICH Q8 (R1) provides an annex to Q8 guideline.This annex elaborates the elements of pharmaceutical development as:

Target Product ProfileCritical Quality Attributes (CQA)Linking material attributes and process parameters to CQAs by risk assessmentDesign SpaceControl StrategyProduct lifecycle management and continual improvement

Page 30: ICHQ8, 9 & 10 the History and Overview

30

ICH Q8 (R1) – Design SpaceICH Q8 (R1) – Design Space

Concept of ‘Design Space’ is elaborated upon with guidance on:

Selection of variablesDefining and describing a design space in a submissionUnit operation design space(s)Relationship of Design Space to scale and equipmentDesign Space versus proven acceptable rangesDesign Space and edge of failure

Concept of ‘Design Space’ is elaborated upon with guidance on:

Selection of variablesDefining and describing a design space in a submissionUnit operation design space(s)Relationship of Design Space to scale and equipmentDesign Space versus proven acceptable rangesDesign Space and edge of failure

Page 31: ICHQ8, 9 & 10 the History and Overview

31

ICH Q8 (R1) – Appendix 1- Overall DevelopmentICH Q8 (R1) – Appendix 1- Overall Development

Systematic, relating mechanistic understanding of input material attributes and process parameters to drug product CQAs

Multivariate experiments to understand product and process

Establishment of design space

PAT tools utilised

Mainly empirical

Developmental research often conducted one variable at a time

QbD Approach‘Minimal’ Approach

Page 32: ICHQ8, 9 & 10 the History and Overview

32

ICH Q9“Quality Risk Management”

ICH Q9“Quality Risk Management”

Page 33: ICHQ8, 9 & 10 the History and Overview

33

ICH Q9 - Principles of Quality Risk ManagementICH Q9 - Principles of Quality Risk Management

Two primary principles:

1. The evaluation of the risk to quality should be based on scientific knowledgeand ultimately link to the protection of the patient.

2. The level of effort, formality and documentation of the quality risk management process should be commensurate with the level of risk.

Two primary principles:

1. The evaluation of the risk to quality should be based on scientific knowledgeand ultimately link to the protection of the patient.

2. The level of effort, formality and documentation of the quality risk management process should be commensurate with the level of risk.

Page 34: ICHQ8, 9 & 10 the History and Overview

34

ICH Q9 –Quality Risk Management Process ICH Q9 –Quality Risk Management Process

Page 35: ICHQ8, 9 & 10 the History and Overview

35

Risk Management Methodology Risk Management Methodology

Failure Mode Effects Analysis (FMEA)

Failure Mode Effects & Criticality Analysis (FMCEA)

Fault Tree Analysis (FTA)

Hazard Analysis of Critical Control Points (HACCP)

Hazard Operability Analysis (HAZOP)

Risk Ranking and Filtering

Preliminary Hazard Analysis (PHA)

Supporting statistical tools

Failure Mode Effects Analysis (FMEA)

Failure Mode Effects & Criticality Analysis (FMCEA)

Fault Tree Analysis (FTA)

Hazard Analysis of Critical Control Points (HACCP)

Hazard Operability Analysis (HAZOP)

Risk Ranking and Filtering

Preliminary Hazard Analysis (PHA)

Supporting statistical tools Annex I:•Short description•Potential areasof use

Page 36: ICHQ8, 9 & 10 the History and Overview

36

ICH Q10“Pharmaceutical Quality

Systems”

ICH Q10“Pharmaceutical Quality

Systems”

Page 37: ICHQ8, 9 & 10 the History and Overview

37

ICH Q10 – ObjectiveICH Q10 – Objective

The objective is to describe a model for an effective quality management system for the pharma. industry, referred to as the pharmaceutical quality system, that:

Ensures the realisation of a quality drug product Establishes and maintains a state of controlFacilitates continual improvement over the product lifecycle

The objective is to describe a model for an effective quality management system for the pharma. industry, referred to as the pharmaceutical quality system, that:

Ensures the realisation of a quality drug product Establishes and maintains a state of controlFacilitates continual improvement over the product lifecycle

Page 38: ICHQ8, 9 & 10 the History and Overview

38

Q10 – IntroductionQ10 – Introduction

Q10 will:Augment existing GMPs

Provide a bridge between different regional regulations

Complement and facilitate implementation of Q8“Pharmaceutical Development” and Q9 “Quality Risk Management”

Q10 will:Augment existing GMPs

Provide a bridge between different regional regulations

Complement and facilitate implementation of Q8“Pharmaceutical Development” and Q9 “Quality Risk Management”

Page 39: ICHQ8, 9 & 10 the History and Overview

39

Q10 - EnablersQ10 - Enablers

The enablers provide the means for science- and risk-based decisions related to product qualityKnowledge Management

Manage knowledge from development through commercialisation to discontinuation

Quality Risk Management (Q9)Proactive approach to managing risks to quality

The enablers provide the means for science- and risk-based decisions related to product qualityKnowledge Management

Manage knowledge from development through commercialisation to discontinuation

Quality Risk Management (Q9)Proactive approach to managing risks to quality

Page 40: ICHQ8, 9 & 10 the History and Overview

40

The ‘Desired State’The ‘Desired State’

Product quality and performance achieved by design

Specifications based on mechanistic understanding of how formulation and process factors impact product performance

Continuous “real time” assurance of quality

Product quality and performance achieved by design

Specifications based on mechanistic understanding of how formulation and process factors impact product performance

Continuous “real time” assurance of quality

Page 41: ICHQ8, 9 & 10 the History and Overview

41

ICH Quality GMP Related Activities - Current StatusICH Quality GMP Related Activities - Current Status

Q8 – Pharmaceutical DevelopmentApproved by ICH in November 2005Implemented in EU, Japan and USA during 2006Q8(R1) at Step 3 of ICH process

Q9 – Quality Risk ManagementApproved by ICH in November 2005Implemented in Japan & USA during 2006 and in EU in March 2008

Q10 – Pharmaceutical Quality SystemsAt Step 3 of ICH processExpect final ICH approval in June 2008

Q8 – Pharmaceutical DevelopmentApproved by ICH in November 2005Implemented in EU, Japan and USA during 2006Q8(R1) at Step 3 of ICH process

Q9 – Quality Risk ManagementApproved by ICH in November 2005Implemented in Japan & USA during 2006 and in EU in March 2008

Q10 – Pharmaceutical Quality SystemsAt Step 3 of ICH processExpect final ICH approval in June 2008

Page 42: ICHQ8, 9 & 10 the History and Overview

e-mail: [email protected]

www.david-begg-associates.com