ici proposal

35
FNBE AUG 2014 INTAKE Lecturer : Ms Ann See Peng Pe Zhi Yong (0319765) Seet Tiong Hong (0320438) 1 Introduction To Construction Industry Final Project ICI Final

Upload: masonsth

Post on 07-Aug-2015

92 views

Category:

Education


0 download

TRANSCRIPT

FNBE AUG 2014 INTAKE

Lecturer : Ms Ann See Peng

Pe Zhi Yong (0319765)

Seet Tiong Hong (0320438)

1Introduction To Construction Industry Final Project

ICI Final Project

ContentNo Description Page

1 Site Introduction 3

2 Zoning 4

3 Site Analysis & Observation 5-11

4 Proposal 12

5 Concept 13

6 Sketch Plan 14

7 Image of Idea 15-218 Rationale & Benefits 22

9 Maintenance 23

10 Costing 24-25

11 Reference 26

2Introduction To Construction Industry Final Project

Site Introduction

3Introduction To Construction Industry Final Project

• Bandar Sungai Long is a main township in Kajang, Selangor, Malaysia. The Universiti Tunku Abdul Rahman (UTAR) operates a campus in Bandar Sungai Long.It is currently under the administration of local council Majlis Perbandaran Kajang (MPKj).

• The Sungai Long Golf & Country Club is situated in this township. Bandar Sungai Long was designed for a population of 10,000 residents. It was built around the "leisure" living theme with residential homes surrounding an 18-hole golf course. High end detached houses were built around the golf course with semi-detached and terraced residential dwellings alongside condominiums, commercial properties and low cost low rise apartments on the outer edges of the development. The majority population in this township are Chinese.

Zoning

4Introduction To Construction Industry Final Project

Residential Area

Commercial Area

Education Area

Picture above showed that the Sungai Long Gold & Country club is surrounded by residential areas. There is 3 Educational Area, which is primary school (under construction), secondary school (SMKBBSL), and university (UTAR).

The site is surrounded by all residential area and each residential area has its own recreational park. The site is located at SL14 residential area which is being called as “ASCARA RESIDENCY”. Ascara Residence is a freehold gated and guarded semi-detached homes nestled in Bandar Sungai Long. The residential development is developed by SHL Consolidated under Sin Heap Lee Development Group, and it was completed in 2005.

Site Analysis&ObservationSite Plan

ASCARA DEVELOPMENT COMPRISES:

5Introduction To Construction Industry Final Project

• 66 semi-detached houses

• Built within parcel of 3.761 hectares (9 acres)

• Building blocks are arranged to avoid facing west

• Playground

• Concealed drains with walk paths

• Concealed telephone & streetlight cabling system

6Introduction To Construction Industry Final Project

The Site

7Introduction To Construction Industry Final Project

The site is located at Jalan SL 14, Bandar Sungai Long, Kajang, Selangor. Which GPS Coordinated (3.038357, 101.799740). It is surrounded by one of the main road in residential area and houses. The Area of the site is amount 1216 m2.The amount of traffic around is high and busy every morning and evening

8Introduction To Construction Industry Final Project

D

B

AC

Site Plan

9Introduction To Construction Industry Final Project

• The site is surrounded by all residential area and each residential area has its own recreational park

Recreational Park Around The Site• Located at SL 14

• Consists of playground ,bench and sidewalks

• Located at Taming Indah 1

• Consist of Playground, Gazebo, Football Field

10Introduction To Construction Industry Final Project

• Located at SL 4• Provided : playground, football field , garden

walk

Conclusion:

In a nutshell, most of the recreational parks do not have common exercising area such as the basketball and badminton courts. However, there's is a country club with comprehensive facilities, which include Olympic sized swimming pool, tennis courts, squash & badminton courts, bowling alley, gym, snooker and pool room, coffee house and a beautiful 18-hole Jack Nicklaus-designed golf course. Sadly, it is a private club which only welcomes its members. Only club members are allow to enjoy those facilities in the club.

11Introduction To Construction Industry Final Project

Proposal – Recreational Area

In this 1216 m2 land, we have decided to develop a mini sports and recreational area (MSRA) that would benefits the residence of Ascara Residence, Kajang, Selangor in terms of health and relationship between the residence. This MRSA consists of a 420 m2 basketball court, two 105 m2 badminton courts, bicycle stop and an exercise area.

Considering that most of the user would be the children and teenagers, the bicycle stop is being introduced. The bicycle stop also encourages the residences to be more active in exercising which promotes good health.

Besides, bleachers are provided to watch competitions that are especially being organized by the authorities of the Ascara Residence. 2 benches are also being provided in between 2 badminton courts as most of the players tend to be very tired after the intensive game and they could keep their eye open on their belongings that are being placed on the benches.

Moreover, there will be one mini garden that the residence could exercise and also relax at as the gazebo is being provided. The senior residences could spend most of their time to keep their minds alert.

Next, the sporting net will be built around the proposed MRSA to prevent the ball from getting out of the court for safety purposes. There will be two entrances in the park. The first one would be the entrance near the mini garden and the other one would be near the basketball courts.

12Introduction To Construction Industry Final Project

Concept – Green Materials

The Mini Sport and Recreational Park will be designed on a 40 m X 30 m site in Kajang, Ascara Residence. The proposed MRSP will be built using mainly green or sustainable materials such as the green concrete. The production of normal concrete produces large amount of carbon dioxide. The badminton and basketball courts will be built mainly using green concrete. By using this material, I could cut the overall construction cost and it’s more sustainable. Besides, the gazebo is being included in the park so that the senior residence is able to keep their minds alert by communicating with each other.

13Introduction To Construction Industry Final Project

Sketch Plan

14Introduction To Construction Industry Final Project

2

4

3 5

1

6

2

1

3

4

6

5

Gazebo

Bench Bleacher

Badminton Court

Basketball Court

Bicycle Stop

BinSpotlight Yellow Flame Tree

Legend

Image Of IdeaBleacher

Bench

15Introduction To Construction Industry Final Project

Purpose: To encourage residence to take part in any activities at the park (support or take part).

Other Uses: Place where spectators will cheer for their teams whenever there is a competition.

Purpose: To let the residence put their belongings (bag, towel) to take a rest and also to wait for their turns in the activities.

Other Uses: Place to have conversation.

Sporting Net

Gazebo

Stainless Bin

16Introduction To Construction Industry Final Project

Purpose: To prevent the ball from getting out of the court.

Other Uses: To prevent the players from falling onto the ground.

Purpose: To gather the residence especially the senior one.

Other Uses: As a place where residence meeting is being held at.

LED Spotlight

17Introduction To Construction Industry Final Project

Purpose: Keep the park clean.

Other Uses: Witstand adverse weather conditions. Easy to maintain.

Purpose: To keep the park in visible at night.

Other Uses: To prevent someone from hiding in the park.

FacilitiesBasketball

A 420 m2 basketball court is being included in the plan. The basketball court will be constructed using green concrete. This is court is being built is because we have found out that the surrounding neighborhoods do not have any basketball court. So, by building it, it helps basketball players and those who are interested to improve their health and also skills as well as unite them.

18Introduction To Construction Industry Final Project

Badminton Court

After doing few researches around the neighborhoods, we have also found out that those neighborhoods are lacked of badminton courts. We have planned to construct two badminton courts at the site to encourage healthy lifestyle and clearer minds.

19Introduction To Construction Industry Final Project

Bicycle Stop

We have also proposed bicycle stop in the recreation park at Ascara Residence. The reason we proposed bicycle stop is that we estimate that most of the user would be the teenagers and children of the Ascara residence. Therefore, most of them would use bicycle to travel to the park. Moreover, adults are also encouraged to cycle to improve their health.

20Introduction To Construction Industry Final Project

SoftscapeName: Peltophorum Pterocarpum (Yellow Flame Tree)

Height: 15-16m

Spacing: 12m

Colour: Yellow

Begins To Flower: 4 years

Distribution: Australasia, Sri Lanka, Thailand, Vietnam, Indonesia, Malaysia, Papua New Guinea and Philippines.

Propagation Method: Seeds, Direct Planting

Uses: Ornament Tree

1) Wood – Cabinet-making2) Foliage - Fodder

21Introduction To Construction Industry Final Project

Rationale & Benefit We found that the surrounding area of Ascara Residence do not have enough sport facilities. In order to take part in sport activities (basketball), one has to travel out from the neighborhood. By doing so, it not only will affect the safety of the residence but also their health. (Intake of CO2 from vehicles)

The site is an abandoned space. As a result, the site is currently purposeless. Therefore, in order to fully utilize the space in the residential area, a park is being built for win-win situation.

This Mini Sport and Recreational Park is being built for several reasons and benefits. First and foremost, it is to promote healthy lifestyle to the Ascara Residence.

The courts are being included in the construction plan is mainly to empower and motivate the youth. Sports will not only keep their minds at the top form but also neutralize youth with higher energy. The park also

Besides, the park is being built to unite the Ascara residence. By taking part in those activities that could be done in the park will improve the bond between the residence which leads to a safer residential area. Everyone will take care and cooperate with each other.

22Introduction To Construction Industry Final Project

MaintenanceMaintenance Cost

Labour cost RM/Mth

1 labourer @ RM 50/day X 4 times a month. 200

1 supervisor @ RM 65/day X 4 times a month. 260

Transportation – lorry @ RM 100/day X 4 times a month 400

Material cost

Fertiliser; once a month 100 Replacement of dead plants. 100

Total 1060

Add profit & overhead 20% 332

RM 1,392/Month

23Introduction To Construction Industry Final Project

CostingHardscape Cost RM

• Green concrete paver @ RM 150 X 630 m2 94,500

• Sporting net @ RM 0.36 X 1216 m2 437.76

• Basketball goal @ RM 1,000 X 2 2,000

• Badminton net @ RM 32 X 2 Nos 64

• LED Spotlight @ RM 98 X 11 Nos 1,078

• Bleacher @ RM 1000 X 1 Set 1,000

• Bench @ RM 100 X 2 Nos 200

• Gazebo @ RM 5000 X 1 No 5,000

• Stainless Steel Bin @RM 80 X 2 Nos 160

• Steel Gate @ RM 400 X 2 Nos 800

Total 105,239.76

24Introduction To Construction Industry Final Project

Softscape Costing RM

• Yellow Flame Tree @RM800 X 5 4,000

• Shrubs @ RM 50 X 50 2,500• Taiwan grass @

RM 30 X 600 m2 18,000

Total RM 24,500

Summary

RM

• Hardscape Costs 105,239.76• Softscape Costs 24,500.00• Maintenance 1,392.00

Total Amount 131,131.76

25Introduction To Construction Industry Final Project

Reference

26Introduction To Construction Industry Final Project

Articles from:• http:// www.myweather2.com/City-Town/Malaysia/Sungai-Long-Golf-And-

Country-Club.aspx• http:// en.wikipedia.org/wiki/Bandar_Sungai_Long • http:// www.bbc.com/news/magazine-17818223 • http://www.thestar.com.my/story/?file=% 2f2012%2f11%2f14%2fcentral

%2f12294699&sec=central• http://www.bandarsungailong.com / • http:// www.shlcb.com.my/bsl/bsl_smd.html

Pictures from:• http:// i.dailymail.co.uk/i/pix/2009/01/16/article-1119504-

03146CB7000005DC-593_468x542.jpg• http:// static.guim.co.uk/sys-images/Guardian/Pix/pictures/

2009/4/15/1239831052790/Free-outdoor-gym-equipmen-001.jpg• http://news.bbcimg.co.uk/media/images/59877000/

jpg/_ 59877917_adult_playground_624.jpg • http:// www.kcrenterprisesllc.com/wp-content/uploads/2013/07/Tennis-court-

and-basketball-court.jpg• http:// www.flexcourt.com/images/layouts/layout-multi-30x64.png • http:// www.falco.co.uk/bestanden/600x600/1140.jpg