idea method overview slides_reviewed_pf

Upload: alina-alex

Post on 03-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    1/87

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    2/87

    Page 2 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    How to use this example

    The presentation covers a complete IDEA cycle, covering all stages, phases, and workstreams

    There is more material than you will need depending on the client situation pick the element that

    fit best in terms of volume and contents

    The following elements have to be adapted to the specific client situation

    Timelines and duration of stages and phases

    Deliverables: Might have to be extended or reduced

    Indication of in scope/out of scope (color code applies only to fix price projects)

    Assignment of tasks to Lodestone, client business, client IT

    In case you need additional material, please contact Jo-Ann Chua

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    3/87

    Page 3 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview slides

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    4/87

    Page 4 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    IDEA methodology

    Overview

    The SAP Solution Manager IDEAroadmaps give SAP implementation projects a rapid start, a clear

    structure and an access to the full library of the IDEAmethod accelerators

    IDEA is a Lodestone owned methodology, structured into a Insight- Design-, Execute-, and Achieve phase to support allstages of global ERP program initiatives

    Lodestone maintains its IDEAmethods as SAP Solution Manager IDEAroadmaps

    The IDEAmethodology is managed within Lodestone by using a Wiki application platform. Via the Wiki every Lodestone

    employee has got an access to the IDEAmethodology and the ability for an active contribution to the methodology

    The methodology has proved to be successful in multiple large, international programs, and is

    continuously enhance with our experience

    The IDEAmethodology is based upon the standard SAP ASAP roadmap, but enlarged by specific stages, accelerators, and

    tools to address complex business transformation requirements

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    5/87Page 5 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    IDEA methodology

    Knowledge sources

    Lodestone has based its methodology on SAP ASAP, Six Sigma and the international

    standard from the Project Management Institute (PMI) (www.pmi.org)

    It combines these standard methodologies with its own best practices and extensive

    experience from various global business harmonization and SAP rollouts projects with

    major global companies

    Lodestone trains its employee communities according to the Lodestone methodology and

    provides them with standard tools, templates and best practices to ensure high qualityand consistency in project work

    +

    Extensive project experience

    and best-practices from

    complex businesstransformation project with

    major global companies

    http://www.pmi.org/http://www.pmi.org/
  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    6/87Page 6 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Stages and work streams

    According to the methodology a business transformation live cycle can be

    divided into four stagesand eleven work-streamsas shown in the figure

    Business Process Management (BPM)

    Training (TRN)

    Org. Change Management (OCM)

    Project Management (PJM)

    Program Management (PRM)

    Data Management (DMA)

    Security and Authorization (SAA)

    Development Management (DEM)

    System and Performance Testing (SPT)

    Centre of Excellence (COE)

    Technical Infrastructure (TIN)

    Achievestage

    Executestage

    Designstage

    Insightstage

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    7/87Page 7 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Stages and phases on Solution Manager

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    8/87Page 8 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    IDEA on ASAP through the Wiki (HTML version)

    IDEA on ASAPlink on the Wiki homepage provides access

    Information, documentation, and contact details are all available

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    9/87Page 9 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    IDEA model based on five terms

    Stage, phase, work stream, work package, accelerator

    ExecuteInsight AchieveDesign

    Global

    preparation

    Global

    realization

    Ongoing

    support,

    rollout and

    maintenance

    Global

    business

    blueprint

    Work streams Work packagesPhasesStages Accelerators

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    10/87Page 10 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Long version of stage overview

    Responsibilities for single activities and deliverables have to be checked

    Number and contents of columns client IT, client business, Lodestone have to be checked

    Adapt logic of fixed price offer

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    11/87Page 11 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight phase

    Insight

    Program

    definition

    Insight

    preparation

    Strategic

    blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    M M

    Insight preparation

    Program definition

    Strategic blueprint

    Insight

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    12/87

    Page 12 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight phase

    Insight preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Main activities Main deliverables

    Defining the main prerequisites and directions

    Initiate and plan the Insight stage Set up Insight stage organization Set up Insight stage infrastructure Review the initial risks Check and adapt methods and structure of the Insight stage

    Insight phase kick off pack and workshop materials Overview and insight stage plan Insight stage project organization chart Insight stage roles and responsibilities High level risk assessment Documentation standards and naming conventions Documentation processes and tools Status management approach Updated budget

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    13/87

    Page 13 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. LodestoneActivities

    Insight phase

    Main activities

    Initiate and plan the Insight stage PRM C C C

    Set up Insight stage organization PJM C C C

    Set up Insight stage infrastructure PJM C C C

    Review the initial risks PRM C C C

    Check and adapt methods and structure of the Insight stage PRM C C C

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight preparation

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    14/87

    Page 14 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. LodestoneDeliverables

    Insight phase kick off pack and workshop materials PRM C C C

    Overview and Insight stage plan PJM C C C

    Insight stage project organization chart PRM C C C

    Insight stage roles and responsibilit ies PRM C C C

    High level risk assessment PJM C C C

    Documentation standards and naming conventions PRM C C C

    Documentation processes and tool PRM C C C

    Status management approach PRM C C C

    Updated budget PRM C C C

    Insight phase

    Insight preparation

    Main deliverables

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    15/87

    Page 15 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight phase

    Strategic blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Main activities Main deliverablesDefining the main prerequisites and directions

    Understand the current strategic business objectives andas-is way of working

    Define/develop the strategic business objectives Describe major future business opportunities/initiatives Identify target benefits Conduct synthesis workshop with senior management and

    key stakeholders Document the strategic vision and case for change Describing the level 0 process overview

    Decomposing the processes to level 2 Developing high level KPIs for the organization at the

    appropriate levels within in the process model Develop a business rules matrix defining the structures within

    the operating model

    Strategic business objectives Identified business initiatives Target business benefits for the business initiatives Level 0 process overview Decomposition of processes to level 2 Strategy blueprint SAP mapping SAP solution map Operations design

    Business rules matrix

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    16/87

    Page 16 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight phase

    Workstream Client IT Client bus. LodestoneActivities

    Understand the current strategic business objectives and as-is

    way of workingPRM C C C

    Define/develop the strategic business objectives PJM

    Describe major future business opportunities/initiatives PJM C C C

    Identify target benefits PRM C C C

    Conduct synthesis workshop with senior management and

    key stakeholdersPRM C C C

    Document the strategic vision and case for change PRM C C C

    Describing the level 0 processes overview PRM C C CDecomposing the processes to level 2 PRM C C C

    Developing high level KPIs PRM C C C

    Develop a business rules matrix PRM C C C

    Main activities

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Strategic blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    17/87

    Page 17 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. Lodestone

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Strategic business objectives PJM C C C

    Business initiatives PJM

    Target business benefits for the business initiatives PJM C C C

    Level 0 process overview PRM C C C

    Decomposition of processes to level 2 PRM C C C

    Strategy blueprint PRM C C C

    SAP mapping PRM C C C

    SAP solution map PRM C C C

    Operations design PRM C C CBusiness rules matrix PRM C C C

    DeliverablesMain deliverables

    Insight phase

    Strategic blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    18/87

    Page 18 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight phase

    Program definition

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight

    Main activities Main deliverablesDetails the strategies for the program

    Define the future setup of all related processes and organizations Definition of the scope and structure of projects, identifying the pilot

    project, and elaborating a implementation plan and sequence Define methods, techniques, tools, standards, and procedures that

    will be applied throughout the life of the program Consolidate the figures and set up a business case and

    describes the transformation concept

    Enterprise IT strategy Implementation scope and strategy Program Management strategy Data Management strategy Organizational Change Management strategy Business case Transformation concept

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    19/87

    Page 19 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Define the future setup of processes and organizations PRM C C C

    Definition of the scope and structure of projects, identifying

    the pilot project, and elaborating a implementation plan

    and sequence

    PRM C C C

    Define methods, techniques, tools, standards, and procedures

    that will be applied throughout the life of the programPRM C C C

    Consolidate the figures and set up a business case and

    describes the transformation conceptPRM C C C

    Workstream Client IT Client bus. LodestoneActivitiesMain activities

    Insight phase

    Program definition

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    20/87

    Page 20 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Enterprise IT strategy PRM C C C

    Implementation scope and strategy PRM C C C

    Organizational Change Management strategy PRM C C C

    Program Management strategy PRM C C C

    Data Management strategy PRM C C C

    Business case PRM C C C

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Workstream Client IT Client bus. LodestoneDeliverablesMain deliverables

    Insight phase

    Program definition

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight preparation

    Program definition

    Strategic blueprintMM

    Insight

    Insight Design Execute Achieve

    I D E A

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    21/87

    Page 21 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Template setup and maintenance

    Ongoing

    support,

    rollout &

    maintenance

    Global

    preparation

    Global

    business

    blueprint

    Global

    realization

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    M M

    Global blueprint Global realization

    Globalpreparation

    M

    Design

    Design

    Insight Design Execute Achieve

    I i h D i E A hi

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    22/87

    Page 22 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global realizationGlobal blueprint

    Globalpreparation M MM

    Design

    Main activities Main deliverablesInitiate and plan the global implementation program

    Initiate and plan the global program Initiate and start planning of the template project Define and document the solution scope Define the implementation strategy, overall program plan,

    and schedule Define and document the program and project standards,

    guiding procedures and governance process Set up project organization Set up project infrastructure

    Review initial risk assessment

    High level program plan Detailed template project plan Template project charter High level risk assessment Solution scope Business scenario and process inventory Data migration strategy Develop implementation standards Develop program standards

    Project organization chart Project team training concept and plan System and client concept

    Design stageglobal template

    Template setup and maintenance

    Insight Design Execute Achieve

    I i ht D i E t A hi

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    23/87

    Page 23 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Initiate and plan the global program PRM C C R, A

    Initiate and start planning of the template project PJM C C R, A

    Define and document the level solution scope PJM C C R, A

    Define the implementation strategy, overall program plan

    and schedulePRM C C R, A

    Define and document the program and project standards,

    guiding procedures and governance processPRM R C R, A

    Set up project organization PRM R R R, A

    Set up project infrastructure PRM R, A C C

    Review initial risk assessment PRM R R R

    Workstream Client IT Client bus. LodestoneActivities

    Main activities

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global realizationGlobal blueprint

    Globalpreparation M MM

    Design

    Design stageglobal template

    Global preparation

    Insight Design Execute Achieve

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    24/87

    Page 24 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. Lodestone

    High level program plan PRM R R R, A

    Detailed template project plan PRM R R R, A

    Template project charter PRM R R R, A

    High level risk assessment PRM R R R, A

    Solution scope PRM R R R, A

    Business scenario and process inventory PJM C R, A R, A

    Data migration strategy DMA R R R, A

    Develop implementation standards PRM R R R, A

    Develop program standards PRM R R R, A

    Project organization chart PJM C C R, A

    Project team training concept and plan TRN C C R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Deliverables

    Main Deliverables

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global realizationGlobal blueprint

    Globalpreparation M MM

    Design

    Design stageglobal template

    Global preparation

    Insight Design Execute Achieve

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    25/87

    Page 25 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global blueprint

    Finalize template project planning Define template scope Define communication strategy and plan Perform team training (phase specific) Develop end-user training strategy Prepare and conduct Business Requirements Workshops

    (BRW)(collect documentation about current processes,standards, systems)

    Propose and decide on solution for gaps

    Prepare and conduct White Smoke (WS) Workshop 1 (businessprocess and design decisions, incl. rough cut prototyping)

    Create blueprint documentation Define center of excellence high level implementation plan Define system specification Quality review

    End-user training strategy Organizational Change Management plan Project team training Business scenario Business process flows Process Master List (PML) Functional specifications (RICEF list) Data conversion object list Authorization strategy

    Job role list Development and configuration standards Technical Change Management strategy User requirements specifications Business blueprint CoE high level processes Quality review report (incl. action plan) Realization phase WBS

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation MBRW WS 1

    Global realization

    MM

    Design

    Main activities Main deliverables

    Finalize the scope in all details and provide a "paper" solution for all processes using "White Smoke" workshops

    Insight Design Execute Achieve

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    26/87

    Page 26 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation MBRW WS 1

    Global realization

    MM

    Design

    Workstream Client IT Client bus. LodestoneActivities

    Main activities

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Finalize template project planning PJM R C R, A

    Define template scope BPM R R R, A

    Define communication strategy and plan PRM C R, A R

    Perform team training (phase specific) TRN C C R, A

    Develop end-user training strategy TRN C C R, A

    Prepare and conduct Business Requirements

    Workshops (BRW)PJM C R R, A

    Propose and decide on solution for gaps BPM R R R, A

    Prepare and conduct White Smoke Workshop 1 (WS1) BPM C R R, A

    Create blueprint documentation BPM R R R, A

    Define center of excellence high level implementation plan COE C C R, A

    Define system specification TIN R R, A

    Quality review PJM R R R, A

    Insight Design Execute Achieve

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    27/87

    Page 27 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation MBRW WS 1

    Global realization

    MM

    Design

    Workstream Client IT Client bus. Lodestone

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    End-user training strategy TRN C R R, A

    Organizational change management plan OCM C R R, A

    Authorization strategy SAA R R R, A

    Business blueprint BPM R R R, A

    CoE high level processes COE R R C

    Development and configuration standards TIN R, A C C

    Technical change management strategy PRM R R, A R

    Project team training TRN C C R, A

    User requirements specifications BPM C R R, A

    Business scenario, process flows and PML BPM R R, A R

    Functional specifications (RICEF List) BPM R R, A R

    Job role list SAA C R, A R

    Data conversion object list DMA R R, A R

    Realization phase WBS PJM R R R, A

    Quality review report (incl. action plan) PRM C C R, A

    Deliverables

    Main deliverables

    g g

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    28/87

    Page 28 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global realization

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M

    Global realization

    MMWS 2 WS 3

    Design

    Main activities Main deliverables

    Generate a SAP solution template according to the defined business blueprint

    Build template system (configuration) Build template system (RICEF development) Update template documentation Perform data cleansing Prepare and conduct White Smoke (WS) workshop 2 for approval of

    template system configuration Perform functional risk assessment Plan, prepare and execute unit- and integration testing Promote template scope to quality system

    Plan cut over Plan data migration Set up of global security and authorization concept Start pilot rollout preparation Prepare and conduct White Smoke (WS) workshop 3 for approval

    of tested template environment Quality review

    System configuration documentation Detail design specifications Data cleansing schedule Test strategy and plan Data migration plan SOP list Functional risk assessment procedure Unit-/integration test overview list Unit-/integration test scripts

    Unit-/integration test data Authorization matrix Cutover plan Promote changes to quality system Quality review/report (incl. action plan)

    g g

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    29/87

    Page 29 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global realization

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M

    Global realization

    MMWS 2 WS 3

    Design

    Workstream Client IT Client bus. LodestoneActivities

    Main activities

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Build template system (configuration) BPM R R R, A

    Build template system (RICEF development) DEM R, A R

    Update template documentation BPM R R R, A

    Perform data cleansing DMA R R, A

    Prepare and conduct White Smoke workshop 2 and 3 BPM C R R, A

    Perform functional risk assessment SPT R, A R

    Promote template scope to quality system TIN R, A C R

    Plan, prepare and execute unit- and integration testing SPT R R R, A

    Plan cut over PJM R R, A R

    Plan data migration DMA R R R, ASet up of global security and authorization concept SAA R R R, A

    Quality review PJM R R R, A

    Start pilot rollout preparation PRM R R R, A

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    30/87

    Page 30 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Global realization

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M

    Global realization

    MMWS 2 WS 3

    Design

    Workstream Client IT Client bus. Lodestone

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    System configuration documentation BPM R R, A

    Detail design specifications DEM R, A R

    Test strategy and plan SPT R R R, A

    Authorization matrix SAA R R R, A

    Data migration plan DMA R R, A R

    Data cleansing schedule DMA R R, A R

    Unit-/integration test overview list SPT R R R, A

    Unit-/integration test scripts SPT R R R, A

    Unit-/integration test data SPT R R, A R

    SOP list PJM R, A R, A Functional risk assessment PJM R R R,A

    Cutover plan PJM/TIN R,A C R,A

    Promote changes to quality system TIN R,A C R,A

    Quality review/report (including action list) PRM C C R, A

    Deliverables

    Main deliverables

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    31/87

    Page 31 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Ongoing support, rollout and maintenance

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M

    Global realization

    MWS 2 WS 3

    Month 10+

    Design

    MOngoing support,

    rollout andmaintenance

    Main activities Main deliverables

    Stabilize the template, finish rollout plans, and finalize packaging of the rollout package

    Production support Going live check: verification session Performance monitoring for long term support Updated long term rollout plan Handover solution to centre of excellence Enhancement of global template Program closure

    Going live check: verification session report Updated long term rollout plan Program closure document

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    32/87

    Page 32 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Ongoing support, rollout and maintenance

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M

    Global realization

    MWS 2 WS 3

    Month 10+

    Design

    MOngoing support,

    rollout andmaintenance

    Workstream Client IT Client bus. LodestoneActivities

    Main activities

    Production support PRM

    Going live check: Verification session PRM

    Performance monitoring for long term support PRM

    Updated long term rollout plan PRM

    Handover solution to centre of excellence PJM

    Enhancement of global template PRM

    Program closure PJM

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    33/87

    Page 33 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Design stageglobal template

    Ongoing support, rollout and maintenance

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Global blueprint

    Globalpreparation M MWS 2 WS 3

    Month 10+

    Design

    MOngoing support,

    rollout andmaintenance

    Going live check: verification session report PJM

    Updated long term rollout plan PRM

    Program closure document PJM

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Workstream Client IT Client bus. LodestoneDeliverables

    Main deliverables

    Global realization

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    34/87

    Page 34 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Execute stagepilot and rollout projects

    Pilot and rollouts

    Local

    preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local blueprint Local realizationLocal

    preparation

    Local

    cut-over

    Local

    business

    blueprint

    Local

    realizatio

    n

    Local

    cut-over

    preparati

    on

    Local cut-over prep.

    Local

    cut-over

    Execute

    Execute

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    35/87

    Page 35 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Main activities Main deliverables

    Provide detailed planning and preparation for the local rollout and mobilize the local project team

    Update rollout project plan Detail blueprint WBS Define project goals and objectives Write local business case Identify project risks Define and document local project scope Perform DRAFT FIT/GAP against template Provide DRAFT solution for GAPs and develop effort estimate for

    solution (GAPS: legal requirements, translations for forms andreports, interfaces to local systems, specific requirements frommajor customers)

    Define local project organizational structure Define local project roles and responsibilities Prepare on-boarding documentation for project team Prepare local project infrastructure Prepare team training

    Updated rollout project plan Business blueprint WBS Project charter Project communication plan Local business case Project organization chart Project roles and responsibilities Project effort estimation Resource plan Documented DRAF FIT/GAP analysis Project team training material Project risk management plan

    Execute stagepilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    36/87

    Page 36 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. LodestoneActivities

    Local preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Main activities

    Update rollout project plan PRM R R R, A

    Detail blueprint WBS PRM R R R, A

    Define project goals and objectives PRM R R R,A

    Write local business case PJM R A, R C

    Define and document local project scope PJM R R R, A

    Perform DRAFT FIT/GAP against template BPM R C A, R

    Provide DRAFT solution for GAPs BPM R C A, R

    Define local project organizational structure PJM C C A, R

    Define local project roles and responsibilities PJM C C A, R

    Prepare on-boarding documentation for project team PJM C A, RPrepare local project infrastructure PRM R, A C C

    Prepare team training TRN C C R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Execute stagepilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    37/87

    Page 37 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. Lodestone

    Local preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Updated rollout project plan PJM R R R, A

    Business blueprint WBS PJM R R R, A

    Project charter PJM R R R, A

    Project communication plan PJM R, A R

    Local business case PJM R R R, A

    Project organization chart PJM R R R, A

    Project roles and responsibilities PJM R R R, A

    Project effort estimation PJM C C R, A

    Resource plan PJM R R R, A

    Documented DRAF FIT/GAP analysis PJM R R R, AProject team training material TRN C C R, A

    Project risk management plan PJM R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Deliverables

    Main deliverables

    Execute stagepilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    38/87

    Page 38 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM MBRW WS 1

    Project team training (template scope and methodology) Perform user requirement workshop to identify local GAPs Agree on solution for local GAPs (reject, local add-on, extend template) Planning for implementation of GAPs (local add ons and

    template extensions) Prepare and conduct Business Requirements Workshops (BRW) Prepare local project documentation Align local data cleansing approach Align local data migration approach Identify and manage required organizational changes Define local end-user training strategy Conduct White Smoke (WS) Workshop to get blueprint approval Perform quality review

    Local kick-off meeting Team and infrastructure setup Template training executed Documented FIT/GAP analysis Process Master List (PML) for project scope Functional specifications for approved local specifics Local business scenarios Local process flows and requirements Data cleansing and collection plan Local data migration object list Assessment of end-user role design Local training strategy Approved local blueprint Detailed work plan for realization phase Quality review/report (incl. action plan)

    Main activities Main deliverables

    Template enhancement with the local specifics, i.e., legal requirements, forms and reports.

    Strict change and scope management to keep local specifics to a minimum and ensure common processes

    Execute stagepilot and rollout projects

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    39/87

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    40/87

    Page 40 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local blueprint

    Month 1Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM MBRW WS 1

    Workstream Client IT Client bus. Lodestone

    Team and infrastructure setup TIN R R R, A

    Local kick-off meeting PJM R R R, A

    Template training executed TRN R R R, A

    Documented FIT/GAP analysis BPM R R R, A

    Process Master List (PML) for project scope PJM R R, A R

    Functional specifications for approved local specifics BPM R R, A R

    Local business scenarios BPM R R, A R

    Local process flows and requirements BPM R R, A R

    Data cleansing an collection plan DMA R R, A R

    Local data migration object list DMA R, A R RAssessment of end-user role design SAA C R, A R

    Local training strategy TRN C R R, A

    Approved of local blueprint PJM R R R, A

    Detailed work plan for realization phase PJM R R R, A

    Quality review/report (incl. action plan) PRM C C R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Deliverables

    Main deliverables

    Execute stagepilot and rollout projects

    E t t il t d ll t j t

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    41/87

    Page 41 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local realization

    Month 1Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Implement local add ons and template extensions(configuration, developments)

    Prepare testing for local scope and template extensions Set up/adapt authorization profiles Prepare test plan Promote local project scope to quality/productive environment Execute unit- and integration testing Execute data collection and cleansing Define data migration plan Prepare cut over plan Preparation of end-user training material Create/update local SOPs Prepare and execute data migration trial runs Promote local project scope to production environment Perform quality review

    Project report (scope, resources, timeline, risks) Configuration logs and development specifications Detail design papers Data conversion programs Functional risk assessment Test strategy and test plan Prepared test documentation (unit-, integration-, user acceptance) Unit- and integration test executed and signed off Data migration plan and schedule defined Cutover strategy and plan defined Training plan and training documentation Local SOPs defined Local authorization concept defined Approval of local build Quality review/report (incl. action plan)

    Main activities Main deliverables

    Implementation of the local specifics like local forms,

    additional local configuration, local interfaces, operational testing, end- user training

    Execute stagepilot and rollout projects

    E t t il t d ll t j t

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    42/87

    Page 42 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local realization

    Month 1Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Workstream Client IT Client bus. LodestoneActivities

    Project team training (local realization) TRN R R R, A

    Impl. local add ons and template ext. (configuration, developm.) BPM/DEM R R R, A

    Build local RICEF DEM R, A R

    Prepare testing for local scope and template extensions SPT R R R, A

    Set up/adapt authorization profiles SAA R R R, A

    Prepare test plan PJM R R R, A

    Promote local project scope to quality/productive environment TIN R, A R

    Execute unit- and integration testing SPT R R R, A

    Execute data collection and cleansing DMA R R, A C

    Define data migration plan DMA R R R, APrepare cut over plan PJM R R R, A

    Preparation of end user training material TRN R R, A R

    Create/update local SOPs OCM/BPM R R, A

    Prepare and execute data migration trial runs DMA R, A R R

    Perform quality review PJM R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Main activities

    Execute stagepilot and rollout projects

    E t t il t d ll t j t

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    43/87

    Page 43 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local realization

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Workstream Client IT Client bus. Lodestone

    System configuration documentation BPM/DEM R R, A

    Detail design papers DEM R, A R

    Data conversion programs DMA R, A R, A

    Functional risk assessment PJM R R R, A

    Test strategy and test plan SPT R R R, A

    Training plan and training documentation TRN R R R, A

    Prepared test documentation SPT R R, A R

    Unit- and integration test executed and signed off SPT C R, A R

    Cutover strategy and plan defined PJM R R R, A

    Data migration plan and schedule defined DMA R R R, ALocal authorization concept defined SAA R R R, A

    Local SOPs defined OCM/BPM R R, A

    Project reporting (scope, resources, timeline, risks) PJM R R, A

    Approval of local build PRM R R, A R

    Quality review/report (incl. action plan) PRM C C R, A

    Deliverables

    Main deliverables

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    44/87

    Page 44 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Support local business during user acceptance testing Define and agree upon go-live criteria list Execute master and transactional data loads Carry out data verification Conduct end-user training Set up user profiles Create quality report Define action plan for open issues Go-live communication to business and customers Perform gono go decision Cut over support and bug fixing

    User acceptance testing executed and signed off Go-live criteria fulfilled and approved Data loads signed off and execute Date verification performed and accepted End-user training executed Training need analysis updated after training execution User profiles setup and blocked Project report (scope, resources, timeline, risks) Quality report signed Corrective actions defined and agreed upon Go live communication Detailed support organization for local cut-over defined Approval for go-live

    Main activities Main deliverables

    Complete the final preparation, system management, move from a pre-production environment to the live system

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    45/87

    Page 45 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Workstream Client IT Client bus. LodestoneActivities

    Support local business during user acceptance testing SPT R R R, A

    Define and agree upon go-live criteria list PJM R R R, A

    Execute master and transactional data loads DMA R, A R R

    Conduct end-user training TRN A R R, A

    Carry out data verification DMA R R, A R

    Set up user profiles SAA R R, A

    Create quality report PJM R R, A

    Define action plan for open issues PJM R R R, A

    Go-live communication to business and customers PJM R R, A C

    Perform gono go decision PJM R R, A RCut over support and bug fixing COE R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Main activities

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    46/87

    Page 46 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over preparation

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Workstream Client IT Client bus. LodestoneDeliverables

    Main deliverables

    User acceptance testing executed and signed off SPT C R, A R

    Go-live criter ia fulfilled and approved PJM R R, A R

    Data loads signed off and executed DMA R R, A R

    Date verification performed and accepted DMA R R, A R

    End-user training executed TRN R R, A C

    Project report (scope, resources, timeline, risks) PJM R R, A

    Quality report signed PJM R, A R

    Corrective actions defined and agreed upon PJM R R, A R

    Approval for go-live PJM R R, A R

    Go live communication OCM R, A CUser profiles setup and blocked SAA R, A R R

    Training need analysis updated after training execution TRN R R, A

    Detailed support organization for local cut-over defined COE R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    47/87

    Page 47 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    End-user support Bug fixing Prepare and execute first month end closing Hand over from local project team to local organization Hand over to support organization and ongoing support

    Final Data loads executed and signed off (finance, after closing) Controlled ramp-up in Hyper-care mode Preparation of handover and handover sessions

    Main activities Main deliverables

    Ramp up live system and finalize cut-over, prepare handover to support organization

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    48/87

    Page 48 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Workstream Client IT Client bus. LodestoneActivities

    End-user support BPM R R R, A

    Bug fixing BPM R R, A

    Prepare and execute first month end closing BPM R R R, A

    Hand over from local project team to local organization PJM R R R, A

    Hand over to support organization and ongoing support PJM R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Main activities

    Execute stagepilot and rollout projects

    Execute stage pilot and rollout projects

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    49/87

    Page 49 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Local cut-over

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Local realizationLocal blueprintLocal

    preparation

    Execute

    Local cut-over prep.

    Local cut-over

    M MMM M

    Workstream Client IT Client bus. LodestoneDeliverables

    Main deliverables

    Final data loads executed and signed off (finance, after closing) DMA R R, A R

    Controlled ramp-up PJM R R R, A

    Preparation of handover and handover sessions PJM R R R, A

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Execute stagepilot and rollout projects

    Achieve stage sustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    50/87

    Page 50 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Achieve stage sustain and continuous improvement

    Sustain and improve

    Month 1Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Achieve

    Ensure

    sustain

    Continuous

    improvement

    Ensure sustain

    Continuous improvement

    Achieve stage sustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    51/87

    Page 51 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Ensure sustain

    Achieve stage sustain and continuous improvement

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Ensure sustain

    Continuous improvement

    System monitoring, management and tuning Incident and problem management Service management User authorizations and profiles management Change request and transport management Job scheduling Support pack and upgrade management Data archiving

    Available and efficient SAP systems Efficient service processes Satisfied end-users Business value generating SAP solution Archived solution data

    Main activities Main deliverables

    Ensure smooth operations of the live site

    Achieve stage sustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    52/87

    Page 52 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Ensure sustain

    Achieve stage sustain and continuous improvement

    Workstream Client IT Client bus. LodestoneActivities

    System monitoring, management and tuning COE

    Incident and problem management COE

    Service management COE

    User authorizations and profiles management SAA

    Change request and transport management COE

    Job scheduling DEM

    Support pack and upgrade management DEM

    Data archiving PRM

    Main activities

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Ensure sustain

    Continuous improvement

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Achieve stagesustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    53/87

    Page 53 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Workstream Client IT Client bus. LodestoneDeliverables

    Main deliverables

    Available and efficient SAP systems COE

    Efficient service processes COE

    Satisfied end-users COE

    Business value generating SAP solution PRM

    Archived solution data PRM

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Ensure sustain

    c e e stage susta a d co t uous p o e e t

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Ensure sustain

    Continuous improvement

    Achieve stagesustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    54/87

    Page 54 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Continuous improvement

    g p

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Ensure sustain

    Continuous improvement

    Identify, scope, and implement improvement projects (on top of allensure sustain activities)

    Optimized SAP system Continuous improvement of business value

    Main activities Main deliverables

    Secure continuous improvement of business value

    Achieve stagesustain and continuous improvement

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    55/87

    Page 55 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Continuous improvement

    g p

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Ensure sustain

    Continuous improvement

    Workstream Client IT Client bus. LodestoneActivities

    Identify, scope, and implement improvement projects (on top ofall ensure sustain activities)

    PRM

    Main activities

    In scope of fix price offer Out of scope of fix price offer A = Accountable, R = Responsible, C = Consulted

    Workstream Client IT Client bus. LodestoneDeliverables

    Main deliverables

    Optimized SAP system BPM

    Continuous improvement of business value PRM

    Short version of stage overview

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    56/87

    Page 56 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    g

    Would be good for an overview of the IDEA stages

    An overview of the 4 stages and the phases

    A high level listing of activities; deliverables and timelines by stages

    IDEA: Stage implementation approach

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    57/87

    Page 57 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight AchieveDesign Execute

    Insight preparationGlobal

    preparation

    Local

    preparationEnsure sustain

    Global business

    bueprint

    Global realization

    Ongoing support,

    rollout and

    maintenance

    Local cutover

    Local business

    blueprint

    Local realization

    Local cutover

    preparation

    Strategy

    bueprint

    Program

    definition

    Continuous

    improvement

    IDEA: Stage implementation approach

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    58/87

    Page 58 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Understand the current

    strategic business

    objectives and as-is way

    of working

    Define/develop the

    strategic business

    objectives, scope,

    and structure Document the strategic

    vision and case

    for change

    Define and document

    the solution scope

    Define the

    implementation strategy,

    overall program plan

    and schedule

    Build and test template

    system (configurationand RICEF

    development)

    Handover solution to

    centre of excellence

    Rollout project plan

    Perform DRAFT FIT/

    GAP against template

    Conduct "White Smoke

    Workshop" to get

    blueprint approval

    Conduct testing

    Prepare cut over plan

    Hand over to support

    organization and

    ongoing support

    System monitoring,

    management and tuning

    Incident and problem

    management

    Service management

    Identify, scope, and

    implement improvement

    projects (on top of allensure sustain activities)

    Key stakeholders

    Business owners

    Sponsors

    Program management

    Business owners

    Project team

    Key users

    Local business owners

    Project team

    Key users

    Centre of excellence

    Support team

    6 months 10 months 10 months TBDDuration

    (estimate)

    Activities

    Required

    resources

    Insight AchieveDesign Execute

    Timelines

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    59/87

    Page 59 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Please update according to the project!

    MFJDNOSAJJMAMFJDNOSAJ

    Year 1 Year 2

    JMAMFJ

    Year 3

    Phases

    Global realization

    Local business blueprint

    Global business blueprint

    Local cut-over prep

    Execute

    Design

    Global project prep

    Local project prep

    Achieve

    Insight

    Local realization

    Ongoing support, rollout & maint

    Local cut over

    Stage: Insight

    I D E A

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    60/87

    Page 60 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Activities

    Initiate and plan the Insight stage Set up Insight stage organization and infrastructure Review the initial risks Understand the current strategic business objectives

    and as-is way of working Define/develop the strategic business objectives Identify target benefits Conduct synthesis workshop with senior management and

    key stakeholders Document the strategic vision and case for change Developing high level KPIs for the organization at the appropriate

    levels within in the process model Define the future setup of all related processes and organizations Definition of the scope and structure of projects, identifying the pilot

    project and elaborating a implementation plan and sequence Define methods, techniques, tools, standards, and procedures that

    will be applied throughout the life of the program Consolidate the figures and set up a business case and describes

    the transformation concept

    Deliverables

    Insight stage project organization chart Overview and Insight stage plan High level risk assessment Insight phase plan and status management approach Insight phase kick off pack and workshop materials Updated budget Strategic business objectives Strategy blueprint SAP solution map Operations design Business initiatives Target business benefits for the business initiatives Enterprise IT strategy Implementation scope and strategy Program management strategy Data management strategy Organizational change management strategy Business case Transformation concept

    Purpose Create a compelling and adaptive business framework for future business processes/scenarios aligned with all stakeholders

    Stage: Design

    I D E A

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    61/87

    Page 61 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Initiate and start planning of the template project Define and document the solution scope Define the implementation strategy, overall program plan and schedule Define and document the program and project standards, guiding

    procedures and governance process Define template scope Prepare and conduct business requirements workshops Prepare and conduct White Smoke Workshop 1.

    Create blueprint documentation Build template system (configuration and RICEF development) Perform data cleansing Prepare and conduct White Smoke Workshop 2 for approval of template

    system configuration Perform functional risk assessment Promote template scope to quality system Plan, prepare and execute unit- and integration testing Plan cut over Set up of global security and authorization concept

    Prepare and conduct White Smoke Workshop 3 for approval of testedtemplate environment

    Production support Going live check: verification session Updated long term rollout plan Handover solution to centre of excellence

    Activities Deliverables

    High level program plan System and client concept End-user training strategy Organizational change management plan Data migration strategy Authorization strategy Development and configuration standards Technical change management strategy Business blueprint Business scenario Business process flows Process Master List (PML) Functional specifications (RICEF List) Data conversion object list System configuration documentation Test strategy and plan Authorization matrix Data Migration plan

    Cut over plan Unit-/integration test overview list Quality review/report (incl. Action plan) Going live check: Verification session report Program closure document

    Purpose

    Design and build of harmonized processes supported by common data standards, and realization of a system global template

    Stage: Execute

    I D E A

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    62/87

    Page 62 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Activities

    Update rollout project plan Detail blueprint WBS Write local business case Perform DRAFT FIT/GAP against template Perform user requirement workshop to identify local GAPs Planning for implementation of GAPs (local add ons and

    template extensions) Align local data cleansing approach Align local data migration approach Identify and manage required organizational changes Define local end-user training strategy Conduct White Smoke Workshop to get blueprint approval Prepare testing for local scope and template extensions Execute unit- and integration testing Execute data collection and cleansing Prepare cut over plan Preparation of end user training material Create/update local SOPs

    Promote local project scope to production environment Define and agree upon go-live criteria list Perform gono go decision Cut over support and bug fixing End-user support Hand over from local project team to local organization Hand over to support organization and ongoing support

    Deliverables

    Business blueprint WBS Project communication plan Project risk management plan Local kick-off meeting Documented FIT/GAP analysis Process Master List (PML) for project scope

    Functional specifications for approved local specifics Local business scenarios Local process flows and requirements Local data migration object list Configuration logs and development specifications Detail design papers Test strategy and test plan Training plan and training documentation Unit and integration test executed and signed off Cutover strategy and plan defined User acceptance testing executed and signed off Go-live criteria fulfilled and approved

    Approval for go-live Training need analysis updated after training execution Preparation of handover and handover sessions

    Purpose

    Implementation of harmonized processes by rolling out the template and managing organizational change

    Stage: Achieve

    I D E A

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    63/87

    Page 63 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Activities

    System monitoring, management, and tuning Incident and problem management Service management User authorizations and profiles management Change request and transport management Job scheduling

    Support pack and upgrade management Data archiving Identify, scope, and implement improvement projects (on top of all

    ensure sustain activities)

    Deliverables

    Available and efficient SAP systems Efficient service processes Satisfied end users Business value generating SAP solution Archived solution data Optimized SAP system

    Continuous improvement of business value

    Purpose

    Stabilization of harmonized processes after the systems are live and the management of continuous improvement

    Mini version focused on description

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    64/87

    Page 64 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    This is more focusing on an overview and explicitly explains difference between

    pilot and rollouts

    "Is that all there is?"

    Insight stagestrategy blueprint and program definition

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    65/87

    Page 65 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview

    Improvement

    Insight stage contains a number of work packages setting the framework and directionfor the program

    Strategic visionclarifies the overall direction the organization is heading to and aligns these

    results among all senior management. The strategic vision is the basis for all follow-up activities

    of the program, It describes the business objectives and collects ideas on business

    opportunities to reach the business objectives

    Macro designdelivers a process overview down to level 2 representing the future operating

    setup. In addition, the processes are mapped to SAP solutions and a first cut of the future

    system landscape is sketched

    IT strategy and architecture: Future setup and governance of the new IT system landscapeand the transformation process towards the system landscape

    Business case and transformation planconsolidates the figures elaborated in previous work

    packages sets up a business case and describes the transformation concept, thus preparing

    the necesSAAy qualitative and quantitative data for the program charter

    Finally program charterbrings together all elements of the Insight phase and enables a formal

    sign off and closure

    Strategy blueprintand program

    definition

    Global template

    Pilot

    Rollout

    Design stageglobal template

    O i

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    66/87

    Page 66 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview

    Creation of a global system and papertemplatethat covers the majority of business

    processes, systems and data. The template system is created, including test scripts, training

    material, high level pilot plan, focusing on global harmonizationof processes

    A core teamof business and IT people from the client together with our consultants will design

    the template and prototype it, business involvement is ensured by following the White Smoke

    Workshopapproach

    The template will cover global conceptsand standardized processesfor all business areas,

    plus standardized datasettings and numbering conventions to support the clients business

    The template design will be based on SAP standard functionalitywherever possible, any

    enhancements or modification to SAP standard functionality have to be covered by a

    business/benefit case and must be approved

    All requirements for new processes or process changes are coordinated by the central

    template team(template guardianship), consisting of business process owners and

    IT model owners

    Strong change controlwill be employed to manage and ensure the integrity of respectiveapplications and infrastructure, all changes have to be approved by the change control board

    Only approved changerequests are implemented

    Improvement

    Strategy blueprintand program

    definition

    Global template

    Pilot

    Rollout

    Execute stagepilot and rollout projects

    O i ( il t)

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    67/87

    Page 67 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview (pilot)

    A pilot sitehas been chosen that is representative for the business needs across all sites.

    Focusing on one pilot site mitigates the risksthat endangers business continuity andis seen as the best learning tool for client staff to familiarize themselves with the technical

    solution and global processes

    The pilot implementation will cover The pilot will prove the designed solution, before parallel

    rolloutsto other countries are initiated

    The pilot will not only prove process designand system functionalitybut also the

    rollout approach

    During the template design and pilot implementation Lodestone experts will conduct

    knowledge transferto client employees, allowing client to start building up an internal SAP

    expert teamthat can execute later rollouts and replace external consultantsImprovement

    Strategy blueprintand program

    definition

    Global template

    Pilot

    Rollout

    Execute stagepilot and rollout projects

    O i ( ll t )

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    68/87

    Page 68 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview (rollouts)

    All rollouts follow the same project phases as the pilot implementation, with defined tasks,deliverables,and responsibilities

    To ensure business continuitythe rollout team will also provide a post go-live support

    to each country, while continuing with the next rollout

    The external time and resourcesrequired for the rollouts decrease constantlysince

    solutions developed in earlier implementations can be leveraged across various countries

    Client will build up an internal organization to support all countriesthat are live on SAP;

    the pilot implementation will be supported by the core team

    Cross functions work streams such as scoping, rollout planning, security, and authorization,

    testing, training, and data migration management will be covered centrallyacross all rollouts,

    to ensure consistency across all rollouts and focused risk and issue management

    Improvement

    Strategy blueprintand program

    definition

    Global template

    Pilot

    Rollout

    Achieve stagesustain and continuous improvement

    Overview

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    69/87

    Page 69 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Overview

    Lodestone will assist the client to setup and implement a powerful and sustainable

    support organization

    The built support organization is responsible for the daily support and takes over

    the planned rollouts in new market organizationsafter program closure

    Improvement

    Strategy blueprintand program

    definition

    Global template

    Pilot

    Rollout

    Alternative non-scientific soft version

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    70/87

    Page 70 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Activities and deliverables represent a client exampleand haveto be adapted!

    They are not always in line with the typical IDEA approach

    Project timelines

    Insight stage

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    71/87

    Page 71 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Insight stage

    WeekWeekWeekWeekWeek

    MonthMonthMonth

    Year

    Week WeekWeekWeekWeekWeekWeek

    Insight

    Design

    Strategy blueprint

    Process and organization review

    Business case transform. conc., project charter

    Program definition

    Program preparation

    Phases

    IDEA Insight stage establishes the project team and the necesSAAy infrastructure and procedures required,

    elaborates a compelling and adaptive business framework for future business processes/scenarios aligned withall stakeholders and details the strategies for implementation, program management, change management and

    data management, the future IT setup. It combines all results and decisions in a business case, a transformation

    concept and a program charter

    Insight: Strategy blueprint

    Detailed timelines strategy blueprint

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    72/87

    Page 72 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Detailed timelines strategy blueprint

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Process/organizationreview and strategy vision

    Program definition

    Strategic blueprint

    M

    Strategy blueprint establishes a compelling and adaptive business framework for future business processes/scenarios. It describes the level 0 process model

    and develop it further down to a level 2 process model representing the future operating setup and evaluating the benefits of changes

    Business case trans-form. conc., project charter

    M M M

    Week

    MonthMonth

    Week WeekWeek Week

    Business rules matrixDevelop business rules matrix

    Opportunities/target benefitsDescribe opportunities/target benefits

    Define SAP mapping/SAP solution map

    Process modelProcess macro design

    Gaps identified

    Fit/Gap-Workshop process macro design

    SAP mapping/SAP solution map

    Fit/Gap-Workshop organization, and roles

    Prototype Workshop

    Define key performance indicators

    Org. setup, roles and responsibility

    Key performance indicators

    Organization, roles and responsibilities

    Deliverables

    Prototype, deltas identified

    Activities

    Aligned strategy blueprint

    Define service level agreements Service level agreements

    Approval Workshop OCM/Training Strategy

    Gaps identified

    Insight: Program definition

    Detailed timelines methodology and validation

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    73/87

    Page 73 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Detailed timelines methodology and validation

    CLIENT will use the Lodestone IDEA methodology and the validation approach incorporated in it. However, IDEA has to be tailored and sized to the CLIENT

    requirements in order to deliver all necessary elements and at the same time chose an efficient approach. At the same time it has to be decided, if and how

    the methodology already used in the ongoing projects can be integrated results will be aligned in two workshops

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Process/organizationreview and strategy vision

    Program definition

    Strategic blueprint

    M

    Business case trans-form. conc., project charter

    M M M

    Month

    Week WeekWeek

    Month

    Week Week DeliverablesActivities

    Approval Workshop OCM/Training Strategy

    Aligned methodology/validationApproval WS meth./validation/document

    Org. setup, roles and responsibility

    Validation planCreate and approve validation plan

    Review development/customizing stand.

    Doc. catalogue/templates

    Fit/Gap Workshop method./validation Identified gaps

    Revized standards

    Review method./validation approach Analyzed approach

    Integrate IDEA into current approach Right sized project method.

    Define document catalogue and templates

    Insight: Program definition

    Detailed program strategies

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    74/87

    Page 74 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Program definition

    Strategic blueprint

    Detailed program strategies

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Process/organizationreview and strategy vision

    M

    The program strategies stream within program definition of the Insight phase sets the cornerstones for the overall implementation strategy by defining the

    template scope, the sequence of country-rollouts and the pilot country, by setting up the organizational change vision and the data management strategy.

    In addition, the overall program management strategy is set up

    Business case trans-form. conc., project charter

    M M M

    WeekWeekWeekWeekWeek

    MonthMonth

    Program management toolsProgram management organization

    Data management strategyApproved OCM/training strategyApproval Workshop OCM/training strategy

    Training strategy

    Organizational change visionOrganizational Change Mgmt. Strategy

    Approved PM/implementationApproval Workshop PM/ implementation

    Roadmap and rollout approachImplementation strategy

    Approval Workshop data mgmt. strategy

    Data management strategy

    Org. setup, roles and responsibility

    Approved data mgmt. strategy

    Training strategy

    DeliverablesActivities

    Master data strategy development approach

    Master data strategy is key for global solutions

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    75/87

    Page 75 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Master data strategy is key for global solutions

    Implementa-

    tion approach

    Target

    benefits

    Analysis Roadmap

    Define strategic

    benefits

    Define

    operational

    benefits

    Define cost

    benefits

    Define effort for

    implementation

    and change

    Elaboration of

    different

    transition paths

    with pros and

    cons

    Alignment with

    overall

    business and

    IT roadmap

    Change

    management

    concept

    Strategic

    framework

    As Is

    analysis

    Understand as-

    is process

    structure and

    behavior

    Fix scope

    Understand

    and deepen

    context

    (business

    strategy,

    products,

    processarchitecture,

    organization)

    Illustrate

    system land-

    scape with all

    data sources

    Identify As-Is

    master data

    situation

    (design areas

    along the

    master data

    strategy)

    Identifyoptimization

    potential (short

    term, middle

    term, long

    term)

    1 2

    Design

    Constitute rules

    for structures

    Define rules for

    terminology

    and syntax

    Constitute

    number range,

    data fields etc.

    Structures

    & standards

    Master data

    processes with

    roles for apply,

    maintain and

    close for

    master data

    Data quality

    concept

    Data ownership

    Processes

    & organization

    Business

    requirements

    for system

    support

    Assessment of

    different

    system setups

    MDM vs. ECC

    Revise system

    landscape

    Decide about

    leading systemper process

    Systems

    & technology

    3 4 5 6 7

    Constitute key design principles Potential changes, fit/gap to best practices

    Master data strategy

    The following approach will be applied for the master data objects materials, customers, vendors, and routing database

    Insight: Program definition

    Detailed IT strategy and architecture

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    76/87

    Page 76 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Program definition

    Strategic blueprint

    Detailed IT strategy and architecture

    Month 1

    Year

    Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10

    Insight

    Process/organizationreview and strategy vision

    M

    IT strategy and architecture defines the funDMAentals of IT approach to the program and aligns it with the enterprise IT strategy.

    It contains the design of the ERP architecture as well as the definition of the IT operational processes, the organizational structure of the support organization

    and the technical change management processes and tools

    Business Case Trans-form. conc.,project charter

    M M M

    WeekWeekWeek WeekWeek

    Month Month

    Activities

    Org. setup, roles and responsibility

    Approved IT org. and proc.

    Technical CM processes/toolsDefine IT change management

    Approval workshop IT org. and proc.

    Define ERP architecture ERP Systems/clients/flows

    Approval Workshop OCM/Training Strategy

    Define IT operation IT Services/infrastr./organiz.

    Deliverables

    Define IT organization Support organization setup

    Project timelines

    Design stage

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    77/87

    Page 77 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    g g

    WeekWeekWeek

    MonthMonthMonthMonth

    YearYear

    Week Week Week WeekWeekWeekWeekWeekWeekWeekWeekWeekWeek

    Program preparation

    M2

    Label

    M3

    Phases

    Solution build

    Solution test

    Global realization

    Label

    M1

    Label

    Global blueprint

    Global blueprint signoff(White Smoke Workshop 1)

    Global system configured(White Smoke Workshop 2)

    Global system tested(White Smoke Workshop 3)

    Design (template)

    Design stageglobal template

    "White Smoke" Workshop 1

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    78/87

    Page 78 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Business process design slides/flows

    Abstracts of reengineering opportunities

    Proposal for org structure

    Gap list from blueprint phase

    Pre-reading for participants

    Agreed organizational structures

    Agreed business processes and concepts

    Decisions for closing identified gaps

    Selections of business processes/solutions to be shown at WS2

    Deliverables

    p

    Month

    Year

    Month Month Month

    Global blueprintProgr.prep. WS 1

    Global realization

    Design (template)

    Solution build Solution test

    M

    M M

    Agree on blueprint deliverables (scope and solutions) as starting point

    for the realization phase

    Sign off/approval of key deliverables

    Formally close blueprint phase

    Objectives

    Perform and finalize business process modeling and prepare slides todemonstrate the business processes with key business activities

    Prepare abstracts on reengineering opportunities (slides) representing

    key statements/decisions

    Elaborate org structure based on business processes collected and

    proposals for mandatory/best practice solutions

    Prepare list of open decisions to be made for closing identified gaps and

    work out options and proposals

    Preparation

    Present proposal for organizational structure set upPresent key content of reengineering opportunities

    Present options and proposals for closing gaps and for degree of

    standardization (mandatory/best practice)

    Present business processes on slides containing key activities incl. brief

    description and responsibilities. Discuss planned/defined harmonization

    per key activity

    Define business processes and/or functionalities to be shown at WS2

    Execution

    Design stageglobal template

    "White Smoke" Workshop 2

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    79/87

    Page 79 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Detailed slides with further explanations of SAP functionalities

    shown in SAP

    Slides with description of new/pending decisions to be made incl.

    proposals of team

    Pre-reading for participants

    Share touch and feel of SAP solutions worked out

    Agree on proposals made for remaining decisions

    Agree on rough cut prototype (RCP) solutions and sign off prototype

    Identify and agree on remaining tasks for closing realization phase

    Define solutions to be shown at last WS3

    Deliverables

    p

    Month

    Year

    Month Month Month

    WS 1Global realization

    Design (template)

    Solution build Solution test

    M

    M M

    Show configured solutions in SAP

    Match expectations/business understanding with solutions presented

    with or without SAP

    Collect areas for adjustments of current solutions

    Objectives

    Configure and set up SAP to be able to show selected businessscenarios, processes and solutions

    Prepare synopsis and detailed slides for SAP demos

    Prepare slides for solutions worked out which will not be shown in SAP

    (e.g., interfaces/solutions based on functional specifications)

    Work out proposals for new/pending decisions

    Preparation

    Present solutions in SAP (processes and functionalities). Use 2 beamers tohave slides for illustration and SAP screen in parallel

    Present solutions not shown in SAP

    Present proposals for new/pending decisions and agree on proposal or define

    mitigating actions

    Execution

    Global blueprintProgr.prep.

    Design stageglobal template

    "White Smoke" Workshop 3

    Insight Design Execute Achieve

  • 8/11/2019 IDEA Method Overview Slides_REVIEWED_PF

    80/87

    Page 80 August 20, 2014IDEA Method Overview Slides_REVIEWED.ppt

    Detailed slides with further explanations of SAP functionalities

    shown in SAP

    Slides with solutions worked out since WS2

    Pre-reading for participants

    Agree on core deliverables and sign off global realization phase

    Deliverables

    Month

    Year

    Month Month Month

    Global blueprintProgr.prep. WS 1