idm; makes ifc work! janne aas-jakobsen industry day 2006-04-05

23
IDM; Makes IFC work! IDM; Makes IFC work! Janne Aas-Jakobsen Janne Aas-Jakobsen Industry Day 2006-04-05 Industry Day 2006-04-05

Upload: frederica-king

Post on 13-Jan-2016

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDM; Makes IFC work!IDM; Makes IFC work!

Janne Aas-JakobsenJanne Aas-Jakobsen

Industry Day 2006-04-05Industry Day 2006-04-05

Page 2: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

OutlineOutline

• IDM definitionIDM definition

• Deployment challengesDeployment challenges

• Contracted Data InterchangeContracted Data Interchange

• ExampleExample

• Wrap upWrap up

Page 3: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDM definitionIDM definition

Contracted data interchange making sure that:Contracted data interchange making sure that:

– Information is available when it is neededInformation is available when it is needed

– The quality of information is appropriateThe quality of information is appropriate

Page 4: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDM definitionIDM definition

Funct. descr.-Functions-Calculation-Requirements-Contsraints

Knowledge databases-Byggforskserien-Company knowledge db’s

Rules and regulations-Plan and building law-Regulations

BIM software-Drawings-Arch, HVAC, EL, CivEng

SIMULATION-Comfort-Air, heating-Lifecycle costr-Light and sound-Insulation-Use-Fire-Environmanteal impact-Life expectancy

Description-Beskrivelsestekster-NS 3420,-BOM-cost estimatesSourcing

-Product databases-Price databases

4D-Schedule-Logistics

FM-Renting, sale and use-Maintenance-Warranty

Demolishing, re-use-Renovation-Demolishing-Reconstruct

VRML-Visualisation-3D models

Pictures from: Selvaagbygg, DDS, Byggforsk, NBLN University of California, CIFE Stanford, Pythagoras and Oluf Granlund Yo.

IDMIDM

IDMIDM

IDMIDM

Page 5: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IFC ChallengesIFC Challenges

IFC does work

What exactly is an IFC model or an IFC file ?• standard format to describe a BIM• how information should be provided/stored through a building

project’s lifecycle.

Will the same users produce the same model with different software?

Will different users produce the same model with the same software?

Is it enough to ask for IFC files in a project?

IDM makes IFC work in business processes

Page 6: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

Deployment ChallengesDeployment Challenges

• Motivation to ask for a BIM/IFC ?• Motivation to deliver a BIM/IFC ?

• Extra work • paid • specified • validated

• Relation to contracts for various business processes

• How can users of software make sure they deliver what is requested, without having to understand every aspect of the BIM?

Page 7: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

Current situationCurrent situation

CAD manualCAD manual -layout-layout-measurement-measurement-line styles-line styles-layers-layers

BIM manualBIM manual

WallWall-------------------------------------------Start Point-Start Point-Lenght-Lenght-Depth-Depth-Height-Height-Connected walls-Connected walls-Attached spaces-Attached spaces

PointPoint------------------------------------------- X coordinate- X coordinate-Y coordinateY coordinate-Z coordinateZ coordinate

SpaceSpace------------------------------------------

-FunctionFunction--Occupant-Occupant--Area-Area

BIM

CAD

CAD

Page 8: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

informationinformation

geometricalgeometricalinformationinformation

documentsdocuments

Task A

Task B

BIMIDM

documentsdocuments

concept design engineering construction use FM

Task A

TaskB

Page 9: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

Share the information of common interest Share the information of common interest through the processthrough the process

Pro !Pro !+ Single source of common data Single source of common data + One entryOne entry+ Open StandardsOpen Standards+ 4 (n) D visualization4 (n) D visualization+ Foundation for simulationsFoundation for simulations+ Early problem detectionEarly problem detection+ Improved decision makingImproved decision making

Page 10: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

DefiningDefining• What’s yours and what’s mineWhat’s yours and what’s mine• Who are allowed toWho are allowed to

• UseUse• ChangeChange• WriteWrite

• What to exchange (no more – no less)What to exchange (no more – no less)

BIMBIMShare the information through the processShare the information through the process

Against !Against !- What’s yours and what’s mineWhat’s yours and what’s mine- Who are allowed toWho are allowed to

UseUse ChangeChange WriteWrite

- ““Do I need to send it all?”Do I need to send it all?”- ““What did I not receive?”What did I not receive?”

Contracted data interchange (IDM)Contracted data interchange (IDM)

Pro !Pro !+ Single source of common data Single source of common data + One entryOne entry+ 4 (5) D visualization4 (5) D visualization+ Foundaton for simulationsFoundaton for simulations+ Early problem detectionEarly problem detection+ Improved decision makingImproved decision making+ Open standardsOpen standards

Page 11: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDMContracted data interchangeContracted data interchange

Page 12: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDM StructureIDM StructureProcess Map

Exchange Requirement

Functional Parts

Wall Window Door Space

Wall

Length

Width

Xxxx

ER building model energy analysis

FP Wall

Door

Length

Width

Xxxx

Window

Length

Width

Xxxx

FP Window FP Door

Page 13: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDM; Makes IFC work!IDM; Makes IFC work!

An EksampleAn Eksample

Page 14: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

ContextContext

• Perform Energy AnalysisPerform Energy Analysis– Need to know whether a wall is an inner wall Need to know whether a wall is an inner wall

or an outer wallor an outer wall– Need to know space informationNeed to know space information– Need to know key indicator valuesNeed to know key indicator values– Need to know what kind of material the wall Need to know what kind of material the wall

consists ofconsists of

Page 15: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

BIM BIM all IFC information…all IFC information…

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Stages

Project Type

National Requirements

Tasks

Process

Geometric Information

Relationship Information

Page 16: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

BIMBIM

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Stages

Project Type

National Requirements

Tasks

Process

Geometric Information

Relationship Information

Page 17: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

BIMBIM

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Stages

Project Type

National Requirements

Tasks

Process

Geometric Information

Relationship Information

Page 18: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

BIMBIM

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Stages

Project Type

National Requirements

Tasks

Process

Geometric Information

Relationship Information

Page 19: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDM

• One need to know what is wanted from the One need to know what is wanted from the model in order to make a good modelmodel in order to make a good model– Define the process in which the model will be Define the process in which the model will be

usedused– Define the information requirementsDefine the information requirements

• ExampleExample– Energy Analysis cannot be performed on a Energy Analysis cannot be performed on a

BIM unless the required information is BIM unless the required information is available when the analysis is to take place!available when the analysis is to take place!

Page 20: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDM

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Stages

Project Type

National Requirements

Tasks

Process

Geometric Information

Relationship Information

Early phase

Energy Analysis

Page 21: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDM

Material Information

Product Information

FM Information

Resource Information

Cost Information

Procurement Information

Project Type

National Requirements

Process

Geometric Information

Relationship Information

Energy Analysis

Detailed Design

Page 22: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDMIDM target both BIM users and solution providers

For BIM users•simple to understand, plain language description of building construction processes •requirements for information to be provided •additional information that may need to be provided by the user

For BIM solution providers•identify and describe the detailed functional breakdown of the process •describe IFC capabilities needing to be supported for each functional part in terms of the entities, attributes, property sets and properties required

Page 23: IDM; Makes IFC work! Janne Aas-Jakobsen Industry Day 2006-04-05

IDMIDMTo improve the construction process:

• Information needs to be available when it is needed

• Quality of information needs to be appropriate

IDM; Makes IFC work!

Keep yourself updated on: http://idm.buildingsmart.no