IDOA Facility Maintenance & Repair
Pre-Proposal ConferenceFebruary 24, 2012
Justin Weidner IDOA Strategic Sourcing Analyst
General Information
• Sign-In Sheet for Attendees• Sign-In Sheet and PowerPoint will be posted on
IDOA’s Solicitation Website• Hold questions until the end of the presentation
Agenda
• General Information• Purpose & Scope of RFP• Key Dates• Proposal Preparation & Evaluation• Minority and Women’s Business Enterprises• Question and Answer Session
Purpose of the RFP
• The purpose of this RFP is to select a vendor that can satisfy the State’s need for facility maintenance and repair.
- It is the intent of Indiana Department of Administration to contract with a vendor that provides quality facility maintenance and repair for the Facilities Management Division of IDOA at a competitive rate.
Scope of RFP
• This RFP covers the solicitation for facility maintenance and repair. More specifically, this RFP is for the complete maintenance and repair of the HVAC, plumbing, electrical, fire alarm, fire suppression, carbon monoxide detectors, kitchen equipment, emergency generators, steam and natural gas systems.
Scope of RFP
The list below provides respondents with the current facilities that are to be included in this solicitation.
• Indiana Government Center South and Workforce Development.
• Indiana Government Center North• Washington Street Parking Facility• Senate Ave. Parking Facility• The Indiana State Capitol Building• The Indiana State Library
Scope of RFP
• All tunnels within and connecting the Government Center North, Government Center South, Capitol Building, State Library, Washington Street Parking Facility, and Senate Avenue Parking Facility.
• Indiana Historical Society• Indiana Governor’s Residence, Annex House, and Out
Buildings.
Scope of RFP•Contract Term
•The term of the contract shall be for a period of two (2) years from the date of contract execution. There may be two (2) one-year renewals for a total of four (4) years at the State’s option.
Key DatesActivity Date
Issue of RFP February 17, 2012
Pre-Proposal Conference February 24, 2012
Deadline to Submit Written Questions March 5, 2012 @ 3:00 P.M.
Response to Written Questions/RFP Amendments
March 15, 2012
Submission of ProposalsMarch 30, 2012
The dates for the following activities are target dates only. These activities may be completed earlier or later than the date shown.
Proposal Evaluation TBD
Proposal Discussions/Clarifications (if necessary)
TBD
Oral Presentations (if necessary) TBD
Best and Final Offers (if necessary) TBD
Contract Award May 11, 2012
Business Proposal(Attachment F)
• Company Financial Information (Section 2.3.3)– Confidential information must be kept separate from the
proposal in both hard and soft copy
• Contract Terms (Section 2.3.5)– Respondent should review sample State contract and note
exceptions to State mandatory and non-mandatory clauses in Transmittal Letter
Technical Proposal(Attachment G)
• Please use the Template we have provided for you.
• Where appropriate, supporting documentation may be referenced by a page and paragraph number.
Cost Proposal(Attachment D)
• The Cost Proposal is broken down into four (4) categories: Labor, Material, Sub-Contractors & Contracts, and Other. The billable rate per hour on the labor tab must meet or exceed the hourly rate for each position noted in attachment I, the construction wage scale.
• Respondents must provide pricing for all categories, with the exception of the Sub-Contractor & Contracts tab if it is not applicable to the proposal.
• Respondent pricing will be assessed based on the total amount calculated on the total bid amount tab.
Cost Proposal(Attachment D)
• Respondents who meet the State’s current baseline cost will receive zero (0) cost points.
• Respondents who propose a decrease to the State’s current costs will receive positive points at the same rate as bid increasing cost.
• Respondents who propose an increase to the State’s current cost will receive negative points at the same rate as bid lowering cost.
• Respondents who propose a 10% decrease to the State’s current baseline cost will receive all of the available cost points.
• If multiple Respondents decrease costs below 10% of the current baseline, an additional 5 points will be added to the Respondent proposing the lowest cost to the State.
Proposal Preparation
• Buy Indiana, Business Proposal 2.3.14– Status shall be finalized by proposal due date– 5 definitions, details provided in Business Proposal
• Indiana Economic Impact, Attachment C– Definition of FTE (Full-Time Equivalent)
– Example: If a Respondent has 5 full time employees and is
bidding on its 5th contract, and all contracts get an equal amount
of commitment from the employees then each employee
commits 20% of his or her time to the new contract:• 0.2 x 5 employees= 1 FTE.
Proposal Preparation
• Attachment D (Cost Proposal) must be returned in Excel
• Use the templates provided for all answers• Do not alter templates• Please submit all questions using attachment L
Proposal EvaluationSummary of Evaluation Criteria:
1. Adherence to Mandatory Requirements– Pass/Fail
2. Management Assessment/Quality (Business & Technical Proposal)– 35 points
3. Cost (Cost Proposal)– 20 points
4. Indiana Economic Impact– 15 points
5. Buy Indiana– 10 points
6. Minority (10) and Women Business (10) – Subcontractor Commitment 20 points
* 100 Total Points (7 bonus possible)
Minority and Women’s Business Enterprises
Charles Hill, MWBE Division• Contact Information
- Email: [email protected] or Phone: 317-233-0545
• Complete Attachment A, MWBE Form- Include sub-contractor letters of commitment
• Goals for Proposal- 8% Minority Business Enterprise
- 8% Women’s Business Enterprise
Minority and Women’s Business Enterprises
Prime Contractors must ensure that the proposed subcontractors meet the following criteria:•Must be listed on the IDOA Directory of Certified Firms•Each firm may only serve as once classification – MBE or WBE•A Prime Contractor who is an MBE or WBE must meet subcontractor goals by using other listed certified firms. Certified Prime Contractors cannot count their own workforce or companies to meet this requirement.•Must serve a commercially useful function. The firm must serve a value-added purpose on the engagement.•Must provide goods or service only in the industry area for which it is certified as listed in the directory at http://www.in.gov/idoa/2352.htm •Must be used to provide the goods or services specific to the contract•National Corporate Diversity Plans are generally not acceptable
Minority and Women’s Business Enterprises
TOTAL BID AMOUNT:
Minority and Women’s Business Enterprises
• Effective May, 2011, a new MWBE scoring methodology will be utilized for all RFP’s released
• New Process – MWBE scoring is conducted based on 20 points plus a possible 2 bonus points scale
- MBE: Possible 10 points + 1 bonus point
- WBE: Possible 10 points + 1 bonus Point
• Professional Services Scoring Methodology:
- The points will be awarded on the following schedule:
- Fractional percentages will be rounded up or down to the nearest whole percentage
- Submissions of 0% participation will result in a deduction of 1 point in each category
- The highest submission which exceeds the goal in each category will receive 11 points (10 points plus 1 bonus point). In case of a tie both firms will receive 11 points
% 1% 2% 3% 4% 5% 6% 7% 8%
Pts. 1.25 2.50 3.75 5.00 6.25 7.50 8.75 10.00
Minority and Women’s Business Enterprises
Bidder MBE % Pts. WBE % Pts. Total Pts.
Bidder 1 12.0% 10.0 10.0% 11.0 21.0
Bidder 2 6.0% 7.5 4.0% 5.0 12.5
Bidder 3 8.0% 10.0 8.0% 10.0 20.0
Bidder 4 16.0% 11.0 0.0% -1.0 10.0
Bidder 5 0.0% -1.0 0.0% -1.0 -2.0
RFP MWBE Scoring Example
Pre-Qualification
• Respondents must be qualified under IC 4-13.6-4
IDOA
Questions and Answers
Thank [email protected]