ids1000 container data center 20150205

Upload: alexandru-halau

Post on 02-Mar-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/26/2019 IDS1000 Container Data Center 20150205

    1/22

    HUAWEI TECHNOLOGIES CO., LTD.

    IDS1000 Container Data Center So

  • 7/26/2019 IDS1000 Container Data Center 20150205

    2/22

    2

    Huawei Container DC Solution

    Successful Cases

    Content

  • 7/26/2019 IDS1000 Container Data Center 20150205

    3/22

    3

    IDS1000-A All-In-One Container DC Solution

    Cabinet

    Anti-fire SystemPower SystemCooling System

    Cabli

    Syste

    Mana

    Syste

    Container

    System

    Rack

    System

    Highly integrated, mobile, convenient container DC solution

  • 7/26/2019 IDS1000 Container Data Center 20150205

    4/22

    4

    Project ScopeITEM Description

    Project preparationGenerally consulting and Designing activities are necessary for a data center project, help theto choose suitable solution and products, also provide all kinds of products specification and

    design, these documents are often used to make a project tender.

    Site Preparation1.Construction of building or room renting for IDS2000 modular data center2. An open field and basic site construction such as civil work needed for IDS1000 container center solution.

    Power system1 High voltage (HV) system, include Transformer, Diesel Generator ,Fuel Tank, HV Distribution S

    Power system2Light voltage (LV) system,include UPS system for IT equipement, Battery system for ITequipement,UPS and Battery system for continuous cooling, LV Power Distribution system

    Racks system All kinds of racks, Server Cabinet, Cabling Cabinet , Aisle containment , and container bodyCooling system Air-conditioner indoor units in IT room and power room

    Management systemUnified data center management system, include Hardware and software, license,basicmanagement fuctions for all facilities,security system, value added fuction :energy efficiency

    management fuction,asset managementFire protection system FM200, coverage, include control unit, cylinders, gas, pipe, sensors, etc

    Cabling System Include Cable tray,Cat 6 UTP cable, OM3 Fiber, patch panel, for 75cabinetsTelecom cabling sy

    Service Product training, I&C, maintenance

  • 7/26/2019 IDS1000 Container Data Center 20150205

    5/22

    5

    Layout

    Summary Description:

    Total area:

    40 ft All-in-one container: 12.192*2.438=29.72

    Battery backup time: 10 minutes

    Adopts in-row precision air conditioner for

    efficient cooling, and hot air containment.

    Total 8 racks, the power density is 6kw/rack ;

    The rack dimension is

    19 inches*45U(Height)*1000m(Depth)

  • 7/26/2019 IDS1000 Container Data Center 20150205

    6/22

    6

    Appearance And Inner decoration

  • 7/26/2019 IDS1000 Container Data Center 20150205

    7/22

    7

    Power Cooling Structure FirPower Supply System:

    G

    ATS

    lighting

    In row A/C

    Battery

    Utility Power Outside Container,

    Customer Scope:

    Base, civil work etc.

    UPS

    AC Load + Monitoring

    Container DC

    Inside Container , Huawei Scope

    customer scope

    G

  • 7/26/2019 IDS1000 Container Data Center 20150205

    8/22

    8

    Power Cooling Structure Fir

    N +1 Redundant Design, High Availability

    Efficient and convenient Redundancy Design Reliable light

    UPS efficiency reached 94.5%, saving

    more energy

    UPS power input range: voltage from

    80V to 280V AC, frequency from 40Hz

    to70Hz, adoptable in to harsh grid

    Rack-mounted UPS. Easy to install,

    expand and maintain

    Support dual power input. The ATS is

    integrated in PDB, and the switching time

    is less than 1second.

    UPS is 3+1 backup, and configured with

    bypass switch.

    Container configure

    bars. IT cabinets , pow

    systems are all

    connected to bars.

    Ground bars

    connect with

    grounding grid

    by earthing point .

    UPS input distributi

    the requirement of cl

    protection. The maxim

    current is 60kA.Huawei UPS 2000G

    Circuit diagram for 40ft AIO

    l

  • 7/26/2019 IDS1000 Container Data Center 20150205

    9/22

    9

    Power Cooling Structure Fire

    In-Row cooling: 20 kW cooling capacity in-row AC with 3+1 redundancy ,DX cooling type , horizon

    Superior operation and maintenance experience

    7-inch touch screen, providing query,

    setting, monitoring and maintenance

    interactive interface

    Electrode humidifier, step

    amount of humidification

    humidity

    A well-known bran

    temperature contrUsing efficient backward EC

    centrifugal fan, air volume redundant

    design.

    Energy-saving and Reliable In-row Precision AC

    P C li St t Fi

  • 7/26/2019 IDS1000 Container Data Center 20150205

    10/22

    10

    Power Cooling Structure Fire

    Cabinet Industry Unique Cabinet Design, Space-savi

    Cabinet meet RoHS requirements, fire performance comply with UL standard.

    The cabinet meets the requirements of the 19-inch mechanical structure size, ensure the strength of the cabinet

    the components from damage.

    Dual-cabinet:

    210011201000mmAvailable space:45UX2Weight:120kg

    Assodesig

    Triple

    supp

    stand

    High quality Cabinet material, reliable welding structure, protect equipment to avoid the external da

    P C li St t Fi

  • 7/26/2019 IDS1000 Container Data Center 20150205

    11/22

    11

    Power Cooling Structure Fire

    High-efficiency fire protection system, reliable and sa

    Controller

    Manual start/stop button

    sprayer

    each aisle

    Smoke sensor

    temperature sensor

    Sound and light alarm

    Emergency light

    (each aisle)

    Alarm bell

    Gas cylinder

    Pipe

    Quick: alarm delay time is 6s, extinguishant spraying time is 8s.

    Reliable:feature backup function, backup time is more than 48h.

    Green and effective: HFA(FM200) is liquid and space-saving; after spray turn to gaseous.

    Fire protection system

    Use the e

    fire or oth

    occur.

    Extinguish

    the fire pro

    the failure

    fire.

    Power Cooling Structure Fire

  • 7/26/2019 IDS1000 Container Data Center 20150205

    12/22

    12

    Power Cooling Structure Fire

    Monitor system- ensure data center safe operation

    Server Data base/operating system System interface Web UI

    ECC

    Water

    leakageSmoke

    Environment

    devices

    Collector

    Security

    Acces

    Cooling devices

    Air

    Condition Chillers PDF UPS PDU

    Power devices

    Platform

    T&H

    Energy Mgt

    Alarm Mgt

    Work-flow Mgt

    View MgtReport Mgt 3D View

    Capacity

    Mgt

    Northbound

    interface

    Functions

    http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%CB%AE%BD%FE%B4%AB%B8%D0%C6%F7&in=8678&cl=2&lm=-1&pn=3&rn=1&di=56604306540&ln=719&fr=&fm=result&fmq=1323996375258_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%D1%CC%B8%D0%CC%BD%B2%E2%C6%F7&in=7651&cl=2&lm=-1&pn=0&rn=1&di=25885237485&ln=1958&fr=&fm=result&fmq=1323996795086_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%B1%A6%C1%A6%C2%ED%CE%C2%CA%AA%B6%C8%B4%AB%B8%D0%C6%F7&in=30293&cl=2&lm=-1&pn=0&rn=1&di=6308582100&ln=415&fr=&fmq=&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2http://image.baidu.com/i?ct=503316480&z=&tn=baiduimagedetail&word=%CB%AE%BD%FE%B4%AB%B8%D0%C6%F7&in=8678&cl=2&lm=-1&pn=3&rn=1&di=56604306540&ln=719&fr=&fm=result&fmq=1323996375258_R&ic=0&s=0&se=1&sme=0&tab=&width=&height=&face=0&is=&istype=2
  • 7/26/2019 IDS1000 Container Data Center 20150205

    13/22

    13

    Fast

    SmartFast Flexible

    Fast Deployment,

    Drives Business Rapidly

    8-10 week

    Prefabrication in factory

    Decoration

    Business rapid on-line

    An

    RackPower

    Cooling

    1

    Inst

  • 7/26/2019 IDS1000 Container Data Center 20150205

    14/22

    14

    Flexible

    Flexible Combination, Come after Customer Require

    SmartFast Flexible

    1

    3

    2

    Business

    Power

    Cooling

    Copy of facility

    container

    Scalable dynamic design

    Uninterruptible upgrade fromTier3 to Tier4Raise density

    Modular structure, easy expansion

    Live in the moment, plan for future

    Save dispensable investment,

    grow with business

    On-demand Deployment

  • 7/26/2019 IDS1000 Container Data Center 20150205

    15/22

    15

    Smart

    Dynamic

    Including monitoringon UPS, PDF, ATS

    and air conditioner

    Environment

    Monitoring DCoperation

    environment throughtemp.& humi. sensor

    Video

    Monitoring DC ormodule through

    camera

    Security

    Access controlthrough access door

    and card reader

    Multi-subsystem monitoring integrated

    Know well about the running status of DC,Ensure safe operation

    SmartFast Flexible

    Smart NetEco6000 Management System

  • 7/26/2019 IDS1000 Container Data Center 20150205

    16/22

    16

    Smart

    Real-time monitoring

    Flexible warning

    methods, like sms, e-mail, sound, displayer

    E-work order

    Warning data base

    store the warninganalysis to guidemaintenance job

    Templatebuild-inabundant reporttemplate and pattern

    Customizationpossibleto customize report,more convenient

    Inquiry support various

    type of inquiry, datagraphic visualization

    Capacity ReportCapacityvisualization of cooling,power and space

    Resource Entrysupportmanual record,electronic tag auto scan

    Change Management

    provide suggestion ofequipment changebased on cooling, poweretc.,

    Warning Report Capacity

    Visualization Smart ManagemenIntelligent analysis, utmost lower management expenses

    SmartFast Flexible

    Smart NetEco6000 Management System

  • 7/26/2019 IDS1000 Container Data Center 20150205

    17/22

    17

    Excellent Environment Adaptation

    Easy Delivery

    ISO standard containerrecognized by classification

    society, connection portsembedded, convenient to

    deliver

    3rdclass road1000km

    delivery tested

    KCC Painting

    8degree anticorrosion(Pass 1000 hour salt spray test asper ASTM B117)

    15year service life

    Ultimate Temp.

    -40to 55 degCWide Range

    Weather Proof

    Class IP56

    Double layer adhesive

    tape for container

    combination

    Optimized container shape, natural favorable outdoor performa

  • 7/26/2019 IDS1000 Container Data Center 20150205

    18/22

    18

    Huawei Container DC Solution

    Successful Cases

    Content

  • 7/26/2019 IDS1000 Container Data Center 20150205

    19/22

    19

    Challenge

    6 months time-to-market

    Harsh Environment

    Insufficient technical support

    Yangon DC Mandalay DC

    Huawei solution10 weeksdeliverywith CT equipment

    4 Months first call

    41+7 containerized data center

    Telenor Myanmar New License Project

  • 7/26/2019 IDS1000 Container Data Center 20150205

    20/22

    20

    Telenor Myanmar New License Project

  • 7/26/2019 IDS1000 Container Data Center 20150205

    21/22

    21

    Challenges Demands

    Huawei Solution

    DC Case: Romania 2K IDS1000 Container Data Center

    The legacy data center is not enough for the fast business development

    Modular design to meet the phased deployment Tier 3 certification

    Annual PUE

  • 7/26/2019 IDS1000 Container Data Center 20150205

    22/22

    Copyright2013 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptaninformation at any time without notice.

    THANK YOU