ie 3101: supply chain modeling project

21
IE 3101: IE 3101: Supply Chain Supply Chain Modeling Modeling Project Project Gita Ayu Damie Bartley Wendy Hsia Leon Liu Peter Severa

Upload: lumina

Post on 05-Feb-2016

41 views

Category:

Documents


1 download

DESCRIPTION

IE 3101: Supply Chain Modeling Project. Gita Ayu Damie Bartley Wendy Hsia Leon Liu Peter Severa. Company Overview. Media Packaging Company CD Jewel Cases DVD Cases Video, Audio packaging, etc. Company Background. Atlanta Precision Molding Japanese Owned Palladium - Nexpak - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IE 3101: Supply Chain Modeling Project

IE 3101:IE 3101:Supply ChainSupply ChainModeling ProjectModeling Project

Gita AyuDamie Bartley

Wendy HsiaLeon Liu

Peter Severa

Page 2: IE 3101: Supply Chain Modeling Project

Company OverviewCompany Overview• Media Packaging Company

– CD Jewel Cases– DVD Cases– Video, Audio packaging, etc..

Page 3: IE 3101: Supply Chain Modeling Project

Company BackgroundCompany Background• Atlanta Precision Molding

– Japanese Owned• Palladium - Nexpak

– 4th Largest Injection Molding Company– Largest Supplier of Media Packaging for

Audio and Video formats

Page 4: IE 3101: Supply Chain Modeling Project

Company BackgroundCompany Background• Competitors Acquired

– Joyce Molding– Alpha Media Packaging

• Mercury Foam

• Competitors– Viva– Tritex Magnetics– Shape (bankrupt)

Page 5: IE 3101: Supply Chain Modeling Project

Supply Chain Flow-ChartSupply Chain Flow-Chart

Suppliers

Purchasing

Manufacturing

Logistics

Shipping

Consignment

MaterialsRequirements

Raw Materials

EngineeringRaw Material Levels

InventoryAllocations

InventoryLevels

Finished Goods

ShippingQuantities

Inventory

CustomerOrders

Customers

FinishedGoods

Sales

Customer Orders

Customer Orders

ShippingQuantities

Materials Flow

Information Flow

Page 6: IE 3101: Supply Chain Modeling Project

SuppliersSuppliers• Chevron, Dow, and Nova Chemicals

– Polystyrene• Benzene and Ethylene

– Gas Prices• Price increased by 100% since January 2000

• Chesapeake, VA– Shipped by barge

Suppliers Purchasing Manufacturing Logistics Shipping

Page 7: IE 3101: Supply Chain Modeling Project

PurchasingPurchasing• Raw Materials

• Delivered by truck daily• ROP is one to two days stock

– monthly projection adjusted daily

• 24 hour Safety Stock• Use Push & Pull method

– Suppliers use 3-month projection– NEXPAK has control to change deliveries

• Lead time is 10-14 days

Suppliers Purchasing Manufacturing Logistics Shipping

Page 8: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Polystyrene

– General Purpose• Clear Trays

– High Impact• Tray Inserts

Suppliers Purchasing Manufacturing Logistics Shipping

Page 9: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Efficiency

– ¼ million lbs per day• 70 million lbs per year• 1.1 billion products per year• 1.5-3% product is scrapped

– Control software used to monitor polystyrene levels

Suppliers Purchasing Manufacturing Logistics Shipping

Page 10: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Product Mix

• NEXPAK produces five different products• DVD cases will start production in January

2001– additional three machines

Suppliers Purchasing Manufacturing Logistics Shipping

Page 11: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Storage of Product / Packaging

– Palettes• 42”x42”• 40”x40” *

– Shelf Life• 2-3 Months

Suppliers Purchasing Manufacturing Logistics Shipping

Page 12: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Capacity

– Atlanta facility is largest• 221,000 sq. ft• 140 Employees• 101 Injection Molding Machines• Fully Automated Production Line

– 76 Machines on Slow Line– 25 Machines on Fast Line

– Current output averages 1.5 million trays / day (3.3 million pieces)

Suppliers Purchasing Manufacturing Logistics Shipping

Page 13: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Special Orders

– Two week lead time– Higher production cost

• Requires special mold to be made• Cost of special mold is absorbed by Nexpak

Suppliers Purchasing Manufacturing Logistics Shipping

Page 14: IE 3101: Supply Chain Modeling Project

ManufacturingManufacturing• Quality Assurance for Customer Service

– Customer reported defects• Warpage• Packaging

– Inspection occurs every four hours– One bundle is inspected per machine for 20-30

criteria• Visual Defects• Physical Defects

Suppliers Purchasing Manufacturing Logistics Shipping

Page 15: IE 3101: Supply Chain Modeling Project

LogisticsLogistics• Seasonal Demand Pattern

– No problem with stock-outs– No production is outsourced

Suppliers Purchasing Manufacturing Logistics Shipping

Page 16: IE 3101: Supply Chain Modeling Project

LogisticsLogistics• Inventory

– 2-3 weeks held on-site• 10-15 million units

– Two offsite inventory locations• Long-term• Consignment Warehouse

– Logistics International

Suppliers Purchasing Manufacturing Logistics Shipping

Page 17: IE 3101: Supply Chain Modeling Project

LogisticsLogistics• Logistics International

– Floor space and time based fees• Only pay for space that is used

– Provide carrier service

Suppliers Purchasing Manufacturing Logistics Shipping

Page 18: IE 3101: Supply Chain Modeling Project

ShippingShipping• Ships full truckloads• LTL shipping occurs very infrequently• Shipping to Europe done by sea

– Only done if European facility cannot meet demand

• Order cut-off time is 1pm ET

Suppliers Purchasing Manufacturing Logistics Shipping

Page 19: IE 3101: Supply Chain Modeling Project

ShippingShipping• Distribution

– 10-30 different locations per month• 3-4 Truckloads per location per day

– Main distribution center in Indiana under consideration

– Atlanta Facility• 10-20 truckloads daily for pre-holiday season• 6-8 truckloads daily during the off-season

Suppliers Purchasing Manufacturing Logistics Shipping

Page 20: IE 3101: Supply Chain Modeling Project

CustomersCustomers• Sony• Warner Brothers• Seagram's• BMG• 20 Smaller companies

– TDK, EMI, JVC ...

Page 21: IE 3101: Supply Chain Modeling Project

Questions?Questions?