iec tc57 cim wg13 model manager report · 2 wg13 recent activity wg 13 cim uml status 61970 cim 16...

35
INTERNATIONAL ELECTROTECHNICAL COMMISSION IEC TC57 CIM WG13 Model Manager Report Kurt Hunter CIM Users Group Gdynia, Poland June 3, 2015

Upload: others

Post on 13-Jul-2020

46 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

INTERNATIONAL

ELECTROTECHNICAL

COMMISSION

IEC TC57

CIM WG13 Model Manager Report

Kurt Hunter

CIM Users Group

Gdynia, Poland

June 3, 2015

Page 2: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

2

WG13 Recent Activity

WG 13 CIM UML Status

61970 CIM 16

61970 CIM 17

CIM 17 New Topics Backlog

CIM Model Management document

WG13 Report Outline

Page 3: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Modeling issues meetings

Regular WG13 weekly web conferences

WG13 modeling call is Wednesday 10 AM US Central time

Email [email protected] to get on email list.

Recent topics:

Frames

Operations

Change modelling

61970-552 update

CIM Issues

Distributed Energy Resources

ICCP Model

61850 Harmonization Measurement model

P 3

Page 4: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

WG13 RECENT ACTIVITY

4

What’s motivating changes to CIM?-Power System Projects

-61850 Harmonization

-ICCP Model

-Distributed Energy Resources

-CDPSM (Common Distribution Power System Model)

-CIM Issues (on going)

Page 5: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

WG 13 Recent Activity

Power System Projects

Needed by ENTSO-E

Initiated Generic Change Modeling

Related to Frames, Model Assembly and

Alternate Models

5

Page 6: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

“Generic Change Modeling” Task Force

Formed June 12, 2014 at Brussels WG 13/14 meeting

Weekly calls on Monday 10 AM US Central time led by Jay

Britton

Working on a generic approach to change modeling to be used

by WG 13 for Power System Projects

Flexible approach of including Header/Envelope data in the CIM

UML

May also be useful for Outage Planning, System Integrity

Protection Schemes (SIPS), SCADA Calculations, etc

No effect on work of other TC 57 WGs. WG 14 and WG 16 can

determine whether or not they will use this approach

WG 13 Recent Activity

Page 7: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

61850 Harmonization

WG 19 effort

Primary use case to define a

transformation of 61850 SCL data to CIM

(61970-452)

Changes to CIM

Enumeration harmonization

TC57 Measurement harmonization

Model changes to support 61850 and CIM transfers use case.

two terminal FlowSensor as ConductingEquipment

7

WG 13 Recent Activity

Page 8: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

ICCP Model

61970-452 has included a work around for

ICCP data for years

Proposal for model to exchange ICCP

configuration data waiting for review

Model changes for 61850 measurement

harmonization will be implemented first

8

WG 13 Recent Activity

Page 9: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Distributed Energy Resources (DER)

Recently reviewed an issue from ENTSO-E

about regulation capabilities for

EnergySource class related to Dynamics

Proposed fix would not be a long term

solution

Need to look at use cases from WG 13, WG

14, WG 16 and 61850 and harmonize

during initial modeling

9

WG 13 Recent Activity

Page 10: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Common Distribution Power System Model

(CDPSM)

61968-13 (CDPSM) responsibility moved to

WG 13

Eric Lambert leading effort for new edition

Reviewing use cases, still to determine if

CIM UML changes will be needed

Initiated Feeder Task Force, which could

result in CIM UML changes

10

WG 13 Recent Activity

Page 11: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

CIM 16

61970CIM16 Model “frozen” several times during 2014

Parallel work on CIM17 - duplicating CIM16 final updates

61960CIM16v29 released fall 2014

61970-301 Ed. 6 draft exists, Lars-Ola Osterlund

CIM 17

Current draft 61970CIM17v07

P 11

WG 13 CIM UML Status

Page 12: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Latest CIM UML drafts available on CIMug

site

12

WG 13 CIM UML Status

Page 13: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Combined CIM UML models include

packages from WG 13, 14 and 16

Name of file includes versions of WG

packages

iec61970cim17v07_iec61968cim12v10_iec62325cim03v02

WG 13 (61970) – cim 17v07

WG 14 (61968) – cim 12v10

WG 16 (62325) – cim 3v02

13

WG 13 CIM UML Status

Page 14: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

CIM UML model zip file contains:

Enterprise Architect (.eap) CIM UML model

Issues lists (combined, WG 13, WG 14 and WG

16)

Change reports from each WG

XMI exports

14

WG 13 CIM UML Status

Page 15: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Package Dependencies

Model Assembly from WG’s

P 15

Page 16: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Model assembly

Working well,

but not fully trusted.

Model Assembly from WG’s

P 16

WG13619706196862325

WG14619706196862325

WG16619706196862325

Page 17: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Issues counts as of June 2015

WG13 issue counts

Open = 44

Closed = 1014

Review = 4

Combined open issues

Open = 7

Review = 5

Closed = 211 + 4 ReadyToClose

P 17

Page 18: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

WHAT’S IN 61970 CIM 16

Ed.6 of IEC 61970-301 (and what is coming for -302)

18

Page 19: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

CIM 16 Quick Recap

Dynamics package added

Rearrange 61970 packages for Base and Dynamics

DC model improvements

New DC terminal connectivity model

Grounding models (Petersen coil, GroundingSwitch, Ground)

Faults

Steady state hypothesis support – target values, etc.

Non-linear Shunt Compensator

Phase shifter updates

StaticVarCompensator updates

P 19

CIM 16 Changes

Page 20: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

New Dynamics package

P 20

CIM 16 Changes

Page 21: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Dynamics embedded diagrams

Relate parameters to diagrams (e.g. JPEG).

P 21

CIM 16 Changes

Page 22: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

HVDC models and DC topology

P 22

Generic DC topological model

HVDC model, described in 61970-301

Base Model

CIM 16 Changes

Page 23: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

DC UML package

P 23

CIM 16 Changes

Page 24: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Petersen coil and grounding classes

P 24

Classes

PetersonCoil (branch to grounding network)

GroundDisconnector (is a Switch)

Ground (like a BusbarSection)

Part of Wires package

CIM 16 Changes

Page 25: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Petersen coil and grounding

P 25

CIM 16 Changes

Page 26: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Fault models

P 26

Node faults or equipment internal faults

CIM 16 Changes

Page 27: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

SVC updates for CIM16

SVC regulates according to following:

P 27

CIM 16 Changes

Page 28: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

WHAT’S NEW IN 61970 CIM 17

Ed.7 of IEC 61970-301

28

Page 29: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

P 29

Domain – datatypes changes

Combined units approach changed

Add new combined UnitSymbol enums

Remove:

denominatorMultipiler

denominatorUnit

Changes to

Requires new enums on UnitSymbol

CIM 17 Changes

Page 30: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Integers on Enumerations

c-039: enums with integer values: e.g.

Currency

Aligned with IEC 61850.

P 30

CIM 17 Changes

Page 31: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

P 31

Added EnergySourcePhase

Similar to EnergyConsumerPhase

Attribution needed

Wires package

CIM 17 Changes

Page 32: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

P 32

Added FlowSensor

Added for 61850 harmonization

Two terminal device

Inherits from ConductingEquipment

CIM 17 Changes

Page 33: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

CIM17 New Topics Backlog

Limit value/specification exchange (High priority, 61970-456)

Limit Types (Medium priority)

Limit Calculation (Low priority)

ICCP Model (High priority)

System Integrity Protection Schemes (informative crude, change

modeling TF)

Contingencies (Medium priority)

ENTSO-E IOP issues (ongoing)

Transmission and Distribution Load model cleanup

SCADA calculations (change modeling TF)

SCADA controls (Low priority)

RegulatingControl complex control (Medium priority)

Violation reporting (Medium priority)

P 33

Page 34: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

Model Manager Guidance document

Not yet formalized as IEC international standard (IS)

Likely to become IEC Technical Report (TR)

Captures guidance but not formal agreement on

everything

Helpful guidance for the canonical model UML (rules)

Many (most) of these rules are codified in the

jCleanCim tool

Covers user extensions to CIM canonical model

Covers canonical model namespace specification

Page 35: IEC TC57 CIM WG13 Model Manager Report · 2 WG13 Recent Activity WG 13 CIM UML Status 61970 CIM 16 61970 CIM 17 CIM 17 New Topics Backlog CIM Model Management document WG13 Report

INTERNATIONAL

ELECTROTECHNICAL

COMMISSION

Q & A

[email protected]