    PROFESSIONAL REVIEW EXAMINATION 

     FEBRUARY/MARCH 2016 

    K.A.N.P.KUMARA

    AM 11644

    THE INSTITUTION OF ENGINEERS SRI

    LANKA

  • 8/18/2019 IESL PR- Nalaka

    2/48

    1. Recognized Training and Responsible Experience

    2. Applications of Five Core Competences

    3. Strctral !esign

    PRESENTATION OUTLINE

  • 8/18/2019 IESL PR- Nalaka

    3/48

    1.1 Recognize T!"ining #P!io! $o G!"%"$ion&

    Ke"ngn"' En$e!(!i)e) L$. * +6 'on$,)

    Re,"-ii$"$ion "n

    U(g!"ing o/

    K"n0 M",i0"ng"n"

    #A*+26& Ro" P!o3ec$

    1. Recognize T!"ining "n Re)(on)i-e

    E(e!ience

  • 8/18/2019 IESL PR- Nalaka

    4/48

  • 8/18/2019 IESL PR- Nalaka

    5/48

    P"ce o/ Wo!5 %!"$ionResident EngineerCentral Engineering Consultancy Bureau(EPC/East)Construction of 'us stand at .anthale, Constructionof Pola at .anthale, Procurement 6or7 at 'ase %&ce-

    .anthale

    08 months

    Resident EngineerCentral Engineering Consultancy Bureau(EPC/East)Construction of Eastern 9ational )port Comple# at 2rincomalee, Construction of Police at 2rincomale

    40 months

    Design EngineerCentral Engineering Consultancy BureauDesign %&ce-EPC Division, Digana

    0: months

     2%2A3 5 months

    1.7 Re)(on)i-e E(e!ience

  • 8/18/2019 IESL PR- Nalaka

    6/48

    G"e!0 8oec$ion8on)$!%c$ion o/ OP 9%iing "$ 9")e Ho)(i$" * K"n$,"e

    !oof 6or7 Precast Concretepurlin

    As;estos !oof 

    Ceiling 6or7 Plum;ing 6or7 2iling and

  • 8/18/2019 IESL PR- Nalaka

    7/48

    G"e!0 8oec$ion*8on)$!%c$ion o/ OP9%iing "$ 9")e Ho)(i$" K"n$,"e "n

    9%) )$"n "$ K"n$,"e

    Aluminum 6or7  2im;er )tage Finishing 6or7

    Finishing 6or7 Asphalt paving 'us stand at .anthale

  • 8/18/2019 IESL PR- Nalaka

    8/48

    G"e!0 8oec$ion8on)$!%c$ion o/ N"$ion" S(o!$ 8o'(e "$ T!inco'"ee

    Preparation for sand;lasting

    Air Compressor forsand ;lasting

    )and pot

    %uter drain of =00m =00m trac7 ground !einforcement 6or7 for

  • 8/18/2019 IESL PR- Nalaka

    9/48

    G"e!0 8oec$ion*8on)$!%c$ion o/ N"$ion" S(o!$ 8o'(e "$T!inco'"ee # 8on)$!%c$ion o/ S:i''ing Poo &

    E#cavation for pipelaying

    Pressure testing 6or7 Pressure testing 6or7

    Pipe laying Pipe laying 'efore screed

  • 8/18/2019 IESL PR- Nalaka

    10/48

    G"e!0 8oec$ion*8on)$!%c$ion o/N"$ion" S(o!$ 8o'(e "$ T!inco'"ee

    #Inoo! S$"i%' "n S:i''ing Poo &

    *ndoor )tadium andling of 2russes )6imming Pool

    $ater tightness )6imming pool and Erection of 2russes

  • 8/18/2019 IESL PR- Nalaka

    11/48

    G"e!0 8oec$ion*8on)$!%c$ion o/ N"$ion"

    S(o!$ 8o'(e "$

    T!inco'"ee #Inoo!

    S$"i%' "n S:i''ing

    Poo &

  • 8/18/2019 IESL PR- Nalaka

    12/48

    2. A((ic"$ion) o/ Fi;e 8o!e 8o'(e$ence)

    2.1 Kno:ege "n Une!)$"ning o/ Enginee!ing

    P!inci(e)

     Anal"zing# !esigning and !etailing of Strctres.

     !esign of strctral elements sc$ as slab# beam# colmn#

    fondations and staircase etc.

     %alit" control of materials Testing and constrction &or'

    in varios pro(ect

    )nderstanding of t$e site conditions

  • 8/18/2019 IESL PR- Nalaka

    13/48

  • 8/18/2019 IESL PR- Nalaka

    14/48

    S"n 9")$ing :o!5 

    A((ic"$ion o/ '"!ine ("in$

  • 8/18/2019 IESL PR- Nalaka

    15/48

    S%!/"ce

    (!e("!"$ion o/

    S$ee

    8!i'(e :i!e c%( -!%),

    T:i)$e :i!e c%( -!%),

  • 8/18/2019 IESL PR- Nalaka

    16/48

    So"5"ge P!o-e'

  • 8/18/2019 IESL PR- Nalaka

    17/48

    E!ec$ion o/ S$ee

    T!%))e)

    ton /obile Crane

    ifting arrangement

    Stiffening of t$e trss

    ton /obile Crane

    ifting arrangement

    Stiffening of t$e trss

  • 8/18/2019 IESL PR- Nalaka

    18/48

    A%$o 8A 8i;i 7

    T"n5 9%n "n c"n"

  • 8/18/2019 IESL PR- Nalaka

    19/48

    8!o)) Sec$ion) # A%$o'"$e&

    T"n5 9%n "n c"n"

  • 8/18/2019 IESL PR- Nalaka

    20/48

    8!o)) Sec$ion) # 8o!!ec$e&

  • 8/18/2019 IESL PR- Nalaka

    21/48

    GI 'e), %ne! $,e A%'in%' Foi

  • 8/18/2019 IESL PR- Nalaka

    22/48

    9i! ne$ /o! (igeon)

  • 8/18/2019 IESL PR- Nalaka

    23/48

    S$"i! c")e) Si$e coni$ion

  • 8/18/2019 IESL PR- Nalaka

    24/48

    P%'-ing

    +roper fnctioning of +trap

    -ent

    +roper &ater seal

    Avoid sip$on action li'e S trap

    Redce emission of se&er gases

    and smell

    +roper fnctioning of +trap

    -ent

    +roper &ater seal

    Avoid sip$on action li'e S trap

    Redce emission of se&er gases

    and smell

  • 8/18/2019 IESL PR- Nalaka

    25/48

    P%'-ing

  • 8/18/2019 IESL PR- Nalaka

    26/48

  • 8/18/2019 IESL PR- Nalaka

    27/48

    Aigning o/

    He"!"ce 8"n"

    In Mini,0!o(o:e!

    (!o3ec$

  • 8/18/2019 IESL PR- Nalaka

    28/48

    Longi$%in" Sec$ion) in Mini,0!o(o:e!

    (!o3ec$

  • 8/18/2019 IESL PR- Nalaka

    29/48

    2.7 Le"e!),i( "n M"n"ge'en$

    Arranging meetings &it$ different parties regarding t$e isses at

    t$e site *Constrction# Safet" 5 6t$er isses

    Coordinate &it$ all pro(ect team members to ac$ieve targets.

    7ssing site instrctions to follo& p t$e dra&ings and approved

    met$odologies to maintain t$e 0alit".

    Trained t$e trainees in order to ac$ieve t$e targets and 0alit".

    /aintained a good interaction &it$ t$e Emplo"er# Consltant and

    Contractor.

    Arranging a&areness programs for varios tec$nical matters.

    Arranging meetings &it$ different parties regarding t$e isses at

    t$e site *Constrction# Safet" 5 6t$er isses

    Coordinate &it$ all pro(ect team members to ac$ieve targets.

    7ssing site instrctions to follo& p t$e dra&ings and approved

    met$odologies to maintain t$e 0alit".

    Trained t$e trainees in order to ac$ieve t$e targets and 0alit".

    /aintained a good interaction &it$ t$e Emplo"er# Consltant and

    Contractor.

    Arranging a&areness programs for varios tec$nical matters.

  • 8/18/2019 IESL PR- Nalaka

    30/48

    2.4 8o''%nic"$ion > In$e!(e!)on" S5i)

    +articipating progress revie& meetings and site meetings

    +reparation of mintes 5 +reparation of detailed progress report for

    mont$l" progress meeting.

    Commnicating &it$ relevant at$orities &it$in t$e organization and

    otside.

    S$aring 'no&ledge &it$ sbordinate# ot$er site peoples and

    arranging discssion to clarif" problems.

  • 8/18/2019 IESL PR- Nalaka

    31/48

    Le"e!),i(

    "n co''%nic"$ion

    8ig$er accrac" in setting ot#

     placement of tile re0ired

    Trained tec$nical staff to

    se Total Station for setting

    ot

    4ell commnication

    Solving problematic

    sitation

  • 8/18/2019 IESL PR- Nalaka

    32/48

    2.? P!o/e))ion" 8on%c$

     +articipated in C+! corses condcted b" )niversities #

    7ES# 5 CEC9 raining nit.

     Condcted Engineering activities conforming to

    standards.

     +roper action and concept to mitigate environmental

    isses.

     Arrange mont$l" meeting 5 Site inspection to c$ec'

    &$et$er t$at safet" of site is compliance &it$ Safet"

    /anal.

  • 8/18/2019 IESL PR- Nalaka

    33/48

    7. S$!%c$%!" e)ignP!o3ec$ @ P!o(o)e Fo%! S$o!ie W"! 8o'(e /o! Gene!"

    Ho)(i$" #Te"c,ing& An%!","(%!"!esign 7nformation

    7nitial member sizing

    !esign of Slab

    !esign of 9eams

    !esign of Staircase

    Frame anal"sis

    Colmn design!esign of Fondations

    T,i) :") c"!!0 o%$ "cco!ing $o $,e E%!o 8oe 2

    #9SEN 1BB2*1*1@2++4&

  • 8/18/2019 IESL PR- Nalaka

    34/48

  • 8/18/2019 IESL PR- Nalaka

    35/48

    Ini$i" e)ign * S"- T,ic5ne))

    Selection of cover  *9SEN 1BB2*1*1@2++4D cl =.=.1.1*2

    9ar diameter @ cl =.=.1.2*3 Exposre class @ Table =.1

    Strengt$ class @ cl =.=.1.2* Fire resistance   7strctE

    /analBT.1&

    Span; effective dept$ ratio Strctral s"stem #/anal for t$e design of

    concrete bilding strctres# to EC2B Table3 5 raded examples in r;f concrete design to

    EC2# 3rd edition b" +ri"an !ias and Desa&an Siva'mar &

    for 6ne &a" spanning# continos slab 3

    for T&o &a" spanning# continos slab =2

    S"- $,ic5ne)) e//. e($, 12 -"! i"'e$e! co;e!

    7.2 e)ign o/ S"-

    l#

  • 8/18/2019 IESL PR- Nalaka

    36/48

    • Calclate design load *7StrctE /analBT3.2

    *1.3g'1.0'

    • Calclate bending moments *7StrctE /analB.2.3.3

    msx  Gsx. n.lx2

    ms"  Gs". n.lx2

    • Calclate s$ear forces *Re"noldsHs 8and 9oo'BT2.=3

      vsx Gvx. n.lx

      vs" Gv". n.lx

    >             

    ly

    l#

    m/

    m#

    m

    my

    m=

    m4

    ly

    l#

    v3 

    v2 

    v1 

    v= 

    One :"0 S"- e)ign Calclate bending moments *7StrctE /analBT.2

    Calclate s$ear forces *7StrctE /analBT.2

    S"- e)ign #8on$=&

    T:o :"0 S"- e)ign

  • 8/18/2019 IESL PR- Nalaka

    37/48

    • 8"c%"$e !ein/o!ce'en$ *7StrctE /analB.2.=.1

      ' /;*bd2f c'  *7f ' I ,.1J># Singl" reinforced

    • ever arm# ? d*,.*,.2*';1.13=,. not greater t$an ,.K

      A s#re0  /;*,.L>f "' ?

    • 8,ec5 /o! 'ini'%' "!e" o/ !ein/o!ce'en$ *cl K.2.1.1*1

    As#min ,.2Jfctm.bt.d;f"' M ,.,,13btd

    • 8,ec5 '"i'%' "!e" o/ !ein/o!ce'en$ *cl K.2.1.1*3

     As#max ,.,=Ac

    • 8,ec5 /o! )("cing *clK.3.1.1*3

      Smax 2d or 2, &$ic$ever lesser 

     

    • 8,ec5 /o! e/ec$ion *cl >.=.2*2

      *l;d Actal  I *l;d Allo&able

    Slab !esign*Contd...

  • 8/18/2019 IESL PR- Nalaka

    38/48

    Seec$ion o/ co;e! "n -e"' :i$, *9SE: 1KK2112,,=D cl =.=.1.1*2

    • 9ar diameter @ cl =.=.1.2*3 Exposre class @ Table =.1

    • Strengt$ class @ cl =.=.1.2* Fire resistance   7strctE

    /analBT.1, 5.11

    8"c%"$e $,e e($,

    Span; effective dept$ ratio Strctral s"stem #/anal for t$e design of

    concrete bilding strctres# to EC2B Table3&

    for simpl" spported beam 1=

    for continos beam 1L

    7.7 e)ign o/ 9e"'

  • 8/18/2019 IESL PR- Nalaka

    39/48

    8"c%"$e $,e e)ign o"

    O-$"in $,e o" co'-in"$ion #c ?.1.7#1&&

    An"0ze $,e -e"'

    Mo'en$ i)$!i-%$ion 'e$,o %)ing /ie en'o'en$

    • F!"'e "n"0)i) %)ing SAP2+++

    !": 9M > SF i"g!"') "n o-$"in $,e en;eo(

    8"c%"$e e//ec$i;e /"nge :i$, #c ?.7.2.1&

    e)ign o/ 9e"' #8on$...&

  • 8/18/2019 IESL PR- Nalaka

    40/48

    • 8"c%"$e !ein/o!ce'en$ *7StrctE /analB.2.=.1

      ' /;*bd2f c'  *7f ' I ,.1J># Singl" reinforced

    • ever arm# ? d*,.*,.2*';1.13=,. not greater t$an ,.K

      A s#re0  /;*,.L>f "' ?

    • 8,ec5 /o! 'ini'%' "!e" o/ !ein/o!ce'en$ *cl K.2.1.1*1

    As#min ,.2Jfctm.bt.d;f"' M ,.,,13btd

    • 8,ec5 '"i'%' "!e" o/ !ein/o!ce'en$ *cl K.2.1.1*3

     As#max ,.,=Ac

    e)ign o/ 9e"' #8on$...&

  • 8/18/2019 IESL PR- Nalaka

    41/48

    !esign of s$ear reinforcement

    C$ec' for crs$ing of diagonal strt of concrete at a distance less NdO fromspport *cl J.2.1*L

    Calclate s$ear resistance &it$ot s$ear lin'*cl J.2.2*1

    7f it is not satisf"# calclate s$ear reinforcement*cl J.2.3*3

    As& -Rds S;*?f "dcotP

    C$ec' for maximm spacing *cl K.2.2*J ,.>d*1cotQ

    C$ec' for s$ear reinforcement ratio # &Mmin

    C$ec' for deflection *cl >.=.2*2

      *l;d Actal I *l;d Allo&able

    Crtailment of reinforcement

    e)ign o/ 9e"' #8on$...&

  • 8/18/2019 IESL PR- Nalaka

    42/48

    Ini$i" e)ign o/ 8o%'n #A!e"&

      Selection of cover 

    Fire resistance @ 6ne and $alf $ors for colmn

    Calclation of action

    Calclation of &ind action @ C+3.C$apter -21K>2

    Frame anal"sis sing SA+2,,,-1= for load combination

    Calclate effective $eig$t of t$e colmn*cl .L.3.2*3 @)nbraced

    member 

    C$ec' for slenderness

    7.4 e)ign o/ 8o%'n

  • 8/18/2019 IESL PR- Nalaka

    43/48

  • 8/18/2019 IESL PR- Nalaka

    44/48

    C$ec' , I 2R I >,,

    Calclate &aist t$ic'ness Calclation of loading

    factor of slope R 2  2 1;2 ;

    Calclation of reinforcement!esign for bending find */ #' # ? # As#re0

    C$ec' for deflection *cl >.=.2*2

      *l;d Actal I *l;d Allo&able

    C$ec' for S$ear *cl J.2.2.1*1

    -Ed I -Rd#c

    7.? e)ign o/ S$"i!c")e

    *Allen boo'

  • 8/18/2019 IESL PR- Nalaka

    45/48

     Calclate t$e loads

    -ertical !ead *! and ive oads * $orizontal 4ind *4

    Anal"sis &ere done sing SA+2,,,-1=

     

    7.6 F!"'e "n"0)i)

    Fig ? Dead loads

  • 8/18/2019 IESL PR- Nalaka

    46/48

    F!"'e "n"0)i) #con&

    Fig ? 6ind loads

  • 8/18/2019 IESL PR- Nalaka

    47/48

    e)ign o/ P" /o%n"$ion

    Calclate t$e base dimension

    Area of 9ase Service load ; 9earing capacit" of soil

    Calclate critical bending moment

    Calclation of reinforcement

      find ' # ? # As#re0

    8,ec5 /o! '" > 'in )$ee

    C$ec' for vertical line s$ear 

    C$ec' for +nc$ing S$ear *at face# NdO # N2dO

    =:

    7.J e)ign o/ Fo%n"$ion

  • 8/18/2019 IESL PR- Nalaka

    48/48

     2A9. @%U