igcdp tier 3 structures and l&d
DESCRIPTION
TRANSCRIPT
TM for iGCDP iGCDP | Tier 3
Tier 1 MC � Tier 3 MC � Tier 4 MC �
organic and balanced growth �
Tier 2 MC �
organic and balanced growth �
These tiers must focus, for Tier 1 and 2 the focus should be on organic and balanced growth (particularly balancing focus with GIP). For Tier 3 and 4 it’s about jumping in GCDP.
What does this mean?
The iGCDP OD Model for 1er 3
GCDP Clustering for LC
iGCDP
Beginner 0-25 X RE Intermediate 25-100 X RE Advanced 100-200 X RE
Mature +200 X RE
What is the current state?
En11es in Tier 3 iGCDP
LCs Combined these entities have…
121 RE �
24 RE �average LC �
Highest �achievement �in 2013�LC FTU HCM �Most LCs do between
20 - 45 RE ��These are the LCs we need to focus on to grow. �
LCs in Tier 3 iGCDP overview
LCs 0-25 Re � LCs 25-100 Re �
LCs have a lot of scope to JUMP!!
What we are aiming for?
Growth Models in Tier 3 iGCDP being aligned to a jump in the programme
LCs in tier 4 (0-25 in iGCDP)
being able to make a BIG jump
If these entities are also
focused on a GIP programme, being able to manage both because they
have 10 LCs or lesser
What is this about? • Pick focus LCs for iGCDP growth in your entity based
on entity growth model
• Using HR Intelligence to grow • Building Capacity for iGCDP • Learning and Development for iGCDP • Team Minimums implementation for iGCDP • Role of MC
How can you take advantage of it?
Let’s GO!
1.Pick focus LCs for iGCDP growth
121 RE �
24 RE �average LC �
Highest �achievement �in 2013�LC FTU HCM �Most LCs do between
20 - 45 RE ��These are the LCs we need to focus on to grow. �
LCs in Tier 3 iGCDP overview
LC Performance over view in this 3er
The top LC does 121 Re in this tier – AIESEC FTC HCM in
Vietnam
A large number of LCs in this
tier do between 0-25 Re
Most entities in this tier have between 2-10
LCs
Only Korea has 12 LCs, rest
entities have 10 or less than 10
LCs
Only about 5 LCs in this tier do above 100
What we observe?
• There are enough 1er 3 and 1er 4 LCs in that can make the JUMP in Tier 3 MCs for iGCDP
• Most of these en11es are either: 1. Focused on iGCDP 2. Have iGCDP as their second focus 3. Intend to ensure iGCDP growth in their 1er 4 LCs
• These en11es should be increasing in their iGCDP contribu1on globally and KEY to their growth is having the right capacity and L&D to be able to grow!
Go through the OD Toolkit for tier 1 and 2 if you have more than 6 LCs and OD toolkit for tier 3 and 4 if you have less
than 6 LCs!
2. Using HR Intelligence to grow in iGCDP
Why does informa1on help?
Example of this
EVERY LC within the MC/Entity needs to increase its productivity, the question is
HOW?
An increase in productivity is POSSIBLE by IDENTIFYING what is your challenge! Examples: 1. If new members/TMP Participants leave the organization within 1-2 weeks of the role
starting, focus on INCREASE in TMP Retention Rate can increase productivity 2. If you do not know which level of membership is achieving or not achieving results,
team minimums implementation to manage performance will allow you to see which level is contributing most to performance and allow you to focus on this segment or the segment that is not performing to increase productivity
REMEMBER: The FINAL KPI you are measuring is PRODUCTIVITY, however you need other KPIs that are based on your specific challenges to indicate this increase in productivity!
How do I measure productivity?
You can measure productivity at raise, match and realize stage!
• Produc'vity at RAISE = Number of members working for raise in iGCDP (in front office and back office)/ Number of Raises (In the specific 'me period)
• Produc'vity at MATCH = Number of members working for match in iGCDP (in front office and back office)/Number of matched (In the specific 'me period)
• Produc'vity at REALIZE = Total number of members working in iGCDP (front office and back office)/Number of realiza'ons in iGCDP (In the specific 'me period)
Generally, team structures in iGCDP involve the same people/number of people working for raise, match and realize – even so since iGCDP runs in peaks it makes sense to measure productivity through the peaks
Productivity at realize is most accurate but we measure productivity at raise and match only to check the progress and always establish the connection between TM/OD and programme growth!
Set an MC goal for productivity per programme: How?
• Work with all iGCDP focus/growth LCs (from your OD Model/Growth Model) to identify what is their challenge, how to solve this and how much productivity increase this will lead to
• Set this as the iGCDP Productivity goal along with LC
• An accumulation of set goals with LCs leads to being certain of the entity productivity goal!
• Though talent planning based on current productivity happens first at an MC level, productivity planning happens with MC and LC together so the goal for productivity has LC Alignment towards MC and is connected to the OD Model!
What business Intelligence can help to drive increase in productivity?
% of people in iGCDP and % of people in Support Functions
Time a new member or new team leader
takes to start performing
Applicants to iGCDP TLP positions
TMP Retention Rate
3. Planning and Building CAPACITY based on challenge identification, Exchange flow and
OD Model of your entity
Use TM Planning Tool to Plan for iGCDP "
1. Number of Members in iGCDP and support
functions
2. Number of TMP and TLP Experiences in iGCDP and support
functions
TM Planning tool download
hTp://www.myaiesec.net/content/viewwiki.do?conten1d=10299749
After planning for capacity you can have any one of these 3 outcomes
1. I do not have enough Members in any
programme/function
2. We have enough members in iGCDP and
support areas
3. We have the right number of members in
the LC/MC but not allocated in the right
proportion across programmes/functions
Run an OPTIMIZED recruitment– 2 weeks!!
1. I do not have enough Members in
any programme/function
Tips to run an optimized recruitment 1. Clear and focused Promotion of Job
description Example: Selling the global internship programme to language institutes !!
2. Specific people responsible for the recruitment
3. Online promotion and Offline promotion ONLY in specific universities
4. Selection based on Interests and Values (striving for
excellence, pro active learner etc.) over only skills for the role
5. When Promotion is on-going through the year, an optimized recruitment becomes simpler since LC/MC already has a pool of
applicants
Determine who is the right member
Skill Attitude Background Interest Time
Timeline Approach existing sign ups for TXP
and GCDP
Rejected applicants from last recruitment
Optimized Selection
1 week 5 days
Optimized
Selection
Value based recruitment
q Committed and motivated members ( GIP needs commitment and persistence)!
q Building "
2. We have enough members in iGCDP and support areas
Focus on increasing productivity through L&D and team minimums
3. We have the right number of members in
the LC/MC but not allocated in the right
proportion across programmes/functions
In many cases there is enough capacity in iGCDP and members need to be re-‐allocated so even the GIP
programmes have the right capacity!
How to balance the iGCDP and iGIP support?
Clear JD for members in Exchange Support
Clear KPIs for each member specifically in iGIP and support areas (TM and BD)
Hybrid Members – Example: TM members in iGIP team and iGCDP team
What structure should I recruit into?
Structures for…
0-25 Re 25-100 Re 100-200 Re
FIN JD in iGCDP TM JD in iGCDP MKT JD in iGCDP iGCDP Coordination JD
Project Structure LC
VP iGCDP
OCP
OCP
OCP
VP FIN VP TM VP MKT
Do Ra-Ma-Re!!
Note!
For ALL
levels!
Beginner LC VP
Member Member Member
(0-25 Re)
∞ Ra-Ma-Re Inner & Outer
Journey Delivery
Note! ∞
Basic Consideration: • As start up, LC manage the basic
process of iGCDP delivery • There is no need to manage iGCDP
as a project yet - in general experience delivery will be TN based
• Member Efficiency: 0-4 X / member
Number of members: 3-4 Job Description: • Selling and raising, matching, and realizing • Incoming preparation seminar • Experience Co-delivery
VP
Member Member Member
∞ Ra-Ma-Re
Beginner LC (0-25 Re)
Back Office Supports TM Member L&D;
Sales Development Program
Finance Project Financial Model
Marketing & Communication
Project packaging, Project showcasing;
ER External Resources integration(new Partners)
VP
Member Member Member
∞ Ra-Ma-Re
Beginner LC (0-25 Re)
VP
TL TL TL
∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re
Intermediate LC (25-100 Re)
VP
TL TL TL
∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re
Basic Consideration: • LCs have more capacity in project management • Project concept will be centralized Nationally
(National project implementation in LCs) • Start to have the needs of event/project management • Member Efficiency: 3-4 X /member
Number of members: Depends on TM Planning Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Incoming preparation seminar • Experience Co-delivery (country-country partnership management)
Intermediate LC (25-100 Re)
Back Office Supports
TM Member profiling Member Learning & Development
Sales Development Program
Finance Project financial model Member development investment
Marketing & Communication
National brand alignment Showcasing
EwA Public Relations Management
ER External resources integration Partner engagement
VP
OCP OCP OCP
∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re
Intermediate LC (25-100 Re)
Advanced LC (100-200 Re)
• Un1l this stage, an LC is only working on na1onal project implementa1on, however here an LC can also start working with local projects
• The LC also should start focusing much more on balancing quality with quan1ty (to ensure it can keep growing in Realiza1ons and NPS)
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Advanced LC (100-200 Re)
∞ Ra-Ma-Re ∞
Ra-Ma-Re ∞
Ra-Ma-Re ∞
Ra-Ma-Re
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Number of members: Depends on TM Planning Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Project brand management • Incoming preparation seminar • Experience Co-delivery (LC-LC partnership management)
Basic Consideration: • LC is considered to have the capacity in
understanding Project management concept and put into implementation
• LC has capacity in innovate a project based on issue
• Member Efficiency: 4-6 X /member
∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re
Advanced LC (100-200 Re)
Back Office Supports
TM Member profiling; Buddy engagement;
Learning & Development for Members; SDP;
Finance Project financial model; Crisis management
Marketing & Communication
Brand audit and national alignment; EwA;
Showcasing.
ER Partnership raise and maintenance
IM Process optimization
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re
Advanced LC (100-200 Re)
4. Learning and
Development
USE TM Planning tool How do I
plan?
FOCUS ON EDUCATION TO DRIVE RESULTS How can i achieve
this?
1. Create a specific iGCDP education cycle
2.
Ensure the education for potential and high potential is making membership productive and able to raise and match simultaneously.
3.
For start up LCs focus on raising education and for one sub-product.
4. Track length of time for membership to perform – IMPORTANT!
5. Ensure strong organizational and operational induction into AIESEC for contribution to summer
iGCDP All Levels
TOPIC! CONTENT! OBJECTIVES! TARGET!
PRODUCT KNOWLEDGE!
q Relevance of the product in the society "
q What is a product and product life cycle"
q Know the elements of products (price, brand, quality, value, customer segments, etc.) and the different stages of products"
q Understand the exchange process from Calls until Completed "
q Know how to use all the functions on myaiesec.net for exchange management to make the process fast and effective" Members,
Leaders, VPs!
EXCHANGE PROCESSES!
q Exchange process flow and yearly timeline (product customer flow)"
q Exchange Management on the GIS"
SUPPLY & DEMAND MANAGEMENT!
q Supply and demand theory and necessity"
q Exchange management on the GIS"
INNER&OUTER JOURNEY!
q Why and how and what of inner and outer journey in AIESEC"
q Delivery of I&O journey to our customers"
q Understand how AIESEC develops leadership through I&O journey and know how to support our customers to go through an intense I&O journey"
CUSTOMER EXPERIENCE MANAGEMENT!
q Why, how and what of CEM?"q Co-delivery"q Information system management for
better customer service "q Data analysis and usage (plan)"
q Understand the importance of customer experience management and know how to use the resources (data, partners) we have to create strategies for improvement"
All levels iGCDP
All levels TOPIC! CONTENT! OBJECTIVES! TARGET!
ISSUE-BASED SEGMENTATION!!
q Why and how of issue segmentation for GCDP in AIESEC"
q Changes in product and process management in the LC"
q Understand why issue segmentation was created and how to work with this model in the LC (changes in processes, product development, structures)"
Leaders & VPs!!
CROSS-CULTURAL COMMUNICATION!
q Hofstede’s cultural dimensions"q Behaviours and attitude
needed for effective cross-cultural communication"
q Understand the 5 cultural dimensions of Hofstede and how to adapt communication based on that"
Members, Leaders,
VPs!
CUSTOMER LOYALTY FOR STUDENTS!
q Building a customer relationship with trainees"
q Minimums of project delivery"q How to satisfy our customers"
q Understand the standards and extra deliveries in iGCDP projects in order to have promoters and develop leadership"
Leaders & VPs!
SALES TRAINING!
q Basic sales knowledge and techniques"
q Practice sales of our products"
q Understand the process of sales and know how to deliver a full selling cycle"
Members, Leaders,
VPs!
iGCDP
iGCDP Intermediate (LCs doing between 25-100)
TOPIC! CONTENT! OBJECTIVES! TARGET!
NATIONAL PROJECTS!
q Product knowledge of national projects"q The responsibility of making national projects"q Devision of responsibilities and roles between
MC and LC and the rules of communication"q Value of national partners & projects"
q Understanding what is the national project, how to operate with MC and feel responsible and commited to national projects."
Leaders & VPs!
PROJECT MANAGEMENT!
q Definition and characterisitics of a project."q Process in project management"q Goals achievement"q Resource management"
q Understand how to build your project and the processes inside, manage effecively resources to achieve the goals."
Leaders & VPs!
COUNTRY-TO-COUNTRY PARTNERSHIPS!
q What is CY2CY partnership"q Value of CY2CY partnership"q Responsibilities in partnerships"q Main processes in cooperation management"
q Understand the processes in CY2CY partnerships, responsibility towards delivering the XPs on LC levels and clear WHY of working by CY2CY "
VPs!
SHOWCASING & PROMOTERS!
q What is showcasing and promoters stories usage"
q How to brand promoters stories and showcase them"
q Showcasing channels and partnerships"
q Understand how to showcase the srories of promoters for getting more customers"
Leaders & VPs!
INTERMEDIATE iGCDP
iGCDP Advanced (LCs doing between 100-200)
TOPIC! CONTENT! OBJECTIVES! TARGET!
BUSINESS MODEL!
q Business model canvas"q Financial model"
q Understand the business strategy and processes within that and feel responsible towards financial sustainability of the project "
Members, leaders, VPs!
PRODUCT DEVELOPMENT!
q Product packaging"q Product development flow &
processes"q Customization"
q Understanding how to package the project, how to sell to different stakeholders and customize to different target groups."
Leaders and VPs!
SALES DEVELOPMENT PROGRAM!
q Knowledge and practice of advance sales techniques" q Increasing the capacity and the productivity
to reach the higer level of sales results"Members,
leaders, VPs!
CRM MANAGEMENT!
q Account management"q System usage and
management"q Rules and regulations of
CRM"
q Working professionaly on customer relationship management"
Members, leaders, VPs!
!
ADVANCED iGCDP
TOPIC! CONTENT! OBJECTIVE! TARGET!
BUDDY & HOST PROGRAM!
q Packaging of host & buddy program"
q Attitude and responsibility towards engaging those customers"
q Concrete processes on working with H&B"
q Know how to engage B&H as a cutomer and have the long-term realtions with them. They understand the clear value of this program"
Leaders, VPs !
CRISIS MANAGEMENT!
q XPP review"q How to deal with the threats
before, during and after they occure"
q Case solving practice"
q Know how to deal with cases and crisises and are not afraid of fire-fighting process."
Leaders. VPs!
LC2LC PARTNERSHIPS!
q What is LC2LC partnership"q Value of LC2LC partnership"q Responsibilities in partnerships"q Main processes in cooperation
management"
q Understand the processes in LC2LC partnerships, responsibility towards delivering the XPs on LC levels and clear WHY of working by LC2LC"
VPs!
ADVANCED iGCDP
Customization is the key to success
Customize by LC Scale
Customize By Target Profile Eg: Team Leader
Customize by LC current reality and
focus
HANDY TIPS
1. Make Virtual learning effective and fun – Ensure continuity and consistency
2. Have practical tasks/assignments at the end of every virtual session
CONTINUITY AND CONSISTENCY PRACTICAL
3. Create virtual trainings aligned to your exchange flow and exchange timeline
Exchange timeline
4. Ensure there is customised content for specific LCs and specific profiles within LCs. (customize to your OD Model)
CUSTOMISED
How to Measure this?
TMP Retention rate (for new members and
existing team members
Increase in Performance over a
period of time
Time to start performing Eg: from 1 month to 1
week – for new members and team leaders
Increase in Performance over a
period of time
A lever to support our ambi1ons for iGCDP Grow iGCDP Raises
we need to have a lever big and strong enough to support our iGCDP ambitions :)
sdp for igCDP why?
Using the Sales Development Program a education and tracking tool to increase the sales capacity and intensity of iGCDP members
Sales Development for iGCDP Golden Rule
70% PRODUCT & PROCESS
KNOWLEDGE
30% SALES KNOWLEDGE
T �G � C � M �RA Goal
Sales Negotiation Meeting Goal
Sales Meeting Goal
Cold Calling Goal
Cold Leads Goal
how much time does this process take?
Define what you want to achieve in iGCDP and when so that your SDP can be tailored to your sales needs.
Sales Development for iGCDP�
How?
t g c m
RA Goal
Sales Negotiation Meeting Goal
Sales Meeting Goal
Cold Calling Goal
Cold Leads Goal
how much time does this process take?
Who is going to achieve this? This will define the key target for your SDP. eg. I’m going to target iGCDP Sales-Raising TMP
sdp for igCDP how?
c m
This is where you make your sales development program framework with the key message and best channels to connect to your target audience! :D
A tracker system
Education Framework/ timeline Customize as per
your sales reality and OD Model!
what is sdp made of?
Content and Delivery
Sales Conference if needed
Educa1on framework and 1meline
Ensure educa1on is ploTed on a 1meline ALIGNED TO PEAKS
link all training to relevant team and individual activity happening at the time (link content to push for Peak)
each class must have clear KPIs and output that are tracked by the LCVP and MCVP responsibles
Ensure the local TM can leverage off SDP by time lining their activity too.
Educa1on framework and
1meline
Right Target/Profile �
Right Content �
Right Delivery/Channel�
Right Timeline �Right KPI and Measurement �
Ensure that SDP content is tailored for LC scale:
- 0-25 - 25-100 - 100-200 - 200+
- 0-25 - 25-100 - 100-200 - 200+
- 0-25 - 25-100 - 100-200 - 200+
- 0-25 - 25-100 - 100-200 - 200+
- 0-25 - 25-100 - 100-200
View sample tracking system and Sample sales conference Agenda on spreadsheets below
Though there is a sample tracker, what makes most sense is to embed even SDP tracking into
team minimums tracking (by focusing on tracking sales teams)
5. Implement Team minimums
Team Minimums Team
Plan
JD
Training
Tracking & Coaching
Evaluation Standard and sense
ReasonDirection
ContributionTool
Performance
The team minimums are the basis of EVERYTHING YOU DO IN YOUR ENTITY!
• Team Minimums help an LC in capacity planning and implementa1on (and makes it simpler for MC to track)
• Team Minimums allows an MC to create the right educa1on cycle for the en1ty and an LC to customize educa1on for every func1on in the right way
• Team Minimums help in Performance Management (Because every team needs to have a JD, MoS, Plan and this needs to be tracked which means performance management in the en1ty can be structures)
• Team minimums help the MC to have the right informa1on to iden1fy what is going well and what are the challenges and how can this lead to increasing produc1vity!
Team minimums are a tool for TEAM MANAGEMENT and not something that is implemented by an MCVP TM or an
MCVP OD! OR AN LCVP TM! Every MCVP and LCVP is using these to lead, manage and track their teams!
HOW DO I TRACK THESE?
Example of how to track team minimums
What should I do to implement them? ü Educate membership completely on the team minimums and how to implement them
ü Create examples of how team minimums need to be implemented across programmes/func1ons by connec1ng them to the structures of teams at LC level
ü Train team leaders across GIP to ensure they know how to implement team minimums through the whole team cycle/dura1on
ü Embed team minimums into capacity and L&D Planning for ALL TEAMS
ü Team minimums implementa1on as a part of na1onal educa1on cycle
ü Track team minimums
MC Team should start implementing team minimums with LCVPs!!
Role of MC! FOCUS ON LCs doing between 0-25 GROWING IN iGCDP!!!
Role of MC! • Pick focus LCs for iGCDP growth
• Support Planning process - Plan for number of members needed through TM Planning tool
• Take action based on your current reality and recruit into the right structures
• Create a specific Learning and Development cycle
(embed SDP and Supply and Demand into this) • Implement Team Minimums (not just the MCVP TM,
all MCVPs need to do this)
Role of MC! • Through data, identify the CHALLENGE of LCs
to figure out what will lead to an increase in productivity!
• Set CLEAR GOALS for PRODUCTIVITY with
LCs per programme, specifically in iGCDP and measure constantly