ijzersmelten verslagje engels draft 8juli2014

10
EXPERIMENTAL ARCHEOLOGY IRON SMELTING - “METAAL WEEKEND” MAY 2014 Morning sun on the iron smelting furnace, No bellows, the high temperature is reached by natural draft only.

Upload: hunebedcentrum

Post on 02-Apr-2016

215 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Ijzersmelten verslagje engels draft 8juli2014

EXPERIMENTAL ARCHEOLOGY

IRON SMELTING - “METAAL WEEKEND”

MAY 2014

Morning sun on the iron smelting furnace,

No bellows, the high temperature is reached by natural draft only.

Page 2: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

INTRODUCTION:

The “members of the iron smelting group” at the “Hunebed Centrum Borger” are already for

some year’s now extracting iron from ore, following a method dated back to the ”iron age“.

That is to say, as far as we can trace back this method.

The “iron period” starts (western Europe) around 800 BC and ends around the Roman period.

Iron ore can be found in Drenthe at many spots in the near subsurface. The ore we use is

found in the banks of a near tiny river/stream at Westerwolde.

One method of extracting iron from the ore goes as follows:

First the ore is roasted on a “good” fire. All organic material is broken down and the ore gets

brittle.

Roasting iron ore

After roasting for a few hours and cooling down, the ore is broken in pieces of an inch (more

or less) and together with charcoal (layer by layer) heated in a furnace.

The iron smelting furnace is build of loam (in Drenthe made/crunched under a thick ice

pack during the Ice Age). A typical model has a height of 60 - 90 cm, a width of 30 a 40 cm

at the bottom and 20 – 25 cm at the top. To reach the desired high temperature of 1100 °C at

which the minerals start melting but not yet the iron, bellows are used for forced air intake.

Page 3: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Often a set of two, manual operated. The airflow has to be regular, sometimes a little bit more,

sometimes less air is needed. A typical smelting session takes about 6 to 9 hours, depending

on the amount of ore and the time the airflow gets blocked. Working with bellows is one of

the difficult parts of the whole smelting process. Last year we started with operating one large

“double action” bellow: one chamber is directly operated using a lever and pushes air into a

second chamber. This second one acts as a buffer and pushes under constant pressure air into

the smelting furnace.

Last year in august, during the “Iron Smelting Days” at Solms, Grube Fortuna, in Germany, a

group from Poland used a hollow tree as an iron smelting furnace.

“Wood Core Furnace” by the “Hutnia” group from

Poland.

This “hollow tree furnace” attracted attention by its height: over 2 meters.

At the bottom of the furnace a venturi is made (inside, not visible on the picture)

directly above a lower chamber. Burning wood in this chamber pre-heats the whole furnace.

The upper part of the hollow tree serves as a chimney. The whole construction is covered with

loam. Most of the wood inside burns up, except the lower part which gives good thermal

insulation. This furnace was operated without using a bellow. Everything works with natural

draft of air needed for combustion. Through the two holes in the upper furnace wall the colour

of the hot smelt gives an indication of the inside temperature.

Page 4: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

This “hollow tree method” is so interesting that it was tested at the “Hunebed Centrum” on

May 24, 2014

How we did it:

As no hollow tree was available, use was made of willow branches to make a copy of a tree,

30 cm diameter, 170 cm height.

First the lower chamber was constructed (60 cm height, lower internal diameter 60 cm) with a

slag pool of 25 cm deep and wood was burned in the chamber to pre-heat the furnace pipe

standing on top of the chamber. Through a hole in the upper part of the lower chamber,

already during preheating, carbon enters the furnace tube and may reduce the ore. (*) Through

this hole, also all the needed air enters the furnace. Because this hole has a smaller diameter

than the furnace tube (12 cm against 40 cm, say 40%), the hole in the construction works as a

venturi and the airflow has a much higher velocity directly above this hole than higher up in

the furnace tube. The effect is more or less the same as using a bellow but now completely

“natural driven” – not mechanical.

(*) Iron envelopes sand grains as rust (red) and taking away the oxygen part of the rust by the binding carbon is called

“reducing” . This process already starts around 700 °C.

To start, we need carbon monoxide (from coal): 2 C + O2 → 2 CO,

to reduce the iron ore: Fe2O3 (rust) + 3 CO → 2 Fe + 3 CO2 (“blank”, “soft” iron and “bubbles”) )

But also possible is: 2 Fe2O3 (rust) + 3 C → 4 Fe + 3 CO2

The furnace was build using loam, stones and willow branches.

After the lower air chamber was built and dry heated, the construction of a fake tree trunk

started: a tube (30 cm x 170 cm) of straight willow branches around three wooden circular

shapes, tightened with rope. The tube was then covered with a sheet to prevent loam falling

into the tube. In the upper part of the lower chamber a venturi was built with loam and bricks,

using a tin can of 12 cm as initial support. Above the venturi the bottom inclines with 15 ° to

the hole in the middle. Four extra air channels allow some airflow regulation through the

venturi

Construction of the venturi with 4 extra air channels

Page 5: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Venturi beneath furnace tube. Bottom 15 degrees dip

Around the tube of willow branches (standing upright on the venturi) the final furnace tube

was built using bricks and loam. Loam was “smashed” on the tube, between and on the

stones.

Furnace tube constructed from willow branches

Page 6: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Furnace tube, mounted on top of lower chamber.

One week later (May 24):

On Saturday morning we started burning wood blocks in the lower chamber to heat the whole

furnace, for several hours.

The iron ore was “roasted” two days earlier on a “good” fire for a few hours. A part of the ore

was crumbled (to pieces of 2 a 3 cm) , the remaining was done this morning, sorted with a

magnet and a little bit of household soda (Na2CO3) was added. (a total of 30 kg ore was

prepared for the smelting process)

After a few hours – early in the afternoon – the furnace tube itself (where the actual smelting

takes place) was topped with bits of wood. Again a few hours were needed to lighten up the

wood in the tube over the whole height and for the first two hours the smoke was grey

(vapour).

Page 7: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Smelting furnace, loaded with wood – burning.

Then the time was reached to put the iron ore into the furnace, cover it with some charcoal,

and leave it to smelt. Also this process takes a few hours. As soon as the colour of the hot ore

in the tube (visible through three inspection holes in the tube wall) turned from bright yellow

to hot white light yellow, to painful for the eyes to look into, the temperature was hot enough

for the minerals to melt and it started to drip out of the ore and flowed slowly down through

the venturi into the lower chamber. A very nice example of slag was formed of around 15 cm

length (photo).

All steps we did so far took some more time then expected – all labour and the whole process

needs some more time than working with bellows – and only late in the evening did the

furnace reach the desired high temperature where ore could be added in the tube for smelting.

Decided was to start with only 6 kg (of 30 kg waiting) to see what would happen and wait

some time before adding the remaining – still to be decided as one volume or layered with

charcoal.

The first “enthusiastic” flames above the furnace however diminished after some time… and

the temperature dropped slowly to a 900 °C. The remaining ore was not used.

Page 8: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Smelting furnace, operating at 1100 °C, by natural ventilation only. (~midnight)

Decided was (around midnight) not to add an extra layer of charcoal followed by ore but

allow the process to end slowly. One personal goal was reached: could the furnace get to the

high melting temperature of minerals (around 1100 °C) without using bellows or other

mechanical means, but only by natural draft : yes! The maximum temperature measured was

even 1200C for a short period. (temperatures are measured by three probes, inserted through the wall, reaching just inside the furnace and the output

displayed on a pc)

Page 9: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Conclusion:

The amount of 6 kg ore was brought into the furnace by simply turning a bucket at the top of

the furnace, at a height 170 cm. It did not reach the smelting area as “one compact volume”

but was the next morning – after opening the furnace tube - found to have spread all over the

bottom. No “loupe” was found, just here and there some bits of light magnetic material. It

would have been better to put the ore (gently) into the tube as one compact volume by putting

it for example in a cloth.

A nice shaped piece of slag.

Page 10: Ijzersmelten verslagje engels draft 8juli2014

Experimental Archaeology: Iron Smelting Hunebed Centrum Borger Leo, May 2014

Drawing of the smelting furnace

This smelting furnace was based on “ancient wood core furnace”, Holy Cross Mountains,

Poland.

More info: www.hutnia.pl www.nowaslupia.pl facebook.com/hutnia