ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Upload: leslie-bonnie-lester

Post on 17-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

ILC Instrumentation and Simulation R&D at SCIPP

DOE Site Visit

Thursday, June 18, 2009

Bruce Schumm

Santa Cruz Institute for Particle Physics

Page 2: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Faculty/Senior

Vitaliy FadeyevAlex Grillo

Bruce Schumm

Collaborator

Rich Partridge(SLAC)

Undergrads

Sean Crosby*Jerome CarmanJared NewmillerSheena SchierKelsey CollierAmy SimonisJeff Schulte*

Chris BetancourtAlex Bogert

The SCIPP/UCSC ILC R&D GROUP

Lead Engineer: Ned Spencer

Technical Staff: Max Wilder

All senior participants mostly working on other projects

*2009 Senior thesis (graduation requirement)

Page 3: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

OUTLINE OF SCIPP ILC R&D PROGRAM

LSTFE Frint-End ASIC

• Optimized for ILC (long ladders for barrel; high rates for forward tracking)

• Applicable to both SiD and ILD

SiD KPIX/Double-Metal Development

• SiD baseline; alternative to LSTFE

• SCIPP has done group’s sensor testing, now beginning critical systems tests

Page 4: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Fundamental (“Generic”) R&D

• Use of charge division for longitudinal coordinate (with Rich Partridge)

• Solid-state noise sources

Prospects for RadHard Sensors (far-forward Calorimetry

If funded, will support SLAC collaboration

ESA test beam: SCIPP sensor expertise plus SLAC operation and dosimetry

OUTLINE (Continued)

Page 5: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

OUTLINE (Continued)

SiD Simulation Projects

• Tracking and momentum reconstruction validation

• Non-prompt signatures

Page 6: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

ILC Tracker Baseline Designs

SiD Baseline: Five barrel and 4 endcap layers, to R = 125cm

ILD Baseline: Si tracking envelops TPC; outer layers

at 1.8m

Page 7: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

1-3 s shaping time (LSTFE-I is ~1.2 s); analog measurement is Time-Over-Threshold

Process: TSMC 0.25 m CMOS

The LSTFE ASIC

Page 8: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

1/4 mip

1 mip

128 mip

Operating point threshold

Readout threshold

High gain advantageousfor overall performance(channel matching)

Page 9: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

FIF

O (L

eadin

g and

trailin

g transition

s)Low Comparator Leading-Edge-Enable Domain

Li

Hi

Hi+4

Hi+1

Hi+2

Hi+3

Hi+5

Hi+6

Li+1

Li+2

Li+3

Li+4

Li+5

Li+6

Proposed LSTFE Back-End Architecture

Clock Period = 400 nsec

EventTime

8:1 Multi-

plexing (clock = 50 ns)

Page 10: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Observed

Expected

1 meter

LSTFE SPACE-POINT RESOLUTION

RMS

Gaussian Fit

Observed noise vs. capacitive load (LSTFE-I)

Simulated space-point resolution for “expected” noise

167 cm Ladder

Page 11: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

LSTFE-II PrototypeOptimized for 80cm ladder (ILD barrel application)

Institute “analog memory cells” to improve power-cycling switch-on from 30 msec to 1 msec

Improved environmental isolation

Additional amplification stage to improve S/N, control of shaping time, and channel-to-channel matching

Improved control of return-to-baseline for < 4 mip signals (time-over-threshold resolution)

128 Channels (256 comparators) read out at 3 MHz, multiplexed onto 8 LVDS outputs

Testing underway in SCIPP lab

Page 12: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

The SiD KPIX/Double-Metal Baseline Design

10cm2 modules tessellate the five barrel tracking layers

Traces on 2nd (surface) metal layer to two 1024-node bump-bonding arrays

Page 13: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

SiD Double-Metal Sensor

• SLAC/FNAL Design

• Hamamatsu Fabrication

• Testing at SCIPP

Page 14: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Sensors bias at ~50 V.Capacitance shown is for all 1840 strips, but strips to backplane only

SiD Tiles: Biasing and Plane-to-Plane Capacitance

For now: single sensor(sensor #26)

Page 15: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

SiD Leakage Current (sensor #26): Average leakage for 1840 channels is about ~160 pA/channel

Next Steps:

Larger-scale testing (statistics)

Test of combined KPIX/Double-Metal perforamce to get underway at SCIPP this summer (pending DOE support)

Page 16: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Longitudinal Resolution via Charge Division

Proposed by Rich Partridge, based on seminal paper by Radeka:

V. Radeka "Signal, Noise and Resolution in Position-Sensitive Detectors", IEEE Trans. Nucl. Sci. 21, 51 (1974),

which in turn references earlier work with planar sensors from

R.B. Owen and M.L. Awcock, IEEE Trans. Nucl. Sci. 15, 290 (1968)

Small ($16K) LCRD grant supports this work. Progress due to UCSC undergraduate physics major Jerome Carman

Basic idea: For resistive sensor, impedances dominated by sensor rather than amplifier input impedance; charge should divide proportional to point of deposition. Read out implant (SLAC/FNAL “charge division” sensor has 600 k implant)

Page 17: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Charge Division Sensor Mock-Up

10-stage RC network PC board (Jerome Carman)

Page 18: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Amplifiers:

First Stage: TI OPA657 Low-noise FET OpAmp

Later Stages: Analog Devices ADA4851 rail-to-rail video amp

Measure Noise (either end): 0.64 fC

Charge Division Sensor Mock-Up

Model 600 k resistive implant with 10-stage RC network

Read out at both left (“L”) and right (“R”) ends

Page 19: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Mean Amplifier Response vs. Injection Point

Fairly linear; little offset from 0 appropriate for charge division.

Right-Hand Amplifier

P-Spice, including all parasitics

Observed signal

Page 20: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Longitudinal Resolution Estimate

Trying to measure fractional distance f from right to left end of strip:

Rewrite:

Then,

and dL, dR apparently uncorrelated.

LR

LRf

RLxx

x

RL

RLf /;

1

1

/1

/1

R

R

L

Lxxx

xf

dddwithd

)1(

2d

2

Page 21: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Longitudinal Resolution Estimate: Conclusion

Depends upon location of hit (middle or near end of resistive implant) and the magnitude of the charge deposition.

Assume a 4 fC deposition in the middle of the strip (x=1):

However, note that , so this is not much better.

Optimize shaping time, implant resistivity, ? Goal of better than 0.1 (1cm for SiD sensors).

23.0fC2

fC64.0

2

2dd

2

1d

R

R

L

Lf

29.012

1

Page 22: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Readout Noise for Linear Collider Applications

Use of silicon strip sensors at the ILC tend towards different limits than for hadron collider or astrophysical applications:

Long shaping time

Resistive strips (narrow and/or long), with significant capacitance (for long ladders)

But must also achieve lowest possible noise to meet ILC resolution goals. How well do we understand Si strip readout noise?

Page 23: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Standard Form for Readout Noise (Spieler)

Series Resistance

Amplifier Noise (series)Amplifier Noise (parallel)

Parallel Resistance

Fi and Fv are signal shape parameters that can be determined from average scope traces.

There is some circumstantial evidence that this may be an oversimplification, particularly for the case of series noise…

Page 24: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Strip Noise Idea: “Center Tapping” – half the capacitance, half the resistance?

Result: no significant change in measured noiseHowever, sensors have 237 m pitch Currently characterizing CDF L00 sensors

Measured noise

Expected noise, assuming75% reduction instrip noise

Page 25: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

CDF L00 Sensor “Snake”

CDF L00 “Snake”

LSTFE1 chip on Readout Board

Page 26: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

CDF L00 Sensor “Snake”

Plus much work eliminating environmental noise, constraining amplifier contributions…Thanks to Sean Crosby, UCSC undergraduate thesis student

Page 27: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

“Rigorous Calc”: Carefully measured shape factors Fi, Fv.

Johnson-Noise-Dominated for greater than 6 strips

Results rather surprising Re-check methodology Develop P-Spice simulation (as for charge-division studies)

Sean’s understudy, Kelsey Collier, will grab the reigns…

Page 28: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Radiation-Hard Silicon Sensors (SCIPP/SLAC)

Far-Forward region: Need to tag electrons from two-photon events to remove SUSY backgrounds (to 20 mrad)

Expected doses of 100s MRad anticipated for ILC running (5x limits for probed for ATLAS upgrade studies)

UCSC experience with rad-hard sensors (e.g. Czochralski-process) and characterization, in combination with SLAC testbeams and dosimetry expertise

Funding expected for studies in 2010-2011

Page 29: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Simulation Studies for the SiD Concept

Tracking Performance Evaluation

• Reconstruction Efficiency

• Momentum Resolution

Non-Prompt Tracks

• Reconstruction Algorithms

• GMSB Signatures

Page 30: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Tracking Performance Studies

Efficiency vs. angular distance from jet coree+e- qq at Ecm= 500 GeV

[Jeff Schulte, senior thesis 2009]

Page 31: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

“Tri-Plot” Curvature-Error Performance Study

From: Michael Young (UCSC Master’s), Snowmass 2005

Reproduction for current reconstruction by Alex Bogert

Page 32: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

3-Hit Tracks & Non-Prompt Signatures

Probably need 5+1 layers for prompt track

If we require 4 hits for non-prompt tracks, sensitive region for kinked tracks is very limited.

Page 33: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

e.g.: Position-matching for isolated muons

(mm)

SCIPP algorithm for non-prompt tracks: match 3-hit seeds from tracker with stubs from calorimeter (developed by UCSC undergrads Meyer, Rice)

• Approximately 60% for 3-hit tracks in Z qq events• Being optimized for non-prompt recon-struction (GMSB signature) by undergraduate major Betancourt

0~

Non-Prompt Tracks and GMSB

Page 34: ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics

Concluding RemarksBroad array of generic and specific tracking R&D:

• Optimized Si strip readout (LSTFE)• SiD baseline concept development (KPIX/2Metal)• Generic study of strip noise sources• Radiation hardness• Exploring use of charge division for strip z coord• Sid tracking performance benchmarking• Non-prompt signature from GMSB

Excellent training ground for undergraduate physics/engineering majors (9 currently working on project)

Schumm also ALCPG Tracking group convener, on ALCPG EXEC Committee