implementation of cisco data center solution · ivana Šimić dubrovnik, croatia, south east europe...
TRANSCRIPT
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Connect 1 1 © 2012 Cisco and/or its affiliates. All rights reserved.
Implementation of Cisco Data Center Solution Council of Ministers BiH
Ivana Šimić
Dubrovnik, Croatia, South East Europe
20-22 May, 2013
Agenda
• About CoM
• Problems in the past
• Goals
• Solution
• Results
Department for Maintenance and Development of IT Systems and E-Gov
• Established in 2010;
• Providing IT services to all BiH state-level institutions;
• Responsible for development of E-administration on state-level.
1. Ministry of Defense
2. Ministry of Civil Affairs
3. Ministry of Comunication and Transport
4. Ministry of Finance and Treasury
5. Ministry of Human Rights and Refugees
6. Ministry of Justice
7. Ministry of Security
8. Ministry of vanjske trgovine i ekonomskih odnosa
9. Ministry of Foreign Affairs
10. Legislative Office
11. General secretariat of CoM
12. Veterinary Office of BiH
13. Procurement Review Body of civil servants
14. Office of the Coordinator of Brcko District
15. Directorate for Economic Planning
1. Directorate for European Integration
2. Directorate for Coordination of Police Bodies of BiH
3. Civil Service Agency of BiH
4. Foreign Investment Promotion Agency of BiH
5. Labour and Employment Agency of B
6. Personal Data Protection Agency
7. State Regulatory Agency for Radiation Safety and Nuclear Safety
8. Police Support Agency of BiH
9. Market Surveillance Agency of BiH
10. Institute of Metrology of Bosnia and Herzegovina
11. Service for Common Affairs of the Institutions of BiH
12. Office of Attorney General of BiH
13. Presidency of BiH
14. The Return Fund of BiH
Users of e-Government services
Old arhitecture
Goals
• Increase the level of services reliability,
• Decrease maintenance and exploitation cost,
• Unify operative and management platform,
• Implement core data center networking on 10Gb FCoE infrastructure,
• Create highly available virtual enviroment,
• Create scalable system,
• Consolidate SQL instance in production,
•
Solution
• Implemented by local partner LOGOSOFT
• Data Centre is based on the following products:
Data Centar Core Switching: 2x Nexus 5548UP- Layer3 module;
Data Centre Aggregation – 2x UCS 6248 Fabric Interconnect – Switches
Data Centre Server Platform – Cisco UCS 5108 blade Server chassis with 6 Cisco UCSB200 M3 servers;
Data storage - EMC VNX5100 Storage;
Back-up solutions - EMC Avamar
© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Connect 8
Layer 1 design
Layer 2
VLAN segmentation
Virtual PortChannel (vPC) protocol
Spanning tree configuration
Host Standby Router Protocol (HSRP)
Dynamic Routing- OSPF
Layer 3
Data Centre of CoM
High availability
• Redundancy of hardware component with an automatic hardware failover;
• Redundant empower in all data centre devices;
• Redundant Layer 2 routes through network;
• Multi-Chassis Link Aggregation (MLAG) – Virtual Port Channel (vPC) for aggregation of link and redundant route;
• Layer 3 redundancy realised by Hot Standby Router Protocol
• For redundancy of routes the OSPF link state routing protocol is configured
Results
• Consolidation and effective use of IT resources;
• Improved multiply infrastructure performances;
• Decreased IT structure complexity;
• Simpler, more unified and centralised administration;
• Decreased electric power costs for empowering and cooling of server room;
• Decreased space needs for server equipment in the server room.