implementation of language proficiency requirement morocco
DESCRIPTION
Implementation of Language proficiency requirement Morocco. plan. National Regulatory Framework Estimate of the national level of LPR implementation for pilots and controllers National LPR implementation plan Maintaining English level Interim Measures. National Regulatory Framework. - PowerPoint PPT PresentationTRANSCRIPT
Implementation of Language proficiency
requirement
Morocco
planplan
1.1. National Regulatory FrameworkNational Regulatory Framework
2.2. Estimate of the national level of LPR Estimate of the national level of LPR implementation for pilots and controllersimplementation for pilots and controllers
3.3. National LPR implementation planNational LPR implementation plan
4.4. Maintaining English level Maintaining English level
5.5. Interim MeasuresInterim Measures
National Regulatory FrameworkNational Regulatory Framework
CAA incorporate ICAO langage proficiency CAA incorporate ICAO langage proficiency requirement in national law(in course of requirement in national law(in course of publication), this legislation includes a publication), this legislation includes a minimum level LP for ab initiominimum level LP for ab initio
Estimate of the national level of Estimate of the national level of LPR implementation for pilots LPR implementation for pilots
and controllersand controllersGlobal National Test (TNP) : pre- evaluation Global National Test (TNP) : pre- evaluation
test to determine the English global level test to determine the English global level of ATC personel. of ATC personel.
Result :Result :
level 4 : 67%level 4 : 67%
Level 5: 3%Level 5: 3%
National LPR implementation National LPR implementation planplan
Stape :N°1All of ATC personnel and particulary ATC who All of ATC personnel and particulary ATC who
have level 3 are following an english training have level 3 are following an english training courses to improve their english level.courses to improve their english level.
Stape:N° 2
Our ANSP “ONDA” has an internal process to nominate a team of 9 ATCo to follow a training for trainers courses on the May Flower Institute”.
Stape:N° 3 The language proficiency training will be assured The language proficiency training will be assured
by the mentioned Instructor on 5 regional by the mentioned Instructor on 5 regional instruction centres “CRI” and also in basic instruction centres “CRI” and also in basic training ATC school,training ATC school,
Stape:N° 4
• The CRI will be equipped by didactic material, The CRI will be equipped by didactic material, langage laboratories, software... etc langage laboratories, software... etc
• The DGAC is on the way of CRI accreditation The DGAC is on the way of CRI accreditation specially for Language proficiency. specially for Language proficiency.
(process in course)
Maintaining English level Maintaining English level
Stape:N° 5
process to maintain the english proficiency process to maintain the english proficiency rating by DGAC is in progressrating by DGAC is in progress
““100 Hour of language training each 6 100 Hour of language training each 6 months” to maintain English level 4? months” to maintain English level 4?
Test ELP
AIMAC / CIRs equipment
Process of Maintaining English level
TNP and up date global level ELP
Trainig for trainers ‘ program
DGAC acreditation for training program and trainer certification
May 2008
Febr
2010
Juin 2008
Apr
2010
Apr 2010
June 2010
Mars 2011
incorporate ICAO langage proficiency in national law
Interim MeasuresInterim Measures
Measures for risk mitigation :Measures for risk mitigation :• At least one member of the cockpit At least one member of the cockpit
crew and of the ATCO team should have crew and of the ATCO team should have level 4 or more.level 4 or more.
• Our ANSP “ONDA” has to assure the Our ANSP “ONDA” has to assure the English training courses to ATCo English training courses to ATCo having level 3 or bellow.having level 3 or bellow.
• A new version of Phraseologies Manual A new version of Phraseologies Manual has to be approved and dispached to has to be approved and dispached to ATCo .ATCo .
thanks