implementation review eppm p6 8.2 at a major utility - oracle primavera p6 collaborate 14
TRANSCRIPT
![Page 1: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/1.jpg)
REMINDER
Check in on the COLLABORATE mobile app
Implementation Review: EPPM P6 8.x at a Major Utility
Prepared by: Bill Hyde Director SUB3 Management, Inc.
Aligning OPPM and SAP Interface Session ID#: 15473
![Page 2: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/2.jpg)
This is a divider slide title that can be two lines
Implementation Review: Pepco Holding, Inc.
![Page 3: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/3.jpg)
Pepco Holding, Inc.
■ Service Area ▪ Delaware ▪ District of District of
Columbia ▪ Maryland and ▪ New Jersey
■ Provides regulated electric service ▪ Atlantic City Electric ▪ Delmarva Power ▪ Pepco
■ Provides Natural Gas Service ■ Provides Energy Efficiency &
Renewable Solutions
![Page 4: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/4.jpg)
Pepco Holding, Inc. Fun Facts
■ Incorporated: 2002 ■ Service Territory:
▪ 8,340 sq miles / 13,421.9 km ▪ Customers: 2M ▪ Substations: 530+ ▪ Transmission Lines:
— 3,500 miles / 5,632.7 km
▪ Distribution Lines: — 30,000 miles /48,280.3 km
■ Diverse geographic area
![Page 5: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/5.jpg)
Project Vision
■ Departments within the organization working in concert with one another utilizing centralized and linked databases to track comprehensive aspects of the capital projects throughout their lifecycle.
![Page 6: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/6.jpg)
Future State Current State / Challenges One Project data repository (Only one version of the truth)
• Department & Individual repositories • Excel for Everything!
Transparency What is the true resource need? Who is accountable?
• SeEng and Enforcing expectaFons of the responsible engineer
• Using the tool conFnuously & consistently
Capital Budget Steering CommiJee • Eliminate best ‘PowerPoint’ wins • Ensure proper representaFon • Eliminates 5 year Excel spreadsheet
Projects entered into PPM @ concepFon with prioriFzaFon criteria
• Provides rich data on upcoming projects • CollaboraFon between planning &
engineering • EliminaFng individual data repositories
Project PorRolio analyzed monthly (actual & forecast spend), target financials from 10K report, and prioriFzaFon cost/value analysis
• Paradigm Shirt • Living to the Target Plan
Future State vs. Current State
![Page 7: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/7.jpg)
Future State Current State / Challenges Fully loaded schedules exist for all project the Project PorRolio
• Implement WBS consistently • Work with responsible engineer
throughout organizaFon
Update schedules consistently and regularly to drive monthly forecast
• SeEng and Enforcing expectaFons of the responsible engineer
Scope Changes: Must be approved by sponsor & routed via the Capital Budget Steering CommiJee prior to any changes
• EliminaFng individual/small group decision making
• Eliminate Monday Morning Quarterbacking
Annual budget prepared from project porRolio which is acFvely managed to financial targets
• Shi_ing the paradigm • AccepFng there is a beJer way
Future State vs. Current State (cont’d)
![Page 8: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/8.jpg)
Previous State: Project Management Lifecycle
![Page 9: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/9.jpg)
Determine the Solution
■ Various Departments ▪ Identify areas of Improvements ▪ Work with ‘bundling’ individuals solutions for the ‘greater good’
■ Utilize Existing IT systems ■ Process Impacts
▪ Cross functional mapping ▪ Data collection
■ Analysis of possible solutions ▪ Vendor presentations ▪ Hands on exercises with vendors ▪ References
![Page 10: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/10.jpg)
Data Repository Solution
![Page 11: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/11.jpg)
Implementation State: Project Management Lifecycle
![Page 12: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/12.jpg)
Reasons for Implementation State Solutions
■ P6 was already being used for schedules (versus SAP, MSP) ■ P6 was already was integrated with SAP ■ OPPM configuration
▪ Build to business requirements ▪ Adjust & made improvements on the fly ▪ Future enhancements
■ OPPM parallel workflows ▪ Align workflow to requirements ▪ Minimize time projects spent within a process
■ PPM -> P6 Bridge exists and configurable
![Page 13: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/13.jpg)
Integrated Solution
■ Four Phase Implementation Methodology ▪ Strategic Alignment ▪ Design ▪ Configure ▪ Implement
■ Strategic Alignment ▪ Align Proposal to true business need ▪ Received approval of modified approach
■ Design ▪ Project Definition to match SAP ▪ Enhanced Work Breakdown Structure ▪ Enhanced SAP->P6 Interface Design
![Page 14: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/14.jpg)
Integrated Solution
■ Configure ▪ Phase 1
— Initiate Project
— Retrofitted In Flight Projects
— Tested Revised SAP->P6 Interface
— Configured flexible solution to allow for easy enhancements
▪ Phase 2 — Populated System
— Analytics / Reporting
■ Implement ▪ JIT Training Workshops ▪ Rolling wave of projects ▪ Lesson Learned
![Page 15: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/15.jpg)
OPPM – Modules Implemented
■ Processes ■ Workflows ■ Investor Module ■ Scorecard Module ■ Forms Module
![Page 16: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/16.jpg)
OPPM System Processes
■ Project Initiation* (5) ■ Scope Change (1) ■ PM Coordination (4) ■ Standard Reporting (1)
■ Instructions, shortcuts and references provided within each process
■ * Tied to P6 EPPM
11 Processes +
![Page 17: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/17.jpg)
OPPM Workflows
■ Project Initiation (21) ■ Scope Change (13)
■ Instructions, shortcuts and references provided within each workflow
■ Provides individuals with their ‘to-do’ list
34 Workflows +
![Page 18: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/18.jpg)
OPPM Investor Module
■ Multi-dimensional view of project data
■ Investor Maps for financial data (3)
■ Color Coding to distinguish different aspects of the project
The Capital Program
![Page 19: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/19.jpg)
OPPM Scorecard Module
■ 40+ Scorecards ▪ Capital Program
— 5 Year Capital Plan
— 1 Year Capital Plan
▪ PJM Interconnection LLC (PJM) Reports — Regional Transmission Organization in the United States
▪ Reliability Enhancement Plan ▪ Manage Portfolio Data Dynamically
— New Project Requests
— Project Scope Change Status
— Project Teams
![Page 20: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/20.jpg)
OPPM Forms
■ 25+ Forms ■ Forms has several tabs (1 to 7) ■ Forms include:
▪ Admin ▪ Scope changes ▪ Project Initiation ▪ Project Prioritization ▪ Project Review ▪ Work Coordination
![Page 21: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/21.jpg)
P6 EPPM – Modules Implemented
■ Professional (Client) ■ EPPM - Web ■ Business Intelligence (BI) Reports ■ Primavera Analytics
![Page 22: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/22.jpg)
P6 Professional (Client)
■ Input: 5 Year Plan Stage Schedule
![Page 23: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/23.jpg)
P6 EPPM (Web)
■ Configurable on a global level or by an individual
■ Select Dashboard and select portlets will be on each
■ Role based profile to minimize Graphical User Interface (GUI) and keep job easy
Dashboards
![Page 24: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/24.jpg)
P6 EPPM (Web)
■ Output: 5 Year Resource Plan Usage
![Page 25: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/25.jpg)
P6 Primavera Analytics
■ Highly Configurable reporting tool
■ Easy to use with minimal data clicks
■ Data is published to system twice a month
The BIG Picture
![Page 26: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/26.jpg)
Lesson Learned – What went well
■ Admit a problem(s) needs to be addressed ■ Senior Management Support ■ Vision ■ Defined Scope ■ Stakeholder involvement ■ Dedicated, multi-disciplinary team ■ Current State / Future State Analysis ■ Embracing Change – the users
![Page 27: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/27.jpg)
Lesson Learned – Opportunities for Improvement ■ IT Resources, competing Projects ■ Some areas did not provide desired level of input during
design stage ■ IT security measures provided some limitations implementing
solutions full capabilities ■ Push back from process changes ‘be careful what you ask
for’ ■ Changing strategies effected timeline ■ Keeping users happy - Rolling out additional features
![Page 28: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/28.jpg)
Thank You!.......Questions
■ Contact Info
▪ Bill Hyde ▪ [email protected] ▪ SUB3 Management Inc.
— www.sub3mgmt.com
— @SUB3MGMT
■ Sources and Thanks to Pepco Holdings, Inc. ▪ Kim Deeley, [email protected] ▪ Pamela Zucaro, [email protected]
![Page 29: Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Collaborate 14](https://reader034.vdocuments.net/reader034/viewer/2022042615/55cee3a6bb61ebbd078b456a/html5/thumbnails/29.jpg)
Please complete the session evaluation We appreciate your feedback and insight
You may complete the session evaluation either on paper or online via the mobile app