important dates projects due research = tuesday 12/11 project = tuesday 12/13 unit test – monday...

25
Important Dates Projects Due •Research = Tuesday 12/11 • Project = Tuesday 12/13 Unit Test Monday 12/16

Upload: angel-washington

Post on 06-Jan-2018

214 views

Category:

Documents


0 download

DESCRIPTION

SPS4: Students will investigate the arrangement of the Periodic Table b. Use the periodic table to predict the above properties for representative elements EQ: What are the representative elements and their location on the periodic table?

TRANSCRIPT

Page 1: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Important Dates• Projects Due

• Research = Tuesday 12/11• Project = Tuesday 12/13

• Unit Test– Monday 12/16

Page 2: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Activator Write and answer the question

in your notes section:• The two rows on the

most bottom part of the periodic table have been “pulled out: of order.

• Why are these rows pulled out of the main periodic table?

Page 3: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

SPS4: Students will investigate the arrangement of

the Periodic Tableb. Use the periodic table to predict

the above properties for representative elements

EQ: What are the representative elements and their location on

the periodic table?

Page 4: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Metals, Nonmetals, Metalloids

• Metals - conductors of electricity, luster, malleable, reactive, solids

• Nonmetals - not conductors of electricity, reactive & non-reactive, gases, liquids and solids

• Metalloids - semiconductors, solids

Page 5: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

8 types of Representative Elements• Alkali metals

• Alkaline Earth Metals• Transition Metals

• Metalloids• Halogens

• Nobel Gases• Lanthanide/Actinides

• Synthetics

Page 6: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16
Page 7: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Alkali Metals• Group 1

Li, Na, K, Rb, Cs, Fr• Highly reactive with

water, can burn in air• Soft, shiny gray • True metals

Page 8: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Alkaline Earth Metals• Group 2 Be, Mg, Ca, Sr, Ba,

Ra• Harder, denser,

stronger than alkali metals

• True metals

Page 9: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Transition metals• Found in middle of chart• Familiar metals; not as

reactive as true metals• Groups 3 to 12

Page 10: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Metalloids• Have properties of metals

and nonmetals• Found along “stair-steps” • Aka: semiconductors,

semimetals.• Used in computer chips,

can “print” electric circuits• Ex: silicon

Page 11: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Halogens• Found in group 17

F, Cl, Br, I, At• Gases (Br liquid) and

highly reactive• Like to react with metals

from groups 1 & 2

Page 12: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Nobel Gases• Group 18

He, Ne, Ar, Kr, Xe, Rn• Inert gases - aren’t

reactive with other elements

Page 13: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Lanthanides and Actinides• Found “pulled” out on the

periodic chart• Used in TV, computers• Radioactive and used in

nuclear energy plants and for bombs

Page 14: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Synthetic Elements• Produced in

laboratory• Technetium and

Promethium• Used in “xray”

machines

Page 15: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Summarizer

• Use your foldable to answer the questions on the handout.

• Answer on a separate piece of paper.

• PUT IN TOD BOX as you leave.

• !

Page 16: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Go to the following site:

• Tiny URL:

http://tinyurl.com/yllemhk

Page 17: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

SPS4: Students will investigate the arrangement of

the Periodic Tableb. Use the periodic table to predict

the above properties for representative elements

EQ: What are the representative elements and their location on

the periodic table?

Page 18: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

RepresentativeElements

With Eight

Page 19: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

METALS

NON-METALS

METALLOIDS

1. Alkali2. Alkaline Earth 3-12. Transition 4. Lanthanide/Actinide

Along Stair Case -Metalloids

Activator: Use Representative Elements to Complete the BRACE MAP:

17. Halogens18Noble Gases

Page 20: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16
Page 21: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16
Page 22: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

B

Si

Ge As

Sb Te

Po

Metalloids

Metals

METALS

Page 23: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

The Periodic Table of Elements

= Element Symbol How many elements = _____

NO SYNTHETICS

Page 24: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16
Page 25: Important Dates Projects Due Research = Tuesday 12/11 Project = Tuesday 12/13 Unit Test – Monday 12/16

Go to google.com and type

• Get Organized A Periodic Table WebQuest

• Click on the Doc. Link• Use the links in the document to get to

the site(s) to use to complete the packet.

• http://education.jlab.org/elementmath/index.html