Page 1: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Importation Procedure for

Construction Materials

Third Edition

Page 2: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Third Edition1st Printed : December 20102nd Printed: December 2011

© Construction Industry Development Board Malaysia 2011All enquiries should be directed to:

Senior General ManagerTechnology & Innovations Development SectionConstruction Industry Development Board Malaysia10th Floor, Grand Seasons Avenue72, Jalan Pahang, 53000 Kuala Lumpur, Malaysia.

Tel. : 03 2617 0200Fax : 03 4045 1808

Page 3: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

ContentsForward 4

Abbreviations 5

1. Introduction 6

2. Terms and Definitions 6

3. Objective 7

4. Roles of CIDB 7

5. Roles of Importers 7

6. Methods of Product Comformity to MS 7

7. Application Process 11

8. Verification Procedure 12

9. Verification Regulations 13

10. Disciplinary Actions on Importers 15

11. Application for Exemption 16 12. General Information 17

Appendix A : Manufacturer’s Confirmation Letter 18

Appendix B : Exporter’s Confirmation Letter 19

Products List 20

List of Laboratories accredited by STANDARDS MALAYSIA 34

List of Foreign Accreditation Bodies and Laboratories Accreditedby STANDARDS MALAYSIA 35

Framework on Enforcement of Importation of Construction Products to MS 40

References 41

Page 4: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

4

Foreword

This guide book has been published as reference for all importers, agents and

forwarding agents who are involved in the importation of products listed under

The Customs Ordinance (Import Prohibitions) 1998 Amendments 2003/2004.

The contents of this book have been dedicated to procedures in the importation

of construction products to Malaysia. All imported construction products to be

imported must conform to the technical specification stipulated in the respective

Malaysian Standards. The importers/agents are obliged to execute the essential

testing requirements in an effort to provide evidences on the conformity of the

imported products to the corresponding Malaysian Standards.

It is hoped that this guide book will serve as a useful reference for all

importers, agents and forwarding agents towards expediting the importation

of construction products listed under The Customs Ordinance (Import

Prohibitions).

Page 5: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

5

Abbreviations

APLAC : Asia Pacific Laboratory Accreditation Cooperation

BL : Bill of Lading

CB : Certification Body

CIDB : Construction Industry development Board

COA : Certificate of Approval

COC : Certificate of Conformity

IAF : International Accreditation Forum

IB : Inspection Body

ILAC : International Laboratory Accreditation Cooperation

KDRM : Kastam DiRaja Malaysia / Royal Malaysian Customs

MITI : Ministry of International Trade and Industry

MLA : Multilateral Recognition Arrangement

MRA : Mutual Recognition Arrangement

MS : Malaysian Standard

OGA : Other Government Agency

PAC : Pacific Accreditation Cooperation

PC : Product Certification

SAMM : Sijil Akreditasi Makmal Malaysia

SMK : Sistem Maklumat Kastam/ Customs Information

System

STANDARDS MALAYSIA : Department Standards of Malaysia

Page 6: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

6

1. INTRODUCTION

a) CIDB is a government agency entrusted with the enforcement of the Malaysian Standard mandated on the importation of construction products that are listed under the Customs Ordinance ( Import Prohibitions) 1998 Amendments 2003, 2004 & 2009, through the issuance of Certification of Approval (COA).

b) Custom Ordinance ( Import Prohibitions) 1998 is a statute regulated under subsection 31(1) Customs Act 1967 (Act 235) whereby it is stipulated that the import of any one product must comply with the Procedure of Importation of Construction Products before its entry into Malaysia.

2. TERMS AND DEFINITIONS

a. Product : Finished product or semi-finished products or materials used in construction works.

b. Certificate of Approval : A certificate issued by CIDB acknowledging that the building product conforms to the respective MS requirements.

c. Product Certification : A certificate issued by the CB that verifies the conformity of the product to the respective MS. This certificate sometimes known as certificate of conformity (COC).

d. Certification Body : A body accredited by STANDARDS MALAYSIA as Certification Body or CB.

e. Laboratory : A test laboratory that has SAMM/ILAC or such certification approved by CIDB within a stipulated criterion.

f. Consignment : A batch of imported consigned construction product.

g. Consignment Test : A test on a batch of consigned imported product.

h. Full Test : A laboratory test that covers full range of testing requirements as stipulated in the MS.

i. Critical Test : Laboratory test that is tested to the specific MS requirements that have been stipulated by CIDB.

j. Verification : The physical inspection on the products by a CIDB Verification Officer.

k. Desk Verifier : A CIDB officer in charge of accepting applications for product verification by importers.

l. Verification Officer : A CIDB technical officer who undertakes product verification.

m. Recommending Officer : A CIDB technical officer who is authorised to make recommendations on the verification report prepared by the Verification Officer.

n. Approving Officer : A CIDB technical officer who is authorised to approve the application of COA.

o. Market Sampling : Collection of product/material samples from the market or at the Customs entry point to be tested by CB or any labs approved by CIDB.

p. Suspension : CIDB will not accept any applications from suspended importers during the suspension period.

q. Black List : A list of importers who are not allowed to apply COA from CIDB.

Page 7: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

7

3. OBJECTIVE

To enforce the compliance of the imported construction materials / product to MS.

4. ROLES OF CIDB

a. Process the applications for verification of products from importers or their authorised agents according to the stipulated procedure.

b. Perform product verifications at all KDRM points of entry throughout Malaysia.

c. Issuance of approvals in the form of e-permit or COA.

d. Collection of product samples for testing.

e. Perform inspection and product verifications at manufacturing plants.

f. Monitor PCs issued by CBs.

g. Carrying out market sampling of imported construction products.

h. Providing COA exemptions based on stipulated terms and conditions.

5. ROLES OF IMPORTERS

a. Submission of verification application through e-permit not less than 14 days before the arrival of the product at port .

b. Ensure the completeness of the supporting documents.

c. Adhere strictly to all CIDB procedural requirements.

d. Proposed the date for product inspection at port.

e. Consistenly in consultation by CIDB officers on any uncertainties/curiosities on the importation procedural requirements.

f. Uphold high level of integrity in any transactions with CIDB.

g. Submission of foreign CBs or labs particulars for CIDB verification prior to their appointments.

h. Make proper arrangements for factory visits at the source country.

6. METHODS OF PRODUCT COMFORMITY TO MS

Generally. there are two methods to provide evidence of imported construction products’ conformance to corresponding MS, i.e through Product Certification and, Consignment Test. Both of these methods are described as below:

6.1. Product Certification (PC) Method

a) This method can further be categorised into two. In this method the importer can appoint any Local or Foreign CB for the issuance of PC. Hence it can be

Page 8: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

8

categorised as follows:

i) LOCAL Category In this category, the PC is issued by a local CB accredited by

STANDARDS MALAYSIA or that which has been approved by CIDB.

ii) FOREIGN Category In this category, the PC is issued by a foreign CB at source country

which is accredited by an accreditation body in that country and must be members of PAC IAF, MLA, APLAC, ILAC, and MRA signatories. However, in exceptional circumstances CIDB may have a direct arrangement with the CB as and when necessary.

b) Any surveillance audits made by the CB concerned must be submitted in a single report to CIDB within the PC validity period.

c) Importers shall submit a complete sets of documents for the application for verification of products.• A completed online e-permit application/Borang Q1 (in cases of

Service disruptions in the e-permit system)• CopyofBL• OriginalLetterofCertificationbymanufacturerorexporter• Originalreceiptfeespayment• CopyofPackingListandInvoice• Certified True Copy of PC* / Original Certificate of Full Test on

Consignment (UPK)• Copy of Malaysian Company Registration (SSM) for first time

applicants (exceptional to contractors).• Copy of Mill Certificate whenever necessary for construction

products.

d) PCs issued to Malaysian importers or directly to foreign manufacturers are non transferrable without prior CIDB approval.

e) CIDB will carry out market sampling and results from product tests will be given out to the relevant CBs.

f) Upon the issuance of PC the importer shall make arrangements for CIDB officers to visit plant for inspection and product verification. The importer is required to make all essential arrangements with the foreign manufacturer to expedite the plant inspection. All travel expenses, air tickets, visa, “airport tax/passenger surcharge” as well as accommodations and transportation to and from the plant will be borne by the importer.

g) The importers adopting this method of confirmity will hold the responsibility in assuring the confirmity of products to MS specification especially product marking.

*Notes:Copy of PC can be certified byi. Respective CBii. CIDB Managerial level and aboveiii. Commission of Oath

6.2. Laboratory Test Report

Laboratory Test Report is an alternative to importing products without PC. This method is especially suitable for importers that are importing products on cosignment basis for a relatively short period of time.

Page 9: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

9

The Laboratory Test Report can be further categorised into four as follows:

i. Laboratory Test Report – UPK1ii. Laboratory Test Report with Double Inspection – UPK2iii. Laboratory Test Report (3 months validity period) – UPK3iv. Laboratory Test Report (Self Regulation) – UPK4

a) Laboratory Test Report – UPK1

There are two(2) choices for importers in this method:

i. Testing by local lab In this case, the importer must contact any local Laboratories for sample

collection. The report will be valid for one (1) verification application only.

ii. Testing by Foreign lab The test may be conducted in a foreign laboratory at the source

country prior to import. It is very important for the importer to submit the laboratory particulars to CIDB for verification. Then the importer will make necessary arrangements for CIDB officers to collect sample at the plant and send it to the appointed laboratory.

The product sample may be taken from a batch of construction products or consignment intended for import in accordance to the following terms:• Testresultsarevalidforaperiodof6monthsfromdateofissue

provided the importer has not yet imported the said products.

• TheReportisvalidforone(1)applicationforproductverificationonly. However for sample collected by represenntative of the foreign laboratory a Critical Test must be conducted on the product.

Reports must be in the English Language and in accordance to CIDB

approved format.

b) Laboratory Test Report with Double Inspection – UPK2

The sampling of products for a Full Test and Product Verification is simultaneously made in the exporting country. The importer will be responsible for making arrangements for CIDB to verify and collect product samples for a full test in the exporting country. Tests shall be conducted in any CIDB approved laboratories. The required test report must be submitted to CIDB before the transportation of the products to Malaysia point of entry. Upon the approval of the conformance of the test report then the products can be transported to the country. A second verification visit will be made by CIDB officer at the point of entrance. A COA will be issued on the same day provided all declarations are in order. This method can only be applied for imports via land with fixed quantities and on the same day. For this method the importer can used local laboratory or laboratory at source country. For the later the importer needs to obtain prior approval from CIDB before appointing the laboratory.

Page 10: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

10

c) Laboratory Type Test Report (3 months validity period) – UPK3

CIDB officers will collect product samples from the manufacturing plant for Consignment Full Test (UPK). The test report is valid for a period of 6 months from the date of issuance. CIDB will issue the Consignment Full Test Certificate upon receive the application for the delivery of the first consignment. This certificate is valid for 3 months from the date of the first COA issued.

Importers are given options of having their products tested in a local or foreign laboratory.

Notes:i. Importers are required to submit a full set of documents to CIDB for

verification purposes at the Malaysian point of entry as stipulated in the procedure for Importation via Product Certification, Copies of Product Certification replaced by certified true copies of Test Results. Importers must bear all test cost.

ii. Only declared products/models that have been passed will be cleared for import.

iii. Only cement products are subjected to a Compulsory Critical Test on every consignment.

d) Laboratory Test Report (Self Regulation) – UPK4

This method is meant for importers who engaged the services of third party inspection body for the purposes of certifying products to MS. This IB must be accredited by a recognised AB. Those using this method are required to submit their IB details to CIDB for validation. They are further required to make essential arrangements between CIDB and the related IB, prior to actual import of the products. The importer is also required to submit a full inspection report from the IB to CIDB for each consignment imported.

IMPORTANT NOTES :

i. In circumstances of scepticism arising over the construction product, much after it has undergone and passed its consignment tests as well as been awarded a PC; CIDB reserves its right to order the importer to conduct extra tests such as a full test or critical test as deem fit on the consignment. The importer will be required to immediately arrange the test procedure and submit its results to CIDB.

ii. For importers or manufacturers which their lab are SAMM accredited can conduct a full or critical test under the supervision of a CIDB officer.

iii. The importer is prohibited from taking samples of products and send them to a laboratory.

Notes : CIDB is not responsible nor be held responsible for any loss/damage on property or, any damage or injury whether directly or indirectly on individual persons during a sampling or verification procedure by CIDB/CB/agents or any authorised personnel to undertake the procedure with/without CIDB’s prior consent.

Page 11: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

11

7. APPLICATION PROCESS

7.1 On-line Application Process

Process flow Discription eCOA Status

APPLICATION OF COA

Applicant logs on to the ePermit system via

http://www.nswtf.gov.my or

http://epermit.dagangnet.com and key in all the mandatory fields and attach the support documents. Applicant pays the processing fee.

Draft

Awaiting OGA Approval

VERIFICATION PROCESS

a. The Desk Verifier verifies the application using ePermit system. Once verified, it will be routed to Verifier.

b. The Verifier inspects the cargo at Customs Entry Point and issues a verification report within 24 hours to Recommendation Officer.

c. Recommendation Officer recommends/rejects the application.

d. Successful application and verification report will be routed to Approver.

Verified by OGA

Rejected by OGA

APPROVAL PROCESS

Approver approves/rejects the application using the

ePermit system. Approved COA will be routed to SMK.

Approved by OGA

Rejected by OGA

ACKNOWLEDGEMENT PROCESS

SMK acknowledges the receipt of COA.

COA printing is not required (unless for special case).

Acknowledged by Customs

Note: OGA - Other Government Agency (Construction Industry Development Board)SMK - Sistem Maklumat Kastam

VALIDATION PROCESS AT SMKSMK will validate on the COA information in Customs declaration against the approved COA received from CIDB.

START

APPLY

ACKNOWLEDGE

No

No

No

Yes

Yes

APPROVED

VERIFY

END

Page 12: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

12

7.2 Manual Application Process (In case of a technical disruption in e-permit system)

Process flow Discription

APPLICATION OF COA

During system interruption, applicant applies for COA manually.Applicantfillsuptheapplicationform(Q1)and submits to CIDB office together with the relevant supporting document. Applicant pays the processing fee.

VERIFICATION PROCESS

a. The Desk Verifier processes the application manually. Manual COA number issued will be recorded. Verified application will be passed to Verifier.

b. The Verifier inspects the cargo at Customs Entry Point and issues a verification report within 24 hours to Recommendation Officer.

c. Recommendation Officer recommends/rejects application. Successful application and verification report will be passed to Approver.

APPROVAL PROCESS

The Approver approves/rejects the application manually.

PRINTING

OGA prints COA for the applicant.

KEY IN APPROVED COA DATA

When the system is back to operation, CIDB officer accesses the system and keys in the manually approved COA data.

Offline Module

Note:OGA - Other Government Agencies (Construction Industry Development Board)SMK - Sistem Maklumat Kastam

8. VERIFICATION PROCEDURE

The verification procedure on inspection of product is as follows:

a. The verification of product must be carried out by an appointed Verification Officer as named in a letter of acknowledgement from CIDB.

b. The importer shall contact the named Verification Officer for a confirmation on

appointment time and place. All related expenses must be borne by the importer except for the Verification Officer’s transportation and meal during domestic verification ( within Malaysia ).

c. The verification of products can be carried out during week days or week ends.

d. The Verification Officer shall prepare a Verification Report within 24 hours after the inspection.

No

Yes

Yes

No

VERIFY

PRINT

END

START

APPLY

APPROVE

KEY IN

PRINT

Page 13: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

13

e. The importer shall bear all the essential cost on the factory visit at the source country by CIDB officer.

f. Importers shall ensure the Verification Officer’s safety at all times during the verification exercise. The Verification Officer has the right to withdraw from the procedure at any time if he feels that his safety is at stake.

g. Regardless of the manner of importation, the importer has to show that the product being imported meets the requirements of the relevant MS. COA will only be issued after the completion of a Verification process. Each verification process is chargeable according to the table below. Importers who fail to arrange verification at the agreed/fixed date, or, fail to inform CIDB a day prior to verification date will be subjected to a second time charge and is required to make a new appointment for a verification date.

Verification Fees

No. ITEM VERIFICATION FEES

01 Weekday RM 500.00 / Verification

02 Weekends RM 700.00 / Verification

03 Public Holiday RM 780.00 / Verification

9. VERIFICATION REGULATIONS

Product verification regulations that need to be complied by importers are as follows:

9.1 Verification Regulations

a) Verification for construction products in a container

i. The CIDB selected container for verification is located at suitable bay for the purpose of inspection.

ii. Importers are required to allocate additional containers for verification in cases where the Verification Officer finds the contents of the initial container is doubtful.

iii. The original seal on the container shall not be removed before the arrival of the Verification Officer.

iv. In cases where importers have to break the original seal for lab test, the seal must be kept inside the container for inspection by the CIDB Verification Officer.

v. The importer shall provide necessary equipment, digital camera, forklift, manpower, machinery and other relevant appliances for the unloading of construction product sampling from any part in the container by the Verification Officer.

Page 14: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

14

b) For verification of construction products in a warehouse, silo or other appropriate storage premises:

i. Make sure all consignments are kept in a proper and convenient manner for individual consignment inspection.

ii. The original seal and container number must be retained for submission to the Verification Officer during product inspection.

c) For verification of construction product in vessel:

i. Make sure all consignments are kept in a proper and convenient manner for individual consignment inspection.

ii. Make sure the BL contains complete information of the vessel concerned.

iii. Ensure that all safety measures during inspection adheres to all safety procedures.

9.2 General Regulations

a) The importer must provide transportation for the Verification Officer to and from the Verification location, whenever the need arises. All transportation costs must be borne by the importer.

b) The importer or its authorised agent (via an agent authorisation letter) must be present throughout the verification process.

c) The importer must ensure physical safety measures are made for the Verification Officer during the verification process.

9.3 Causes of Verification Failure

a) Importer’s fails to comply to any regulation which resulted in the inability of the Verification Officer to conduct the verification process.

b) Non-compliance to markings as stated in the MS.c) Inability of importer to provide containers that has been specified by CIDB.d) Absence of importer or an authorised agent within the alloted hour for the

verification process.e) The number on container seal does not match with the number stated in the BL

(except for seals issued by an OGA).f) Absence of seal on the selected container.g) Lost of seal or, broken before verification procedure.h) Non-permanent markings.i) Listed product not found in the packing list.j) Brand or model is inconsistent with that stated in PC, packing list or letter from

manufacturer.

ACTIONS BY IMPORTERS UPON FAILURES

9.4 Conduct a Critical Test

a) The sealed number does not tally with that in the BLb) Seal is broken before inspection is made by Verification Officerc) Lost seald) Non-compliance on markings reruirements as stipulated in MS

Page 15: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

15

9.5 Reverification Process

a) Unclear numbering on sealb) Missing seal for product transfer to warehouse.c) Labelling on the packaging does not match with the PC.

Notes:Importers are required to acquire consignment verification and obtain a COA for Malaysian products that have reached at their (export) destination and returned to Malaysia (as import).

9.6 Postponement of Verification

a) Heavy rainfall at commencement of verification process.b) 2 days postponement notice by importers before date of verification

procedure.c) Occurence of natural disaster

10. DISCIPLINARY ACTION ON IMPORTERS

Importers found violating any regulations in a COA application process will be subjected to the following disciplinary actions:

A. Reminder one and two

i. Alterations made in the supporting documents submitted to CIDB.ii. Non-compliance to MS requirements on markings.iii. Importation of construction products under the Customs Ordinance(Prohibitions

on Imports) which are not listed in the packinglist/invoice.v. Failure to make available the CIDB’s selected container.vi. Absence of Importer or his authorised agent during the one hour allocated for

the verification process.vii. The number on the seal does not match with that in the BLix. Lost seal or seal broken before verification.x. Markings are non-permanent.xi. Brand or model is inconsistent with that in the packing list or letter from

manufacturer.

B. 3 months suspension of COA application on the importer

Repititive offences as mentioned above whether in a different manner in each case or the same being repeated in 3 occassions (para A).

C. Blacklisting of Importer

i. Falsifying COA/PC/Laboratory test reportii. Falsifying supporting documentsiii. Perform any form of activities that deemed to taruish the image and credibility

of CIDB.

D. Any transfer of ownership without prior consent from CIDB, the new PC holder shall not be certified by CIDB for a period of three (3) months from the date of PC transfered if CIDB allows the transfer to be made, then the relevant CB can then proceed with the transfer.

Page 16: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

16

11. APPLICATION FOR EXEMPTION

Applications for exemption of COA can be considered based on the following criterion:

a) Directive by MITI or other authorised government agencies.

b) Imports for laboratory tests that have been approved by CIDB. A supporting letter from CIDB must be attached to the application.

c) Samples taken by any CIDB official from a foreign manufacturing plant which are meant for testing.

d) Maximum quantities of imported products for display or samples allowed:i. Ceramic tiles = 3m2 / design codeii. Sanitary ware = 2 units/modeliii. Cement = not exceeding 500kg

Ceramic tiles/sanitary wares/cement model or design that has been approved may not be re-considered in a period of (1) one year before the next sample import.

If imports of products exceed a listed construction product quantity, the products will be subjected to a Consignment Full Test.

e) Tiles that are not in the manufactured according to MS scope, e.g hand made tiles, not dry pressed or extruded types, modes of manufacturing not covered by MS ISO 13006..

f) Importation of sanitary wares of the types unintended for the purposes set out in MS 147, MS 1522 & MS 795 such as sanitary ware not made of Vitreous China.

g) Quantitiesofironandsteelproductsnotexceeding500kg.

h) CIDB assessment reveals the limited usage of the imported materials or any other reasons that can be interpreted justifiable by CIDB.

Notes:1. All applications for exemption must be submitted by the product owner and

accompnaied by the following documents:i. Application letterii. Specifications/brochure/technical report/product imagesiii. Bill of Lading/Air Way Bill/Transportation Billiv. Invoicevi. Packing Listvii. Other relevant documents

2. Exemption of COA approval that does not fulfill the above requirements will be determined by the Application for COA Exemption Assessment Committee.

Page 17: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

17

12. GENERAL INFORMATION

Completed Applications may be sent to the following addresses:

Senior General ManagerTechnology & Innovations Development SectorConstruction Industry Development Board Malaysia10th Floor, Grand Seasons Avenue72, Jalan Pahang, 53000 Kuala Lumpur, Malaysia.

CONTACT DETAILS:

Construction Industry DevelopmentBoard Malaysia (CIDB)Technology & Innovation, Development Sector10th Floor, Grand Seasons Avenue,No. 72, Jalan Pahang, 53000 Kuala Lumpur.Tel: 03-26170200 (General Line)Fax: 03-40451808General Email: [email protected]

Standard and Quality Department, QUEST Unit,

Officers’ list:Ir. Hj Mukhtar Che AliEn. Ismail Mat NorTel : 03 - 26170332Pn. Rohana Abdul MananTel : 03 - 26170250Pn Anisa Zainal AbidinTel : 03 - 26170370Pn. Nor Fazliyana Mohd RauzanTel : 03 - 26170256En. Zulkefli IsmailTel : 03 - 26170233En.Yusrillhaffiz HamzahTel : 03 - 26170287En.Awang Bulqiah bin Awang Maulana.Tel : 03 - 26170375Email: [email protected]

Dagang Net Technologies Sdn BhdCareline Interaction CentreTower 3, Avenue 5, The Horizon,No 8, Jalan Kerinchi, 59200 Kuala Lumpur

Operation hours: 24 hours daily(7 days a week)Tel: 1.300.133.133 Fax: 603.2713.2990Email: [email protected]

Website: http://www.dagangnet.com

Royal Malaysian Customs Department HeadquartersMinistry Of Finance Complex, No. 3 Persiaran Perdana,Precinct 2, 62596 PutrajayaGeneral Line: 03-8882 2100/2300/2500

(Procedure)Pn. Rapeah Abd. HadiCustoms DivisionRMCD Headquarters 4th Floor, Block 2G1B,Ministry Of Finance Complex, No. 3 Persiaran Perdana,Precinct 2, 62596 Putrajaya Tel: 03-8882 2663Fax: 03-8888 5881Email: [email protected]

(Regulation)Pn. Habsah Kamaron6th Floor, Block 2G1BMinistry Of Finance Complex, No. 3 Persiaran Perdana,Precinct 2, 62596 Putrajaya Tel: 03-8882 2498Fax: 03-8889 5906Email: [email protected]

(Technical)Pn. Rita Paul5th Floor, Block 2G1BMinistry Of Finance Complex, No. 3 Persiaran Perdana,Precinct 2, 62596 Putrajaya Tel: 03-8882 2329Fax: 03-8888 4589Email: [email protected]

Page 18: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

18

Appendix A

Manufacturer’s Company Letter Head

To : CONSTRUCTION INDUSTRY DEVELOPMENT BOARD (CIDB) MALAYSIA

CIDB Headquarters, 8th Floor, Grand Season Avenue,

No. 72, Jalan Pahang, 53000, Kuala Lumpur

P.O Box 12278, 50772 Kuala Lumpur

MALAYSIA

Tel : 603-26170200 (GL)

Fax : 603-40451808

Attn : Senior General Manager

Construction Technology Development & Innovation Sector

MANUFACTURER’S LETTER OF CONFIRMATION

With reference to the above, we hereby confirm the details described below.

Details of the Manufacturer:-

Full Name and Full Address of the Manufacturer

No

Description of Product

(size, type, model, group & others)

CodeProduct

Quantity

Brand Name on the

Packaging (Boxes / Cartons

/ others)

Marking on the Product

In additional, we also hereby confirm that the said product is being arranged for export by Name of

Exporter (where applicable) to Name of Importer, as the consignment detailed below :-

1. Invoice, Packing List No. & Date and

2. Bill of Lading No. & Date

Signature:

Name:

Designation:

Date:

Firm / Company Stamp:

Page 19: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

19

Appendix B

Exporter’s Company Letter Head

To : CONSTRUCTION INDUSTRY DEVELOPMENT BOARD (CIDB) MALAYSIA

CIDB Headquarters, 10th Floor, Grand Season Avenue,

No. 72, Jalan Pahang, 53000, Kuala Lumpur

P.O Box 12278, 50772 Kuala Lumpur

MALAYSIA

Tel : 603-26170200 (GL)

Fax : 603-40451808

Attn : Senior General Manager

Construction Technology Development & Innovation Sector

EXPORTER’S LETTER OF CONFiRMATION

With reference to the above, we hereby confirm the details described below.

Details of the Exporter:-

Full Name and Full Address of the Exporter

No

Description of Product

(size, type, model, group & others)

CodeProduct

Quantity

Brand Name on the

Packaging (Boxes / Cartons

/ others)

Marking on the Product

In additional, we also hereby confirm that the said product is being arranged for export by Name of

Manufacturer to Name of Importer, as the consignment detailed below :-

1. Invoice, Packing List and Bill of Lading No. & Date:

Signature :

Name :

Designation :

Date :

Firm / Company Stamp :

Page 20: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

20

NO

.P

RO

DU

CT

HS

CO

DE

AS

TN

CO

DE

MA

LA

YS

IAN

STA

ND

AR

DS

/ I

SO

/ F

NS

U

ng

laze

d /

Gla

zed

Cer

am

ic T

iles

6907

/ 6

908

1U

ng

laze

d C

eram

ic T

iles

(<7c

m)

6907

1010

069

0710

0010

MS

IS

O 1

3006

:200

3

2U

ng

laze

d C

eram

ic T

iles

(>7c

m)

6907

9010

069

0790

0010

MS

IS

O 1

3006

:200

3

3G

laze

d C

eram

ic T

iles

(<7c

m)

6908

1010

069

0810

0010

MS

IS

O 1

3006

:200

3

4G

laze

d C

eram

ic T

iles

(>7c

m)

6908

9010

069

0890

1010

MS

IS

O 1

3006

:200

3

C

eram

ic P

ipes

an

d P

ipe

Fit

tin

gs

6906

1C

eram

ic p

ipes

, con

du

its,

gu

tter

ing

an

d p

ipe

fitti

ng

s69

0600

000

6906

0000

00M

S 1

061:

Par

t 2:

2008

S

an

itary

ware

6910

/ 3

922

1C

eram

ic F

lush

ing

Cis

tern

s N

ot E

qu

ipp

ed W

ith

Mec

han

ism

6910

1090

069

1010

0090

MS

147

:200

1

2C

eram

ic W

ash

Bas

in (P

edes

tal)

6910

1020

069

1010

0020

MS

147

:200

1

3C

eram

ic F

lush

ing

Cis

tern

s E

qu

ipp

ed W

ith

Mec

han

ism

6910

1090

069

1010

0090

MS

795

:200

2, M

S 1

47:2

001

4C

eram

ic W

ash

Bas

in69

1010

200

6910

1000

20M

S 1

47:2

001

5C

eram

ic W

ater

Clo

set

Pan

s W

ith

out

Flu

shin

g C

iste

rns

6910

1090

069

1010

0090

MS

147

:200

1, M

S 1

522:

2007

6C

eram

ic B

idet

s69

1010

900

6910

1000

90M

S 1

47:2

001

7C

eram

ic U

rin

als

6910

1090

069

1010

0090

MS

147

:200

1

8C

eram

ic W

ater

Clo

set

Pan

s W

ith

Flu

shin

g C

iste

rns

(On

e P

iece

)69

1090

900

6910

9000

90M

S 1

47:2

001,

MS

152

2:20

07, M

S 7

95:2

002

9P

last

ic F

lush

ing

Cis

tern

s E

qu

ipp

ed W

ith

Mec

han

ism

3922

9011

039

2290

1911

MS

795

:200

2

P

ortl

and

Cem

ent

2523

1W

hit

e P

ortl

and

Cem

ent

2523

2100

025

2310

1000

MS

888

:199

1

2P

ortl

and

Cem

ent

(Ord

inar

y an

d R

apid

Har

den

ing

)25

2329

900

2523

2990

00M

S 5

22 P

art

1 :2

003

3S

ulp

hat

e-re

sist

ing

Por

tlan

d C

emen

t25

2329

900

2523

2990

00M

S 1

037:

1986

4P

ulv

eris

ed F

uel

Ash

Por

tlan

d C

emen

t25

23 2

9 90

025

2329

9000

MS

122

7:20

03

5B

last

Fu

rnac

e P

ortl

and

Cem

ent

2523

29

900

2523

2990

00M

S 1

389:

1995

Page 21: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

21

NO

.P

RO

DU

CT

HS

CO

DE

AS

TN

CO

DE

MA

LA

YS

IAN

STA

ND

AR

DS

/ I

SO

/ F

NS

H

ydra

ulic

Cem

ent

1P

ozzo

lon

ic P

ulv

eris

ed F

uel

Ash

Cem

ent

2523

90

000

2523

9000

00M

S 1

520

:200

1

2H

igh

Sla

g B

last

Fu

rnac

e C

emen

t25

23 9

0 00

025

2390

0000

MS

138

8:19

95

3M

ason

ry C

emen

t25

23 9

0 00

025

2390

0000

MS

794

:201

0

IRO

N A

ND

ST

EE

L P

RO

DU

CT

S L

INE

S:

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

7207

Sem

i-fin

ish

ed p

rod

uct

s of

iron

or

non

-allo

y st

eel

Co

nta

inin

g b

y w

eig

ht

less

th

an

0.2

5%

of

carb

on

:

172

07 1

1 90

072

07 1

1 00

90 -

Oth

erB

illet

s, B

loom

sB

eam

Bla

nks

.M

S 1

494

272

07 1

9 90

072

07 1

9 00

90 -

Oth

erB

loom

sM

S 1

495

Co

nta

inin

g b

y w

eig

ht

0.2

5%

or

mo

re o

f ca

rbo

n

372

07 2

0 91

072

07 2

0 91

0072

07 2

0 99

90 -C

onta

inin

g b

y w

eig

ht

0.6%

or

mor

e of

car

bon

Bea

m B

lan

ks.

MS

149

6

472

07 2

0 99

072

07 2

0 11

0072

07 2

0 19

90 -O

ther

7208

Fla

t-ro

lled

pro

du

cts

of ir

on o

r n

on-a

lloy

stee

l, of

a w

idth

of

600m

m o

r m

ore,

hot

-rol

led

, not

cla

d, p

late

d o

r co

ated

.

572

08 1

0 00

072

08 1

0 00

00-

In c

oils

, not

fu

rth

er w

orke

d t

han

hot

-rol

led

, wit

h p

atte

rns

in r

elie

fS

teel

Str

ip a

nd

Sh

eet

MS

170

5:20

03

672

08 2

5 00

072

08 2

5 10

00-O

f a

thic

knes

s of

4.7

5mm

or

mor

e.S

teel

Str

ip a

nd

Sh

eet

MS

170

5:20

03

7208

25

9000

772

08 2

6 00

072

08 2

6 00

00-O

f a

thic

knes

s of

3m

m o

r m

ore

bu

t le

ss t

han

4.7

5mm

.P

ipes

& T

ub

esM

S 1

768:

2004

872

08 2

7 00

072

08 2

7 00

00-O

f a

thic

knes

s of

less

th

an 3

mm

.P

ipes

& T

ub

esM

S 1

768:

2004

972

08 3

6 00

072

08 3

6 00

00-O

f a

thic

knes

s ex

ceed

ing

10m

m.

Pip

es &

Tu

bes

MS

176

8:20

04

Page 22: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

22

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

1072

08 3

7 00

072

08 3

7 00

00-O

f a

thic

knes

s of

4.7

5mm

or

mor

e b

ut

not

exc

eed

ing

10m

m.

Pip

es &

Tu

bes

MS

176

8:20

04

1172

08 3

8 00

072

08 3

8 00

00- O

f a

thic

knes

s of

3m

m o

r m

ore

bu

t le

ss t

han

4.7

5mm

.P

ipes

& T

ub

esM

S 1

768:

2004

Of

a t

hic

kn

ess

of

less

th

an

3m

m

1272

08 3

9 10

072

08 3

9 00

10-C

onta

inin

g b

y w

eig

ht

0.6%

or

mor

e of

car

bon

Mild

Ste

el S

trip

an

d

Sh

eet

MS

170

5:20

03

JIS

G31

31

1372

08 3

9 99

072

08 3

9 00

99-O

ther

Mild

Ste

el S

trip

an

d

Sh

eet

MS

170

5:20

03

JIS

G31

31

Of

thic

kn

ess

of

less

th

an

3 m

m:

1872

08 5

4 10

072

08 5

4 00

10 -C

onta

inin

g b

y w

eig

ht

0.6%

or

mor

e of

car

bon

Mild

Ste

el P

late

s,

Sh

eet

& S

trip

MS

170

5:20

03JI

S G

313

1

1972

08 5

4 99

072

08 5

4 00

99 -O

ther

Pla

tes,

Wid

e F

lats

, an

d W

ide

Str

ips

MS

172

1

Car

bon

Str

uct

ura

l S

teel

AS

TM

A36

Rol

led

Ste

el f

or

Gen

eral

str

uct

ure

JIS

G31

01

JIS

G31

06

Pip

es &

Tu

bes

MS

176

8:20

04 J

IS G

313

2

Str

uct

ura

l Ste

elM

S E

N 1

0025

:200

9

Sea

mle

ss P

ipe

AP

I 5L

Ste

el P

late

s, S

hee

ts

and

Str

ips.

JIS

G 3

113

Ste

el S

hee

ts, P

late

sJI

S G

311

6

Cor

rosi

on R

esis

tin

g

Rol

led

Ste

elJI

S G

312

5

Hot

-rol

led

Hig

h-

stre

ng

th S

teel

Sh

eets

JIS

G 3

134

Page 23: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

23

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

Str

uct

ura

l Ste

el f

or

Sh

ips

AS

TM

A13

1 A

ST

M A

242

AS

TM

A28

3 A

ST

M A

285

Car

bon

Str

uct

ura

l S

teel

AS

TM

A 3

6

Pre

ssu

re V

esse

l P

late

, Car

bon

Ste

el

Str

uct

ura

l Ste

el

AS

TM

A51

5 A

ST

M A

516

Str

uct

ura

l Ste

elM

S E

N 1

0025

:200

9

7209

Fla

t-ro

lled

pro

du

cts

of ir

on o

r n

on-a

lloy

stee

l, of

a w

idth

of

600m

m o

r m

ore,

col

d-r

olle

d (c

old

-red

uce

d),

not

cla

d, p

late

d

or c

oate

d.

In c

oils

, not

fu

rth

er w

orke

d t

han

col

d-r

olle

d (c

old

-red

uce

d):

2072

09 1

5 00

072

09 1

5 00

00 -O

f a

thic

knes

s of

3 m

m o

r m

ore

Ste

el S

hee

tM

S I

SO

357

4:20

09 (P

)

2172

09 1

6 00

072

09 1

6 00

00 -O

f a

thic

knes

s ex

ceed

ing

1 m

m b

ut

less

th

an 3

mm

MS

IS

O 4

997:

2009

(P)

2272

09 1

7 00

072

09 1

7 00

00 -O

f a

thic

knes

s of

0.5

mm

or

mor

e b

ut

not

exc

eed

ing

1 m

mM

S I

SO

138

87:2

009

(P)

Of

a t

hic

kn

ess

of

less

th

an

0.5

mm

:

2372

09 1

8 99

072

09 1

8 10

99 -O

ther

MS

IS

O 5

001:

2009

(P)

7209

18

9090

No

t in

co

ils,

no

t fu

rth

er w

ork

ed t

han

co

ld-r

oll

ed (

cold

-re

du

ced

):

2472

09 2

5 00

072

09 2

5 00

00 -

Of

a th

ickn

ess

of 3

mm

or

mor

eM

S I

SO

500

1 :2

009

(P)

2572

09 2

6 00

072

09 2

6 00

00 -

Of

a th

ickn

ess

exce

edin

g 1

mm

bu

t le

ss t

han

3 m

m

2672

09 2

7 00

072

09 2

7 00

00 -

Of

a th

ickn

ess

of 0

.5 m

m o

r m

ore

bu

t n

ot e

xcee

din

g 1

mm

Of

a t

hic

kn

ess

of

less

th

an

0.5

mm

:

2772

09 2

8 99

072

09 2

8 90

90 -

Oth

er

7210

Fla

t-ro

lled

pro

du

cts

of ir

on o

r n

on-a

lloy

stee

l, of

a w

idth

of

600m

m o

r m

ore,

cla

d, p

late

d o

r co

ated

.

Pla

ted

or

Coa

ted

wit

h t

in:

Ele

ctro

lyti

cally

pla

ted

or

coat

ed w

ith

zin

c

Page 24: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

24

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

2872

10 3

0 91

072

10 3

0 10

00 -1

.5m

m o

r le

ss in

th

ickn

ess

Ste

el S

hee

tM

S I

SO

500

2:20

09

2972

10 3

0 92

072

10 3

0 90

91 -M

ore

than

1.5

mm

bu

t le

ss t

han

3m

m in

th

ickn

ess

Co

rru

gate

d:

3072

10 4

1 91

072

10 4

1 10

9072

10 4

1 20

00 -1

.5m

m in

or

less

in t

hic

knes

sH

ot D

ip Z

inc

Coa

ted

S

hee

t an

d C

oil.

MS

606

3172

10 4

9 91

072

10 4

9 20

00 -1

.5m

m o

r le

ss in

th

ickn

ess

3272

10 4

9 99

072

10 4

9 10

9072

10 4

9 90

90 -O

ther

Pla

ted

or

Co

ate

d w

ith

alu

min

ium

-zin

c all

oys

: C

orr

ug

ate

d:

3372

10 6

1 21

072

10 6

1 10

10 -1

.5m

m o

r le

ss in

th

ickn

ess

Hot

Dip

Zin

c C

oate

d

Sh

eet

and

Coi

l.M

S 1

196:

2004

3472

10 6

1 22

072

10 6

1 90

12 -M

ore

than

1.5

mm

in t

hic

knes

s

3572

10 6

1 92

172

10 6

1 10

90 -1

.5m

m o

r le

ss in

th

ickn

ess

3672

10 6

1 92

272

10 6

1 90

99 -M

ore

than

1.5

mm

in t

hic

knes

s

3772

10 7

0 91

072

10 7

0 10

00 -1

.5m

m o

r le

ss in

th

ickn

ess

Hot

Dip

Zin

c C

oate

d

Ste

el S

hee

t an

d C

oil.

JIS

G 3

312

3872

10 7

0 92

072

10 7

0 90

20 -M

ore

than

1.5

mm

in t

hic

knes

sA

lum

iniu

m-z

inc

Allo

y-co

ated

Ste

el

Sh

eet

In C

oil.

JIS

G 3

322

7211

Fla

t-ro

lled

pro

du

cts

of ir

on o

r n

on-a

lloy

stee

l, of

a w

idth

of

less

th

an 6

00m

m, n

ot c

lad

, pla

ted

or

coat

ed.

3972

11 1

3 91

072

11 1

3 90

12 -U

niv

ersa

l pla

te.

Ste

el S

trip

an

d S

hee

tM

S 1

705:

2003

4072

11 1

3 92

172

11 1

3 10

90 -E

xcee

din

g 1

50m

m b

ut

not

exc

eed

ing

400

mm

in w

idth

Pip

es &

Tu

bes

MS

176

8:20

04

4172

11 1

3 92

972

11 1

3 90

22 -O

ther

4272

11 1

4 91

072

11 1

4 90

12 -U

niv

ersa

l pla

tes

4372

11 1

4 92

172

11 1

4 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

4472

11 1

4 92

272

11 1

4 10

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

4572

11 1

4 92

972

11 1

4 90

22 -O

ther

4672

11 1

4 93

072

11 1

4 93

0 -C

oils

for

re-

rolli

ng

SA

E J

403

:200

9

Page 25: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

25

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

4772

11 1

4 99

072

11 1

4 90

99 -O

ther

Ste

el S

trip

an

d S

hee

tM

S 1

705:

2003

4872

11 1

9 91

172

11 1

9 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

Pip

es &

Tu

bes

MS

176

8:20

04

4972

11 1

9 91

272

11 1

9 10

22 -E

xcee

din

g 1

50m

m, b

ut

not

exc

eed

ing

400

mm

in w

idth

5072

11 1

9 91

972

11 1

9 90

12 -O

ther

5172

11 1

9 92

072

11 1

9 90

30 -C

oils

for

re-

rolli

ng

5272

11 1

9 99

172

11 1

9 30

90 -

Of

a th

ickn

ess

of 0

.17

mm

or

less

5372

11 1

9 99

972

11 1

9 90

99 -O

ther

5472

11 2

3 11

072

11 2

3 20

10 -N

ot e

xcee

din

g 2

5mm

in w

idth

Ste

el S

trip

MS

IS

O 6

932:

2009

5572

11 2

3 12

072

11 2

3 20

20 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

5672

11 2

3 19

072

11 2

3 90

10 -O

ther

5772

11 2

3 91

072

11 2

3 30

00 -

Of

a th

ickn

ess

of 0

.17

mm

or

less

5872

11 2

3 99

072

11 2

3 90

90 -O

ther

5972

11 2

9 11

172

11 2

3 20

11 -N

ot e

xcee

din

g 2

5mm

in w

idth

Ste

el S

trip

MS

IS

O 4

960:

2009

6072

11 2

9 11

272

11 2

9 20

12 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

6172

11 2

9 11

972

11 2

9 90

11 -O

ther

6272

11 2

9 19

172

11 2

9 30

10 -

Of

a th

ickn

ess

of 0

.17

mm

or

less

6372

11 2

9 19

972

11 2

9 90

91 -O

ther

6472

11 2

9 21

172

11 2

9 20

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

6572

11 2

9 21

272

11 2

9 20

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

6672

11 2

9 21

972

11 2

9 90

12 -O

ther

6772

11 2

9 29

072

11 2

9 10

2072

11 2

9 30

2072

11 2

9 90

99

-Oth

er

7212

Fla

t-ro

lled

pro

du

cts

of ir

on o

r n

on-a

lloy

stee

l, of

a w

idth

of

less

th

an 6

00m

m, n

ot c

lad

, pla

ted

or

coat

ed.

6872

12 2

0 91

172

12 2

0 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

Ste

el S

hee

tM

S I

SO

500

2:20

09

6972

12 2

0 91

272

12 2

0 10

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

Page 26: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

26

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

7072

12 2

0 91

972

12 2

0 90

22 -O

ther

7172

12 2

0 99

172

12 2

0 20

00 -1

.5m

m o

r le

ss in

th

ickn

ess.

7272

12 2

0 99

972

12 2

0 90

99 -O

ther

7372

12 3

0 91

172

12 3

0 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

Hot

Dip

Zin

c C

oate

d

Sh

eet

In C

oil

MS

606

7472

12 3

0 91

272

12 3

0 10

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

7572

12 3

0 91

972

12 3

0 90

22 -O

ther

7672

12 3

0 99

172

12 3

0 20

00 -1

.5m

m o

r le

ss in

th

ickn

ess.

7772

12 3

0 99

972

12 3

0 90

99 -O

ther

7872

12 4

0 91

172

12 4

0 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

Hot

Dip

Zin

c C

oate

d

Ste

el S

hee

ts a

nd

Coi

lsJI

S G

3312

7972

12 4

0 91

272

12 4

0 10

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

8072

1240

919

7212

40

9022

-Oth

er

8172

12 4

0 99

172

12 4

0 20

00 -1

.5m

m o

r le

ss in

th

ickn

ess.

Alu

min

ium

-zin

c al

loy-

coa

ted

st

eel s

hee

t an

d c

oil.

JIS

G 3

322

8272

12 4

0 99

272

12 4

0 90

99 -M

ore

than

1.5

mm

in t

hic

knes

s.

8372

12 5

0 91

172

12 5

0 10

21 -N

ot e

xcee

din

g 2

5mm

in w

idth

Hot

Dip

Zin

c C

oate

d

Ste

el S

hee

ts a

nd

Coi

lsM

S 1

196

:200

4

8472

12 5

0 91

272

12 5

0 10

22 -E

xcee

din

g 2

5mm

, bu

t n

ot e

xcee

din

g 4

00m

m in

wid

th

8572

12 5

0 91

972

12 5

0 90

22 -O

ther

8672

12 5

0 99

172

12 5

0 20

00 -1

.5m

m o

r le

ss in

th

ickn

ess.

8772

12 5

0 99

272

12 5

0 90

99 -M

ore

than

1.5

mm

in t

hic

knes

s.

8872

13 1

0 00

072

13 1

0 00

00 -C

onta

inin

g in

den

tati

ons’

, rib

s, g

roov

es o

r ot

her

def

orm

atio

ns

pro

du

ces

du

rin

g t

he

rolli

ng

pro

cess

.H

ot R

olle

d S

teel

R

ein

forc

emen

t B

arM

S 1

46:2

006

8972

13 2

0 00

072

13 2

0 00

00 -O

ther

, of

free

cu

ttin

g s

teel

.F

ree

Cu

ttin

g S

teel

MS

149

5

9072

13 9

1 00

072

13 9

1 00

00 -O

f ci

rcu

lar

cros

s se

ctio

n m

easu

rin

g le

ss t

han

14m

m in

dia

met

er.

Ste

el W

ire

Rod

.M

S I

SO

161

20: P

art

1 &

2

9172

13 9

9 00

072

13 9

9 00

00 -O

ther

MS

IS

O 1

6120

: Par

t 3

Page 27: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

27

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

MS

IS

O 1

6120

: Par

t 4

7214

Oth

er b

ar a

nd

rod

s of

iron

or

non

-allo

y st

eel,

not

fu

rth

er w

orke

d t

han

for

ged

, hot

-rol

led

, hot

-dra

wn

or

hot

-ext

rud

ed, b

ut

incl

ud

ing

th

ose

twis

ted

aft

er r

ollin

g.

9272

14 1

0 11

072

14 1

0 21

00 -R

oun

dC

arb

on s

teel

for

st

ruct

ura

l mac

hin

e u

se

MS

224

7:20

09

9372

14 1

0 91

072

14 1

0 11

00 -R

oun

dH

ot R

olle

d S

teel

R

ein

forc

emen

t b

arM

S 1

46:2

006

9472

14 1

0 99

072

14 1

0 19

00 -O

ther

Car

bon

ste

el f

or

stru

ctu

ral m

ach

ine

use

MS

224

7:20

09

9572

14 2

0 11

072

14 2

0 21

00 -R

oun

dC

arb

on s

teel

for

st

ruct

ura

l mac

hin

e u

se

MS

224

6:20

09

9672

14 2

0 91

072

14 2

0 11

00 -R

oun

dH

ot R

olle

d S

teel

R

ein

forc

emen

t b

arM

S 1

46:2

006

9772

14 3

0 10

072

14 3

0 00

10 -R

oun

dF

ree

Cu

ttin

g S

teel

MS

149

5

9872

14 9

9 11

072

14 9

9 90

10 -R

oun

dC

arb

on s

teel

for

st

ruct

ura

l mac

hin

e u

se

MS

224

7:20

09

9972

14 9

9 91

072

14 9

9 90

21 -R

oun

dS

tru

ctu

ral S

teel

.M

S E

N 1

0025

:200

9 M

S 2

247:

2009

100

7215

10

100

7215

10

0010

-Rou

nd

Fre

e C

utt

ing

Ste

elM

S 1

495

101

7215

50

110

7215

50

9010

-Rou

nd

PC

Str

and

MS

113

8: p

art

1 -

4:

2007

102

7215

50

910

7215

50

9020

-Rou

nd

103

7215

50

100

7215

90

0010

-Rou

nd

Page 28: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

28

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

7216

An

gle

s, S

hap

e an

d s

ecti

ons

of ir

on o

r n

on-a

lloy

stee

l.

104

7216

10

100

7216

10

0010

-O

f a

thic

knes

s of

5m

m o

r le

ssS

tru

ctu

ral S

teel

&

Sh

eet

Pile

.M

S 1

490

105

7216

10

900

7216

10

0090

-Oth

erM

S 1

491

106

7216

21

900

7216

21

0090

-Oth

er

107

7216

22

100

7216

22

0010

-Oth

er

108

7216

22

900

7216

22

0090

-Oth

er

109

7216

31

100

7216

31

0010

-O

f a

thic

knes

s of

5m

m o

r le

ss

110

7216

31

900

7216

31

0090

-Oth

er

111

7216

32

100

7216

32

0010

-O

f a

thic

knes

s of

5m

m o

r le

ssS

tru

ctu

ral S

teel

&S

hee

t P

ile.

MS

149

0

112

7216

32

900

7216

32

0090

-Oth

erM

S 1

491

113

7216

33

100

7216

33

0010

-Con

tain

ing

by

wei

gh

t 0.

6% o

r m

ore

carb

on

114

7216

33

911

7216

33

0021

-Th

ickn

ess

of w

eb o

f 9m

m a

nd

ab

ove.

115

7216

33

919

7216

33

0022

-Oth

er

116

7216

40

100

7216

40

0010

-L S

ecti

on

117

7216

40

910

7216

40

0021

-O

f a

thic

knes

s of

5m

m o

r le

ss

118

7216

40

990

7216

40

0029

-Oth

er, T

sec

tion

119

7216

50

191

7216

50

9012

-Of

a h

eig

ht

of 8

0mm

or

mor

e.

120

7216

50

192

7216

50

1012

-Of

a h

eig

ht

of le

ss t

han

80m

m

121

7216

50

211

7216

50

10 2

1 -

Of

a th

ickn

ess

of 5

mm

or

less

122

7216

50

219

7216

50

1029

-Oth

er

123

7216

50

221

7216

50

9021

-O

f a

thic

knes

s of

5m

m o

r le

ss

124

7216

50

229

7216

50

9029

-Oth

er

125

7216

61

191

7216

61

0013

-Of

a h

eig

ht

of 8

0mm

or

mor

e.S

tru

ctu

ral S

teel

&

H P

ileM

S 2

259:

2009

Page 29: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

29

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

126

7216

61

192

7216

61

0014

-Of

a h

eig

ht

of le

ss t

han

80m

m

127

7216

61

211

7216

61

0021

-O

f a

thic

knes

s of

5m

m o

r le

ssS

tru

ctu

ral S

teel

&

H P

ileM

S 1

490

128

7216

61

219

7216

61

0029

-Oth

er, s

hap

es a

nd

sec

tion

s.M

S 1

491

129

7216

69

211

7216

69

0021

-O

f a

thic

knes

s of

5m

m o

r le

ss

130

7216

69

219

7216

69

0029

-Oth

er, s

hap

es a

nd

sec

tion

s.S

tru

ctu

ral S

teel

&

H P

ileM

S 2

259:

2009

7217

Wir

e of

iron

an

d n

on-a

lloy

stee

l.

131

7217

10

000

7217

10

1000

7217

10

2200

7217

10

2900

7217

10

3100

7217

10

3900

-N

ot p

late

d o

r co

ated

, wh

eth

er o

r n

ot p

olis

hed

.M

S 1

137

MS

144

132

7217

20

000

7217

20

1000

7217

20

2000

7217

20

9100

7217

20

9900

- P

late

d o

r co

ated

wit

h z

inc

MS

123

8

MS

123

9M

S 1

240

133

7217

30

000

7217

30

1000

7217

30

2000

7217

30

3100

7217

30

3900

-Pla

ted

or

coat

ed w

ith

oth

er b

ase

mat

eria

lM

S I

SO

166

50:2

009

134

7217

90

000

7217

90

0000

-Oth

erS

teel

Wir

e &

Fab

ric

AS

TM

A 9

33

7222

Oth

er b

ars

and

rod

s of

sta

inle

ss s

teel

: an

gle

s, s

hap

es a

nd

sec

tion

of

stai

nle

ss s

teel

.

135

7222

20

100

7222

20

1000

-Rou

nd

MS

224

0-2

136

7222

30

100

7222

30

1000

7228

Oth

er b

ars

and

rod

s of

allo

y st

eel:

ang

les,

sh

apes

an

d s

ecti

on o

f al

loy

stee

l; h

ollo

w d

rill

bar

s an

d r

ods,

of

allo

y or

non

-al

loy

stee

l.

137

7228

70

110

7228

70

0011

-Of

a h

eig

ht

of 8

0mm

or

mor

e.

138

7228

70

120

7228

70

0012

-Of

a th

ickn

ess

of 5

mm

or

less

139

7228

70

211

7228

70

0021

-O

f a

thic

knes

s of

5m

m o

r le

ssS

tru

ctu

ral S

teel

&

H P

ileM

S 1

491

MS

149

0

Page 30: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

30

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

7229

Wir

e of

oth

er a

lloy

stee

l.

140

7229

20

900

7229

20

0090

-Oth

erP

C S

tran

dM

S 1

138:

par

t 1

- 4:

20

07

7301

Wel

ded

an

gle

s, s

hap

es a

nd

sec

tion

s, o

f ir

on s

teel

or

stee

l.

141

7301

10

000

7301

10

0000

-Rai

lsS

hee

t P

ileM

S 2

025-

1 M

S20

25-2

142

7301

20

000

7301

20

0000

-An

gle

s, S

hap

es a

nd

sec

tion

s.S

tru

ctu

ral S

teel

&

H P

ileM

S 1

490

MS

149

1

7302

Rai

lway

or

tram

way

tra

ck c

onst

ruct

ion

mat

eria

l of

iron

or

stee

l

143

7302

10

000

7302

10

0000

-Rai

lsS

teel

Rai

lsB

S 1

1

144

7302

90

100

7302

90

1000

-Sle

eper

s (c

ross

-tie

s)A

S 1

085.

1 &

2

Lig

ht

Rai

lJI

S E

110

3

Cra

ne

Rai

lD

IN 5

36

7303

Tub

es, P

ipes

an

d h

ollo

w p

rofil

es o

f ca

st ir

on.

145

7303

00

000

7303

00

1000

7303

00

9000

-Tu

bes

, pip

es a

nd

hol

low

pro

files

of

cast

iron

.D

uct

ile ir

on p

ipes

, fit

tin

gs,

acc

esso

ries

.B

S E

N 5

45:2

006

BS

E

N 5

98:2

007

7304

Tub

es, P

ipes

an

d h

ollo

w p

rofil

es, s

eam

less

of

iron

(oth

er t

han

cas

t ir

on) o

r st

eel.

146

7304

11

000

7304

11

0000

-Of

stai

nle

ss s

teel

.B

oile

r, S

up

er h

eate

r,

& h

eat

exch

ang

er

tub

es

AS

TM

/SA

213

Con

den

ser

tub

eA

ST

M A

249

Sta

inle

ss s

teel

pip

eA

ST

M 3

12

AS

TM

A35

8

AS

TM

A37

6

AS

TM

A40

9

AS

TM

A81

3

147

7304

19

000

7304

19

0000

-Oth

erS

teel

Pip

eA

ST

M A

53

Sea

mle

ss P

ipe

AP

I 5L

Car

bon

Ste

el P

ipe

AS

TM

A10

6

Page 31: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

31

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

Ste

el P

ipe

AS

TM

A33

3

Car

bon

Ste

el P

ipe

AS

TM

A10

6

Ste

el B

oile

r &

AS

TM

A21

0

Su

per

hea

ter

Tub

es

148

7304

22

000

7304

22

0000

-Dri

ll p

ipe

of s

tain

less

ste

elB

oile

r, S

up

er h

eate

r,

& H

eat

exch

ang

erA

ST

M/S

A 2

13

149

7304

23

000

7304

23

0000

-Oth

er d

rill

pip

eTu

bes

150

7304

24

000

7304

24

0000

-Oth

er o

f st

ain

less

ste

elC

ond

ense

r Tu

bes

AS

TM

A24

9

151

7304

29

000

7304

29

0000

-Oth

erS

tain

less

Ste

el P

ipes

AS

TM

312

152

7304

31

100

7304

31

1010

7304

31

9010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

AS

TM

A35

8

153

7304

31

900

7304

31

1090

7304

31

9090

-Oth

erA

ST

M A

376

154

7304

39

100

7304

39

0010

- Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

AS

TM

A40

9

155

7304

39

900

7304

39

0090

-Oth

erA

ST

M A

813

156

7304

41

100

7304

41

0010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

Boi

ler,

Su

per

hea

ter,

&

Hea

t ex

chan

ger

Tub

es

AS

TM

/SA

213

157

7304

41

900

7304

41

0090

-Oth

erC

ond

ense

r Tu

bes

AS

TM

A24

9

158

7304

49

100

7304

49

0010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

Sta

inle

ss S

teel

Pip

esA

ST

M 3

12

159

7304

49

900

7304

49

0090

-Oth

erA

ST

M A

358

160

7304

51

100

7304

51

1010

7304

51

9010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

AS

TM

A37

6

161

7304

51

900

7304

51

1090

7304

51

9090

-Oth

erA

ST

M A

409

162

7304

59

100

7304

59

0010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

AS

TM

A81

3

163

7304

59

900

7304

59

0090

-Oth

er

164

7304

90

100

7304

90

0010

-Hig

h p

ress

ure

hyd

ro-e

lect

ric

con

du

its

Page 32: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

32

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

7305

Oth

er t

ub

es a

nd

pip

es (e

.g. w

eld

ed, r

ivet

ed o

r si

mila

rly

clos

ed) h

avin

g c

ircu

lar

cros

s-se

ctio

ns,

th

e ex

tern

al d

iam

eter

of

wh

ich

exc

eed

s 40

6.4m

m o

f ir

on a

nd

ste

el.

165

7305

11

000

7305

11

0000

-Lon

git

ud

inal

ly s

ub

mer

ged

arc

wel

ded

Tub

es a

nd

Pip

esM

S I

SO

318

3

166

7305

12

000

7305

12

0000

-Oth

er, l

ong

itu

din

ally

wel

ded

167

7305

19

000

7305

19

0000

-Oth

er

168

7305

20

000

7305

20

0000

-Cas

ing

of

a ki

nd

use

d in

dri

llin

g f

or o

il an

d g

asC

asin

g t

ub

esA

PI

5CT

169

7305

31

000

7305

31

1000

7305

31

9000

-Lon

git

ud

inal

ly w

eld

edB

oile

r, S

up

er h

eate

r &

H

eat

exch

ang

er t

ub

esS

tain

less

Ste

el P

ipes

AS

TM

/SA

213

AS

TM

312

AS

TM

A37

6A

ST

M A

333

AS

TM

A53

AS

TM

A13

5

170

7305

39

000

7305

39

0000

-Oth

erN

on-a

lloy

stee

l tu

be

and

fitt

ing

sM

S 1

968:

2007

171

7305

90

000

7305

90

0000

-Oth

erN

on-a

lloy

stee

l tu

be

and

fitt

ing

sM

S 1

968

MS

186

2

7306

Oth

er t

ub

es, h

ollo

w p

rofil

e an

d p

ipes

(e.g

. op

en s

eam

or

wel

ded

, riv

eted

or

sim

ilarl

y cl

osed

) of

iron

or

stee

l.

172

7306

11

000

7306

11

0000

-Wel

ded

of

stai

nle

ss s

teel

.S

eam

less

Pip

eA

PI

5L

173

7306

19

000

7306

19

0000

-Oth

erB

oile

r, S

up

er h

eate

r &

H

eat

exch

ang

er t

ub

esS

tain

less

Ste

el P

ipes

AS

TM

/SA

213

AS

TM

312

AS

TM

A37

6A

ST

M A

333

AS

TM

A53

AS

TM

A13

5

174

7306

21

000

7306

21

0000

-Wel

ded

of

stai

nle

ss s

teel

.S

tain

less

Ste

el P

ipes

MS

184

1

175

7305

30

000

7306

30

1000

7306

30

2000

7306

30

3000

7306

30

9000

-Oth

er, w

eld

ed o

f ci

rcu

lar

cros

s se

ctio

n o

f ir

on o

r n

on-a

lloy

stee

l.C

arb

on S

teel

Tu

bes

.

Wel

ded

Ste

el P

ipes

MS

186

2

MS

196

8M

S 8

63:2

004

Page 33: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

33

No

HS

CO

DE

AH

TN

CO

DE

PR

OD

UC

T D

ES

CR

IPT

ION

PR

OD

UC

T T

YP

ES

TAN

DA

RD

S

176

7306

40

000

7306

40

1000

7306

40

2000

7306

40

3000

7306

40

9000

-Oth

er, w

eld

ed o

f ci

rcu

lar

cros

s se

ctio

n o

f ir

on o

r n

on-a

lloy

stee

l.S

tain

less

Ste

el P

ipes

JIS

G34

59

AS

TM

312

SU

S 3

04S

US

316

SU

S 3

17S

US

321

177

7305

50

000

7306

50

1000

7306

50

9000

-Oth

er, w

eld

ed o

f ci

rcu

lar

cros

s se

ctio

n o

f ot

her

allo

y st

eel.

Car

bon

Ste

el T

ub

es.

MS

186

2

178

7306

61

000

7306

61

0000

-Of

squ

are

or r

ecta

ng

ula

r cr

oss-

sect

ion

179

7306

69

000

7306

69

0000

-Of

oth

er n

on c

ircu

lar

cros

s-se

ctio

n

180

7306

90

000

7306

90

1000

7306

90

9000

-Oth

erN

on-a

lloy

stee

l &

Tub

es &

fitt

ing

sM

S 1

968

MS

863

:200

4M

S 2

75

7308

Str

uct

ure

s (b

rid

ges

, tow

ers,

doo

rs s

caff

old

ing

), w

ind

ows,

181

7308

40

900

7308

40

1090

7308

40

9090

-Oth

erTu

be

for

scaf

fold

ing

MS

146

2

7312

Str

and

ed w

ire

rop

es, c

able

s, p

lait

ed, b

and

s, s

ling

s an

d t

he

like

of ir

on s

teel

not

ele

ctri

cally

insu

late

d.

182

7312

10

000

7312

10

1000

7312

10

2000

7312

10

4000

7312

10

9000

-Str

and

ed w

ire

rop

es a

nd

cab

les

Wir

e ro

pes

& w

ire

Str

and

, Wir

e ca

ble

.M

S I

SO

240

8M

S 5

51M

S 5

52M

S I

SO

434

4

183

7312

90

000

7312

90

0000

-Oth

erS

ing

le w

ire

for

wir

e S

tran

d, W

ire

cab

le.

BS

EN

134

14-1

BS

EN

134

14-2

BS

EN

134

14-3

7314

Clo

th (i

ncl

ud

ing

en

dle

ss b

and

s) g

rill,

net

tin

g a

nd

fen

cin

g e

xpen

ded

met

al o

f ir

on s

teel

.

184

7314

20

000

7314

20

0000

-Gri

ll, n

etti

ng

an

d f

enci

ng

, wel

ded

at

the

inte

rsec

tion

, of

wir

e w

ith

a

max

imu

m c

ross

-sec

tion

al d

imen

sion

of

3mm

or

mor

e an

d h

avin

g a

m

esh

siz

e of

siz

e 10

0cm

2 or

mor

e.

Ste

el f

abri

c, m

esh

for

fe

nci

ng

MS

145

185

7314

50

000

7314

50

0000

-Exp

end

ed m

etal

Ste

el G

rati

ng

BS

405

7325

Oth

er c

ast

arti

cles

of

iron

an

d s

teel

.

186

7325

10

100

7325

10

9010

-Man

hol

e co

vers

, gra

tin

gs

and

fra

mes

th

ereo

fM

anh

ole

Top

s &

gu

llyB

S E

N 1

24:1

994

187

7325

99

000

7325

99

9010

Page 34: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

34

List of Laboratories accredited by department of STANDARDS MALAYSIA www.standardsmalaysia.gov.my

NO. SAMM NO. LABORATORY NAME PRODUCT TESTED LABORATORY’S

CONDITION

1 003 CEMENT INDUSTRIES (SABAH) SDN BHD

Cement Conditionally available for public testing

2 016 PRIMA METAL INDUSTRIES SDN BHD, PERAK

Metal & metal products Normally not available to public testing

3 017 CONCRETE MATERIALS LABORATORY SDN. BHD

Cement & aggregate Available for public testing

4 038 ASSOCIATED PAN MALAYSIA CEMENT SDN BHD (RAWANG WORKS)

Cement Normally not available to public testing

5 059 ASSOCIATED PAN MALAYSIA CEMENT SDN BHD (KANTHAN WORKS)

Cement Normally not available for public testing

6 085 CIVIL AND CONSTRUCTION SECTION (CCST-TESTING GROUP)SIRIMQASINTERNATIONALSDN.BHD.

Cement, Metal & metallic products, ceramic tiles, Sanitary appliance, wire rope

Available for public testing

7 100 CMS CEMENT SDN BHD, Kuching Cement Conditionally available for public testing

8 104 TASEK CORPORATION BERHAD, Ipoh

Cement Normally not available for public testing

9 150 NSCI LABORATORYNEGERI SEMBILAN CEMENT INDUSTRIES, Kangar

Cement Normally not available for public testing

10 155 PERAK - HANJOONG SIMEN SDN. BHD.

Cement Normally not available for public testing

11 181 SOUTHERN CEMENT INDUSTRIES SDN BHD, PASIR GUDANG

Cement Normally not available for public testing

12 228 PERFECT CHANNEL SDN BHD, Gurun, Kedah

Steel bar, plate Normally not available for public testing

13 235 UTM, SKUDAI Concrete, metal Available for public testing

14 257 BS TESTING Cube concrete, hardener concrete

Available for public testing

15 259 PAHANG CEMENT Cement Normally not available for public testing

16 268 MALAYAN TESTING Cement Normally not available for public testing

17 289 SOUTHERN PC STEEL SDN BHD, Shah alam

Strand for Prestressed Concrete

Normally not available for public testing

Page 35: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

35

18 302 Ipoh Lab Sdn Bhd hardener concrete, metallic

Normally not available for public testing

19 313 JOINING TECHNOLOGY AND INSPECTION PROGRAMME , SIRIM BHD

Metal (NDT) Available for public testing

20 314 KUAD sDN bHD, pENANG Aggregates, premix Public Testing

21 PROFESSIONAL TESTING SERVICES SDN BHD, Johor Bahru

Metal & metal products

NO. SAMM NO. LABORATORY NAME PRODUCT TESTED LABORATORY’S

CONDITION

22 347 MATERIAL TESTING LABORATORIES,IKRAMQASERVICES SDN. BHD.

Concrete, Metal, Aggregate, Ceramic Tiles,QualityofVitreous China Sanitary Appliances, Vitreous China Water Closet Pans, WC Flushing Cistern and Flush Pipes

Available for Public Testing

23 373 TESTECH SDN. BHD. Hardened Concrete, Aggregates, Soil

Available for public testing

24 397 BS EN TEST SDN. BHD. Concrete Cube Available for public testing

25 408 SOIL INSTRUMENTS (M) SDN. BHD. Hardened Concrete, Soil

Normally not available for public testing

26 410 SLAG CEMENT (SOUTHERN) SDN. BHD.

Ordinary Portland Cement

Normally not available for public testing

27 429 MAKMAL UJIAN BAHAN BINAAN CIDB HOLDINGS SDN. BHD

CeramicTiles,Qualityof Vitreous China Sanitary Appliances, Vitreous China Water Closet Pans, WC Flushing Cistern

Available for Public Testing

List of Foreign Accreditation Bodies and Laboratories Accredited by department of STANDARDS MALAYSIA

1) Details of accreditation bodies located in manufacturing countries.

2) To enable tests to be made at the country of origin, here is a list of Construction Product test laboratories in largest exporting countries to Malaysia namely China, Japan and Korea.

NO COUNTRYOF ORIGIN

ACCREDITED BODY / ACCREDITED

AGENCYREMARKS

1. Indonesia KAN

tel: +62 21 574 7042/3fax: +62 21 5970 2948email: [email protected] site: http://www.bsn.or.idList of accredited facilities not available.

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

Page 36: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

36

NO COUNTRYOF ORIGIN

ACCREDITED BODY / ACCREDITED

AGENCYREMARKS

2. China CNAS

tel: +86 10 6599 4568 fax: +86 10 6599 4079 email: [email protected] site: http://www.cnas.org.cnList of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsShenzhenFutianConstructionEngineeringQualityTestingCenterEngineering Test Centre of China Railway Eryuan Engineering Group Co. Ltd.Materials Inspecting Institute of Shengli Oil-Field Branch SINOPEC Joint-Stock Company Ltd.Guangxi Hydropower Research InstituteTesting Center of the First Company of China Railway 23 Ju Group CorporationLaboratory of Gansu Building Materials Research & Design InstituteTechnology Center of Laboratory of Center of Shandong Nanshan Aluminum Co., LtdAolai Guoxin(Beijing) Engineer Material Detection Co., Ltd.Test Center of Xinyu Iron and Steel Co., Ltd.BeijingXinxingJianhengEngineeringQualityTestingCo.,LtdDiaojuntaiHamlet,QianshanTownQuianDistrictAnshanCity, Liaoning Province.Testing Centre Of Baotou Iron and Steel, Boatou, Inner Mongolia, PR China.

b) Steel Welded FabricTiada

c) Steel Frame ScaffoldingSupervising and Test Centre of Construction Machinery Quality,ShangdongProvincialAcademyofBuildingResearchXinjiangUygurAutonomousRegionProductQualitySupervision Testing InstituteFujianProvinceCenterforQualityTestofConstructionEngineering(QinHuangdao)Laboratory,Testing,LaboratoryofoilTubular Goods, Tubular Goods Research Centre of CNPC,No. 4 Beijingzhongdao RoadEconomic and Technoligical Development Zone (east zone)Qinhuangdao,Hebei,Chinad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

CERAMIC AND SANITARYWARESFoshanSupervisionTestingCentreofQualityandMetrology Guangdong Technical Supervision And Inspection

InspectionAndQuarantineComprehensiveTechnologyCentreOfFoshanEntry-ExitInspection&QuarantineBureau, State key Testing Laboratory of Building Ceramic and Sanitary wares.

Page 37: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

37

NO COUNTRYOF ORIGIN

ACCREDITED BODY / ACCREDITED

AGENCYREMARKS

3. Thailand DMSc

tel: +66 2 951 1278 fax: +66 2 951 1270email: [email protected] site: www.dmsc.moph.go.thList of accredited facilities not available.

*WebsitedalambahasaThai

DSS

tel: +66 2 201 7027 fax: +66 2 201 7201 email: [email protected] web site: www.dss.go.thList of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

NSC - ONAC (previously TLAS)

tel: +66 2 202 3327fax: +66 2 354 3133 email: [email protected] web site: www.tisi.go.th List of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

4. Vietnam BoA

tel: +84 4 791 1551; 791 1552fax: + 84 4 791 1551email: [email protected] site: www.boa.gov.vnList of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsVILAS 052; 061; 071; 077; 109; 111; 112; 114; 117; 118; 148; 156; 161; 173; 179; 181; 184; 189; 254; b) Steel Welded FabricVILAS 052; 148; 173; 181; 184; c) Steel Frame ScaffoldingVILAS 052; 061; 071; 077; 109; 111; 112; 114; 117; 118; 148; 156; 161; 173; 179; 181; 184; 189; 254;d) Wire ropes for liftsVILAS 052; 077; 109; 111; 112; 114; 117; 118; 148; 156; 161; 173; 179; 181; 184; 189; 254;e) Angles, shape and sections VILAS 077; 148; 184

5. Filipina PAO

tel: +63 2 751 4707; 63 2 751 3127 fax: +63 2 751 4706 email: [email protected] site: http://www.bps.dti.gov.phList of accredited facilities not available.

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

Page 38: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

38

NO COUNTRYOF ORIGIN

ACCREDITED BODY / ACCREDITED

AGENCYREMARKS

6. Jepun JAB

tel: +81 3 3442 1210 fax: +81 3 5475-2780 email: [email protected] site: http://www.jab.or.jp

List of accredited facilities (Testing, Calibration, Medical)List of accredited facilities (Inspection)

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsAccreditation no:RTL00020RTL00050RTL00070RTL00090RTL00100RTL00110RTL00120RTL00130RTL00150RTL00170RTL00180RTL00190RTL00200RTL00640

b) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

IAJapan

tel: +81 3 3481 1939fax: +81 3 3481 1937email: [email protected]: http://www.nite.go.jp/asse/iajapan/List of accredited facilities (JCSS)List of accredited facilitiies (JNLA) List of accredited facilities (ASNITE)

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

VLAC

tel: +81 3 3568 2152fax: +81 3 3568 2153email: [email protected] site: http://www.vlac.co.jpList of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

Page 39: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

39

NO COUNTRYOF ORIGIN

ACCREDITED BODY / ACCREDITED

AGENCYREMARKS

7 Taiwan(Chinese Taipei)

TAF tel: +886 3 572 3316 fax: +886 3 572 6308 email: [email protected] web site: http://www.taftw.org.tw List of accredited facilities not available.

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

8 Hong Kong HKAS

tel: +852 2829 4813 fax: +852 2824 1302email: [email protected] web site: http://www.itc.gov.hk/hkas List of accredited facilities (Testing, Calibration, Medical) List of accredited facilities (Inspection)

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

9 Singapore SAC

tel: +65 6279 1847fax: +65 6272 1937email: [email protected] site: http://www.sac-accreditation.gov.sgList of accredited facilities (Testing)List of accredited facilities (Inspection)

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsb) Steel Welded Fabricc) Steel Frame Scaffoldingd) Wire ropes for liftse) Angles, shape and sections

SETSCO Services Pte LtdTUV-SUD PSB Pte LtdProfessional Testing Services Pte LtdCAST Laboratories Pte LtdCPG Laboratories Pte Ltd

10 Korea KOLAS tel: +82 2 507 7649 fax: +82 2 507 6875 email: [email protected] web site: http://kolas.kats.go.kr List of accredited facilities

IRON AND STEEL PRODUCTS

a) Wire rods and steels barsTiadab) Steel Welded FabricTiadac) Steel Frame ScaffoldingTiadad) Wire ropes for liftsTiadae) Angles, shape and sections Tiada

Page 40: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Issu

an

ce o

f C

OA

fo

r Im

po

rted

Co

nst

ruct

ion

Pro

du

cts

PR

OD

UC

TC

ON

FO

RM

ITY

TO

MS

AR

RA

NG

E F

OR

SA

MP

LIN

GF

UL

L T

YP

E T

ES

T*

PC

AP

PO

INT

CB

FO

RE

IGN

CB

IAF

/ A

PC

ML

A

SU

BM

IT C

BIN

FO

TO

CID

B

Pri

or

to A

pp

oin

tmen

t

Lo

ng

Ter

mS

ho

rt T

erm

OB

JEC

TIV

E :

To

en

forc

e co

nfo

rmit

y to

MS

on

imp

ort

ed c

on

stru

ctio

n p

rod

uct

s.C

ON

DIT

ION

: S

atis

fact

ory

ob

ject

ive

evid

ence

on

co

nfo

rmit

y o

f p

rod

uct

s to

MS

.

* P

rod

uct

Cer

tifi

cati

on

= C

erti

fica

te o

f C

on

form

ity

= P

rod

uct

Lic

ense

• C

olle

ct e

vid

ence

• O

ne

tim

e o

nly

fo

r

sam

e p

rod

uct

&

Fac

tory

• Te

stin

g S

cop

e (p

rod

uct

)•

Test

ing

Met

ho

d (

MS

)

• A

t P

ort

• A

t P

ort

• A

t F

acto

ry

Mar

kin

g t

o M

MS

Mar

kin

g t

o M

MS

• C

olle

ct e

vid

ence

• O

ne

tim

e o

nly

fo

r

sam

e p

rod

uct

&

Fac

tory

Mar

kin

g t

o M

SCO

NF

IRM

AT

ION

BY

CID

B

CO

ND

UC

TA

SS

ES

ME

NT

ISS

UE

PC

BY

CID

B

SU

BM

ITA

PP

LIC

AT

ION

CO

PY

PC

TO

CID

B

AR

RA

NG

EFA

CT

OR

Y V

ISIT

FO

R C

IDB

SU

BM

IT C

OP

Y P

CT

O C

IDB

PH

YS

ICA

LIN

SP

EC

TIO

N A

TP

OR

T E

NT

RY

LO

CA

L C

B

PC

FO

RE

IGN

CO

MF

IRM

AT

ION

BY

CID

B

CO

ND

UC

TA

SS

EM

EN

T

ISS

UE

PC

AR

RA

NG

E F

AC

TO

RY

VIS

IT F

OR

CID

B

SU

NM

IT A

PP

LYA

CT

ION

CO

PY

TO

CID

B

PH

SY

SIC

AL

INS

PE

CT

ION

AT

PO

RT

EN

TR

Y

PC

LO

CA

L

FO

RE

IGN

LA

BA

PL

AC

/IL

AC

) M

RA

SE

LE

CT

LA

BC

OL

LE

CT

SA

MP

LE

1 *

VE

RIF

ICA

TIO

N /

SA

MP

LIN

G

SU

BM

IT T

O C

IDB

FO

RC

OM

FIR

MA

TIO

N

CO

LL

EC

T S

AM

PL

EA

T F

AC

TO

RY

CO

ND

UC

T L

AB

TE

ST

SU

BM

IT F

TR

TO

CID

B

CE

RT

ICA

L T

ES

TF

OR

PR

OD

UC

T

PH

YS

ICA

LIN

SP

EC

TIO

N A

TP

OR

T

LA

B

LO

CA

L L

AB

(SA

MM

)

CO

ND

UC

T L

AB

TE

ST

CO

ND

UC

T L

AB

TE

ST

CO

MF

IRM

AT

ION

BY

CID

B

AR

RA

NG

E F

OR

SA

MP

LIN

G

ISS

UE

FT

TR

SU

BM

IT F

TT

RT

O C

IDB

ISS

UE

FT

TR

SU

BM

IT F

TT

RT

O C

IDB

SU

BM

IT F

TT

RT

O C

IDB

PH

YS

ICA

LIN

SP

EC

TIO

N A

TP

OR

T

UP

K –

2U

PK

– 3

LO

CA

L L

AB

(SA

MM

)

2n

d V

ER

IFIC

AT

ION

AN

D P

HY

SIC

AL

INS

PE

CT

ION

AT

PO

RT

CID

B

SU

BM

IT C

BIN

FO

TO

CID

B

CO

LL

EC

T S

AM

PL

E /

EV

IDE

NC

E A

TFA

CT

OR

Y /

WA

RE

HO

US

E

CE

RT

ICA

L T

ES

TF

OR

PR

OD

UC

T W

ITH

NO

MA

RK

ING

Exp

: C

emen

t

CO

ND

UC

T L

AB

TE

ST

ISS

UE

FT

TR

PH

YS

ICA

LIN

SP

EC

TIO

N A

TP

OR

T

SE

LF

RE

GU

LA

TO

RY

BY

CL

IEN

T

SU

BM

IT I

NF

O O

NC

ON

SU

LTA

NT

/3

rd P

AR

TY

INS

PE

CT

ION

AR

RA

NG

E F

OR

JOIN

T I

NS

PE

CT

ION

WIT

H C

IDB

CO

ND

UC

T J

OIN

TIN

SP

EC

TIO

N

SU

BM

IT R

EP

OR

TB

Y 3

rd

PA

RT

Y I

NS

PE

CT

ION

ISS

UE

CO

A

PH

SY

SIC

AL

INS

PE

CT

ION

AT

PO

RT

EN

TR

Y

UP

K –

1N

ote

fo

r U

PK

2 M

eth

od

s

1.

UP

K F

TR

is v

alid

fo

r 6

mo

nth

2.

FT

TR

Im

prt

atio

n p

rod

uct

va

lid f

or

3 m

on

th

ISS

UE

FT

R

UP

K F

OR

EIG

NU

PK

LO

CA

LU

PK

V2

Page 41: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

41

REFERENCES

i. Perintah Kastam (Larangan Mengenai Import) 1998 Pindaan 2003/2004.

ii. Guidelines on SIRIM QAS Product Certification that are described in SIRIM QAS

documentreference‘SQAS-PCS/PRO/01’canbeobtaineddirectlyfromSIRIMQAS

iii. Guidelines on SIRIM QAS Consignment Sampling and Testing Services that are

describedinSIRIMQASdocumentreference‘SQAS-CST/PRO/01’canbeobtained

directlyfromSIRIMQAS.

iv. Guidelines on IKRAM QA Product Certification that are described in reference

‘IKRAMQA-AP-1’canbeobtaineddirectlyfromIKRAMQA.

v. Guidelines on IKRAM QA Consignment Sampling and Testing Services that are

described in IKRAM QA document reference ‘IKRAM QA-AP-1’ can be obtained

directlyfromIKRAMQA.

vi. Buku Keperluan Dan Panduan Mengimport Bahan Binaan (Kulit Hijau)

Page 42: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

42

This page intentionally left blank

Page 43: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

rials Im

po

rt Pro

ce

du

res

43

This page intentionally left blank

Page 44: Importation Procedure for Construction Materials Procedure for Construction Materials Third ... with the enforcement of the Malaysian Standard mandated on the importation of ... MS,

Bu

ildin

g M

ate

ria

ls I

mp

ort

Pro

ce

du

res

44

This page intentionally left blank