improvement programme techniques

22
Improvement Programme Techniques

Upload: felicia-clay

Post on 03-Jan-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Improvement Programme Techniques. Content. Context KPIs and Managing risk Understanding your cost base VfM Quick Benchmarking Lean and Rapid Process Design Timetabling and Space Management Options for Service Delivery. Context. Which University KPIs are you supporting? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Improvement Programme Techniques

Improvement ProgrammeTechniques

Page 2: Improvement Programme Techniques

Content

Context

KPIs and Managing risk

Understanding your cost base

VfM

Quick Benchmarking

Lean and Rapid Process Design

Timetabling and Space Management

Options for Service Delivery

Page 3: Improvement Programme Techniques

Context

Which University KPIs are you supporting?

What are your PIs and how are you performing?

What are your strategic risks?

What do your services cost?

How good are customer satisfaction levels?

Page 4: Improvement Programme Techniques

KPIs and managing risk

Include KPIs into corporate dashboards

Link KPIs to the risk register; this helps ensure an overall view of VFM and the impact of failure cover areas not explicitly mentioned in the Corporate Plan assists individuals in their decision making and prioritisation.

Page 5: Improvement Programme Techniques

Risk awareness and mitigation

Strategic Risk Source: Business Case

Impact on Registry and Student Services

Implication for New Structure and Activities

Diversity in income Need to support income generating activities in appropriate areas in the centre and in academic areas

1. Market intelligence capacity required

2. Investment in Research opportunity sourcing required

3. Institutional CRM strategy required4. Support needed for Deans/HODs,

development of strategic plans

Diversity in student recruitment: study and domicile

Need to support a diverse student body which will require different skill mixes and resources

1. Planning/coordination in Recruitment and Admissions initiatives required

2. Good Market intelligence is required; specialist capability will need to be deployed centrally

3. Support needed for overseas students and WP

4. Need to complement new Internationalisation Strategy

Page 6: Improvement Programme Techniques

Understanding your cost base

Methodology

ABC-type methodology Payroll report – ALL university staff Dept, name, employee no, grade, FTE Separate staff between academic and support Allocate support staff FTE across activities Add payroll costs – employee no key Prepare management reports

Page 7: Improvement Programme Techniques

Template

1. Recruit/

Admissions 2. Records/ Registration

3. Assess/ Progress 4. Welfare 5. Finance 6. HR 7. Estates

8. IT/Library 9 - 14. Etc

15. Misc/ Other

Total Support

Faculty 1 xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Business School xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Politics xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Law xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Economics xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Faculty Office xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx

Faculty 2 xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Biological Sciences xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Chemistry xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Mathematics xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Physics xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Faculty Office xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx

Central Administration xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx HR xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Finance xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx IT xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Estates xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Central Secretariat xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx Etc xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx

UNIVERSITY TOTAL xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx

Page 8: Improvement Programme Techniques

FTE/Cost Support Activity by Location

Page 9: Improvement Programme Techniques

Opportunities Identified

Current Spend

Potential Savings

% of Activity

Comment

1. IT/Library 23.5 - N/a Out of scope 2. Management

and support 22.2 2.8 13% 20% reduction in non-

management support staff 3. Misc Other 15.7 - 0% Check vs robust Business Plans 4. Estates 15.1 0.8 5% 5% cost saving; Space Planning 5. Research Support 6.9 0.9 13% DeptX normalised to DeptY level 6. Finance 6.2 0.3 5% Merge with Research Support 7. Prog. Support 4.5 0.8 18% DeptX normalised to Faculty avg 8. Recruit/Admit 3.4 1.0 29% Scope for centralisation 9. HR 2.9 - 0% 10. Assess/Progress 2.3 - 0% 11. Marketing 2.3 0.4 17% DeptX normalised to Faculty avg 12. Careers/Alumni 1.9 - 0% 13. Welfare 1.6 - 0% Alternative service delivery 14. Records 1.1 0.2 18% Faculty normalised to other Facs 15. T&D 1.0 - 0% Increase levels of expenditure 16. Procurement 0.9 - 0% TOTAL £mn 111.5 7.3 7%

Page 10: Improvement Programme Techniques

VfM

activity 01

activity 02

activity 03

activity 04

activity 05

activity 06

activity 07 activity 08

This example is for a professional services: an example for academic department should look very different!

Contribution to Objectives

Positive

0

Negative

Contribution GridCost Income0

Financial Contribution

Mission Strategy Reputation

INCREASE

INCREASE

CONTINUE

START

REDUCE

CONTINUE

STOP REDUCE

This example is for a professional services: an example for academic department should look very different!

Mission Strategy Reputation

0

Negative

Contribution GridFinancial Contribution

Cost 0 Income

Positive

Contribution to Objectives

Page 11: Improvement Programme Techniques

VfM - Resource and Satisfaction Grids

FUNCTION [1 ... n]Must Should Could Would

FTE £ FTE £ FTE £ FTE £Direct

activity 1                

activity 2                

activity 3                

activity 4                

activity 5                

activity 6                Indirect

activity 7                

activity 8                

activity 9                

activity 10                

activity 11                

activity 12                Management

activity 13                

activity 14                

activity 15                

activity 16                

activity 17                

activity 18                Compliance

activity 19                

activity 20                

activity 21                

activity 22                

activity 23                

activity 24                

FUNCTION [1 ... n]

Must Should Could Would

Satisfaction Satisfaction Satisfaction SatisfactionDirect

activity 1                

activity 2                

activity 3                

activity 4                

activity 5                

activity 6                Indirect

activity 7                

activity 8                

activity 9                

activity 10                

activity 11                

activity 12                Management

activity 13                

activity 14                

activity 15                

activity 16                

activity 17                

activity 18                Compliance

activity 19                

activity 20                

activity 21                

activity 22                

activity 23                

activity 24                

Page 12: Improvement Programme Techniques

Quick Benchmarking

Page 13: Improvement Programme Techniques

Identify Customers & Specify Value

Identify & Mapthe

Value Stream

Create Flow by Eliminating Waste

Respondto

Customer Pull

PursuePerfection

MaximiseThe

Value

What is Lean?

Page 14: Improvement Programme Techniques

Elements of the Lean Project

Strategy

End-to-End

ContinuousImprovement

Vision

Alignment

Prioritisation

Measures

Action Plans

Current StateFuture StateImplementation Plans

Specific Problem

Limited Area

University

OSHEU

HUMRS

PLANN

Purchase to PayCourse Approval

Research Funding

INTER

RACDV

Payroll

Page 15: Improvement Programme Techniques

Process Review

Structured and managed framework

Participative or consultant led PR

Organisation, policy, resources

Approach documentation and ‘Toolkit’

Assist with planning for implementation

Complement internal offering

Guide change management.

Pointing to good practice

Challenging by benchmark

Additional flexible resource

Honest broker

Page 16: Improvement Programme Techniques

Rapid Process Design

Current

University of Bath: Programme Lifecycle – Approval Process: Stage 2 Full 2.4

Oth

er a

nd E

xter

nal

Uni

vers

ityLT

EO

/SR

EO

Fac

ulty

Aca

dem

ic D

epar

tmen

t

Version: 1.0 Final Author: Agnes Gibson & Jack KenwardDate: 08 December 2009 Source: QA3 Approval of New Programmes of Study

© 2009 SUMS & University of Bath

No

Yes: To InitialApproval (Renewal)

From 7.5.1

7.5.2>18m since

initial approval? Yes

No No No

Yes Yes

No

Yes

To7.11.1

7.6.4Consistent with initial approval?

7.6.1Consider for full

approval(Faculty)

FT&QCMinute

7.6.2Fits with

AcademicFramework?

FT&QC

7.7.2Submit to Each

Relevant Faculty T&QC

7.7.1Cross

Faculty?

7.6.3Consistent

with Code of Practice?

Programme Proposal

(full accepted: FT&QC)

7.5.3Submit to Faculty

T&QC

(any exemptions approved by QAC)

(any variations set out and justified)

7.8.1Set Up

Programme Approval Panel

FEA

Page 17: Improvement Programme Techniques

Rapid Process Design: Action Plan

Ref Cur

Action Tim

Scale Revised Priority / Status

Summary Benefit / Opportunity Summary Additional Cost / Risk

Board Decision Implementation Owner Resources Required Progress 1 [Date] Progress 2 [Date]

28Manage and monitor Points Based Immigration S

hoMedium

High Mandatory. Retain licence to recruit international students.

To be determined. Director SRS

4Improve source information for recruitment targets. Formalise process and timetable with

MeSmall

High Recruitment impact. Realistic targets based on market research and SOAS capacity.

Extension of UNIT-e. Head of Admissions and Recruitment

7Improve conversion of existing students to further study. Develop and implement strategy.

ShSmall

High Recruitment impact. Increased continuation rates. Internal advertising and extra events.

Head of Admissions and Recruitment

29Monitor planned PGT application fees. Identify decision point in calendar for any policy reversal.

ShSmall

High Recruitment impact. Quickly identify any negative impact on student numbers.

None. Head of Admissions and Recruitment

3Develop communication plan for applicants M

edi

MediumHigh Efficiency and student experience.Consistent

communication for all applicants.Plan development an correspondence review.

Head of Admissions and Recruitment

8Route and follow-up significant enquiries M

eMedium

High Efficiency and student experience. Appropriate and timely responses. MI available for enquiry reason

Extension of UNIT-e. Head of Admissions and Recruitment

9Redesign on-line PGT and PGR application forms M

eMedium

High Efficiency and student experience. Reduced supplementary information. Validation rules

Extension of UNIT-e. Director SRS

11Scan and store supplementary information on paper with application forms

MedMedium

High Efficiency. Immediate availability of information, reduced risk of loss.

Extension of UNIT-e, extra storage, scanning software.

Head of Admissions and Recruitment

20Maintain automatic post-offer contact M

edMedium

High Efficiency and student experience. Keep applicant engaged.

Extension of UNIT-e. Head of Admissions and Recruitment

32Transfer PGT admissions to Recruitment & Admissions

ShMedium

High Efficiency and student experience. Improve consistency and reduce Faculty effort.

None. Head of Admissions and Recruitment

18Support interviews only for PGR and non-standard PGT or UG

ShLarge

High Efficiency and student experience. Reduced effort in interview. Focus on appropriate applicants.

None. Head of Admissions and Recruitment

30Establish performance indicators S

hMedium

High Effective management. Demonstrate improved performance or identify areas for improvement.

None. Director SRS

15Admissions Tutors access UG UCAS application forms online

ShoMedium

Medium Immediate availability of application forms. Controlled distribution and access.

Extension of UNIT-e. Head of Admissions and Recruitment

2Route, monitor and action applications online L

oLarge

Low - due to cost implications

Processes to progress smoothly and actions to be timely.

Extension of UNIT-e. Director SRS

12Store supplementary information from e-mail with application forms

LonMedium

Low - due to cost implications

Immediate availability of information. Extension of UNIT-e. Head of Admissions and Recruitment

19Issue offer packs online M

eMedium

Low Ease of access. Reduced printing costs. Extension of UNIT-e. Director SRS

21Redesign Orientation Handbook - part postal distribution, most online

LoSmall

Low Applicants will get key information. Extension of UNIT-e. Director SRS

26Submit Digital Photos in advance of attendance L

oSmall

Low Timely production of ID/Library Cards. Part cost of School Identity database.

Director SRS

5Market SOAS brand and distinctive programmes L

oMedium

In progress. Increased awareness of SOAS - recruitment tool. None. Head of Admissions and Recruitment

10Online application for PGT and PGR M

eMedium

In progress Immediate access for applicants. Automatic validation of completeness.

Extension of UNIT-e. Head of Admissions and Recruitment

33Review organisational structures within Recruitment & Admissions and Registry

MeMedium

With EB. Consistent applicant-facing and Faculty-facing processes.

None. Director SRS

6Create web-designed publications S

hLarge

In progress for 2011 Immediate access to information by applicants. Focus on target growth areas.

Web design, Content and Document Management.

Head of Admissions and Recruitment

13Automatic chase up and online entry of references S

hLarge

In progress Reduced workload seeking and chasing references. Extension of UNIT-e. Head of Admissions and Recruitment

14Enable applicants to track the progress of their applications and view offers. Can currently view event log. Needs further enhancing.

ShoMedium

In-progress - partially supported.

Meets applicants expectations. Reduce enquiries. Extension of UNIT-e. Head of Admissions and Recruitment

16Admissions Tutors access PGT and PGR applications forms online

MeLarge

In progress Immediate availability of application forms. Controlled distribution and access.

Extension of UNIT-e. Head of Admissions and Recruitment

17Redefine the priority of English Language Assessments

ShLarge

In-progress Not rejecting good academic applicants. None. Head of Admissions and Recruitment

22Pre-sign-up for courses online, before attendance M

eMedium

In-progress - still require physical

Early confirmation of timetabling. Extension of UNIT-e. Head of Registry

23Pay fees online and online student account S

hLarge

In progress Ensure students have paid before starting course.Reduced queuing at sign-up.

Extension of UNIT-e and Agresso.

Director SRS

24

Pre-register to programme and pre-enrol tosession online, before attendance. Will stillrequire physical attendance.

Medi

Medium

In-progress Early identification of potential no-shows. Reducedqueuing at sign-up.

Extension of UNIT-e. Head of Registry

25Consider reducing course options for Year One students

MeLarge

In progress Reduced complexity of course management and timetabling.

None. Head of Registry

31Renegotiate contracts with accommodation agencies

LoLarge

In progress Control allocation of accommodation as recruitment tool.

None. Director SRS

27Automatically notify all other School information systems of student ID

MeLarge

Not owned by Student & Registry Services

Quick access to service prior to and on arrival. Part cost of School Identity database.

Director SRS

1Restructure Website to support on-line processes S

hoLarge

Not owned by Student & Registry Services

Consistent source of information. Increased access to more information. Decreased enquiry time.

Web design, Content and Document Management.

Head of Admissions and Recruitment (pilot) / Director SRS

School of Oriental and African Studies, Process Change: Team 2 Student Recruitment, Admissions and Registration, Appendix C Action Plan

Page 18: Improvement Programme Techniques

Timetabling

POLICYCONSTRAINTS

TIMETABLINGROOM

ALLOCATION

CALENDAR SYSTEMS

DATAENTRY

PR

OC

ES

SE

NA

BL

ER

SP

LA

NN

ING

PUBLISHING

STUDENT CHOICE

SPACECONSTRAINTS

ORGANISATION

Page 19: Improvement Programme Techniques

Timetabling and Space Planning

POLICY CONSTRAINTSContact hrs

Length of teaching dayClass size

etc

POLICY CONSTRAINTSContact hrs

Length of teaching dayClass size

etc

CORPORATE PLANStudent nos. Programmes

CORPORATE PLANStudent nos. Programmes

Required capacity * best utilisation

Required capacity * best utilisation

GAP

FINANCIAL FORECASTFINANCIAL FORECAST

OPTIONS APPRAISAL

ESTATES STRATEGYESTATES STRATEGYTIMETABLINGTIMETABLING

Actual capacity

* actual utilisation

Actual capacity

* actual utilisation

Page 20: Improvement Programme Techniques

Communication strategy engaging stakeholders

SUMS with HEI HEI

Options for Service Delivery

Page 21: Improvement Programme Techniques

Position of HEI

1 Strategy

22.1

2.2

2.4

2.5

2.6

ProcessTransaction volume

In-house specialism

Specific to HEI

Service standards

Costs by c/f to benchmark

high

Sufficient/sustainableunique

high

higher

medium

struggling

distinct featuresadequate

in-line

low

Inadequate/unsustainablecommon

poor

lower

3 Systems

4 Skills

5 Context

Assessment

Page 22: Improvement Programme Techniques

Contacts

Bernarde Hyde

[email protected]

0118 935 7073