improving international connectivity to help access to telecommunications in central asia
DESCRIPTION
Caspian Telecom. Improving International Connectivity to Help Access to Telecommunications in Central Asia. Eshmambet Amatov Executive Director for Strategic Development Kyrgyz Telecom OJSC. Istanbul, 28-29 April 2010. - PowerPoint PPT PresentationTRANSCRIPT
Improving International Improving International Connectivity to Help Access to Connectivity to Help Access to Telecommunications in Central Telecommunications in Central
AsiaAsia
Eshmambet AmatovExecutive Director for Strategic Development
Kyrgyz Telecom OJSC
Eshmambet AmatovExecutive Director for Strategic Development
Kyrgyz Telecom OJSC
Istanbul, 28-29 April 2010 Istanbul, 28-29 April 2010
Caspian TelecomCaspian Telecom
Specifics of the development of transmission Specifics of the development of transmission networks in the Kyrgyz Republicnetworks in the Kyrgyz Republic
Perspectives of provisioning transit services in Perspectives of provisioning transit services in Central Asia over international FO backbonesCentral Asia over international FO backbones
Current KT’s Network Development OutlinesCurrent KT’s Network Development OutlinesYear 2009 can be marked by extensive scope and intensiveness of Year 2009 can be marked by extensive scope and intensiveness of Kyrgyztelecom network modernization and development project works due Kyrgyztelecom network modernization and development project works due to completion of almost all functionally distinguishable stages of currently to completion of almost all functionally distinguishable stages of currently being implemented company’s projects such as: being implemented company’s projects such as: Finalization of the base stage of CDMA-450 wireless access network Finalization of the base stage of CDMA-450 wireless access network
building project and preparation to the stage of reconfiguration, building project and preparation to the stage of reconfiguration, expansion and optimization of the networkexpansion and optimization of the network
Completion of most of works on building “Regional microwave Completion of most of works on building “Regional microwave network”, and following to network optimization stage – extension of network”, and following to network optimization stage – extension of MWS network and expansion of microwave network capacitiesMWS network and expansion of microwave network capacities
Completion of Digital Horizon telecommunication project’s “Bishkek” Completion of Digital Horizon telecommunication project’s “Bishkek” phase and redistribution of and moving project resources to the project phase and redistribution of and moving project resources to the project phase named “Regional networks”phase named “Regional networks”
Completion of the trial DVB-T broadcasting network in Batken region;Completion of the trial DVB-T broadcasting network in Batken region;
Most of all newly built FO cable systems just were put in operation, or Most of all newly built FO cable systems just were put in operation, or are in theirare in their final stage like cabling of internationally significant “Osh-final stage like cabling of internationally significant “Osh-Irgeshtam” FO link segment, or starting project works on building of a Irgeshtam” FO link segment, or starting project works on building of a strategically important FO backbone between North and South of the strategically important FO backbone between North and South of the Kyrgyz RepublicKyrgyz Republic
Specifics of the development of transmission Specifics of the development of transmission networks in the Kyrgyz Republicnetworks in the Kyrgyz Republic
Development of Microwave Communications in Development of Microwave Communications in the Kyrgyz Republic in mid 90-sthe Kyrgyz Republic in mid 90-s
Transmission systems in the KR are Transmission systems in the KR are mostly consisted of the microwave mostly consisted of the microwave networks. From the beginning of its networks. From the beginning of its history wireless communication was history wireless communication was considered to be the most attractive due considered to be the most attractive due to the landscape. The microwave network to the landscape. The microwave network has more than 65 years history beginning has more than 65 years history beginning after Second World War. First digitalization after Second World War. First digitalization took place in mid 90-s consisting today of took place in mid 90-s consisting today of 76 microwave stations. 76 microwave stations.
22ndnd and 3 and 3rdrd run modernization of the MWS run modernization of the MWS networknetwork
Quad STM-1Year 2009
Double STM-1Year 2004
OSN3500 flex cross-connectors
Perspectives of provisioning transit services Perspectives of provisioning transit services in Central Asia over international FO in Central Asia over international FO
backbonesbackbones Currently our telecommunications backbones are not as powerful as Currently our telecommunications backbones are not as powerful as
necessary for provisioning modern ICT services what makes constraints necessary for provisioning modern ICT services what makes constraints in level and quality of participation of Kyrgyzstan in international in level and quality of participation of Kyrgyzstan in international information exchange process, even though the geographical position information exchange process, even though the geographical position of the country favors it.of the country favors it.
Therefore among perspective plans of KT are activities on rapid Therefore among perspective plans of KT are activities on rapid building and development of transnational high speed FO backbones, building and development of transnational high speed FO backbones, connecting Kyrgyzstan with neighboring countries’ networks. Thus connecting Kyrgyzstan with neighboring countries’ networks. Thus Kyrgyzstan might become a transit telecommunications state located Kyrgyzstan might become a transit telecommunications state located right in the center of the Eurasia continent.right in the center of the Eurasia continent.
An attendant problem for KT here is making use of existing An attendant problem for KT here is making use of existing (modernization) and future FO systems effective in terms of application (modernization) and future FO systems effective in terms of application of WDMs technologiesof WDMs technologies
There were several telecom projects under which KT has been There were several telecom projects under which KT has been introducing FO cable systems. Among them are TAE, Chuy projects, introducing FO cable systems. Among them are TAE, Chuy projects, North Issyk-Kul, HSIB of ShOC.North Issyk-Kul, HSIB of ShOC.
International Trans-Asia-Europe ProjectInternational Trans-Asia-Europe ProjectA A 27 27 thth..km length km length FibeFiber-r-Optical Cable System connects the countries Optical Cable System connects the countries
of Asia and Europe by modern telecommunications facilities of Asia and Europe by modern telecommunications facilities
The 9The 9thth TAE TAE Operation, Maintenance and Operation, Maintenance and Restoration WGRestoration WG meeting in Cholpon-Ata meeting in Cholpon-Ata
The main questions discussed are:The main questions discussed are: The 9th TAE ORMWG Meeting The 9th TAE ORMWG Meeting isis bebeinging held in held in CholpCholpoon-Ata, n-Ata,
Kyrgyzstan, March 23-26, 2010.Kyrgyzstan, March 23-26, 2010. PPossibility of each TAE Party to ossibility of each TAE Party to designate capacity in TAE route designate capacity in TAE route for common usagefor common usage
EElaboration of the common form laboration of the common form for TAE statistics informationfor TAE statistics information
RReviewing of Status of Observer eviewing of Status of Observer in TAE and consideration of in TAE and consideration of proposalsproposals o on its modernizationn its modernization
PProposals for possibilities of restoration of problematic roposals for possibilities of restoration of problematic partsparts of of TAE routeTAE route
CConsideration of other tasks set by TAE Management onsideration of other tasks set by TAE Management CommitteeCommittee
Sary-Bulak
Merke
Korday
Bishkek
Kazakhstan TAE segment
Kyrgyz Republic TAE segment
82 km
93 km
25 km
TAE Fiber-Optical Line in KyrgyzstanTAE Fiber-Optical Line in Kyrgyzstan
In In 2007 2007 KT finished building a redundant section Bishkek-Korday KT finished building a redundant section Bishkek-Korday (25 (25 kmkm) ) related to relocation by Kazakhtelecom of the connection node to Kordayrelated to relocation by Kazakhtelecom of the connection node to Korday
Connection with the Kazakhtelecom network isConnection with the Kazakhtelecom network is STM-4. Expansion is STM-4. Expansion is considredconsidred. . Local and intra-aerial networks are using STM-1Local and intra-aerial networks are using STM-1
Commenced into operation inCommenced into operation in 2000 2000Two entriesTwo entries::
From Merke sideFrom Merke side – – subsegment legnthsubsegment legnth 93 93 kmkmFrom Sary-Bulak sideFrom Sary-Bulak side – – subsegment legnthsubsegment legnth 82 82
kmkm
Commenced into operation inCommenced into operation in 2000 2000Two entriesTwo entries::
From Merke sideFrom Merke side – – subsegment legnthsubsegment legnth 93 93 kmkmFrom Sary-Bulak sideFrom Sary-Bulak side – – subsegment legnthsubsegment legnth 82 82
kmkm
ShCO’s High-Speed Information Backbone ShCO’s High-Speed Information Backbone International ProjectInternational Project
ChinaChina, , RussiaRussia, , KazakhstanKazakhstan, , KyrgyzstanKyrgyzstan, , TajikistanTajikistan, , UzbekistanUzbekistan
Participating countries :Participating countries :
Project goals:Project goals:
Improvement of existing and buildingImprovement of existing and building new new infrastructures of ShCO countriesinfrastructures of ShCO countries
Promoting cooperation in ICT field between Promoting cooperation in ICT field between membersmembers
Cooperation and development in the sphere of Cooperation and development in the sphere of economicseconomics of ShCO countries and growth of their of ShCO countries and growth of their international influenceinternational influence
ShCO-HSIB Implementation DiagramShCO-HSIB Implementation Diagram
PetropavlovskSamara
Atyrau
Astana
AlmatyBishkek
Tashkent
OshAndijan
Urumchi
KashiDushanbe
DWDM systemsDWDM systemsFirst connectivity with KTFirst connectivity with KT – – two two
lambdas by 2lambdas by 2,5,5Gbps/Gbps/λλExpandable up to 400 GbpsExpandable up to 400 Gbps
Samara
Astana
Atyrau
Tashkent
Bishkek Almaty
Andijan
OshSary-Tash
Kashi
Urumchi
Dushanbe
Northern Ring7480 km
Southern Ring4995 km
Subsidiary Ring
3195 km
Kyrgyztelecom OJSC activities with ShCO-HSIBKyrgyztelecom OJSC activities with ShCO-HSIB
China Telecommunication CorporationChina Telecommunication Corporation and Kyrgyztelecom and Kyrgyztelecom OJSC have signed a memorandum OJSC have signed a memorandum of understanding on HSIBof understanding on HSIB
Kyrgyztelecom OJSC and Uzbektelecom JSC have Kyrgyztelecom OJSC and Uzbektelecom JSC have signed a signed a protocol of intentions on Osh-Andijan FO projectprotocol of intentions on Osh-Andijan FO project
Built and put in operation Batken-IsfaraBuilt and put in operation Batken-Isfara and Osh-Andijan and Osh-Andijan lines, and thus made FO connectivity with Uzbektelecom JSClines, and thus made FO connectivity with Uzbektelecom JSC, , Tajiktelecom OJSCTajiktelecom OJSC
Finished building of 265 km length China-Irgeshtam-Finished building of 265 km length China-Irgeshtam-Sarytash-Uzbekistan FO lineSarytash-Uzbekistan FO line
Completed works on Osh-Uzgen section and started project Completed works on Osh-Uzgen section and started project works on Jalal-Abad - Bishkek north-south FO backboneworks on Jalal-Abad - Bishkek north-south FO backbone
Perspective of provisioning transit services Perspective of provisioning transit services over international fiber-optical highwaysover international fiber-optical highways