improving international connectivity to help access to telecommunications in central asia

15
Improving International Improving International Connectivity to Help Access Connectivity to Help Access to Telecommunications in to Telecommunications in Central Asia Central Asia Eshmambet Amatov Executive Director for Strategic Development Kyrgyz Telecom OJSC Istanbul, 28-29 April 2010 Caspian Telecom Caspian Telecom

Upload: chenoa

Post on 12-Jan-2016

19 views

Category:

Documents


0 download

DESCRIPTION

Caspian Telecom. Improving International Connectivity to Help Access to Telecommunications in Central Asia. Eshmambet Amatov Executive Director for Strategic Development Kyrgyz Telecom OJSC. Istanbul, 28-29 April 2010. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Improving International Improving International Connectivity to Help Access to Connectivity to Help Access to Telecommunications in Central Telecommunications in Central

AsiaAsia

Eshmambet AmatovExecutive Director for Strategic Development

Kyrgyz Telecom OJSC

Eshmambet AmatovExecutive Director for Strategic Development

Kyrgyz Telecom OJSC

Istanbul, 28-29 April 2010 Istanbul, 28-29 April 2010

Caspian TelecomCaspian Telecom

Page 2: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Specifics of the development of transmission Specifics of the development of transmission networks in the Kyrgyz Republicnetworks in the Kyrgyz Republic

Perspectives of provisioning transit services in Perspectives of provisioning transit services in Central Asia over international FO backbonesCentral Asia over international FO backbones

Page 3: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Current KT’s Network Development OutlinesCurrent KT’s Network Development OutlinesYear 2009 can be marked by extensive scope and intensiveness of Year 2009 can be marked by extensive scope and intensiveness of Kyrgyztelecom network modernization and development project works due Kyrgyztelecom network modernization and development project works due to completion of almost all functionally distinguishable stages of currently to completion of almost all functionally distinguishable stages of currently being implemented company’s projects such as: being implemented company’s projects such as: Finalization of the base stage of CDMA-450 wireless access network Finalization of the base stage of CDMA-450 wireless access network

building project and preparation to the stage of reconfiguration, building project and preparation to the stage of reconfiguration, expansion and optimization of the networkexpansion and optimization of the network

Completion of most of works on building “Regional microwave Completion of most of works on building “Regional microwave network”, and following to network optimization stage – extension of network”, and following to network optimization stage – extension of MWS network and expansion of microwave network capacitiesMWS network and expansion of microwave network capacities

Completion of Digital Horizon telecommunication project’s “Bishkek” Completion of Digital Horizon telecommunication project’s “Bishkek” phase and redistribution of and moving project resources to the project phase and redistribution of and moving project resources to the project phase named “Regional networks”phase named “Regional networks”

Completion of the trial DVB-T broadcasting network in Batken region;Completion of the trial DVB-T broadcasting network in Batken region;

Most of all newly built FO cable systems just were put in operation, or Most of all newly built FO cable systems just were put in operation, or are in theirare in their final stage like cabling of internationally significant “Osh-final stage like cabling of internationally significant “Osh-Irgeshtam” FO link segment, or starting project works on building of a Irgeshtam” FO link segment, or starting project works on building of a strategically important FO backbone between North and South of the strategically important FO backbone between North and South of the Kyrgyz RepublicKyrgyz Republic

Page 4: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Specifics of the development of transmission Specifics of the development of transmission networks in the Kyrgyz Republicnetworks in the Kyrgyz Republic

Page 5: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Development of Microwave Communications in Development of Microwave Communications in the Kyrgyz Republic in mid 90-sthe Kyrgyz Republic in mid 90-s

Transmission systems in the KR are Transmission systems in the KR are mostly consisted of the microwave mostly consisted of the microwave networks. From the beginning of its networks. From the beginning of its history wireless communication was history wireless communication was considered to be the most attractive due considered to be the most attractive due to the landscape. The microwave network to the landscape. The microwave network has more than 65 years history beginning has more than 65 years history beginning after Second World War. First digitalization after Second World War. First digitalization took place in mid 90-s consisting today of took place in mid 90-s consisting today of 76 microwave stations. 76 microwave stations.

Page 6: Improving International Connectivity to Help Access to Telecommunications in Central Asia

22ndnd and 3 and 3rdrd run modernization of the MWS run modernization of the MWS networknetwork

Quad STM-1Year 2009

Double STM-1Year 2004

OSN3500 flex cross-connectors

Page 7: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Perspectives of provisioning transit services Perspectives of provisioning transit services in Central Asia over international FO in Central Asia over international FO

backbonesbackbones Currently our telecommunications backbones are not as powerful as Currently our telecommunications backbones are not as powerful as

necessary for provisioning modern ICT services what makes constraints necessary for provisioning modern ICT services what makes constraints in level and quality of participation of Kyrgyzstan in international in level and quality of participation of Kyrgyzstan in international information exchange process, even though the geographical position information exchange process, even though the geographical position of the country favors it.of the country favors it.

Therefore among perspective plans of KT are activities on rapid Therefore among perspective plans of KT are activities on rapid building and development of transnational high speed FO backbones, building and development of transnational high speed FO backbones, connecting Kyrgyzstan with neighboring countries’ networks. Thus connecting Kyrgyzstan with neighboring countries’ networks. Thus Kyrgyzstan might become a transit telecommunications state located Kyrgyzstan might become a transit telecommunications state located right in the center of the Eurasia continent.right in the center of the Eurasia continent.

An attendant problem for KT here is making use of existing An attendant problem for KT here is making use of existing (modernization) and future FO systems effective in terms of application (modernization) and future FO systems effective in terms of application of WDMs technologiesof WDMs technologies

There were several telecom projects under which KT has been There were several telecom projects under which KT has been introducing FO cable systems. Among them are TAE, Chuy projects, introducing FO cable systems. Among them are TAE, Chuy projects, North Issyk-Kul, HSIB of ShOC.North Issyk-Kul, HSIB of ShOC.

Page 8: Improving International Connectivity to Help Access to Telecommunications in Central Asia

International Trans-Asia-Europe ProjectInternational Trans-Asia-Europe ProjectA A 27 27 thth..km length km length FibeFiber-r-Optical Cable System connects the countries Optical Cable System connects the countries

of Asia and Europe by modern telecommunications facilities of Asia and Europe by modern telecommunications facilities

Page 9: Improving International Connectivity to Help Access to Telecommunications in Central Asia

The 9The 9thth TAE TAE Operation, Maintenance and Operation, Maintenance and Restoration WGRestoration WG meeting in Cholpon-Ata meeting in Cholpon-Ata

The main questions discussed are:The main questions discussed are: The 9th TAE ORMWG Meeting The 9th TAE ORMWG Meeting isis bebeinging held in held in CholpCholpoon-Ata, n-Ata,

Kyrgyzstan, March 23-26, 2010.Kyrgyzstan, March 23-26, 2010. PPossibility of each TAE Party to ossibility of each TAE Party to designate capacity in TAE route designate capacity in TAE route for common usagefor common usage

EElaboration of the common form laboration of the common form for TAE statistics informationfor TAE statistics information

RReviewing of Status of Observer eviewing of Status of Observer in TAE and consideration of in TAE and consideration of proposalsproposals o on its modernizationn its modernization

PProposals for possibilities of restoration of problematic roposals for possibilities of restoration of problematic partsparts of of TAE routeTAE route

CConsideration of other tasks set by TAE Management onsideration of other tasks set by TAE Management CommitteeCommittee

Page 10: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Sary-Bulak

Merke

Korday

Bishkek

Kazakhstan TAE segment

Kyrgyz Republic TAE segment

82 km

93 km

25 km

TAE Fiber-Optical Line in KyrgyzstanTAE Fiber-Optical Line in Kyrgyzstan

In In 2007 2007 KT finished building a redundant section Bishkek-Korday KT finished building a redundant section Bishkek-Korday (25 (25 kmkm) ) related to relocation by Kazakhtelecom of the connection node to Kordayrelated to relocation by Kazakhtelecom of the connection node to Korday

Connection with the Kazakhtelecom network isConnection with the Kazakhtelecom network is STM-4. Expansion is STM-4. Expansion is considredconsidred. . Local and intra-aerial networks are using STM-1Local and intra-aerial networks are using STM-1

Commenced into operation inCommenced into operation in 2000 2000Two entriesTwo entries::

From Merke sideFrom Merke side – – subsegment legnthsubsegment legnth 93 93 kmkmFrom Sary-Bulak sideFrom Sary-Bulak side – – subsegment legnthsubsegment legnth 82 82

kmkm

Commenced into operation inCommenced into operation in 2000 2000Two entriesTwo entries::

From Merke sideFrom Merke side – – subsegment legnthsubsegment legnth 93 93 kmkmFrom Sary-Bulak sideFrom Sary-Bulak side – – subsegment legnthsubsegment legnth 82 82

kmkm

Page 11: Improving International Connectivity to Help Access to Telecommunications in Central Asia

ShCO’s High-Speed Information Backbone ShCO’s High-Speed Information Backbone International ProjectInternational Project

ChinaChina, , RussiaRussia, , KazakhstanKazakhstan, , KyrgyzstanKyrgyzstan, , TajikistanTajikistan, , UzbekistanUzbekistan

Participating countries :Participating countries :

Project goals:Project goals:

Improvement of existing and buildingImprovement of existing and building new new infrastructures of ShCO countriesinfrastructures of ShCO countries

Promoting cooperation in ICT field between Promoting cooperation in ICT field between membersmembers

Cooperation and development in the sphere of Cooperation and development in the sphere of economicseconomics of ShCO countries and growth of their of ShCO countries and growth of their international influenceinternational influence

Page 12: Improving International Connectivity to Help Access to Telecommunications in Central Asia

ShCO-HSIB Implementation DiagramShCO-HSIB Implementation Diagram

PetropavlovskSamara

Atyrau

Astana

AlmatyBishkek

Tashkent

OshAndijan

Urumchi

KashiDushanbe

DWDM systemsDWDM systemsFirst connectivity with KTFirst connectivity with KT – – two two

lambdas by 2lambdas by 2,5,5Gbps/Gbps/λλExpandable up to 400 GbpsExpandable up to 400 Gbps

Samara

Astana

Atyrau

Tashkent

Bishkek Almaty

Andijan

OshSary-Tash

Kashi

Urumchi

Dushanbe

Northern Ring7480 km

Southern Ring4995 km

Subsidiary Ring

3195 km

Page 13: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Kyrgyztelecom OJSC activities with ShCO-HSIBKyrgyztelecom OJSC activities with ShCO-HSIB

China Telecommunication CorporationChina Telecommunication Corporation and Kyrgyztelecom and Kyrgyztelecom OJSC have signed a memorandum OJSC have signed a memorandum of understanding on HSIBof understanding on HSIB

Kyrgyztelecom OJSC and Uzbektelecom JSC have Kyrgyztelecom OJSC and Uzbektelecom JSC have signed a signed a protocol of intentions on Osh-Andijan FO projectprotocol of intentions on Osh-Andijan FO project

Built and put in operation Batken-IsfaraBuilt and put in operation Batken-Isfara and Osh-Andijan and Osh-Andijan lines, and thus made FO connectivity with Uzbektelecom JSClines, and thus made FO connectivity with Uzbektelecom JSC, , Tajiktelecom OJSCTajiktelecom OJSC

Finished building of 265 km length China-Irgeshtam-Finished building of 265 km length China-Irgeshtam-Sarytash-Uzbekistan FO lineSarytash-Uzbekistan FO line

Completed works on Osh-Uzgen section and started project Completed works on Osh-Uzgen section and started project works on Jalal-Abad - Bishkek north-south FO backboneworks on Jalal-Abad - Bishkek north-south FO backbone

Page 14: Improving International Connectivity to Help Access to Telecommunications in Central Asia

Perspective of provisioning transit services Perspective of provisioning transit services over international fiber-optical highwaysover international fiber-optical highways

Page 15: Improving International Connectivity to Help Access to Telecommunications in Central Asia

•Thank you!