Via Ocel ltd was founded in the year 2000 as enterprise for manufacturing, engineering, sales, export and import Via Ocel took part in realization of significant international projects of modernization, reconstruction and development of district heating system in Belgrade - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: In 2007 ,  significant part of our activities have been focused on thermo energy
Page 2: In 2007 ,  significant part of our activities have been focused on thermo energy

Via Ocel ltd was founded in the year 2000 as enterprise for manufacturing, engineering, sales, export and import

Via Ocel took part in realization of significant international projects of modernization, reconstruction and development of district heating system in

Belgrade

So far enterprise done many miles of hot water pipe systems, hundreds of district heating system connections

and almost 30% of total substations reconstructed in Belgrade

Page 3: In 2007 ,  significant part of our activities have been focused on thermo energy

In 2007, significant part of our activities have been focused on thermo energy.

Beside manufacture and delivering parts for substantial overhaul in power plants , services have been provided in a field of basic, detailed and reversed engineering such as:

• pressure parts• fossil fuel firing equipment• boiler pipe systems and steam lines • transport and handling systems for coal, slug and ash

…all in order to increase energy efficacy, reliability and extend life of coal mill equipment and FD and ID fans; above all, to reduce pollution and emission of environment unfriendly gases.

Page 4: In 2007 ,  significant part of our activities have been focused on thermo energy

Certificates

Wholesale of metal products, engineering and mounting

Page 5: In 2007 ,  significant part of our activities have been focused on thermo energy

Certificates

Material and welding technology

Pressure equipment 97/23/EG

Page 6: In 2007 ,  significant part of our activities have been focused on thermo energy

OSNOVNE DELATNOSTI

MAIN ACTIVITIES

MAIN ACTIVITIES

Page 7: In 2007 ,  significant part of our activities have been focused on thermo energy

HEATING AND DISTRICT HEATINGInternal hot water pipe systems, substations

POWER PLANTS AND FACILITIESSteam and hot water boilers, heating services for boilers, mills and combustiondevices

EXPORT AND IMPORT / TRADEFerrous and non ferrous products

ENGINEERINGDesign, construction and maintenance

Page 8: In 2007 ,  significant part of our activities have been focused on thermo energy

TERMOTEHNIČKA POSTROJENJA

THERMOTECHNICAL FACILITIES

Page 9: In 2007 ,  significant part of our activities have been focused on thermo energy

• Heating substations for district heating and domestic hot water

• Monitoring and control of function from the distribution centers

• Equipment made by leading world producers

HEATING SUBSTATIONS

Page 10: In 2007 ,  significant part of our activities have been focused on thermo energy

• Compact design, reliable and easy to maintain

• Fully automated operation in accordance with clients requires

• Significant saving of energy consumption

Page 11: In 2007 ,  significant part of our activities have been focused on thermo energy

TERMOENERGETSKE INSTALACIJETHERMOENERGETIC FACILITIES

Page 12: In 2007 ,  significant part of our activities have been focused on thermo energy

• Energy boilers piping system• Steam and pipelines• Combustion systems of solid

fuel• Coal mills• Energetic ventilators• Ash and coal transport

systems

Page 13: In 2007 ,  significant part of our activities have been focused on thermo energy

FANS

Designing, production, erection, commissioning, inspection and maintenance and upgrading radial i axial fans diameter up to 4250 mm.

Flow rate up to 3.000.000 m3/h

Pressure up to 18.000 Pa

Page 14: In 2007 ,  significant part of our activities have been focused on thermo energy

Fans type AVS are designed to extract flue gases from power boilers with dust concentration up to 10 g/m³ and temperature up to 300°C. Regulation of parameters is carried out by means of axial guide vanes controlled by a pneumatic or electric actuator.

Material used for producing fan elements:o Vanes steel grade S355NHo Shaft steel grade 16Mo3o Inner bearing housing steel casting S355J2G3

Designing of fans Inspection and designing the nature frequency of fan’s blades

Page 15: In 2007 ,  significant part of our activities have been focused on thermo energy

Calotte produced in one piece is the main advantage of our construction

and production

Page 16: In 2007 ,  significant part of our activities have been focused on thermo energy

TRADE

Page 17: In 2007 ,  significant part of our activities have been focused on thermo energy

Sales of ferrous products

Sales of non ferrous products

Page 18: In 2007 ,  significant part of our activities have been focused on thermo energy

ENGINEERING

Page 19: In 2007 ,  significant part of our activities have been focused on thermo energy

Basic and detailed engineering of thermo technical and thermo energetic facilities

Reverse engineering in production of spare parts for IO subsystems

Project of rehabilitation and improvement of the facilities in order to:

• Increase efficiency and reliability • Extension of the life span• Reduction of the harmful particles emission

Errection, reparation and maintenance

Welding technology

Page 20: In 2007 ,  significant part of our activities have been focused on thermo energy

PROJECTS

Page 21: In 2007 ,  significant part of our activities have been focused on thermo energy

2004-2006

Construction and reconstruction works on heating substations in Belgrade - projects sponsored by KfW Bank, EBRD and World Bank

2007

PCE “ Beogradske elektrane“ Reconstruction and modernization of heating substations

PCE “Beogradske elektrane” Works on pipe systems as a part of major reconstruction of 232 MW heating plant Konjarnik

PE EPS, TPP “Nikola Tesla” Supply of parts for boiler pipe system for TPP “Nikola Tesla”

Page 22: In 2007 ,  significant part of our activities have been focused on thermo energy

2008

PE EPS, TPP “Nikola Tesla” Works on pressure parts major overhaul of steam boiler capacitty 1000 t/h TPP “Nikola Tesla” unit A6

PE EPS, TPP “Nikola Tesla” Production and delivery convective heating surfaces of the boiler for the A6 steam boiler whose capacity is 1000 t/h

PCE “Beogradske elektrane“ Indirect heat transfer station TO “Novi Beograd”

Page 23: In 2007 ,  significant part of our activities have been focused on thermo energy

2009

PCE“ Beogradske elektrane” Production and delivery of 340 heating substations

PE EPS, TPP “Nikola Tesla” Production and delivery of feed water heater for 1000 t/h capacity steam boiler in TPP “Nikola Tesla”

PE EPS, TPP “Nikola Tesla” Production and delivery of inlet and outlet reheater collector for steam boiler capacity 400 t/h TPP “Morava”

Page 24: In 2007 ,  significant part of our activities have been focused on thermo energy

PE EPS, TPP “Nikola Tesla” Production and delivery of three beater wheels fon coal mills type N 400.42, capacity 130t/h row coal

2010

PE EPS,TPP “Nikola Tesla” Design,production and delivery of main steam,hot reheat and cold reheat steam pipeline for unit 6 320 MW electric in TPP “Nikola Tesla” in the Consortium with Kraftanlagen Muenchen

TPP “Isalnita”Krajova Romania Design,upgrading,production and delivery of four impellers of FD fan for steam boilers capacity 1000t/h

Page 25: In 2007 ,  significant part of our activities have been focused on thermo energy

PE EPS, TPP “Nikola Tesla” Production and delivery of superheater 6, material X10CrMoVNb9-1 for 1000 t/h capacity steam boiler in TPP “Nikola Tesla” Unit A3

2011

PE EPS,TPP “Nikola Tesla” Design,production and delivery of reheater 3 and superheater 1 for unit B2 capacity 620 MW electric in TPP “Nikola Tesla” B

PE EPS,TPP “Nikola Tesla” Upgrading (Design,production and delivery) of Ash handling system unit B capacity 2x620 MW electric in TPP “Nikola Tesla” B

Page 26: In 2007 ,  significant part of our activities have been focused on thermo energy

2012

PE EPS,TPP “Nikola Tesla” Design,production and delivery of reheater 2 reheater 3 and superheater 1 for unit B1 capacity 620 MW electric in TPP “Nikola Tesla” B

PE EPS,TPP “Nikola Tesla” Design,production and delivery of feed water heater, reheater 2 and superheaters 2,3 and 5 for unit A5 capacity 308 MW electric in TPP “Nikola Tesla” A

PE EPCG,TPP “Plevlja” Design,production and delivery of superheater 4 for unit capacity 210 MW electric in TPP “Plevlja”

Babcock Borsig Steinmüller ,TPP “Bitola” Design,production and delivery of low radiation parts including openings and superheater for unit 3 capacity 210 MW electric in TPP “Bitola”

Page 27: In 2007 ,  significant part of our activities have been focused on thermo energy

2008. 2009. 2010. 2011. 2012.

10,327,990

5,729,000

8,917,407

6,358,746

9,830,781

Anual Turnover (eur)

Page 28: In 2007 ,  significant part of our activities have been focused on thermo energy

DEVELOPMENT

Page 29: In 2007 ,  significant part of our activities have been focused on thermo energy

Production and erection of thermo technical facilities

Production and assembly pressure

for steam boilers capacity greater than

500t/h

Basic and detailed engineeringon thermo technical and thermo energetic

facilities

Design and deliverySteam pipe lines for steam boilers capacity greater

than 500 t/h

Engineering and production developmentRehabilitation and

upgrading projects Design and production of pressure Parts,coal mills and ID/FD fans

2000 -2002.

2004.

2006.

2007.

2008.

2009 -2015.

Page 30: In 2007 ,  significant part of our activities have been focused on thermo energy

Our development is based on modern direction which anticipates increasing the efficiency, reliability and environmental-friendly design of utilities.

Development and research are reflected in the following fields:

• development of new manufacturing and technological procedures,

• development of ecological technologies,

• development of new technologies and products

Page 31: In 2007 ,  significant part of our activities have been focused on thermo energy

Mentioned settings are fulfilled in the following utilities:

• boilers with supercritical parameters where increased steam parameters result in increased efficiency in electric generation in coal fired power plants,

• combined generation of electric energy and heat in co-generating power plants,

• utilization of waste heat used for steam or heat generation,

• modern waste incinerating plants as one of possible solution of waste disposal,

• biomass, agricultural and wood waste, firing boilers (other prospective possibility to generate heat) using combustible waste of farm and wood processing products.

Page 32: In 2007 ,  significant part of our activities have been focused on thermo energy

National and international promotions, fairs and symposiums

National economy exhibition in Krasnodar 2008

Symposium Power Plants 2008

Page 33: In 2007 ,  significant part of our activities have been focused on thermo energy

Via Ocel has established itself as a reliable partner and has reached leading position in its scope of services

thanks to high quality of conducted projects

In addition to partnership with major Serbian public enterprises, Via Ocel is established partner with international companies such as:

“Kraftanlagen Munchen”

“Doosan Babcock Energy”

“Benteler Stahl/Rohr”

“Babcock Borsing Steinmüller GmbH”

“Danfoss”

“Grundfos”

Page 34: In 2007 ,  significant part of our activities have been focused on thermo energy

Tadeuša Košćuška 56

Belgrade, Serbia

+381 11 6557 - 928 +381 11 6557 - 929

E mail: [email protected]