in-house ingeneering

9
IN-HOUSE INGENEERING AND V.E PERCY CASANI Work place : College Point College : CITY COLLEGE OF NEW YORK Major: CIVIL ENGINEERING Summer - 2015

Upload: percy-casani

Post on 17-Feb-2017

211 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IN-HOUSE INGENEERING

IN-HOUSE INGENEERING AND V.EPERCY CASANIWork place : College PointCollege : CITY COLLEGE OF NEW YORKMajor: CIVIL ENGINEERINGSummer - 2015

Page 2: IN-HOUSE INGENEERING

UPLIFT CAPACITYProject: Rockefeller UniversitySupervisor: Doug JacksonDesigner: LANGANObjective: Determine the uplift nominal capacity of 400 Tons Mini-plie embedded in Manhattan schist rock.Methodology: Total weight of an inverted cone equal to the uplift capacityCone: Tu=400 Kips < Tn = 526.59 KipsCylinder : Tn = 213.64 Kips

Page 3: IN-HOUSE INGENEERING

DRILLING TOOLS INVENTORYProject: QP, AY, VPSupervisor: Dave SpositoObjective: Graphical Drilling Tools Data Base.Methodology: Data collection Field observations/InvoicesMachinery and Drill method: RH32 : Reverse circulation

DTH hammer/ RotoLoc

Cast in-place bored 24”C8, MC1200, MC1500, RH34

Page 4: IN-HOUSE INGENEERING

LIFTING BEAM CAPACITYProject: NW Manhattan TowerSupervisor: Tom C. / Erick G.Designer: FNAObjective: Design of a lifting beam and determination of the correct rigging Methodology: FBD, SFD, BMD using LRFD Method 2011 AISC ManualCONTROLS: FLBMu=150 < ΦMn = 228 Kips-ft (weak)

Page 5: IN-HOUSE INGENEERING

SOE: SHEET WALL DESIGNProject: 50 Kent Ave - BrooklynSupervisor: Andy B. / Doug J.Costumer: National GridObjective: Design of a SOE system using sheet piles and tiebacksMethodology: Geotechnical and Structural DesignGeo-Company: URS

Page 6: IN-HOUSE INGENEERING

SECTION D : SOIL PROFILE

Page 7: IN-HOUSE INGENEERING

STRUCTURAL ANALYSIS

Page 8: IN-HOUSE INGENEERING

MAX MOMENT, SHEAR AND TENSILE FORCES

Page 9: IN-HOUSE INGENEERING

TIEBACK: FREE AND BOND LENGHT