in kohler india corporation pvt. ltd. installation...

2
171 73 G1/2" G1/2" WALL RANGE WALL INSERTED DEPTH 1220 WALL INSERTED DEPTH WALL RANGE 1220 73 155 G1/2" G1/2" G1/2" G1/2" All information is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. Please leave these instructions for the consumer. They contain important information. NOTES: 1. Flush the water supply pipes thoroughly to remove debris. 2. Observe all local plumbing and building codes. 3. Shut off the main water supply. 4. Do not remove the plaster guard fromthe valve body until instructed to. 5. Check for leaks before covering the pipes, repairs as needed. 6. The dimension from the finished wall to the centerline of the valve as shown on the sticker. 7. Min. working pressure is 0.2~0.3 bar, Ideal recommended pressure is 3 bar & Max. working pressure 8. Please ensure only apply water pressure test on the product, and empty the air in pipe and faucet thoroughly before the test. Please ensure maximum test pressure is 8.6 bar and test for 5 minutes. is 5.5 bar. 1218088-IN2-D 1 880IN-** AQUA TURBO 135 882IN-** AQUA TURBO 235 BEFORE YOU BEGIN 1218088-IN2-D INSTALLATION INSTRUCTIONS AQUA TURBO HANDLE OPERATION ROUGH-IN DIMENSIONS For 882, lift diverter, turn clockwise until it stops for shower, turn counter-clockwise until it stops for bath spout. 880IN-** 882IN-** Kohler India Corporation Pvt. Ltd. 6th Floor. Office Block, Ambiance Island, NH-8 IN Gurgaon - 122002, Haryana, India Customer Care No : 1800 103 2244 (Toll Free) & +91-124-4319685 / 86 Customer Care Email : [email protected] www.kohler.co.in Ground Centerline of valve 1220 to the ground (for shower faucet) 370 to up side of bath fringe (for bath & shower faucet) Centerline of valve Ground

Upload: others

Post on 01-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IN Kohler India Corporation Pvt. Ltd. INSTALLATION ...resources.kohler.com/plumbing/kohlerindia/pdf/880.pdf · Kohler India Corporation Pvt. Ltd. IN 6th Floor. Office Block, Ambiance

171

73

G1/2"

G1/

2"

WALL RANGE

WALL INSERTED DEPTH

1220

WALL INSERTED DEPTH

WALL RANGE

1220

73

155

G1/

2"

G1/2"

G1/

2"

G1/

2"

All information is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.

Please leave these instructions for the consumer. They contain important information.

NOTES:

1. Flush the water supply pipes thoroughly to remove debris.2. Observe all local plumbing and building codes.3. Shut off the main water supply.4. Do not remove the plaster guard fromthe valve body until instructed to.5. Check for leaks before covering the pipes, repairs as needed.6. The dimension from the finished wall to the centerline of the valve as shown on the sticker.7. Min. working pressure is 0.2~0.3 bar, Ideal recommended pressure is 3 bar & Max. working pressure

8. Please ensure only apply water pressure test on the product, and empty the air in pipe and faucet thoroughly before the test. Please ensure maximum test pressure is 8.6 bar and test for 5 minutes.

is 5.5 bar.

1218088-IN2-D 1

880IN-** AQUA TURBO 135882IN-** AQUA TURBO 235

BEFORE YOU BEGIN

1218088-IN2-D

INSTALLATION INSTRUCTIONS AQUA TURBO

HANDLE OPERATION

ROUGH-IN DIMENSIONS

For 882, lift diverter, turn clockwise until it stops for shower, turn counter-clockwise until it stops for bathspout.

880IN-** 882IN-**

Kohler India Corporation Pvt. Ltd.6th Floor. Office Block, Ambiance Island, NH-8INGurgaon - 122002, Haryana, India

Customer Care No : 1800 103 2244(Toll Free) & +91-124-4319685 / 86Customer Care Email : [email protected] www.kohler.co.in

Ground

Centerline of valve

1220

to th

e gr

ound

(for s

how

er fa

ucet

)37

0 to

up

side

of b

ath

fring

e(fo

r bat

h &

show

er fa

ucet

)

Centerline of valve

Ground

Page 2: IN Kohler India Corporation Pvt. Ltd. INSTALLATION ...resources.kohler.com/plumbing/kohlerindia/pdf/880.pdf · Kohler India Corporation Pvt. Ltd. IN 6th Floor. Office Block, Ambiance

1218088-IN2-D 2

Determine where the valve body(1) will be located on the wall. Besure the arrow mark on the valve body is facing upward. The mark"hot water connection" is on the left.

As Fig.1 shown. The min. and max. dimensions between the centerline of the valve and the outside of the finished wall will vary according to sticker. Ensure shower mark should be at upper side. The size of finished wall hole extendes from the size of body should be less than 5mm.

Note: Ensure the centerline of valve is perpendicular to the wall, theup plane of guard is level.

Connect G1/2" hot and cold supplies, showerhead and bath pipingsto valve body as Fig.2 shown. Connect hot supply to the end on theleft. For 880, do not connect the bath spout pipe. Supply enough tape or sealant.

Install temporary nipples for showerhead and bath spout. Duringinstallation, keep valve guard on valve body.

INSTALLATION

CLEANING INSTRUCTIONS

All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with a clean soft cloth. Many cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. Which could adversely affect the finish and are not recommended for cleaning.

Do not use abrasive cleaners or solvents on Kohler faucets and fittings.

**Color code must be specified when ordering

SERVICE PARTS

1218088-IN2-D 3

880IN-** AQUA TURBO 135882IN-** AQUA TURBO 235

3006991Valve

AQUA TURBO

5

(Hot)

(Cold)

5

55

123

70

Fig. 1

Fig. 2

Handspray or bath spout for 882

Showerhead

1089477-**Diverter(only for 882)

1238399Nut

Wall Inserted Depth

Wall Range