June 22, 2016 In the Matter of Water Quality Certification for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project APPLICANT: Pacific Gas and Electric Company RECEIVING WATER: Humboldt Bay HYDROLOGIC UNIT: Eureka Plain Hydrologic Unit, No. 110.00 COUNTY: Humboldt FILES: PG&E Humboldt Bay Power Plant Final Site Restoration Plan Implementation; ECM PIN CW‐816482; WDID No. 1B15086WNHU FINDINGS BY THE EXECUTIVE OFFICER: 1. On May 18, 2016, the North Coast Regional Water Quality Control Board (Regional Water Board) received an application from the Pacific Gas and Electric Company (Applicant) requesting Federal Clean Water Act (CWA), section 401 Water Quality Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project (Project). 2. Public Notice: Information describing the Project was noticed for public comment on the Regional Water Board’s website on July 9, 2015. No comments were received. 3. Receiving Waters: The proposed Project will cause disturbances to jurisdictional wetlands in the Eureka Plain.

Upload: others

Post on 24-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

June22,2016

IntheMatterof

WaterQualityCertification

forthe

HumboldtBayPowerPlantFinalSiteRestorationPlanImplementationProject

APPLICANT: PacificGasandElectricCompanyRECEIVINGWATER: HumboldtBayHYDROLOGICUNIT: EurekaPlainHydrologicUnit,No.110.00COUNTY: HumboldtFILES: PG&EHumboldtBayPowerPlantFinalSiteRestorationPlan

Implementation;ECMPINCW‐816482;WDIDNo.1B15086WNHU

FINDINGSBYTHEEXECUTIVEOFFICER:1. OnMay18,2016,theNorthCoastRegionalWaterQualityControlBoard(Regional

WaterBoard)receivedanapplicationfromthePacificGasandElectricCompany(Applicant)requestingFederalCleanWaterAct(CWA),section401WaterQualityCertification(certification)fortheHumboldtBayPowerPlantFinalSiteRestorationPlanImplementationProject(Project).

2. PublicNotice:InformationdescribingtheProjectwasnoticedforpubliccommentontheRegionalWaterBoard’swebsiteonJuly9,2015.Nocommentswerereceived.

3. ReceivingWaters:TheproposedProjectwillcausedisturbancestojurisdictional

wetlandsintheEurekaPlain.

Page 2: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐2‐ June22,2016WDIDNo.1B15086WNHU

4. ProjectDescription:TheApplicantiscurrentlydecommissioningthreeseparate,defunctpowergeneratingunits,andhasalreadyconstructedonenewactivegeneratingfacilityat1000KingSalmonAve.,intheCityofEureka.Thethreedefunctgeneratingunitswerecomponentsofthe“HumboldtBayPowerPlant”(HBPP).Thenewpowergeneratingfacilityisreferredtoasthe“HumboldtBayGeneratingStation.”

Decommissioningactivitieshaveresultedinrequirementstorestorepreviouslydisturbedareasandimplementmitigationtocompensatefordevelopmentimpactstojurisdictionalresources.ThepurposeoftheProjectistoimplementsiterestorationactivitiesthatarerequiredasacomponentofformallydecommissioningtheHBPPunits.Requirementsassociatedwithsiterestorationactivitiesincluderestoringthelandsformerlyoccupiedbythedefunctunits,implementingmitigationrequirementsforimpactstojurisdictionalwaters,andinstallingpermanentstormwatertreatmentcontrols.

TheProjectinvolvestheon‐sitereuseoflow‐levelradioactivesoils.Thiscertificationdoesnotauthorizeorprovidecriteriaforanycleanuporreuseofcontaminatedsoils.CleanupandreuseofcontaminatedsoilsaresubjecttotheApplicant’sLicenseTerminationPlanasapprovedbytheNuclearRegulatoryCommission.ImpactsandmitigationassociatedwithconstructionoftheHumboldtBayGeneratingStationareaddressedinaseparate401waterqualitycertificationissuedtotheApplicantonOctober10,2008.Anotherseparate401waterqualitycertificationwasissuedtotheApplicantonApril18,2014,toaddressimpactstojurisdictionalwatersassociatedwiththeIntake/DischargeCanalRemediationProject(CanalRemediationcertification).TheApplicanthasdividedtheProjectsiteintothefollowingtwelvefunctionalareastofacilitatetheProjectdescription:

BuhnePoint; BayviewHeights; IndependentSpentFuelStorageInstallation(ISFSI)andISFSISupportArea; TrailerCity; DuckPond; HBPPCore; HBGS/60kVSubstation; IntakeCanal; AssemblyBuildingArea; BuhnePointWetlandPreserve; ContractorParkingLot#1;and BuhneSloughSaltMarsh.

Projectelementswithinnineofthetwelvefunctionalareasinclude,butarenotlimitedto:

BuhnePoint AbandonmentofCharlieRoad,restorationofwetlands,andconstructionofa

newroadtoaccesstheISFSIarea;

Page 3: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐3‐ June22,2016WDIDNo.1B15086WNHU

ISFSIandISFSISupportArea

CreationofnewwetlandsinaportionoftheexistingContractorParkingArea#1;

ConstructionofanewculvertbeneaththenewISFSIaccessroadtoconnectabiodetentionbasinintheCoreareawithadetentionbasinintheISFSIarea;

RemediationofanareaofcontaminationassociatedwiththeformerLiquidFuelTank#2(formerlyatthesiteoftheCountRoom)intheFrogPondarea;

ReconfigurationoftheFrogPondaspartoftheISFSI“SupportStormwaterDetentionBasin;”

Constructionofabiodetentionbasin; RestorationofthewesternportionofContractorParkingLot#2topre‐project

conditions;

BayviewHeights Excavation,grading,andpossibleon‐sitereuseofsoilthatmaycontainlow

levelsofradioactivity; Soilexcavationandtestingtoconfirmthepresenceofleadandotherpotential

contaminationandremediationasappropriate; AftertheongoingCanalRemediationProjectiscomplete,upto55,000cubic

yardsofcleansoilsfromon‐sitewillbeplacedintotheDischargeCanal,graded,andplantedwithcoastalbluffscrubvegetation.Beforethen,theexcavatedcanalwillbeusedasabasinforinterimstorageofsoilsexcavatedduringtheReactorVesselCaisson/SpentFuelPoolRemovalDecommissioningProject;

Stabilizationofslopesexceeding3:1(H:V); Buildingdemolitionandconstructiontrailerremoval;

TrailerCity

Creationofthe“ShorelineWetlandsMitigationArea.”Thecreatedwetlandswillconnectwiththeexistingbrackishmarshwetland(i.e.,the“DuckPond”);

Gradingoftheareatopre‐developmentelevations,includingremovalandcharacterizationofapproximately30,000cubicyardsofearthenmaterial,whichisproposedforon‐sitereuse;

CreationofabiodetentionbasinatthesouthernedgeofTrailerCity,totreatstormwaterrunofffromtheBayviewHeightsandHBPPCoreareas.ThebasinwilloutlettotheShorelineWetlandsMitigationArea;

Removalofremnanthazardouswastesurfaceimpoundmentstructures.TheDepartmentofToxicSubstancesControlapprovedacleanclosureoftheimpoundmentsin1997;

Soilinvestigationtoconfirmpresenceofleadanddefinevolumeofsoiltoberemoved;

Page 4: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐4‐ June22,2016WDIDNo.1B15086WNHU

Soilcharacterizationwillbeperformedtodeterminewhetherthereisanyradiologicalcontamination;

Removalofsanitarysewerpiping,sewerliftstation,fireanddomesticwaterlines,andcommunicationlines;

HBPPCore

Constructionofabiodetentionbasintopre‐treatstormwaterrunofffromthesitebeforebeingconveyedtotheAssemblyBuildingstormwaterdetentionbasin;

IntakeCanal

ModificationoftheintersectionofAlphaRoadandKingSalmonAvenuetomeetata90‐degreeintersectionangleandconformwithHumboldtCountyspecifications;

ReplacementoftheexistingculvertbeneathAlphaRoadthatconnectsanintermittentdrainagewithBuhneSlough;

Removalofa105‐foot‐longby10‐foot‐wideintakecanalpedestrianbridgeanditsconcretefoundations;

TheAlphaRoadParkingLotwillberemovedandexcavatedandjoinedwiththeIntakeCanaltocreatemitigationrequiredbytheCanalRemediationcertification;

Twosmall,leveledandopenparkingareasalongthesouthsideofAlphaRoadwillberestoredtoCoastalbluffscrubvegetation;

AssemblyBuildingArea

RestorationoftheAssemblyBuildingparkingareatonaturalconditions; ImprovementandrepavingofBravoRoad; Creationofastormwaterpre‐treatmentareaandbiodetentionbasintotreat

stormwater; Constructionofastormwaterdetentionbasintocollectandtreatstormwater

fromBuhnePointHill,theIFSIarea,andtheWasteManagementBuildingarea,beforebeingreleasedtotheBuhnePointWetlandPreserve.ThebasinwillbelocatedinportionsoftheformerAssemblyBuildingparkinglotareaandtheexistingFrogPond;

ContractorParkingLot#1

Removaloftheexistinggraveledparkingareaandconversionofthesitetofreshwaterwetlands.

BuhnePointWetlandPreserveTheBuhnePointWetlandPreserve(Preserve)includescoastalsaltmarshandfreshwaterwetlands,andwasestablishedin2008tomitigateforimpactstowetlandsresultingfromoftheHBGSandHBPPdecommissioning.Tidalflowismaintainedto

Page 5: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐5‐ June22,2016WDIDNo.1B15086WNHU

thesaltwaterportionofthePreserveviaaninflow‐outflowpipetotheHBPPintakecanal.ProposedactivitiesatthePreserveinclude:

ReplacetheexistingculvertbeneathBravoRoadthatconnectstheHBPPintakecanalwiththeBuhnePointeWetlandPreserve;

ReplacetheexistingculvertbeneathBravoRoadthatconnectstheHBPPintakecanalwiththeFrogPond;

RestorationofthePreservefringewithnativespecies; Replacementofselectednon‐nativetreeswithnativeonesandplantingof

nativeshrubsandherbaceousspecies; Removalofthecontractorpedestriantrailandrestorationofthearea;and Restorecontractorparkinglot#2tonaturalvegetation.

5. ConstructionTiming:Projectimplementationisexpectedtolast16monthsand

occurbetweenJune27,2016,andOctober18,2017.

6. ProjectImpacts:Projectimplementationwouldresultinapproximately0.434acresofpermanentand0.261acresoftemporaryimpactstojurisdictionalestuarineandfreshwaterwetlands.Permanentandtemporaryimpactsaresummarizedinthebelowtables.

Table1:PermanentImpactstoJurisdictionalWetlands

Activity FunctionalArea WaterBodyPermanentImpact Area

(acres)Grading,stormwater

treatmentISFSIandISFSISupportArea FrogPond 0.295

AlphaRoadrealignment IntakeCanal BuhneSlough 0.001Biodetentionbasin

construction TrailerCityDrainagetoShoreline

WetlandsMitigationArea 0.023

Grading BayviewHeightsRemnantdrainageditchandperchedseasonally

floodedlowarea0.112

Total: 0.434acres

Table2:TemporaryImpactstoJurisdictionalWetlands

Activity FunctionalArea WaterBodyTemporaryImpactArea

(acres)AlphaRoadrealignment,constructionaccess

IntakeCanal BuhneSlough 0.050

Mitigationwetlandgrading TrailerCity DuckPond 0.100

Constructionaccessforculvertreplacement

BuhnePointWetlandPreserve BuhnePointWetlands 0.018

Mitigationwetlandgrading

ContractorParkingLot#1

KingSalmonAve.roadsidewetland 0.063

Page 6: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐6‐ June22,2016WDIDNo.1B15086WNHU

Activity FunctionalArea WaterBodyTemporaryImpactArea

(acres)

Culvertreplacementandbridgefootingremoval

IntakeCanal Intakecanal 0.036

Constructionaccessforculvertreplacement

IntakeCanalDrainagetoBuhneSloughfromAlpha

parkinglot0.005

Wetlandenhancement TrailerCityDrainagetoShorelineWetlandsMitigation

Area0.016

Total: 0.261acres7. MitigationforProjectImpacts:Tomitigateforpermanentimpactsto0.434acresof

jurisdictionalwetlands,theApplicantshall:

Createnolessthan0.638acresofwetlandsattheShorelineWetlandsMitigationArea,atthecurrentlocationofTrailerCity.ThesewetlandswillbehydraulicallyconnectedtotheexistingDuckPond;and

Createnolessthan0.234acresofwetlandadjacentKingSalmonAve.,intheexistingContractorParkingLot#1area.

Theabovemitigationacreageswouldbeaportionoftotalwetlandcreationintherespectiveareas,asadditionalcreationwouldbeimplementedtosatisfyotherregulatorypermitrequirements.Tomitigatefortemporaryimpactsto0.261acresofjurisdictionalwetlands,theApplicantproposestorestorealltemporarilyimpactedareaswithnativespeciesandremoveinvasivespeciesinexistingwetlands.TheApplicanthaspreparedanEelgrassMitigationandMonitoringPlanthatprovideseelgrassavoidancemeasuresandmitigationmeasuresintheeventofunintendedeelgrassimpactsduringworkintheIntakeCanal.

8. DisturbedSoilArea:Projectimplementationwillresultingreaterthanoneacreof

disturbedsoilarea.TheApplicantshallobtaincoverageundertheNationalPollutantDischargeEliminationSystemGeneralPermitforStormWaterDischargesAssociatedwithConstructionandLandDisturbanceActivities(OrderNo.2009‐0009‐DWQ)andprepareaStormwaterPollutionPreventionPlandetailingbestmanagementpractices(BMPs)tocontrolpollutionfromtheProjectareaduringconstruction.AlltemporarilydisturbedareaswithintheProjectareashallbeappropriatelystabilizedand/orreplantedwithappropriatenativevegetation.

9. OtherAgencyActions:TheApplicanthasappliedtotheUnitedStatesArmyCorpsof

EngineersforcoverageunderNationwidePermitNos.3,Maintenance,18,MinorDischarges,38,CleanupofHazardousandToxicWastes,and43,Stormwater

Page 7: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐7‐ June22,2016WDIDNo.1B15086WNHU

ManagementFacilities,pursuanttosection404oftheCleanWaterAct.TheApplicantisconsultingwiththeUnitedStates(U.S.)FishandWildlifeServiceandtheU.S.NationalMarineFisheriesServicetodeterminewhetherProjectimplementationmayresultinimpactstospecial‐statusspecies.TheApplicanthasalsoappliedforaCoastalDevelopmentPermitfromtheCaliforniaCoastalCommission.

10. CEQACompliance:Asleadagency,theHumboldtBayHarborRecreationand

ConservationDistrictpreparedaMitigatedNegativeDeclarationfortheProject(SCHno.2015062028).TheApplicantsignedaNoticeofDeterminationadoptingtheMitigatedNegativeDeclarationsonAugust27,2015,inordertocomplywiththeCaliforniaEnvironmentalQualityAct.

11. AntidegradationPolicy:Thefederalantidegradationpolicyrequiresthatstate

waterqualitystandardsincludeanantidegradationpolicyconsistentwiththefederalpolicy.TheStateWaterBoardestablishedCalifornia’santidegradationpolicyinStateWaterBoardResolutionNo.68‐16.ResolutionNo.68‐16incorporatesthefederalantidegradationpolicywherethefederalpolicyappliesunderfederallaw.ResolutionNo.68‐16requiresthatexistingqualityofwatersbemaintainedunlessdegradationisjustifiedbasedonspecificfindings.TheRegionalWaterBoard’sBasinPlanimplements,andincorporatesbyreference,boththeStateandfederalantidegradationpolicies.ThiscertificationisconsistentwithapplicablefederalandStateantidegradationpolicies,asitdoesnotauthorizethedischargeofincreasedconcentrationsofpollutantsorincreasedvolumesoftreatedwastewater,anddoesnototherwiseauthorizedegradationofthewatersaffectedbythisProject.

12. ThisdischargeisalsoregulatedunderStateWaterResourcesControlBoardOrderNo.

2003‐0017‐DWQ,"GeneralWasteDischargeRequirementsforDredgeandFillDischargesThatHaveReceivedStateWaterQualityCertification,"whichrequirescompliancewithallconditionsofthiswaterqualitycertification.TheOrdermaybeaccessedatthiswebaddress:http://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2003/wqo/wqo2003‐0017.pdf

ReceivingWater: HumboldtBayFilledand/orExcavatedAreas:

Permanentimpactstojurisdictionalwetlands:Temporaryimpactstojurisdictionalwetlands:

0.434acres

0.261acres

Latitude/Longitude: 40.741,‐124.2131

1WGS84datum

Page 8: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐8‐ June22,2016WDIDNo.1B15086WNHU

CertificationExpiration: June22,2021

Accordingly,basedonitsindependentreviewoftherecord,theRegionalWaterBoardcertifiesthattheHumboldtBayPowerPlantFinalSiteRestorationPlanImplementationProject(WDIDNo.1B15086WNHU)asdescribedintheapplicationwillcomplywithsections301,302,303,306and307oftheCleanWaterAct,andwithapplicableprovisionsofstatelaw,providedthattheApplicantcomplieswiththefollowingtermsandconditions:

AllconditionsofthiscertificationapplytotheApplicant(andtheiremployees)and

allcontractors(andtheiremployees),sub‐contractors(andtheiremployees),andanyotherentityoragencythatperformsactivitiesorworkontheProjectasrelatedtothisWaterQualityCertification.Project‐SpecificConditions

1. TheApplicantshallimplementtheBiologicalMitigationandMonitoringPlanfortheHumboldtBayPowerPlantFinalSiteRestorationProject,datedApril2016(MMP),andcreatenolessthan0.638acresofbrackishmarshwetlandsattheShorelineWetlandsMitigationArea,andcreatenolessthan0.234acresofseasonalfreshwaterwetlandadjacentKingSalmonAve.,intheexistingContractorParkingLot#1area.

2. MitigationsuccessshallbesubjecttothereviewandacceptancebyRegionalWater

Boardstaff,andshallnotbeconsideredsuccessfuluntilaminimumoffiveyearsofmonitoringhasoccurred.

3. TheApplicantshallimplementtheEelgrassMitigationandMonitoringPlanforthe

HumboldtBayPowerPlantFinalSiteRestorationProject,datedApril2016.DeviationsfromthisplanaresubjecttothepriorreviewandacceptanceofRegionalWaterBoardstaff.

Project‐SpecificConditionsRequiringReports

4. Annualmitigationandmonitoringreportsshallbesubmittedannuallyfornolessthanfiveyearsfollowingmitigationimplementation(Reports).ReportsshallbesubmittedtotheRegionalWaterBoardbyJanuary31anddetailthemonitoringresultsfromthepriorcalendaryear.Theyear1reportshallbedueJanuary31,2018.Reportsshallinclude: Maintenanceactivitiesperformed Monitoringmethods Monitoringresults Time‐seriesphotographs Statusofachievementtowardssuccesscriteria;and Recommendationsforadaptivemanagement.

Page 9: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐9‐ June22,2016WDIDNo.1B15086WNHU

StandardConditions

5. Thiscertificationactionissubjecttomodificationorrevocationuponadministrativeorjudicialreview,includingreviewandamendmentpursuanttoWaterCodesection13330andtitle23,CaliforniaCodeofRegulations,section3867.

6. ThiscertificationactionisnotintendedandshallnotbeconstruedtoapplytoanydischargefromanyactivityinvolvingahydroelectricfacilityrequiringaFederalEnergyRegulatoryCommission(FERC)licenseoranamendmenttoaFERClicenseunlessthepertinentcertificationapplicationwasfiledpursuanttotitle23,CaliforniaCodeofRegulations,section3855,subdivision(b)andtheapplicationspecificallyidentifiedthataFERClicenseoramendmenttoaFERClicenseforahydroelectricfacilitywasbeingsought.

7. Thevalidityofthiscertificationisconditionedupontotalpaymentofanyfeerequiredundertitle23,CaliforniaCodeofRegulations,section3833,andowedbytheApplicant.Thetotalapplicationfeeis$4,541.TheRegionalWaterBoardreceived$600fromtheApplicantonJuly8,2016,and$3,941onJune13,2016.

8. Thiscertificationwillbesubjecttoannualbillingduringtheconstructionphase

(“AnnualActiveDischargeFee”)andduringthemonitoringphaseoftheProject(“AnnualPostDischargeMonitoringFee”),perthecurrentfeeschedule,whichcanbefoundonourwebsite:http://www.swrcb.ca.gov/northcoast/water_issues/programs/water_quality_certification.shtml.ThesefeeswillbeautomaticallyinvoicedtotheApplicant.

9. TheApplicantshallnotifytheRegionalWaterBoarduponProjectconstructioncompletiontorequestterminationoftheAnnualActiveDischargeFeeandtoreceivea“NoticeofCompletionofDischargesLetter.”IftheProjectissubjecttotheAnnualPostDischargeMonitoringFee,thentheApplicantshallalsonotifytheRegionalWaterBoardattheendofthemonitoringperiodtorequestterminationofthefeeandreceivea“NoticeofProjectCompleteLetter.”TheApplicantmayberequiredtosubmitcompletionreportsattheendofeachofthesephases.RegionalWaterBoardstaffmayrequestsitevisitsattheendofeachProjectphasetoconfirmProjectstatusandcompliancewiththiscertification.

10. Thiscertificationdoesnotauthorizedraftingofsurfacewaters.Anydraftingof

surfacewatersshallbeincompliancewithStatewaterrightslawanddiversionrequirementsoverseenbytheStateWaterResourcesControlBoard’sDivisionofWaterRights.

11. HerbicidesandotherpesticidesshallnotbeusedwithintheProjectlimits.Ifthe

Applicanthasacompellingcaseastowhypesticidesshouldbeused,thenarequestforpesticideuseandaBMPplanmaybesubmittedtotheRegionalWaterBoardstaffforreviewandacceptance.

Page 10: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐10‐ June22,2016WDIDNo.1B15086WNHU

12. Onlywildlife‐friendly,100percentbiodegradableerosionandsedimentcontrol

productsthatwillnotentraporharmwildlifeshallbeused.Erosionandsedimentcontrolproductsshallnotcontainsynthetic(e.g.,plasticornylon)netting.Photodegradablesyntheticproductsarenotconsideredbiodegradable.TheApplicantshallrequestapprovalfromtheRegionalWaterBoardifanexceptionfromthisrequirementisneededforaspecificlocation.

13. BMPsshallbeimplementedasproposedintheapplicationmaterials.BMPsfor

erosion,sedimentandturbiditycontrolshallbeimplementedandinplaceatcommencementof,duringandafteranygroundclearingactivitiesoranyotherProjectactivitiesthatcouldresultinerosionorsedimentdischargestosurfacewater.Severeandunseasonalraineventsarebecomingmorefrequentduetotheeffectsofclimatechange.Therefore,BMPsshallbeimmediatelyavailablefordeploymentatalltimestopreventdischargestowatersofthestate.

14. TheApplicantisprohibitedfromdischargingwastetowatersoftheState,unless

explicitlyauthorizedbythiscertification.Forexample,nodebris,soil,silt,sand,bark,slash,sawdust,rubbish,cementorconcretewashings,oilorpetroleumproducts,orotherorganicorearthenmaterialfromanyconstructionorassociatedactivityofwhatevernature,otherthanthatauthorizedbythiscertification,shallbeallowedtoenterintoorbeplacedwhereitmaybewashedbyrainfallintowatersofthestate.Whenoperationsarecompleted,anyexcessmaterialordebrisshallberemovedfromtheworkarea.

15. TheApplicantisliableandresponsiblefortheproperdisposal,reuse,and/or

recyclingofallProject‐generatedwasteincompliancewithapplicableStateandFederallawsandregulations.

16. TheApplicantshallprovideRegionalWaterBoardstaffaccesstotheProjectsiteto

documentcompliancewiththiscertification.

17. Workinflowingorstandingsurfacewaters,unlessotherwiseproposedintheprojectdescriptionandapprovedbytheRegionalWaterBoard,isprohibited.

18. If,atanytime,anunauthorizeddischargetosurfacewater(includingwetlands,lakes,

riversorstreams)occurs,oranywaterqualityproblemarises,theassociatedProjectactivitiesshallceaseimmediatelyuntiladequateBMPsareimplementedincludingstoppingwork.TheRegionalWaterBoardshallbenotifiedpromptlyandinnocasemorethan24hoursaftertheunauthorizeddischargeorwaterqualityproblemarises.

19. AllProjectactivitiesshallbeimplementedasdescribedinthesubmittedcertificationapplicationpackageandthefindingsandconditionsofthiscertification.SubsequentProjectchangesthatcouldsignificantlyimpactwaterqualityshallfirstbesubmitted

Page 11: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐11‐ June22,2016WDIDNo.1B15086WNHU

toRegionalWaterBoardstaffforpriorreview,consideration,andwrittenconcurrence.IftheRegionalWaterBoardisnotnotifiedofasignificantalterationtotheProject,itwillbeconsideredaviolationofthiscertification,andtheApplicantmaybesubjecttoRegionalWaterBoardenforcementactions.

20. PriortoimplementinganychangetotheProjectthatmaybeamaterialchangeas

definedinCaliforniaWaterCodesection13260(c)asaproposedchangeincharacter,location,orvolumeofthedischarge,theApplicantshallobtainpriorwrittenapprovaloftheRegionalWaterBoardExecutiveOfficer.IftheRegionalWaterBoardisnotnotifiedofthematerialchangetothedischarge,itwillbeconsideredaviolationofthiscertification,andtheApplicantmaybesubjecttoRegionalWaterBoardenforcementaction(s).

21. TheApplicantshallprovideacopyofthiscertificationandStateWaterResources

ControlBoard(SWRCB)OrderNo.2003‐0017‐DWQtoanycontractor(s),subcontractor(s),andutilitycompany(ies)conductingworkontheProject,andshallrequirethatcopiesremainintheirpossessionattheworksite.TheApplicantshallberesponsibleforensuringthatallworkconductedbyitscontractor(s),subcontractor(s),andutilitycompaniesisperformedinaccordancewiththeinformationprovidedbytheApplicanttotheRegionalWaterBoard.

22. Disturbanceorremovalofexistingvegetationshallnotexceedtheminimum

necessarytocompletetheProject.23. Fueling,lubrication,maintenance,storage,andstagingofvehiclesandequipment

shallnotresultinadischargeorthreateneddischargetoanywatersofthestateincludingdryportionsoftheshoreline.AtnotimeshalltheApplicantoritscontractorsallowuseofanyvehicleorequipment,whichleaksanysubstancethatmayimpactwaterquality.

24. TheApplicantshallnotuseleakingvehiclesorequipmentwithinStatewatersor

riparianareas.VehiclesandequipmentusedwithinStatewatersshallbecheckedforleaksatthebeginningofeachworkday.

25. Intheeventofanyviolationorthreatenedviolationoftheconditionsofthis

certification,theviolationorthreatenedviolationshallbesubjecttoanyremedies,penalties,processorsanctionsasprovidedforunderapplicablestateorfederallaw.Forthepurposesofsection401(d)oftheCleanWaterAct,theapplicabilityofanystatelawauthorizingremedies,penalties,processorsanctionsfortheviolationorthreatenedviolationconstitutesalimitationnecessarytoassurecompliancewiththewaterqualitystandardsandotherpertinentrequirementsincorporatedintothiscertification.Inresponsetoasuspectedviolationofanyconditionofthiscertification,theStateWaterBoardmayrequiretheholderofanyfederalpermitorlicensesubjecttothiscertificationtofurnish,underpenaltyofperjury,anytechnicalormonitoring

Page 12: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐12‐ June22,2016WDIDNo.1B15086WNHU

reportstheStateWaterBoarddeemsappropriate,providedthattheburden,includingcosts,ofthereportsshallbearareasonablerelationshiptotheneedforthereportsandthebenefitstobeobtainedfromthereports.Inresponsetoanyviolationoftheconditionsofthiscertification,theRegionalWaterBoardmayaddtoormodifytheconditionsofthiscertificationasappropriatetoensurecompliance.

26. TheRegionalWaterBoardmayaddtoormodifytheconditionsofthiscertification,as

appropriate,toimplementanyneworrevisedwaterqualitystandardsandimplementationplansadoptedorapprovedpursuanttothePorter‐CologneWaterQualityControlActorsection303oftheCleanWaterAct.

27. Intheeventofanychangeincontrolofownershipoflandpresentlyownedor

controlledbytheApplicant,theApplicantshallnotifythesuccessor‐in‐interestoftheexistenceofthiscertificationbyletterandshallemailacopyofthelettertothefollowingemailaddress:[email protected].

Thesuccessor‐in‐interestshallemailtheRegionalWaterBoardExecutiveOfficerat:NorthCoast@waterboards.ca.govtorequestauthorizationtodischargedredgedorfillmaterialunderthiscertification.Therequestmustcontainthefollowing:

i) Effectivedateofownershipchange;ii) Requestingentity’sfulllegalname;iii) Thestateofincorporation,ifacorporation;iv) Theaddressandphonenumberofcontactperson;andv) AdescriptionofanychangestotheProjectorconfirmationthatthe

successor‐in‐interestintendstoimplementtheprojectasdescribedinthiscertification.

28. Exceptasmaybemodifiedbyanyprecedingconditions,allcertificationactionsare

contingenton:i) Thedischargebeinglimitedtoandallproposedmitigationbeing

completedinstrictcompliancewiththeApplicant’sProjectdescriptionandCEQAdocumentation,asapprovedherein;and

ii) CompliancewithallapplicablewaterqualityrequirementsandwaterqualitycontrolplansincludingtherequirementsoftheWaterQualityControlPlanfortheNorthCoastRegion(BasinPlan),andamendmentsthereto.

29. TheauthorizationofthiscertificationforanydredgeandfillactivitiesexpiresonJune

22,2021.Conditionsandmonitoringrequirementsoutlinedinthiscertificationarenotsubjecttotheexpirationdateoutlinedabove,andremaininfulleffectandareenforceable.

Page 13: In Quality for the Bay Power Plant Final Site Restoration ...€¦ · Certification (certification) for the Humboldt Bay Power Plant Final Site Restoration Plan Implementation Project

HBPPSiteRestoration ‐13‐ June22,2016WDIDNo.1B15086WNHU

Condition4hasrequirementsforinformationandreports.AnyrequirementforareportmadeasaconditiontothiscertificationisaformalrequirementpursuanttoCaliforniaWaterCodesection13267,andfailureorrefusaltoprovide,orfalsificationofsuchrequiredreportissubjecttocivilliabilityasdescribedinCaliforniaWaterCode,section13268.Ifyouhaveanyquestionsorcomments,pleasecallBrendanThompsonofmystaff,at(707)576‐2699,orviae‐[email protected]._______________________________

MatthiasSt.John ExecutiveOfficer160622_BJT_dp_HumBayPowerPlantFSR_401

Originalto: LorenSharp,PG&E;1000KingSalmonAve.,Eureka,CA95503,[email protected]: StateWaterResourcesControlBoard,[email protected] EnvironmentalProtectionAgency,Region9R9‐WTR8‐[email protected] CameronPurchio,U.S.ArmyCorpsofEngineers,[email protected] CarolHeidsiek,U.S.ArmyCorpsofEngineers,[email protected] CristinKenyon,CaliforniaCoastalCommission,[email protected] DougDavy,CH2MHill,[email protected] EmilyKingTeraoka,StillwaterSciences,[email protected] KrisVardas,PG&E,[email protected]