1 IN-SITU ROCK STRESS MEASUREMENTS Brief description of methods applied by SINTEF Practical applications Lists of clients SINTEF Civil and Environmental Engineering Rock and Soil Mechanics 7465 Trondheim, Norway Tel +47 73 59 31 76 Fax +47 73 59 47 78 E-mail: [email protected] E-mail: anders.beitnes@ civil.sintef.no Web: http://www.sintef.no/units/civil/index.html

Upload: others

Post on 09-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

IN-SITU ROCK STRESS MEASUREMENTS

Brief description of methods applied bySINTEF

Practical applications

Lists of clients

SINTEF Civil and Environmental EngineeringRock and Soil Mechanics7465 Trondheim, Norway

Tel +47 73 59 31 76Fax +47 73 59 47 78E-mail: [email protected]: anders.beitnes@ civil.sintef.noWeb: http://www.sintef.no/units/civil/index.html

Page 2: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

The Rock Mechanics Laboratory of the Norwegian University of Science and Technology(NTNU) and SINTEF (Foundation of Technical and Scientific Research at NTNU) hasbeen performing in-situ rock stress measurements since 1964. Through SINTEF Civiland Environmental Engineering, Dept. of Rock and Soil Mechanics, measurements arecarried out on a commercial basis.

Several measuring methods have been applied over the years, including the USBM 2Dcell and the photoelastic 2D cell. However, the present applied techniques are:

Self developed and highly improved versions of the originally South African CSIR 2-DDoorstopper and 3-D CSIR overcoring cells.

Self developed hydraulic fracturing equipment

Appendices 1, 2 and 3 show brief principal descriptions of the methods.The methods have been continuously developed and improved through extensive useand research during more than 30 years.Whenever possible, the procedures described in the International Society for RockMechanics (ISRM) “Suggested methods for Rock Stress Determinations“ are used toevaluate the measurements. However, it must be pointed out that these are onlysuggestions based on papers published in the International Journal for Rock Mechanicsand Mining Sciences in 1989, and not by any means a norm or standard. Some of theprocedures used by SINTEF are superior to the ISRM suggestions and accordingly usedfor evaluation.3-D determination of the stress tensor at a site is normally based on 7 – 10 successfulsingle measurements well away from the influence of the tunnel in a sub-horizontalborehole. The stresses are calculated by the computer programme DISO (Determinationof In-situ Stress by Overcoring) developed by SINTEF. By randomly selecting strainreadings from different positions along the measuring hole, up to 35,000 groups ofresults can be achieved. From this statistical calculations are carried out, resulting inmean values and deviation of the principal stresses. The programme automaticallyremoves obvious erroneous strain values. The magnitudes of the principal stresses arepresented graphically in a histogram plot, while the directions are given in an equal arealower hemisphere steronet plot.

The time needed for one single overcoring measurement is about 1 hour. Typically, acomplete measuring cycle with 7 – 10 single successful measurements will take about 2days. Preliminary results may normally be given on site, using a laptop computer andelastic constants determined by application of a biaxial cell.

SINTEF normally provides all necessary equipment, including core drilling machine. Allequipment, including the hydraulic fracturing system may be shipped by normal airfreight.

Appendices 4, 5 and 6 present lists of clients and projects within mining and civilengineering, comprising some 125 entries from 10 countries throughout the world. Aseach client or location may represent a number of measuring sites, the total number ofsites/measuring holes are in the order of 300, corresponding to approximately 3000single measurements.This probably makes SINTEF the most experienced provider of in-situ rock stressdetermination in the world.

Page 3: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

The great majority of the projects have been very applied industrial projects connected toa wide variety of civil and mining engineering projects. The measurements are activelyused as a practical engineering tool. An important contribution is to provide reliable in-situ rock stresses as in-put in connection with numerical modelling.The Norwegian mining industry very early recognised that proper use of rock stressmeasurements could give considerable boost of profits. A typical example is stressmeasurements in rock pillars, where the results in many cases indicated that valuableore pillars could be drastically reduced or even removed, giving considerable increase inore extraction. In many of the mining projects, regular measurement programmes havebeen carried out over long periods of time (in one case more than 25 years). Theintention of these programmes has been design of mining chambers and pillars, as wellas stability control of stopes and pillars as the mining situation changes over time.

During the 1970ies through 1990ies Norway experienced a vast amount of rockengineering projects within hydropower, storage, sports halls and road and rail tunnels.In many cases rock stress problems have been encountered.In other cases, sufficient horizontal stresses have been a prerequisite for stable largespan underground caverns. This includes the world’s largest rock hall for public use, theGjøvik Olympic Ice Hockey Rink with a span of 62 m.This has over the years called for a large number of in-situ rock stress measurements,which mainly have been provided by SINTEF/NTNU.2D and 3D rock stress measurement are used to provide in-put for numerical modelling,as well as to check the tangential and axial stresses in the roof of the excavations andthe load on rock pillars between excavations. This may give crucial information about thegeneral stability of rock structures.2-D doorstopper measurements have also on a number of occasions been successfullyused to measure stress in shotcrete and concrete rock support. Doorstoppermeasurements is the only possible method for stress determination in a thin layer ofshotcrete.Another important market is the determination of the minor principal rock stress inconnection with underground hydropower plants with unlined headrace pressure tunnelsor pressure shafts. This is the case with many Norwegian power plants, and thistechnology has also been exported to a number of power plants in other countries. Acrucial prerequisite in this case is that the minor principal stress in the rock mass must belarger than the water head. Stress measurements are therefore a must. SINTEF hascarried out a large number of stress measurements of this type, both with overcoring andhydraulic fracturing.

Altogether, the measurements connected to civil and mining engineering projects havegiven the SINTEF measuring crew an unique practical experience. Though principallyrelatively simple, the measurements require an experienced crew, who knows all the“tricks of the trade”, to obtain reliable results.

The rock stress measurements are quite often only part of larger projects, and SINTEF isalso providing rock deformation measurements (Borehole extensometer and tunnelconvergence measurements), rock bolt testing, numerical modelling, and civil andmining engineering solutions in general. A number of state-of-the art 2D and 3Dnumerical modelling codes are available.

Page 4: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 1

Page 5: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 2

Page 6: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Core drilling 0 - 90° upward ( drained holes)

Maximum hole depth from tunnel: 25 mBorehole diameter: 76 mmCore diameter: 62 mmTime per single measurement: Approx. 1 hourTime per stress tensor ( 7 – 10 single measurements): Approx. 2 days Equipment units ( including core drilling machine) may be skipped as normal airfreightBoreholes may after measurements be used for stress monitoring and hydraulicfracturing, and also for borehole extensometers

Page 7: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 3Hydraulic Fracturing for Rock Stress Determination

The hydraulic fracturing technique may be used to determine the in-situ rock stress in a planeperpendicular to borehole. This is done by application of fluid pressure( normally water) in a test section in a borehole isolated by packers until the rock fails in tension.The fluid pressures required to generate, propagate, sustain and reopen tensile fractures in the rockare recorded as function of time, and these may be related to magnitude of the existing stress field.Directions of measured stress are normally achieved by observing and measuring the orientationof the hydraulically induced fracture plane by the use of a so-called impression packer. Theinduced hydrofracture is oriented parallel with the major secondary principal stress σH in a planeperpendicular to the borehole.

Straddle packer arrangement Impression packer Fracture initiation

Hydraulic fracturing principles

Time / fluid pressure recording

Page 8: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Hydraulic fracturing may be carried out in vertical holes drilled from the surface or undergroundin holes drilled from tunnels ( vertical, inclined or horizontal). May be combined with overcoringfrom tunnels, i.e. hydraulic fracturing is carried out after overcoring in the same hole.• Maximum borehole length: 250 m• Borehole diameter: 46 – 76 mm• Computerised logging equipment• Equipment may be shipped by normal air freight

Page 9: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 4LIST OF CLIENTS - OVERCORING - CIVIL ENGINEERING PROJECTS

Client Country Years Branch Method Purpose

Statkraft* Norway 1970 Hydropower 3D Design of underground power station, SkjomenStatkraft ” 1970 ” 3D Design of unlined pressure shaft, MaurangerStatkraft ” 1975, 76 ” 3D Design of unlined air cushion chamber, Ulla FørreStatkraft ” 1974, 75 ” 3D Design of power station and unlined pressure shafts,

EidfjordNorkraft ” 1979, 80 ” 2D, 3D Design of power station, stress control, SildvikNorkraft ” 1982 ” 3D Design of unlined pressure shaft, SørfjordØvre Otra Kraft ” 1980 ” 3D Water inflow vs. stress direction, Holen (Bykle)Lyse Kraft ” 1982 ” 3D Design of unlined pressure shaft, TjodanNorsk Hydro ” 1985 ” 3D Design of unlined pressure shaft, Nyset-SteggjeStatkraft ” 1985 ” 3D Design of power station and unlined pressure shaft,

JostedalenStatkraft ” 1985 ” 3D Design of power station and unlined pressure shafts,

KobbelvTafjord Kraft ” 1986, 87 ” 3D Control of air cushion surge chambers, TafjordSogn og FjordaneEnergi

” 1986 ” 3D Design of power station and unlined pressure shaft,Mel

N.Trøndelag El. ” 1987 ” Design of unlined pressure shaft, OrmsetfossResearch council ” 1987 ” 3D Control of air cushion surge, BrattsetOpplandskraft ” 1988 ” 3D Design of unlined pressure shaft, TorpaStatkraft ” 1988,90 ” 2D,3D Design of power station, pressure tunnels and stress

control, KilvikResearch council ” 1988 ” 3D Design of unlined pressure shaft, OsaNorsk Hydro ” 1990 ” 3D Generator displacement vs.rock stress, MårNorsh Hydro ” 1990 ” 3D -------------------------”-----------------, MoflåtStatkraft ” 1990 ” 3D -------------------------”---------------------, TokkeLyse Kraft ” 1997, 98 ” 3D Design of unlined pressure tunnel, FløyrliTrondheim Energ ” 1998 ” 2D, 3D Deformation of powerhouse vs. stress, NeaTrondheim Energ ” 1993 ” 2D Stress measurements in concrete dam, SylsjøStatkraft ” 2001 ” 3D Design of powerstation and unlined pressure tunnel,

BjølvoVBB Stockholm Sweden 1973 ” 2D, 3D Control of high horizontal stress and stresses in

shotcrete in headrace tunnel, LjungaverkSri Lanka Power Sri Lanka 1996 ” 3D Design of pressure tunnel,Kukule GangaNorplan Tanzania 1996-98 ” 3D Design of power station and unlined pressure tunnel,

Lower KihansiNorwegian RoadAuthority

Norway 1974 Road tunnel 3D High horizontal stress problems, Strynefjell

” ” 1977,78 ” 3D High horizontal stress problems, Høyanger” ” 1978 ” 3D Check mountain side stresses, Pollfjell, Troms” ” 1981, 96 ” 2D, 3D Check mountain side stresses, stress in shotcrete,

repeated 1996, Heggura, Tafjord” ” 1981 ” 3D High horizontal stress problems, Fjærland” ” 1981 ” 3D Rock stress check , Flåm” ” 1985, 96 ” 2D, 3D High horizontal stress problems, stress in shotcrete,

repeated 1996, Kobbskaret, Nordland” ” 1986 ” 3D Rock stress check, Svartisen, Nordland” ” 1986 ” 3D Design of tunnel, Oslotunnelen” ” 1998 ” 3D High horizontal stress problems, LærdalNorw. Defence ” 1982 Access shaft 3D Design access shaft to military installationSwedish Rail Sweden 1999 Railway tunnel 2D Roof stress control, HallandsåsenLørenskog Mun. Norway 1979 U.g. sports hall 2D Design and control of roof stress, SkårerSkedsmo Mun. ” 1980 ” 2D ---------------------”-----------------, TærudOslo Municip. ” 1980 ” 2D ---------------------”-----------------, HolmliaGjøvik Municip. ” 1989-93 ” 2D, 3D ---------------------”-----------------, Gjøvik Olympic HallNamsos Mun. ” 1984 ” 3D ---------------------”-----------------, OasenStavanger Mun. ” 1996 ” 3D ---------------------”---------------, TastavardenNorzink ” 1986-95 Waste storage 3D Design of u.g. waste storage caverns, OddaStatoil ” 1997 Gas storage 3D Design of u.g. gas storage caverns, KårstøStatoil ” 1986 Oil storage 3D Design of u.g. oil storage caverns, MongstadNorsk Hydro ” 1987, 98 Oil storage 3D Initial design and upgrade u.g. caverns, StureSingapore State Singapore 2001 Strategic storage 3D Rock stress controlNorsk Hydro Norway 1986 Shore approach

tunnel3D Rock stress control in North Sea oil pipeline tunnel,

Hjartøy

Each client may comprise several measuring sites.

* Former Norwegian State Power Board.

Page 10: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 5

LIST OF CLIENTS – OVERCORING - MINING ENGINEERING PROJECTSClient Country Years Branch Method Purpose

Orkla Mining Norway 1966-87 Cu,Zn - mining 2D, 3D Regular programme for design and stress control ofsublevel stopes and pillars until operations ceased

Sulitjelma Mining ” 1967-85 ” 2D, 3D ”(room and pillar)

Elkem Skorovas ” 1971-85 ” 2D, 3D ”(sublevel stoping)

Folldal Verk ” 1971-92 ” 2D, 3D ” ”Grong Gruber ” 1976-98 ” 2D, 3D ” ”Rødsand Mining ” 1966-80 Fe-mining 2D, 3D ” ”Røros Copper ” 1971,77 Cu-mining 2D Design of room-and-pillar miningSydvaranger ” 1971-96 Fe-mining 2D, 3D Open pit stability control, design of new sublevel stop.

underground mine, stress control until operationsceased

Fosdalen Mining ” 1977, 90 ” 2D, 3D Control of high stress areaRana Gruber ” 1978 –

present” 2D, 3D Design of underground crusher station, design of new

sublevel stop. underground mine, stress control inpillars

Bleikvassli Mines ” 1976-90 Pb, Zn-mining 2D, 3D Design of u.g. mining methods and stress controlTitania Mines ” 1976, 83 Ilmenite mining 3D Open pit stability, design of u.g. product storage silosNikkel & Olivin ” 1989, 97 Ni-mining 2D, 3D Design of u.g. sublebvel stoping and r &p mining

methods, stress control in pillarsStore Norske Coal ”

Spitsbergen

1977-present

Coal mining 2D, 3D Design and control of longwall and room-and-pillarmethods in 4 mines (partly in permafrost)

Norcem Norway 1966-present

Limestone mining 2D, 3D Regular programme for design and stress control in 2underground room-and-pillar mines

Hustad Group ” 1978-present

Limestone /marblemining

2D, 3D Design of room-and-pillar and sublevel stopingsystems in 4 mines

Franzefoss ” 1976-78 Limestone mining 2D Stress control in pillars in r & p mine in an urban areaNorth CapeMinerals

” 1973-present

Nepheline syenitemining

2D, 3D Regular programme for design and stress control insublevel stoping with stopes up to 400 m high

North CapeMinerals

” 1988-present

Olivine mining 2D, 3D Regular programme for design and stress control in aroom and pillar mine

Industrimineraler ” 1999,2000

Olivine mining 2D, 3D Design of room and pillar system and stress control inroof and pillars in a new u.g. mine

Nås Kalkstein ” 1998 Limestone mining 3D Design of r & p and sublevel stoping u.g. mineNorcalsitt ” 1997, 00 Limestone mining 2D, 3D Design of r & p and stress control in pillars and roofFalkhammar Magn ” 1991 Fe-mining 3D Design of r & p miningSkaland Grafit ” 1983, 97 Graphite mining 3D Design of sublevel stoping u.g. miningHammerfall ” 2001 Dolomite mining 2D, 3D Design of u.g. room & pillar miningMinnor Minerals ” 1984 Quarz mining 3 D Design of underground miningNorwegian Talc ” 1992 Talc mining 3 D Design of underground r & p mine, RaudbergetArna Knuseverk ” 1982 Aggregate mining 2D Stress control in pillars and roof in u.g. r& p mineGudvangen Stein ” 1992 Aggregate mining ----------------------”---------------------------Norstone ” 1992 Aggregate mining 3D Design of potential underground mining of gneissFauskemarmor ” 1996 Marble quarry 3D Destressing of high, near surface horizontal stressLundhs Labrador ” 1999 Labrador quarry 2D, 3D ---------------------- ” -------------------------J. Grønseth ” 1997 ” 3D Evaluation of underground quarrying of labradorBoliden Mineral Sweden 1973-90 Cu,Pb,Au mining 2D,3D Design and stress control in 6 minesLKAB Sweden 1972 Fe -mining 3-D Virgin stress determination, Malmberget mineDannemora Mine Sweden 1989 Fe-mining 3D Evaluation of after-use for gas storageGränges Sweden 1986 Fe-mining 2D,3D Design sublevel caving mining, pillar stress controlBjörka Mineral Sweden 1998 Limestone mining 2D, 3D Design and stress control underground miningSala Mineral Sweden 1999 Limestone mining 2D, 3D Design and stress control underground r&p miningRautarukki OY Finland 1978-80 Fe-mining 2D, 3D Design and stress control i 3 sublevel stoping minesGreenex Mines Greenland 1983 Pb, Zn-mining 2D Control of pillar load in a r&p u.g. mine in permafrostRio Tinto Mines Spain 1974, 75 Cu-mining 2D, 3D Design of mining and pilar stress control in 2 minesIMM-EU research Italy 2001 Marble quarry 3D Evaluation of possible rock stress related problems in

3 marble quarries in the Cararra.

Each client may comprise several measuring sites within one or more mining areas, and in many cases measurements have beencarried out over a number of years

Page 11: IN-SITU ROCK STRESS MEASUREMENTS - SINTEF...Singapore State Singapore 2001 Strategic storage 3D Rock stress control Norsk Hydro Norway 1986 Shore approach tunnel 3D Rock stress control

1

Appendix 6

LIST OF CLIENTS - HYDRAULIC FRACTURING - CIVIL AND MINING ENGINEERING PROJECTSClient Country Years Branch Purpose

Research council Norway 1987 Hydropower HF Determination of minor principal stress atunderground air cushion surge chamber, Brattset

Tafjord Kraft ” 1987 ” HF Minor principal stress, unlined pressure shaft, K1N.Trøndelag El. ” 1987 ” HF --------------------”-------------------- OrmsetfossResearch council ” 1988 ” HF Minor principal stress at air cushion, Tafjord K5Research council ” 1988 ” HF ---------------------”------------------- , OsaBKK Bergen ” 1988 ” HF Minor principal stress, unlined pressure shaft,

FossmarkOpplandskraft ” 1990 ” HF Minor principal stress at air cushion, TorpaVestfold Kraft ” 1991 ” HF Minor principal stress for unlined pressure shaft or

tunnel DaleelvenBKK Bergen ” 1993 ” HF ------------------”-----------------------, ÅsebotnGrøner Consult ” 1994 ” HF ------------------”-----------------------, SkjerkaBuskerud Kraft ” 1996 ” HF ------------------”-----------------------, AskerudfossLyse Kraft ” 1997, 98 ” HF ------------------”-----------------------, FløyrliAura Kraft ” 1998 ” HF ------------------”-----------------------, GrøaVeidekke “ 2000 “ HF ------------------“-----------------------, ÅbjøraNuuk Kraft Greenland 1991 ” HF --------------------”----------, Buksefjord ( in permafrost )Norplan Tanzania 1993 ” HF --------------------”----------, Pangani FallsNorconsult Tanzania 1993 ” HF --------------------”------------------, Lower Kihansi FallsNorconsult Nepal 1993 ” HF --------------------”------------------, Kali GandakiNorconsult Pakistan 1996 ” HF --------------------”-----------------, Neelum JhehlumNorplan Tanzania 1996-98 ” HF --------------------”-----------------, Lower Kihansi FallsStore Norske Coal Norway

Spits-bergen

1991 Coal mining HF Det.of tectonic horizontal stresses in a vertical holedrilled through a glacier into rock ( permafrost ) inconnection with a new longwall coal mine

Rana Gruber Norway 1993 Fe- mining HF Det. of tectonic horizontal stresses in a verticalborehole in connection with a new u.g. mine, Rana

NGU* ” 1993 Research HF Horizontal stress vs. groundwater flow in cryst. rock,Hvaler

NGU ” 1996 ” HF -------------------”------------------, Ytre SognNGU ” 1999 ” HF Horizontal stress vs. neo-tectonics, Stuoragurra fault,

Masi, FinnmarkResearch council ” 1990 U.g gas storage HF Minor pricipal stress for test storage facility, FosdalenGUN** Sweden 1990 ” HF ------------------------”-----------------, DannemoraSydkraft Konsult Sweden 1994 ” HF ------------------------”-----------------, LövesåsenResearch council Norway 1990 U.g. cold storage HF Minor principal stress vs. water, LadehammerenNorske Skog /Statkraft Grøner

” 2001 U.g. rail terminaland exportstorage

HF Horizontal stresses for design of large span rockcaverns, Sauøya, Halden

Each client may comprise several test sites and boreholes.

* NGU = Geological Survey of Norway** GUN = Gass Utvikling i Norden (Natural gas development in the Nordic countries).