incentives talk… conservation incentives advisor rob detta colli (416) 450-7989...

13
Incentives talk… Conservation Incentives Advisor Rob Detta Colli (416) 450-7989 [email protected]

Upload: bernice-edwards

Post on 31-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Incentives talk…

Conservation Incentives AdvisorRob Detta Colli (416) 450-7989

[email protected]

My Mandate is…

IS IS NOT

Rental & Condo Social HousingNew Build

416 905

Smaller portfolio focussed Large portfolio focussed

One-window to incentive info Replacing energy professionals

Informational Selling retrofits

Current incentives “New” money

Why do people offer incentives?

Government Incentives:• It’s not their money – it’s ours!• It’s in the public’s

best intereste.g. costs of pollution

Regulated by Government:• Condition of licencing• Public’s best interest• Infrastructure cost avoidance• Revenue formula changes for

conservation

What’s next?

Heat Electricity

o Solar Thermal

o Solar Electricity

o Wind

o Geo-thermal

o Co-Gen

Solar Thermal• Federal & Provincial:

1. ecoEnergy Retrofit (a.k.a. “NRCan program”)…not stackable with…

2. Federal: ecoEnergy for Renewable Heat

o Last application - October 1, 2010

o Max - $400,000 per Solar Water install…$80,000 per Solar Air

o $$ = Performance Factor x Incentive Rate x Collector Area

o Perf. Factor - There is a list of accepted solar collectors1

o Incentive Rate - $/m2…Solar Air, Solar Water Glazed…Unglazed

o E.g. – (Unglazed) 0.97 x 30 $/m2 x 4’ x 10’ x 10 = $1,065

o Provincial (OSTHI) – matches ecoEnergy = $1,065

3. A 50% accelerated CCA is provided under Class 43.2 of Schedule II

1 - http://ecoaction.gc.ca/ecoenergy-ecoenergie/heat-chauffage/v2008/collectors-capteurs-eng.cfm

Solar Electricity

• Federal:1. ecoEnergy Retrofit (a.k.a. “NRCan program”)…not stackable with…

2. ecoEnergy for Renewable Power

o To March 31, 2011

o 1 cent/kWh for up to 10 years

3. A 50% accelerated CCA is provided under Class 43.2 of Schedule II

• Provincial:1. Feed-In-Tariff

Wind Electricity

• Federal:1. ecoEnergy Retrofit (a.k.a. “NRCan program”)…not stackable with…

2. ecoEnergy for Renewable Power

o To March 31, 2011

o 1 cent/kWh for up to 10 years

3. A 50% accelerated CCA is provided under Class 43.2 of Schedule II

• Provincial:1. Feed-In-Tariff

Geothermal & Co-Gen

“Standard” incentives?

Enbridge BPP Tor Water NRCan

Audits

Electricity

Gas

Water

Start Date Case by case

New App:Jan 2008

Old App:Jul 2006

Annually Pre-approval required

End Date N/D

Sept 2010

Apr 2011 for chillers

2011 MAR 2012

Enbridge…

Toronto Better Building Partnership…

• Audits:o $35 per unit…yup…can be used with Enbridge`s $$o 4 measures must be assessed…i.e. not just lightingo Must have done at least 1 recommended measureo Traditional or modeling approaches

• Prescriptive:o No pre-approval – No energy calculations requiredo Based on a predefined eligibility listo $1 to $250 per fixture• Exit signs• EnergyStar CFLs• Standard T8s• T5s• Occupany Sensors• Photocells & timers• Programmable Thermostats

• Non-electric Chillers• Heat Pumps• Solar Hot Water• Gas Dryers• Energy Star appliances

Toronto Better Building Partnership…

• Calculated: 7¢ per kWh or $400 per kW:

o Anything covered – must be able to prove the savingso Must have before and after photoso Limited to 50% of the project costo Trick – Anything that’s 24/7…calculated gives more $$o Application is really only 4 of the 17 pages

• HVAC upgrades• Building automation• Chiller replacements• Deep lake water cooling

And if you don’t listen to any of that…

Move forwardwith

energy projects…

How will HST impact your project costs and utility bills?

Will OPA incentives continue for lighting?