ind: assam power sector enhancement investment · pdf filethis report has been submitted to...
TRANSCRIPT
Environmental Monitoring Report
This report has been submitted to ADB by the Assam Power Distribution Company Limited, Guwahati and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Project Number: 41614-033 May 2017 Period: January 2016 – June 2016
IND: Assam Power Sector Enhancement Investment Program - Tranche 2
Submitted by
Assam Power Distribution Company Limited, Guwahati
This environmental safeguard monitoring report is a document of the borrower and made publicly available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff.
Environmental Safeguard Monitoring Report
Reporting Period: January, 2016 to June, 2016
Loan No.:2677 - Tranche 2
Assam Power Sector Enhancement Investment Program
Prepared by the Assam Power Distribution Company Limited for the Asian Development Bank
TABLE OF CONTENTS SL. NO. ITEMS Page No.
Abbreviations 1 1.0 Introduction 2 1.1 Brief Project Description 2 1.2 Project Progress Status and Implementation Schedule 5
A. Progress Status 5
B. Implementation Schedule 9
2.0 Compliance to National Regulations 13 3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 14 4.0 Compliance to Environmental Management Plan 14 5.0 Safeguards Monitoring Results and Unanticipated Impacts 21
A. Environmental Monitoring Schedule 21 B. Environmental Monitoring Parameters 21 C. Environmental Monitoring Status 22
6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders
22
7.0 Institutional Arrangement 23 8.0 Public Consultation and Site Visits Undertaken 23 9.0 Environmental Review Meetings 24
10.0 Conclusion and Recommendations 24
LIST OF ANNEXURE
Annexure Details Page No.
I(A) Ambient Air Quality Monitoring Locations 25 I(B) Noise Level Monitoring Locations 30 I(C) Water Quality Monitoring Locations 35 II(A) Site Photographs Showing Ambient Air Quality Monitoring Being
Undertaken 40
II(B) Site Photographs Showing Noise Level Monitoring Being Undertaken 43 II(C) Site Photographs Showing Water Quality Monitoring Being Undertaken 45 III Photographs of Site Visits (Bilasipara Substation and Matia Substation) 47 IV Attendance Sheet for Review Meetings 48
LIST OF TABLES
TABLE NO.
ITEMS Page No.
1.0 Sub-Projects under Tranche 2 3 2.0 Project Progress Status(Substations) 5 2.1 Project Progress Status(Transmission Lines) 6 2.2 Project Progress Status(Augmentation, Extension and refurbishment of
existing sub-stations and reactive power compensation)
8
3.0 Package wise Progress Details 10 4.0 Applicable Acts and Legislations to the project 13 5.0 Environmental Covenants 14 6.0 Compliance to Environmental Management Plan (Tranche 2
Subprojects) 15
7.0 Environmental Monitoring Schedule for Tranche 2 21 8.0 Environmental Monitoring Parameters 21
1
ABBREVIATIONS
ADB Asian Development Bank ADEF Assam Department of Environment and Forest ADH Assam Department of Health AEGCL Assam Electricity Grid Corporation Ltd. APCB Assam Pollution Control Board APDCL Assam Power Distribution Company Limited ASEB Assam State Electricity Board ASI Archeological Survey of India dB Decibels EA Executing Agency EARF Environmental Assessment and Review Framework EIA Environmental Impact Assessment EMA Environment Monitoring Agency EMP Environmental Management Plan ESMC Environmental and Social Management Cell ESMU Environmental and Social Management Unit GHG Greenhouse Gas GOA Government Of Assam GOI Government Of India GRC Grievance Redressal Committee IA Implementing Agency IEE Initial Environmental Examination Ltd. Limited MFF Multi-Tranche Financing Facility NO2 Nitrogen dioxide PM10 Particulate Matter (Size less than 10 µm) PM2.5 Particulate Matter (Size less than 2.5 µm) PMU Project Management Unit ROW Right of Way S/S Sub Station SEIA Summary Environmental Impact Assessment SIEE Summary Initial Environmental Examination SO2 Sulphur dioxide T&D Transmission and Distribution
Electrical Terminology V Volt Unit of Voltage kV Kilovolt 1000 volts W Watt Unit of active power kW Kilowatt 1000 watts MW Megawatt 1000 kW MWh Megawatt hour Unit of energy VA Volt ampere Unit of apparent power MVA Million volt ampere 106 VA Transmission System 400kV, 220kV, 132kV and/or 66kV lines supplying (incoming
& outgoing feeder) grid substations (Substation) with primary voltage of 400kV, 220kV, 132kV, or 66kV
LILO Line – in – Line - Out
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
2
1.0 Introduction 1. The Government of India and Government of Assam have requested Asian Development Bank (ADB) to provideUS$200 million loan funding via a Multi-tranche Financing Facility (MFF) to support continued investment in power sector in the state of Assam. 2. The project is implemented in 3 Tranches viz. Tranche 1, Tranche 2 and Tranche 3. The original Loan Agreement (LOAN NUMBER 2592 - IND) for Tranche 1 was signed on 15February 2010 between Government of India and Asian Development Bank (ADB). While the Loan Agreement (LOAN NUMBER 2677 - IND) for Tranche 2 was signed on 17 January 2011 and Loan Agreement (LOAN NUMBER 2800 - IND) for Tranche 3 was signed on 27 February2012 between Government of India and ADB. 3. As per the original Loan Agreement ADB has agreed to make to the Government of India, GOI (Borrower) the loan on the terms and conditions set forth in the Loan Agreement, but only on the condition that the proceeds of the Loan be made available to the State and through the State (Government of Assam, GOA) to Assam State Electricity Board (ASEB). ASEB was the Executing Agency (EA) for all the three tranches. The Borrower in its letter of 11th June 2014has informed ADB of the dissolution of erstwhile EA for the Projects i.e., the ASEB and its place of its successive entities namely the Assam Power Generation Corporation Limited (APGCL), Assam Electricity Grid Corporation Limited (AEGCL) and Assam Power Distribution Company (APDCL). The Borrower further requested ADB to accordingly make the relevant change in the EAs as AEGCL for Tranche 1 and 2, and APDCL for Tranche 3. ADBhas approved the request and communicated to Department of Economic Affairs (DEA), Ministry of Finance, GOI on 5th August 2014 for Amendment related to Minor Change inMFF. 4. Now, as per the amendment Government of Assam (GOA) and Assam Electricity Grid Corporation Ltd. (AEGCL) are the Executing Agencies (EA) and Assam Electricity Grid Corporation Ltd. (AEGCL) is the Implementing Agency (IA) for Tranche 1 and Tranche 2.While Government of Assam (GOA) and Assam Power Distribution Company Ltd. (APDCL) are the Executing Agencies (EA) and Assam Power Distribution Company Ltd. (APDCL) is the Implementing Agency (IA) for Tranche 3. 5. The power sector investments are necessary to support continued investment in the state power sector, which is necessary for economic growth and poverty reduction. The MFF will partly finance the expansion and augmentation of the transmission and distribution (T&D) networks. The proposed investments are necessary to: (i) facilitate increased power transfers to accommodate increased demand and economic growth; (ii) improve supply-side energy efficiency by system de-bottlenecking and reducing technical losses; (iii) reduce the intensity of greenhouse gas (GHG) and other emissions via improved system efficiency; (iv) support expanded private sector participation in distribution system operations and other energy services; and (v) facilitate poverty reduction via improved electricity services and economic growth. 6. These environmental safeguard monitoring report provides information pertaining to Tranche 2 for the period January 2016 to June 2016. 1.1 Brief Project Description 7. The proposed Assam Power Sector Enhancement Investment Program of Assam State Electricity Board (ASEB) which is being processed under ADB’s Multi-tranche Financing Facility (MFF) would have the following components in Tranche 2, namely: Part A: 220/132 kV sub-stations Part B: 132/33 kV sub-stations Part C: 220 kV transmission lines
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
3
Part D: 132 kV transmission lines Part E: Augmentation, Extension and refurbishment of existing sub-stations and reactive
power compensation Part F Communication system Part G Capacity Development Program The details of Sub-Projects under Tranche 2are given below in Table No. 1.0:
Table No.1.0: Sub-Projects under Tranche 2 Sl. No. Name of the Sub-Project
Part A: 220/132/33 kV sub-stations MVA
a) 2x100 MVA 220/132/33kV Sonapur Sub Station 200 b) 2x100 MVA 220/132/33kV Sonabil Sub Station 200
Part B: 132/33 kV sub-stations a) 2x40 MVA 132/33kV Kamakhya Sub Station 80 b) 2x40 MVA 132/33kV Jorhat (West) Sub Station 80 c) 2x25 MVA 132/33kV Bordubi Sub Station 50 d) 2x25MVA 132/33kV Matia Sub Station 50 e) 2x16 MVA 132/33kV Bilasipara Sub Station 32 f) 2x16 MVA 132/33kV Hailakandi Sub Station 32
Part C: 220kV transmission lines Length (Km)
a) 220kV D/C LILO of Samaguri - Sarusajai Line at Sonapur
13.4131
b) 220kV S/C Mariani - Namrup Line on D/C Towers 145.9562
c) 220kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
1.5413
Part D: 132 kV transmission lines Length (Km)
a) 132kV D/C LILO of Depota - Gohpur Line at Sonabil
1.2274
b) 132kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
41.3045
c) 132kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)
1.9586
d) 132kV S/C LILO of Namrup - Tinsukia Line at Bordubi
2.4277
e) Stringing of 2nd
Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line
60.4558
f) 132kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
1.2029
g) 132kV S/C of Agia - Matia Line (On D/C Towers) 22.53410
1The line length provided in original IEE Report (April, 2010) was 20 km. There was no change in alignment. However, the final
length after route survey was found to be 13.413 km. 2The line length provided in original IEE Report (April, 2010) was 140 km. Due to realignment the revised length was 145.956 km.
(excluding gantry length). Addendum IEE was prepared in April 2016 and disclosed on ADB website in May 2016. 3The line length provided in original IEE Report (April, 2010) was 2.5 km. There was no change in alignment. However, the final
length after route survey was found to be 1.541 km. 4The line length provided in original IEE Report (April, 2010) was 1.5 km. There was no change in alignment. However, the final
length after route survey was found to be 1.227 km. 5The line length provided in original IEE Report (April, 2010) was 25 km. However, the final length after route survey was 41.304
km. The work is under progress and line length may change further. Addendum IEE is required to be prepared. 6The line length provided in original IEE Report (April, 2010) was 5.0 km. There was no change in alignment. However, the final
length after route survey was found to be 1.958 km. 7The line length provided in original IEE Report (April, 2010) was 6.0 km. There was no change in alignment. However, the final
length after route survey was found to be 2.427 km. 8 The line length for 2nd circuit stringing was not provided in the original IEE Report. The stringing has been done on existing
towers only.Addendum IEE is required to be prepared. 9The line length provided in original IEE Report (April, 2010) was 4.0 km. There was no change in alignment. However, the final
length after route survey was found to be 1.202 km.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
4
Part E:Augmentation, Extension and refurbishment of existing sub-stations and reactive power compensation Augmentation of Transformer Capacity MVA
a) Jagiroad (Baghjap), 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers
b) Gohpur, 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
c) North Lakhimpur, 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
d) Lanka (Sankardevnagar), 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers
e) Margherita (Ledo) 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
f) Tinsukia, 220/132/33 kV Substation
Addition of new 2x40 MVA 132/33 kV transformers and new 2x100 MVA 220/132 MVA transformers in place of old 2x50 MVA, 220/132 transformers
g) Kahilipara, 132/33 kV Substation
New 2x40 MVA, 132/33 MVA transformers in place of old 2x10 MVA, 132/33/11 kV transformers.
h) Mariani, 220/132/66/33 kV Substation Addition of new 2x25 MVA, 132/33 MVA transformers
i) Boko. 220/132/33 kV Substation Addition of new 1x100 MVA, 220/132 MVA transformers
Extension for Line Bays
a) Mariani 220/132/66/33 kV Substation Two numbers of 220 kV Line Bays for Mariani - Namrup 220 kV S/C transmission Line on D/C towers.
b) Namrup, 220/132/33 kV Substation Two numbers of 220 kV Line Bay for Mariani - Namrup 220 kV S/C transmission Line.
c) Tinsukia, 220/132/33 kV Substation One number of 132 kV Line Bays for Tinsukia - Rupai 132 kV S/C Transmission Line
d) Agia, 220/132/33 kV Substation One number of 132 kV Line Bays for Agia - Matia 132 kV S/C Transmission Line
Installation of 33 kV Capacitor Banks MVAR
a) Pailapool 132/33 kV Substation
2x5 MVAR
b) Gohpur 132/33 kV Substation 2x5 MVAR c) Jorhat (Gormur) 132/33 kV Substation
2x10 MVAR
d) Sishugram 132/33 kV Substation 2x10 MVAR e) Nazira 132/33 kV Substation 2x5 MVAR f) Panchgram 132/33 kV Substation 2 x 5 MVAR g) Chandrapur 132/33 kV Substation 2 x 5 MVAR h) Barnagar 132/33 kVSubstation 2x10 MVAR
Replacement of Old & Obsolete Equipment
a) Circuit Breakers 220 kV: 12 nos., 132 kV: 66 nos., 33 kV: 61 nos
b) Current Transformers 220 kV: 6 nos., 132 kV: 69 nos., 33 kV: 42 nos
c) Potential Transformers 132 kV: 9 nos., 33 kV: 9 nos
10
The line length provided in original IEE Report (April, 2010) was 35.0 km. There was no change in alignment. However, the final
length after route survey was found to be 22.534 km.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
5
d) Isolators 220 kV: 6 nos., 132 kV: 26 nos
e) Relay and Control Panels
220 kV Line Panel: 2 nos., 132 kV Line panel: 15 nos., 132 kV Transformer Panel: 2 nos., 132 kV Bus Coupler Panel: 8 nos.
f) Numerical Relays Distance Relays Distance Relay: 3 nos., Differential Relay: 2nos
g) Battery Bank 220 volt system: 1 no., 110 volt system: 5 nos.
Part G: Capacity Development Program: Training program to enhance the capacity building for EA/IA officials conducted on 21
st November, 2014 at Guwahati and on 12
th December, 2014 at Jorhat.
1.2 Project Progress Status and Implementation Schedule A. Progress Status 8. The updated project progress status for the Substations, Transmission Lines and Augmentation, Extension and Refurbishment of Existing Sub-Stations and Reactive Power Compensation from January to June 2016 under Tranche 2 are given below in Table No. 2.0, Table No. 2.1and Table No. 2.2 respectively:
Table No. 2.0: Project Progress Status (Substations) SI. No.
Name of sub-project Status
1
Construction of 220/132/33 kV Sub Station. (Contractor: M/S NECCON Power & Infra Ltd.)
A. Sonapur Sub Station. (4.29ha of private barren land acquired)
Construction of Boundary wall is in progress (approx. 45%.completed). Top soil is being preserved for reuse in project.
The overall work progress of this Substation is 62.25% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land
No major adverse environmental issues identified
B. Sonabil Sub Station. (7.33 ha of private barren land acquired)
This Substation was commissioned on 18th February 2016
No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
Construction of 132/33 kV Sub Station. (Contractor: Alstom T & D India Ltd.)
2
A. Kamakhya Sub Station (0.4ha of private barren land acquired)
Construction of Boundary wall is in progress (approx. 60%.completed).
The overall progress of this Substation is 51.36% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
B. Jorhat (West) Sub Station. (3.43 ha of private barren land acquired)
This Substation was commissioned on 26th December 2015
No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
C. Bordubi Sub Station. This Substation was commissioned on 20th December 2015
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
6
SI. No.
Name of sub-project Status
(2.48 Ha. Private Tea Garden land acquired)
No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
D. Matia Sub Station. (3.33 ha of Govt. land acquired)
Construction of Boundary wall is completed. Switch yard & control room work is completed. Transformer and control room equipment testing is in progress. No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
E. Bilasipara Sub Station. (4.0 ha of Government land acquired)
Construction of Boundary wall is completed. Control room &switch yard works are completed. Land development works within the yard are completed. Equipment testing is in progress No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
F.
Hailakandi Sub Station. (1.81ha of private land acquired)
Construction of Boundary wall is completed. The overall progress of this Substation location is 98.98% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified
Table No. 2.1: Project Progress Status (Transmission Lines)
SI. No.
Name of sub-project Status
Construction of 220kV Transmission Lines. (Contractor: M/S NECCON Power & Infra Ltd.)
1.
A.
220 kV D/C LILO of Samaguri - Sarusajai Line at Sonapur. Length – 13.413 kms.
Tower foundation work up to this period completed to 95.35% and tower erection completed to 60.97%
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of March 2016.
B.
220 kV S/C Mariani - Namrup Line on D/C Towers. Length – 145.956kms.
1 Circuit of this line is tested & commissioned No Forest Land and No Wild Life Sanctuary falling in the route
alignment No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of April 2016.
C.
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil. Length – 1.541kms.
This Transmission line was charged on 18th February 2016
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of April 2016.
Construction of 132kV Transmission Lines. (Contractor: M/S Shyama Power India Ltd.)
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
7
SI. No.
Name of sub-project Status
2.
A.
132 kV D/C LILO of Depota - Gohpur Line at Sonabil. Length – 1.227 kms.
Line was charged on 31st August 2015
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of April 2016.
B.
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur. Length – 41.304kms.
Tower foundation work up to this period completed to 65.69% and erection completed to 46.71%.
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of March 2016.
C.
132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West). Length – 1.958 kms.
Line was charged on 06th July 2015
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of April 2016.
D.
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi. Length – 2.427 kms.
Line is charged on 13th July 2015.
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of May 2016.
E.
Stringing of 2nd
Circuit of 132 kV Samaguri– Lanka (Sankardevnagar) Line. Length – 60.455 kms.
This line is under operation stage. No Forest Land and No Wild Life Sanctuary falling in the route
alignment No major adverse environmental issues identified.
Air, water and noise monitoring in post construction period was conducted by the Environmental Monitoring Agency in the month of December, 2015.
F.
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi. Length – 1.202kms.
Line is charged on 01st June 2015.
No Forest Land and No Wild Life Sanctuary falling in the route alignment
No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of May 2016.
G. 132 kV S/C of Agia - Matia Line (On D/C Towers). Length – 22.534 kms.
All work for this line is completed. No Forest Land and No Wild Life Sanctuary falling in the route
alignment No major adverse environmental issues identified.
Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of February 2016
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
8
Table No. 2.2 Project Progress Status (Augmentation, Extension and refurbishment of existing sub-stations and reactive
power compensation)
Name of Subproject Status
Augmentation of Transformer Capacity
MVA
Jagiroad (Baghjap), 132/33 kV Substation
New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers
All works at these Substation locations are completed.
Gohpur, 132/33 kV Substation
New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
North Lakhimpur, 132/33 kV Substation
New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
Lanka (Sankardevnagar), 132/33 kV Substation
New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers
Margherita (Ledo) 132/33 kV Substation
New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers
Tinsukia, 220/132/33 kV Substation
Addition of new 2x40 MVA 132/33 kV transformers and new 2x100 MVA 220/132 MVA transformers in place of old 2x50 MVA, 220/132 transformers
Kahilipara, 132/33 kV Substation
New 2x40 MVA, 132/33 MVA transformers in place of old 2x10 MVA, 132/33/11 kV transformers. Mariani,
220/132/66/33 kV Substation Addition of new 2x25 MVA, 132/33 MVA transformers
Boko. 220/132/33 kV Substation
Addition of new 1x100 MVA, 220/132 MVA transformers
Extension for Line Bays
Mariani 220/132/66/33 kV Substation
Two numbers of 220 kV Line Bays for Mariani - Namrup 220 kV S/C transmission Line on D/C towers.
Erection work is Completed. Line Bays are completed and commissioned
Namrup, 220/132/33 kV Substation
Two numbers of 220 kV Line Bay for Mariani - Namrup 220 kV S/C transmission Line.
Earthing System, Cable Trench and stringing work of bus is completed.
Tinsukia, 220/132/33 kV Substation
One number of 132 kV Line Bays for Tinsukia - Rupai 132 kV S/C Transmission Line
All work at this Substation location is completed.
Agia, 220/132/33 kV Substation
One number of 132 kV Line Bays for Agia - Matia 132 kV S/C Transmission Line
All work at this Substation location is completed.
Installation of 33 kV Capacitor Banks
MVAR
Pailapool 132/33 kV Substation:
2x5 MVAR
For Installation of 2 Sets 2x5MVAR Capacitor Bank with NCT, Reactors, BPI and with other associated equipment’s, Bay Steel Structures for extension of 33KV Bus, space and locations at this sub-station are not available/sufficient. This work scope is now diverted to Kahilipara Substation. The work is yet to
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
9
commence.
Gohpur 132/33 kV Substation: 2x5 MVAR
The erection of Capacitor Bank and Bus work is completed at this Substation. Commissioning work is in progress
Jorhat (Gormur) 132/33 kV Substation
2x10 MVAR All work at this Substation location is completed.
Sishugram 132/33 kV Substation: 2x10 MVAR
All the equipment’s for Capacitor Bank are now erected. However, due to non-availability of Cables the Capacitor Bank is not commissioned. Erection, Testing & Commissioning of 2 Sets 132KV C.B. completed.
Nazira 132/33 kV Substation: 2x5 MVAR All work at these Substation locations is completed.
Panchgram 132/33 kV Substation 2 x 5 MVAR Chandrapur 132/33 kV Substation 2 x 5 MVAR
Barnagar 132/33 kv Substation 2x10 MVAR It was proposed earlier but actually not required.
Replacement of Old & Obsolete Equipment
Circuit Breakers 220 kV: 12 nos., 132 kV: 61 nos., 33 kV: 61 no’s
All the work are completed under this subproject
Current Transformers 220 kV: 6 nos., 132 kV: 69 nos., 33 kV: 42 no’s
Potential Transformers 132 kV: 9 nos., 33 kV: 9 no’s Isolators 220 kV 6 nos., 132 kV: 26 no’s
Relay and Control Panels
220 kV Line Panel: 2 nos., 132 kV Line panel: 15 nos., 132 kV Transformer Panel: 2 nos., 132 kV Bus Coupler Panel: 8 nos.
Numerical Relays Distance Relays 3 nos., Transformer Differential Relay: 2nos
Battery Bank 220 volt system: 1 no., 110 volt system: 5 Nos.
B. Implementation Schedule 9. The entire works related to tranche 2 were scheduled to be completed within 36 months from effective date of project approval from ADB. Package wise contract details are provided below in Table No. 3.0:
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
10
Table No. 3.0: Package Wise Progress Details
Name of the
Packages
Sub projects under this package
Contractor Contract
Award Date
Contract Completion Date
Cumulative % Progress Remarks
A
220/132/33KvSonapur S/S M/S NECCON Infra
& Power Ltd 20.07.2012
31.03.2013 (Original)
30.06.2016 (4th Revision)
88.62%
Sonabil Substation is Commissioned on 18
th February 2016.
Work at Sonapur Substation is in progress.
220/132/33KvSonabil S/S
B
132/33kVKamakhya S/S
M/S Alstom T&D India Ltd
14.09.2012
07.05.2014 (Original)
30.06.2016 (4th Revision)
94.01%
Work is in progress at Kamakhya Substation. Jorhat and Bordubi Substations commissioned in December 2015. At Matia, BilasiparaHailakandi Substations work is near completion.
132/33kV Jorhat (West) S/S 132/33kVBordubi S/S 132/33kVMatia S/S 132/33kVBilasipara S/S 132/33kVHailakandi S/S
C
220kV D/C Sonapur LILO J/V of M/S NECCON Power Infra Ltd and M/S Trans Global Power Ltd
12.11.2011
11.12.2013 (Original)
30.06.2016 (4th Revision)
92.80%
Work in progress at Sonapur LILO Testing and Commissioning ongoing at Mariani-Namrup line Sonabil LILO charged on 18
th February
2016
220kV S/C Mariani–Namrup Line on D/C Towers 220kV D/C Sonabil LILO
D
132kV D/C Sonabil LILO.
M/S Shyama Power India Ltd
21.09.2011
16.11.2013 (Original)
31.03.2016 (2nd Revision)
88.03%
Jorhat (West), Bordubi, Agia-Matia, Hailakandi and Samaguri – Lanka Transmission Line work is completed. Samaguri– Lanka T/L is under operation. Sonapur LILO T/L tower foundation anderection works are in progress.
132kV D/C Sonapur LILO 132kV S/C Jorhat LILO 132kV S/C Bordubi LILO Stringing of 2
nd Circuit of 132
kV Samaguri - Lanka T/L 132kV S/C Hailakandi LILO
132kV S/C of Agia – MatiaT/L
E
Augmentation of Transformer Capacity
M/S NECCON Infra & Power Ltd
03.09.2012
30.04.2014 (Original)
31.03.2016 (2nd Revision)
98.35% Work is completed under this subproject.
Jagiroad (Baghjap), 132/33 kV Substation Gohpur, 132/33 kV Substation North Lakhimpur, 132/33 kV Substation Lanka (Sankardevnagar),
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
11
Name of the
Packages
Sub projects under this package
Contractor Contract
Award Date
Contract Completion Date
Cumulative % Progress Remarks
132/33 kV Substation Margherita (Ledo) 132/33 kV Substation Tinsukia, 220/132/33 kV Substation Kahilipara, 132/33 kV Substation Mariani, 220/132/66/33 kV Substation Boko. 220/132/33 kV Substation Extension for Line Bays Erection work is completed at Mariani
substation. Line Bays are Completed and commissioned Earthling System, Cable Trench and Stringing of Bus is Completed at Namrup substation but not connected with existing twin bus. Work is completed for Agia and Tinsukia substation.
Mariani 220/132/66/33 kV Substation Namrup, 220/132/33 kV Substation Tinsukia, 220/132/33 kV Substation Agia, 220/132/33 kV Substation Installation of 33 kV Capacitor Banks Pailapool 132/33 kV Substation
In Sishugram substation all the equipment’s for Capacitor Bank are now erected. However, due to non-availability of cables, the capacitor bank is not commissioned. Erection, Testing& Commissioning of 2 Sets 132KV C.B. completed. The scope of work for Pailapoolsubstation is now diverted to Kahilipara substation. The work is yet to commence.
Gohpur 132/33 kV Substation Jorhat (Gormur) 132/33 kV Substation Sishugram 132/33 kV Substation: Nazira 132/33 kV Substation: Panchgram 132/33 kV Substation Chandrapur
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
12
Name of the
Packages
Sub projects under this package
Contractor Contract
Award Date
Contract Completion Date
Cumulative % Progress Remarks
132/33 kV Substation The erection of Capacitor Bank and Bus work is completed at Gohpur substation. Commissioning work is in progress In case of Barnagar substation the work proposed earlier is not required now. Work is completed at Jorhat (Gormur), substation, Nazira substation, Panchgram substation and Chandrapur substation.
Barnagar 132/33 kV Substation
Replacement of Old & Obsolete Equipment
All the work are completed under this subproject
Circuit Breakers Current Transformers Potential Transformers Isolators 220 kV Relay and Control Panels Numerical Relays Distance Relays Battery Bank
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
13
2.0 Compliance to National Regulations The relevant applicable Acts and Legislations to the project are given in the Table No.4.0
Table No. 4.0: Applicable Acts and Legislations to the project
Act/Rule/Notification Year Objectives Compliance
Status
The Environment (Protection) Act The Environment (Protection) Rules
1986 1986
To protect and improve the overall environment.
Complied
Indian Forest Act Forest (Conservation) Act Forest (Conservation) Rules
Forest Conservation Rules (Notification)
1927
1980
1981
2003
To consolidate the laws related to forest, the transit of forest produce and the duty levy able on timber and other forest produce. Conservation of Forests, Judicious use of forestland for non-forestry purposes; and to replenish the loss of forest cover by Compensatory Afforestation on degraded forestland and non-forest land. Procedure for submission of the proposals seeking approval for Central Government for diversion of forestland to non-forest purposes.
Not Applicable
No Forest
Land is involved in the project.
Wild Life (Protection) Act
The Wild Life (Protection) Amendment Act
1972
2002
To protect wildlife in general and National Parks and Sanctuaries in particulars. To protect wild animals, birds and plants with a view to ensure the ecological and environmental security of the country
Not Applicable
No Wild Life
Protected area is
involved in the project.
The Water (Prevention and Control of Pollution) Act
1974 To control water pollution by controlling discharge of pollutants as per prescribed standards
Complied
The Air (Prevention and Control of Pollution) Act
1981 To control air pollution by controlling emission of air pollutants as per prescribed standards
Complied
The Noise Pollution (Regulation and Control) Rules The Noise Pollution (Regulation and Control) Amendment Rules
2000
2006
To regulate and control noise producing and generating sources with the objective of maintaining the ambient air quality standards in respect of noise
Complied
The Ancient Monuments and Archaeological Sites and Remain Act
1958
To provide for the preservation of ancient and historical monuments and archaeological sites and remains of national importance and protection sculptures, carvings and other like objects.
Not Applicable No ASI site identified so
far.
The Electricity Act 2003
Although the Act does not explicitly deal with environmental implications of activities related to power generation, transmission and distribution. However, ASEB integrates environment protection as a part of its project activities.
Complied
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
14
3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 10. The Table 5.0 shows the applicable Environmental Covenants from the ADB Loan Agreement
Table No.5.0: Environmental Covenants
Product Schedule Para No. Description Remarks/Issues
Loan 2677
5 14
The State through ASEB shall ensure that the Subprojects under the Project are undertaken and that all Project facilities are designed, implemented, operated and maintained in accordance with all applicable laws, and regulations of the Borrower, the State, and ADB's Safeguard Policy Statement (2009), as set out in the EARF. The State shall ensure that all associated projects will be constructed and commissioned in compliance with the laws and regulations of the Borrower.
It is being complied as per ADB's Environment Policy (2002), as set out in the EARF. The EMP is being implemented in accordance with applicable laws and regulations of GOI, GOA, and the ADB guidelines. Further an Environment monitoring agency has been placed to carry out the regular environmental monitoring as set out in the EMP. The environmental monitoring has been carried out in all three phases’ i.e. pre- construction, during construction and post construction phase.
Loan 2677
5 15
For each Subproject, ASEB shall cause the IA to prepare and implement the necessary IEE/EIA as applicable, and EMP (with budget) in accordance with the EARF. For Subprojects, the environmental categorization and assessment procedures defined in the EARF shall be followed. For any environment category A or B sensitive Subproject, a SEIA/SIEE as applicable shall be prepared and made available to the public 120 days before the Subproject is submitted to ADB for approval. ASEB through the IA shall monitor, audit, and report to ADB twice a year on the implementation of the EMPs for each Subproject.
It is being complied. The project falls under category B and IEE for the subprojects has been prepared accordingly. Consultant Supporting ESMU in PMU is internally monitoring the EMP implementation and submitting semi-annually progress reports to PMU which are further being submitted to ADB by PMU. Further an Environment monitoring agency is in place and is carrying out environmental monitoring regularly as set out in the EMP for all three phases i.e. pre- construction, during construction and post construction phase. Since subproject involves no major environmental issues, hence hiring of independent external monitoring agency is not felt by APDCL & AEGCL (EA).
4.0 Compliance to Environmental Management Plan 11. Based on the Environmental Management Plan the Compliance Status on Environmental issues in Tranche 2 Subprojects for ConstructionPhaseand Operation & Maintenance Phase has been prepared and presented in Table No. 6.0
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
15
Table No. 6.0: CompliancetoEnvironmental Management Plan (Tranche 2 Subprojects)
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
Construction Stage
Equipment layout and installation
Noise and vibrations
Construction techniques and machinery selection to minimize noise and vibration. Noise to be limited to 70 dB (A) at site boundaries. Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) to conduct periodic spot checks to confirm compliance.
Construction Contractor PMU/ESMC
APCB
Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) conducted periodic spot check to confirm compliance. Being Complied. The noise level monitoring is being carried by the environment monitoring agency (ENGECORC, Guwahati) on regular basis.
Physical construction (manual labor)
Disturbance of farming activity
Construction activities on cropping land timed to avoid disturbance of field crops (within one month of harvest wherever possible).
Construction Contractor PMU/ESMC
ADEF Being complied. Contractors are avoiding disturbance to field crops
Mechanized construction
Noise, vibration, and operator safety, equipment wear and tear
Construction equipment to be maintained in accordance with GOI standards for noise exposure to workers. Equipment to be shut off when not in use.
Construction Contractor PMU/ESMC
APCB
Being Complied. Noise level monitoring was conducted by environment monitoring agency as per monitoring scheduled agreement.
Substation site clearance
Removal of trees and other vegetation
Marking of trees / vegetation to be removed prior to clearance, and strict control on clearing activities to ensure minimal clearance.
Construction Contractor PMU/ESMC
ADEF
Being complied. Enumeration of trees / vegetation to be removed prior to clearance, to ensure minimal clearance.
Trimming /cutting of trees within Right-of-Way(RoW)
Fire hazards
Trees allowed growing up to a height within the RoW by maintaining adequate clearance between the top of tree and the conductor as per transmission design
Construction Contractor PMU/ESMC
ADEF
Being Complied. Adequate clearance between the top of tree and the conductor as per
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
16
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
Temporary loss of vegetation and permanent deforestation
standards. Trees that can survive pruning to comply with vertical and horizontal separation requirements should be pruned instead of cleared. Felled trees and other cleared or pruned vegetation to be disposed of as authorized by ADEF
transmission design standards being maintained within RoW.
Wood /vegetation harvesting
Temporary loss of vegetation and permanent deforestation
Construction workers prohibited from harvesting wood in the project area (apart from locally employed staff continuing current legal activities).
Construction Contractor PMU/ESMC
ADEF Being Complied. Contractors are using gas/ kerosene for cooking.
Temporary encroachment into farmland
Temporary loss of agricultural productivity
Use existing access roads wherever possible. Ensure existing irrigation facilities are maintained in working condition. Protect/preserve top soil and reinstate after construction completed. Repair/reinstate any damaged bunds after construction completed.
AEGCL/PMU APCB
Wherever possible existing access roads are being used. Farmers being compensated wherever temporary lands are being encroached. Top soil are being preserved and being reused for filling.
Social inequities Compensation for temporary loss in agricultural production as per resettlement plan
AEGCL/PMU ADB Being complied.
Ambient air quality and noise level and Water quality
Dust, exhaust, & noise emissions from construction equipment. Noise impacts on nearby communities& construction workers
Controlled construction activities & maintenance of machineries, timely scheduling of construction activities to avoid nuisance to nearby communities. Construction equipment to meet GOI
Construction Contractor
PMU /ESMC APCB
Being Complied. Monitoring of air, water and noise was conducted by the environment monitoring agency as per monitoring scheduled agreement.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
17
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
emissions & noise standards. Water sprays to be used for dust control as necessary.
Storage of chemicals and any hazardous materials
Possible spills resulting in contamination land, water, and air
Fuel and any other hazardous materials will be securely stored to prevent spills. Contractors to provide spill response kit in accordance with Material Safety Data Sheets for chemicals and hazardous materials.
Construction Contractor
PMU /ESMC APCB
Being Complied. Contractors are storing oils and fuels on cemented floor to prevent spills leading to contamination of surface&ground water and land.
Construction equipment maintenance
Industrial waste water from maintenance may cause petroleum and detergent contamination of soil and water
Construction contractor to provide sedimentation and biological treatment if necessary
Construction contractor
PMU/ESMC
APCB
Construction equipment maintenance to prevent soil and water contamination.
Construction schedules
Noise nuisance to neighboring properties
Construction activities only undertaken during the day and local communities informed of the construction schedule.
Construction Contractor
PMU /ESMC APCB
Being Complied. Monitoring of noise levels was undertaken by the environment monitoring agency as per monitoring scheduled agreement.
Health and safety Injury and sickness of workers and members of the public
Contract provisions specifying minimum sanitation, health, and safety requirements for construction camps. Contractor to prepare and implement a health and safety plan including worker training and daily/weekly briefings.
Construction Contractor PMU/ESMC
APCB, ASSAM
DEPARTMET OF HEALTH
Being Complied. Contractors are regularly using Personnel Protective Equipment’s during construction time. First aid box and fire extinguisher are kept at work site.
Provision of Sanitary facilities for construction workers
Potential BOD and fecal coli form contamination
Construction workforce facilities to include proper sanitation, water supply, waste disposal facilities, including primary treatment for domestic sewage and secure disposal of domestic solid wastes.
Construction Contractor
PMU /ESMC APCB
Being Complied. Contractors are providing sanitary and waste disposal facilities at construction camp.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
18
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
Construction waste management
Air, soil, and water pollution due to inadequate management and control
Construction wastes to be managed in accordance with GOI standards & industry best practices. Waste lubricating oils to be disposed or recycled off-site by licensed service companies. Transformer oils to be returned to vendors via existing arrangements for transformer maintenance. Scrap steel & other salvaged materials to be auctioned and disposed / recycled off-site by licensed vendors.
Construction Contractor
PMU /ESMC APCB
ADB Review Mission
Being Complied. Construction waste is being managed properly.
Construction Stage Monitoring
Inadequate Monitoring and Mitigation leading to environmental impairments at and around project sites
Training of AEGCL/PMU/ESMC staff Implementation of effective environmental monitoring and reporting system using checklist of all contractual environmental requirements.
PMU/ESMC and safeguard consultants
APCB
Training of AEGCL/PMU/ESMC staff conducted. Environmental monitoring and reporting was carried out.
Operational And Maintenance Phase
Design and location of substations and transmission towers
Exposure to noise and other safety related risks
Set back of dwellings to overhead line route designed in accordance with transmission design standards Buffer zones and across control at substations. Transmission line design to comply with the limits of electromagnetic interference from overhead power lines
AEGCL/PMU/ ESMC
APCB Being complied Transmission line designs are of desired standards.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
19
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
Provision of staff/workers health and safety during operations
Injury and sickness of staff and other workers Soil and water contamination from domestic wastewater and solid wastes
Best design practices will be followed to minimize hazards. Housekeeping and maintenance at substation in accordance with GOI standards and industry best practices. Safety and awareness for staff. Preparation of fire emergency action plan and relevant staff training Provide adequate sanitation , water supply, wastewater control, and solid waste management facilities
AEGCL/PMU/ ESMU
APCB, Assam
Department Of Health
Being complied Sanitation facilities, Drinking water and Safety facilities are in place. . Housekeeping and maintenance also being done as per guidelines.
Electric shock hazards
Injury/mortality to staff and public
Careful design using appropriate technologies to minimize hazards Barriers to prevent climbing on/dismantling of transmission towers. Appropriate warning signs on facilities. Electricity safety awareness raising in project areas.
AEGCL/PMU/ ESMU
APCB, Assam
Department Of Health
Substations and transmission towers have been designed by using appropriate technologies to minimize hazards. Electrical safety sign boards are installed. Rubber mats, fire extinguisher, sand buckets and PPE are available in substations.
Fire and explosion hazards
Loss of property and health hazards
Maintaining adequate clearance from conductors and ground vegetation, adequate safety design in substations to avoid fire hazards due to flashovers
AEGCL/PMU/ ESMU
APCB
Adequate clearance between the top of tree and the conductor as per transmission design standards being maintained within RoW
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
20
Project Activity Environmental Issues Management / Mitigation Measures Responsibility
Compliance Status/ Remarks Planning/
Implementation Monitoring/ Supervision
Industrial waste generation
Potential soil and water contamination
Waste to be managed in accordance with GOI standards and industry best practices. Waste lubrication oils to be disposed or recycled off- site by licensed service companies. Transformer oils to be returned to vendors via existing arrangements for transformer maintenance
AEGCL/PMU/ ESMU
APCB
ADB review Mission
Industrial waste shall be managed properly in accordance with applicable laws.
Transmission line maintenance
Exposure to electromagnetic interference
Transmission line design to comply with the limits of electromagnetic interference from overhead power lines.
AEGCL/PMU/ ESMU
ADEF, APCB Being complied.
Operation and maintenance staff skills
Potential list time accidents and injuries, and possible environmental losses of various types
Adequate training in O&M to all relevant staff of transmission line and substation maintenance crews Preparation and training in the use of O&M manuals and standards operation practices
AEGCL/PMU/ ESMU
APCB, other relevant state
agencies
Being complied.
Periodic environmental monitoring
Inadequate monitoring may result in diminished ecological and social values
AEGCL/PMU staff to receive training in environmental monitoring of project operations and maintenance activities
AEGCL/PMU/ ESMU
ADB review missions
Post construction environmental monitoring conducted for all transmission line between February 2016 to May 2016 expect for Stringing of 2nd Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line where monitoring was conducted in December 2015 .
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
21
5.0 Safeguards Monitoring Results and Unanticipated Impacts A. Environmental Monitoring Schedule 12. In order to comply with requirements of Environmental monitoring an external environmental monitoring agency11 (M/s En Geo Consultancy & Research Centre, Guwahati) has been hired by PMU to carry out the environmental monitoring with regards to air quality, water quality and noise levels during preconstruction, construction and post construction stage. The primary responsibility of the environmental monitoring agency are for testing, analysing and reporting impact of transmission lines & substation projects on air, ground/ surface water and noise levels. 13. Since the civil construction works under the project are very meagre, hence, the environmental monitoring for ambient air quality, water quality and noise levels during various stages – pre construction, construction and post construction are being monitored for Tranche 2 as per below schedule. (Refer Table 7.0).
Table No. 7.0: Environmental Monitoring Schedule for Tranche 2
Sl. No.
Parameters Locations Frequency As per IEE
Monitoring Conducted
Construction Period
1 Ambient Air quality monitoring
All substation Sites and selected transmission lines.
Every 6 months, beginning with initial activity, for total of 18 months
At Sub Stations: Twice during construction At Transmission lines: Once during pre-construction; Twice during construction
2 Ambient Noise level monitoring
3 Water quality monitoring
Operation and Maintenance Period
1 Ambient Air quality monitoring All substations
and transmission lines
As necessary based on inspections and complaints
At Transmission lines: Once during post construction 2
Ambient Noise level monitoring
3 Water quality monitoring
B. Environmental Monitoring Parameters 14. The details of parameters for Ambient Air, Water and Noise being monitored by external environmental monitoring agency are given below in Table 8.0.
Table No. 8.0: Environmental Monitoring Parameters Sl. No.
Environmental Parameters
Analytical Parameters
1 Air Quality Monitoring PM10, PM2.5 ,SO2, NO2
2 Ground Water Quality Monitoring
pH, Turbidity (NTU), Specific Conductance (micro mhos/cm), Total Dissolved Solids (TDS), Total Alkalinity (as CaCO3), Total Hardness (as CaCO3), Calcium (as Ca), Magnesium (as Mg), Chlorides (as Cl), Sulphates (as SO4), Nitrates (as NO2), Fluoride (as F), Arsenic (as As), Selenium (as Se), Cadmium (as Cd), Copper (as Cu), Lead (as Pb), Zinc (as Zn).
11
Ref.Contract Agreement No. PMU/03/OF 2011-12 dated June 04, 2012 between Assam State Electricity Board and En-Geo
Consultancy & Research Centre
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
22
Sl. No.
Environmental Parameters
Analytical Parameters
3 Surface Water Quality Monitoring
Colour (Hazen Units), Dissolved Oxygen (DO), pH, Iron (as Fe), Chlorides (as Cl), Biological Oxygen Demand (BOD), Total Dissolved Solids (TDS), Copper (as Cu), Total Chromium (as Cr), Sulphate (as SO4), Nitrates (as NO3), Fluoride (as F), Total Coliform (MPN/100ml), Cadmium (as Cd), Selenium (as Se), Arsenic (as As), Lead (as Pb), Zinc (as Zn), Chromium (as Cr+6), Phenolic compounds (as C6,H5OH, Oil & Grease).
4 Noise Level Day and Night time
C. Environmental Monitoring Status 15. The environmental monitoring for ambient air quality, water quality and noise levels have been conducted and details are as under: Substation: Environmental monitoring was conducted twice during construction stage in the month of November 2013 and April 2014. Transmission lines: Environmental monitoring conducted once during preconstruction stage in the month of December 2012/January 2013 and twice during construction stage in the month of November 2013 and April 2014 and once during post construction stage in the period December 2015 to May 2016. Post construction environmental monitoring for ambient air quality, water quality and noise levels along all thetransmission lineswas carried out during this reporting period between February 2016 and May 2016 (expect for Stringing of 2nd Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line where monitoringwas completed in December 2015). Monitoring of ambient air quality, noise level and water quality was conducted betweenFebruary 2016 - May 2016 at 61 locations Ref. Annexure – I (A), Annexure – I (B) and Annexure – I (C) respectively. Site photographs showing ambient air quality monitoring, noise level monitoring and Water quality monitoring undertaken during this reporting period are given inAnnexure – II (A), Annexure – II (B) and Annexure – II (C) respectively. The environmental monitoring results are awaited and same shall be provided in next Environmental Safeguard Monitoring Report i.e. July– December, 2016. 6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders 16. There are 5 circles under AEGCL for substations and T/Ls. One Grievance Redressal Committee (GRC) cell at each circles level has been formed (i) to provide support to affected persons (AP’s) on problems arising from the environmental activities. (ii) record grievances of the AP’s and resolve them; and (iii) review grievances involving benefits like compensations for private tree loss and assistance to AP’s. A directive in this regard from Director (PMU), ASEB dated January 19, 2012 have been issued to AEGCL and APDCL, who are the Implementing Agencies of the MFF. GRC at circle levels are formed and Project Authorities are the Chairman of respective circles to comply the grievances in regard to environmental activities if any. The GRC constitutes representatives of
i. Concerned Project Authority (IA) Chairman of the committee
ii. One official from the o/o the concerned
District Magistrate or SDM (Civil) Member
iii. Concerned Circle Officer or his representative Member
iv. Concerned Project Manager (IA) Member
v. Deputy General Manager (PMU), APDCL Member
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
23
vi. AGM, Environment & Social Management Unit (ESMU) Member
vii. Land Acquisition Officer (LAO), AEGCL Member
viii. Affected Person(s)/GaonBurha Member
17. Grievance Redress Committee (GRC) set up at circle level to monitor subprojects Implementation for each subproject affected area. The GRC will determine the merit of each grievance, and resolve grievances within an outer time limit of three months of receiving the complaint. The AP has the right to refer the grievances to appropriate courts of law if not satisfied with the redress at any stage of the process. The set up GRC has the system of records keeping, contact details of complainant, date of the complaint received, nature of grievance etc. if any for the ongoing project and taking the necessary action against the complaint. During this reporting period no formal complaint or grievances from have been registered. 7.0 Institutional Arrangement
18. The primary institutions involved in the project are: Assam Electrical Grid Corporation and Assam Power Distribution Company Limited (EA and IA), Project Management Unit (PMU), Environment and Social Management Unit (ESMU) at PMU Level and External Environmental Monitoring Agency. 19. The Assam Electrical Grid Corporation Limited (AEGCL) is the executing agency (EA) for the Tranche-2. The AEGCL functions as the implementing agency (IA) for the project with a dedicated Project Management Unit (PMU). The PMU is assisted by an Environment and Social Management Unit (ESMU) to deal with the environmental and social safeguards issues. 20. The Environment and Social Management Unit (ESMU) has been set up within the PMU/APDCL, along with other engineering units, to address all environmental and social issues of Tranche-2. The ESMU is headed by an Assistant General Manager, who works closely with other staff of the PMU and assists the PMU in getting all necessary clearances and in the implementation of environmental management plan The ESMU coordinates safeguard activities both at headquarter and PIU level. All safeguards activities are managed and supervised by the Assistant General Manager based at the Head Office. The ESMU is assisted by designated site engineers who will be responsible for the field activities 21. To support the ESMU in the PMU has appointed an Environmental Safeguard Consultant. The Consultant’s responsibilities include advising and assisting the EA/IA in mitigating Social and Environmental issues and administration and Implementation of measures in Environmental Management Plan, as required. During the reporting period, Environmental Safeguard Consultant has been deployed on intermittent basis. 22. An external environmental monitoring agency is hired to carry out the monitoring during various phases of project actives in order to implement the environmental monitoring plan. External monitoring agencies carry out monitoring under supervision of the ESMU
8.0 Public Consultation and Site Visits Undertaken 23. A site visit was undertakenby Environmental and Social Expert on 3rd June, 2016 to check environmental compliance status of 2x16 MVA 132/33 kV Bilasipara Substation and 2x25 MVA 132/33 kV Matia Substation. The observations are listed below.
a) 132/33kV Bilasipara (2x16 MVA) substation (3rd June, 2016): The civil work and technical work was already completed and oil filling of transformers was under process. No outstanding social and environmental issues were observed during the site visit. Fire safety equipment’s i.e. Fire extinguisher and sand buckets were available inside the substation
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
24
premises. Personal Protective Equipment’s (PPE’s) were available at site and were found to be adequate. Drinking water facility is provided and found adequate.First Aid box was also available at substation site. The precaution sign board near the high voltage machine will be mounted when commissioned will be done.
b) 132/33kV Matia (2x25 MVA) substation (3rdJune, 2016): Civil and technical work has been complete and the substation will be commissioning soon. No outstanding social and environmental issues were observed during the site visit. Tree plantation and water sprinkling was observed along approach road and in open spaces. Personal Protective Equipment’s (PPE’s) were available at substation site and were found to be adequate. Fire safety equipment’s i.e. Fire extinguisher and sand buckets were available in the site. The precaution sign board near the high voltage machine will be mounted when commissioned will be done. The photographs of both the site visit are attached in Annexure - III 9.0 Environmental Review Meetings 24. Environmental review meetings were held with external environmental monitoring agency M/s En Geo Consultancy & Research Centre, Guwahati on 10th March, 2016 and 11th May, 2016 to review the progress regarding the environmental monitoring works during post construction phase. Issues related to monitoring schedule and progress achieved was discussed. Attendance sheets of both the review meets are attached as Annexure - IV. 10.0 Conclusion and Recommendations 25. In order to have a sustainable development in the project the emphasis on the implementation of EMP has been given top most priority. Compliances to National Regulations and to Environmental Covenants as contained in ADB Loan Agreement are being met. Environment and Social Cell is monitoring the implementation of environmental safeguards measures being undertaken by the contractor on regular basis. A Grievance Redressal Committee has been constituted with due representation of the people residing near the project site. Environmental monitoring is being conducted by external environmental monitoring agency for ambient air quality, water quality and noise levels along transmission lines as per the schedule. .
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
25
Annexure - I (A) Ambient Air Quality Monitoring Locations
S. No.
Location Name Location ID Coordinates Date of Monitoring Location Type Remarks
220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur
1 Buramayong T2A1 26° 10' 32.2" N 92° 00' 32.1" E
24/03/2016 Rural
Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
2 KamarpurPahar T2A2 26° 13' 22.6" N 92° 01' 50.9" E
23/03/2016 Residential
3 DhupguriKalangpar T2A3 26° 11' 35.9" N 92° 00' 47.3" E
23/03/2016 Residential/ Rural
4 Parakumar (Bejeni) T2A4 26° 10' 18.9" N 92° 00' 07.6" E
22/03/2016 Rural/Silence
5 SamotaPothar (Quarry) T2A5 26° 07' 39.1" N 92° 00' 37.0" E
22/03/2016 Residential/ Rural
220 kV S/C Mariani - Namrup Line on D/C Towers
6 Parbatpur T2A6 27° 10' 47.9"N 95° 22' 16.4"E
16/04/2016 Rural &
Residential
Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
7 Coal Pit T2A7 27° 8' 25.7"N 95° 21' 45.0"E
16/04/2016 Rural &
Residential
8 Nagakatagaon T2A8 27° 9' 13.4"N 95° 18' 45.6"E
15/04/2016 Rural &
Residential
9 Misajangaon T2A9 27° 09' 16.8" N 95° 15' 27.1" E
15/04/2016 Rural &
Residential
10 Sundarpur TG T2A10 27° 8' 29.08" N 95° 13' 13.02"E
14/04/2016 Rural
11 Atal Pathargaon T2A11 27° 08' 25.1" N 95° 10.5' 9.3" E
14/04/2016 Rural &
Residential
12 KathiyaKhunda No.1 T2A12 27° 7' 8.15" N 95° 9' 19.47" E
13/04/2016 Rural &
Residential
13 Rahanshyam T2A13 27° 5' 47.29" N 95° 07' 28.8" E
13/04/2016 Rural &
Residential
14 Ujanlongpatiya T2A14 27° 06' 32.8" N 95° 5' 57.76" E
12/04/2016 Rural &
Residential
15 Changmaigaon T2A15 27° 04' 29.4" N 95° 02' 57.8" E
12/04/2016 Rural &
Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
26
S. No.
Location Name Location ID Coordinates Date of Monitoring Location Type Remarks
16 Bagriguri T2A16 27° 03' 40.0" N 95° 01' 35.7" E
11/04/2016 Rural &
Residential
17 Barohar TG T2A17 27° 02' 34.1"N 94° 59' 26.2"E
11/04/2016 Rural &
Residential
18 Rangapathar T2A18 27° 00' 12.5"N 94° 57' 32.2"E
10/04/2016 Rural &
Residential
19 Maibela T2A19 26° 59' 4.4"N 94° 55' 36.2"E
10/04/2016 Rural &
Residential
20 Manuharigaon T2A20 26° 59' 32.2"N 94° 54' 2.1"E
9/04/2016 Rural &
Residential
21 Kongargaon No.2 T2A21 26° 58' 04.5" N 94° 51' 45.5" E
9/04/2016 Rural &
Residential
22 Halal Gaon T2A22 26° 56' 38.8" N 94° 51' 34.4" E
08/04/2016 Rural &
Residential
23 Mohangaon T2A23 26° 55' 14.4" N 94° 49' 13.4" E
08/04/2016 Rural &
Residential
24 ChengdharaGaon T2A24 26° 53' 21.5" N 94° 47' 31.8" E
07/04/2016 Rural &
Residential
25 Hatipati TG T2A25 26° 50' 39.7" N 94° 44' 16.4" E
07/04/2016 Rural &
Residential
26 RangagaraGaon T2A26 26° 49' 15.4" N 94° 42' 39.9" E
06/04/2016 Rural &
Residential
27 DeopaniGohainGaon T2A27 26° 48' 59.3" N 94° 39' 44.4" E
05/04/2016 Rural &
Residential
28 Dulia Gaon T2A28 26° 48' 33.7" N 94° 37' 36.1" E
05/04/2016 Rural &
Residential
29 Naragaon T2A29 26° 48' 41.5" N 94° 34' 15.5" E
06/04/2016 Rural &
Residential
30 JapihajiaGaon T2A30 26° 48' 11.1" N 94° 30' 53.3" E
04/04/2016 Rural &
Residential
31 Basahabi TG T2A31 26° 46' 14.5" N 94° 29' 17.7" E
04/04/2016 Rural &
Residential
32 Gandhia T2A32 26° 43' 49.5" N 94° 26' 35.4" E
03/04/2016 Rural &
Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
27
S. No.
Location Name Location ID Coordinates Date of Monitoring Location Type Remarks
33 Sonakhati TG (Triwal TG) T2A33 26° 41' 57.8" N 94° 23' 53.5" E
03/04/2016 Rural &
Residential
34 Dihingpar TG T2A34 26° 39' 41.4" N 94° 23' 01.0" E
02/04/2016 Rural &
Residential
35 Near Mariani SS (Bosagaon) T2A35 26° 37' 45.9" N 94° 21' 44.8" E
02/04/2016 Silence
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
36 Aka Basti T2A36 26° 48' 46.1" N 92° 49' 06.4" E
26/04/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
37 Gudamghat T2A37 26° 47' 41.4" N 92° 49' 30.3" E
27/04/2016 Residential
132 kV D/C LILO of Depota - Gohpur Line at Sonabil
38 Konnamukh T2A38 26° 48' 30.4" N 92° 49' 47.5" E
27/04/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
39 Gudamghat (KosariGaon) T2A39 26° 47' 56.2"N 92° 49' 31.6"E
28/04/2016 Residential
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
40 Chandrapur T2A42 26° 14' 13.1" N 91° 57' 12.2" E
25/03/2016 Silence
Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
41 Govardhan T2A43 26° 14' 08.7" N 91° 58' 23.6" E
25/03/2016 Residential
42 Belguri TG (DigaruparChangbil)
T2A44 26° 11'14.66"N 91° 59' 34.71"E
24/03/2016 Residential
43 Nagabil T2A45 26° 9' 45.7"N 91° 59' 36.9"E
24/03/2016 Residential
44 Keohutuli (Bojrangbosti) T2A46 26° 09' 04.9" N 91° 59' 57.2" E
26/03/2016 Residential
45 Sanarupathar T2A47 26° 08' 15.4" N 91° 59' 32.9" E
26/03/2016 Silence
132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)
46 Panichakua T2A48 26° 44' 02.3" N 94° 05' 41.7" E
01/04/2016 Rural &
Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi 47 PuranimatiSatra T2A49 26° 43' 19.7" N 01/04/2016 Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
28
S. No.
Location Name Location ID Coordinates Date of Monitoring Location Type Remarks
94° 06' 13.0" E Annual Environmental Safeguard Monitoring Report.
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi
48 Monkhusi TG T2A50 27° 24' 06.5" N 95° 20' 48.4" E
08/05/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
49 Borgurigaon No.2 T2A51 27° 23' 16.4" N 95° 19' 46.9" E
09/05/2016 Rural &
Residential
132 kV S/C of Agia - Matia Line on D/C Towers
50 Ulupara T2A52 26° 05' 48.1" N 90° 33' 57.3" E
24/02/2016 Residential
Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
51 Chamaguri (Solamari) T2A53 26° 06' 50.2" N 90° 34' 38.2" E
25/02/2016 Residential
52
Gorokhuta T2A54 26° 06' 38.6" N 90° 36' 40.8" E
21/02/2016 Residential
53 Garimari T2A55 26° 06' 03.6" N 90° 39' 19.3" E
22/02/2016 Residential
54 Harimura T2A56 26° 05' 00.4" N 90° 39' 59.1" E
22/02/2016 Residential
55 Lalabari T2A57 26° 04' 58.7" N 90° 41' 36.7" E
23/02/2016 Residential
56 Doshikata T2A58 26° 04' 38.2" N 90° 43' 19.1" E
26/02/2016 Residential
57 Domani T2A59 26° 04' 26.0" N 90° 45' 44.0" E
27/02/2016 Residential
132 kV Samaguri - Lanka (Sankardevnagar) Line12
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
58 Balikandi T2A72 24° 42' 18.8" N 92° 31' 44.7" E
27/05/2016 Silence Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi 59 KhuliChhara T2A73 24° 42' 14.5" N 27/05/2016 Rural &Residential
12
Ambient Air Quality Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual Environmental
Safeguard Monitoring Report.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
29
S. No.
Location Name Location ID Coordinates Date of Monitoring Location Type Remarks
92° 30' 32.2" E Annual Environmental Safeguard Monitoring Report.
60 ChakChandpur T2A74 24° 41' 55.3" N 92° 31' 15.8" E
28/05/2016 Rural &
Residential
61 Chandpur T2A75 24° 42' 10.4" N 92° 32' 10.1" E
28/05/2016 Silence
Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
30
Annexure - I (B) Noise Level Monitoring Locations
Sl. No. Location Name Location ID Coordinates Date of
Monitoring Category of
Area Remarks
220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur
1. Buramayong N1 26° 10' 32.2" N 92° 00' 32.1" E
24/03/2016 Residential
Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports.
2. KamarpurPahar N2 26° 13' 22.6" N 92° 01' 50.9" E
23/03/2016 Residential
3. DhupguriKalangpar N3 26° 11' 35.9" N 92° 00' 47.3" E
23/03/2016 Residential
4. Parakumar (Bejni) N4 26° 10' 18.9" N 92° 00' 07.6" E
22/03/2016 Residential
5. SamotaPothar (Quarry) N5 26° 07' 39.1" N 92° 00' 37.0" E
22/03/2016 Residential
220 kV S/C Mariani - Namrup Line on D/C Towers
6. Parbatpur N1 27° 10' 47.9"N 95° 22' 16.4"E
16/04/2016 Rural &
Residential
Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
7. Coal Pit N2 27° 8' 25.7"N 95° 21' 45.0"E
16/04/2016 Rural
&Residential
8. Nagakatagaon N3 27° 9' 13.4"N 95° 18' 45.6"E
15/04/2016 Rural &
Residential
9. Misajangaon N4 27° 09' 16.8" N 95° 15' 27.1" E
15/04/2016 Rural &
Residential
10. Sundarpur TG N5 27° 8' 29.08" N 95° 13' 13.02"E
14/04/2016 Rural &
Residential
11. Atal Pathargaon N6 27° 08' 25.1" N 95° 10.5' 9.3" E
14/04/2016 Rural &
Residential
12. KathiyaKhunda No.1 N7 27° 7' 8.15" N 95° 9' 19.47" E
13/04/2016 Rural &
Residential
13. Rahanshyam N8 27° 5' 47.29" N 95° 07' 28.8" E
13/04/2016 Rural &
Residential
14. Ujanlongpatiya N9 27° 06' 32.8" N 95° 5' 57.76" E
12/04/2016 Rural
&Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
31
Sl. No. Location Name Location ID Coordinates Date of
Monitoring Category of
Area Remarks
15. Changmaigaon N10 27° 04' 29.4" N 95° 02' 57.8" E
12/04/2016 Rural &
Residential
16. Bagriguri N11 27° 03' 40.0" N 95° 01' 35.7" E
11/04/2016 Rural &
Residential
17. Barohar TG N12 27° 2' 34.1"N 94° 59' 26.2"E
11/04/2016 Rural &
Residential
18. Rangapathar N13 27° 0' 12.5"N 94° 57' 32.2"E
10/04/2016 Rural &
Residential
19. Maibela N14 26° 59' 4.4"N 94° 55' 36.2"E
10/04/2016 Rural &
Residential
20. Manuharigaon N15 26° 59' 32.2"N 94° 54' 2.1"E
09/04/2016 Rural &
Residential
21. Kongargaon No.2 N16 26° 58' 04.5" N 94° 51' 45.5" E
09/04/2016 Rural &
Residential
22. Halal Gaon N17 26° 56' 38.8" N 94° 51' 34.4" E
08/04/2016 Rural &
Residential
23. Mohangaon N18 26° 55' 14.4" N 94° 49' 13.4" E
08/04/2016 Rural &
Residential
24. ChengdharaGaon N19 26° 53' 21.5" N 94° 47' 31.8" E
07/04/2016 Rural &
Residential
25. Hatipati TG N20 26° 50' 39.7" N 94° 44' 16.4" E
07/04/2016 Rural &
Residential
26. RangagaraGaon N21 26° 49' 15.4" N 94° 42' 39.9" E
06/04/2016 Rural &
Residential
27. DeopaniGohainGaon N22 26° 48' 59.3" N 94° 39' 44.4" E
05/04/2016 Rural &
Residential
28. Dulia Gaon N23 26° 48' 33.7" N 94° 37' 36.1" E
05/04/2016 Rural &
Residential
29. Naragaon N24 26° 48' 41.5" N 94° 34' 15.5" E
06/04/2016 Rural &
Residential
30. JapihajiaGaon N25 26° 48' 11.1" N 94° 30' 53.3" E
04/04/2016 Rural &
Residential
31. Basahabi TG N26 26° 46' 14.5" N 94° 29' 17.7" E
04/04/2016 Rural &
Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
32
Sl. No. Location Name Location ID Coordinates Date of
Monitoring Category of
Area Remarks
32. Gandhia N27 26° 43' 49.5" N 94° 26' 35.4" E
03/04/2016 Rural &
Residential
33. Sonakhati TG (Triwal TG)
N28 26° 41' 57.8" N 94° 23' 53.5" E
03/04/2016 Rural &
Residential
34. Dihingpar TG N29 26° 39' 41.4" N 94° 23' 01.0" E
02/04/2016 Rural &
Residential
35. Near Mariani SS (Bosagaon) N30 26° 37' 45.9" N 94° 21' 44.8" E
02/04/2016 Silence
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
36. Aka Basti N1 26° 48' 46.1" N 92° 49' 06.4" E
26/04/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
37. Gudamghat N2 26° 47' 41.4" N 92° 49' 30.3" E
27/04/2016 Residential
132 kV D/C LILO of Depota - Gohpur Line at Sonabil
38. Konnamukh N1 26° 48' 30.4" N 92° 49' 47.5" E
27/04/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
39. Gudamghat(KosariGaon) N2 26° 47' 56.2"N 92° 49' 31.6"E
28/04/2016 Residential
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
40. Chandrapur N1 26° 14' 13.1" N 91° 57' 12.2" E
25/03/2016 Silence
Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
41. Govardhan N2 26° 14' 08.7" N 91° 58' 23.6" E
25/03/2016 Residential
42. BeguriTG(DigaruparChangbil) N3 26° 11' 14.66"N 91° 59' 34.71"E
24/03/2016 Residential
43. Nagabil N4 26° 9' 45.7"N 91° 59' 36.9"E
24/03/2016 Residential
44. Keohutuli(Bojrangbosti) N5 26° 09' 04.9" N 91° 59' 57.2" E
26/03/2016
Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
33
Sl. No. Location Name Location ID Coordinates Date of
Monitoring Category of
Area Remarks
45. Sanarupathar N6 26° 08' 15.4" N 91° 59' 32.9" E
26/03/2016 Silence
132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)
46. Panichakua N1 26° 44' 02.3" N 94° 05' 41.7" E
01/04/2016 Rural &
Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
47. PuranimatiSatra N2 26° 43' 19.7" N 94° 06' 13.0" E
01/04/2016 Residential
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi
48. Monkhusi TG N1 27° 24' 06.5" N 95° 20' 48.4" E
08/05/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
49. Borgurigaon No.2 N2 27° 23' 16.4" N 95° 19' 46.9" E
09/05/2016 Rural &
Residential
132 kV S/C of Agia - Matia Line on D/C Towers
50. Ulupara N1 26° 05' 48.1" N 90° 33' 57.3" E
24/02/2016 Residential
Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
51. Chamaguri (Solamari) N2 26° 06' 50.2" N 90° 34' 38.2" E
25/02/2016 Residential
52. Gorokhuta N3 26° 06' 38.6" N 90° 36' 40.8" E
21/02/2016 Residential
53. Garimari N4 26° 06' 03.6" N 90° 39' 19.3" E
22/02/2016 Residential
54. Harimura N5 26° 05' 00.4" N 90° 39' 59.1" E
22/02/2016 Residential
55. Lalabari N6 26° 04' 58.7" N 90° 41' 36.7" E
23/02/2016 Residential
56. Doshikata N7 26° 04' 38.2" N 90° 43' 19.1" E
26/02/2016 Residential
57. Domani N8 26° 04' 26.0" N 90° 45' 44.0" E
27/02/2016
Residential
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
34
Sl. No. Location Name Location ID Coordinates Date of
Monitoring Category of
Area Remarks
132 kV Samaguri - Lanka (Sankardevnagar) Line13
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
58. Balikandi N1 24° 42' 18.8" N 92° 31' 44.7" E
27/05/2016 Silence Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports
59. KhuliChhara N2 24° 42' 14.5" N 92° 30' 32.2" E
27/05/2016 Rural &
Residential
60. ChakChandpur N3 24° 41' 55.3" N 92° 31' 15.8" E
28/05/2016 Rural &
Residential
61. Chandpur N4 24° 42' 10.4" N 92° 32' 10.1" E
28/05/2016 Silence
Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016
13
Noise Level Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual Environmental Safeguard
Monitoring Report.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
35
Annexure - I (C) Water Quality Monitoring Locations
S. No. Name of the Location
Location ID Coordinates Date of
Sampling Type of water
Source of water
Remarks
220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur
1. BuraMayong T2W1 26° 14' 29.4"N 92° 00' 39.4"E
24/03/2016 Ground Water
Ring Well
Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
2. KamarpurPahar T2W2 26° 13' 23.2"N 92° 01' 49.9"E
23/03/2016 Ground Water
Ring Well
3. Parakumar (Bejini) T2W3 26° 10' 18.2"N 92° 00' 06.9"E
22/03/2016 Ground Water
Tara Pump
4. Samotapathar (Quarry)
T2W4 26° 07' 32.8"N 92° 00' 37.6"E
22/03/2016 Ground Water
Ring Well
5. DhupguriKalangpar T2W5 26° 12' 02.3"N 92° 01' 06.5"E
23/03/2016 Surface Water
Kalang River
220 kV S/C Mariani - Namrup Line on D/C Towers
6. Parbatpur T2W6 27° 10' 48.6" N 95° 22' 14.7" E
16/04/2016 Ground Water
Tube well
Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
7. Nagakatagaon T2W7 27° 9' 15.1" N 95° 18' 47.8" E
15/04/2016 Ground Water
Tube well
8. Sundarpur TG T2W8 27°8'27.8"N 95°13'22.8"E
14/04/2016 Ground Water
Tube well
9. Atal Pathargaon T2W9 27° 08' 26.9"N 95° 11' 03.8"E
14/04/2016 Ground Water
Tube well
10. KathiyaKhunda No.1 T2W10 27° 07' 11.1"N 95° 09' 18.4"E
13/04/2016 Ground Water
Tube well
11. Rahanshyam T2W11 27° 06' 32.9"N 95° 07' 32.2"E
13/04/2016 Ground Water
Tube well
12. Ujanlongpatiya T2W12 27° 05' 46.4"N 95° 06' 02.0"E
12/04/2016 Ground Water
Tube well
13. Changmaigaon T2W13 27° 04' 31.0"N 95° 02' 59.3"E
12/04/2016 Ground Water
Tube well
14. Bagriguri T2W14 27° 03' 43.5"N 95° 01' 35.7"E
11/04/2016 Ground Water
Tube well
15. Maibela T2W15 26° 59' 4.6" N 10/04/2016 Ground Tube well
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
36
S. No. Name of the Location
Location ID Coordinates Date of
Sampling Type of water
Source of water
Remarks
94° 55' 36.6" E Water
16. Manuharigaon T2W16 26° 59' 27.9" N 94° 54' 7.0" E
9/04/2016 Ground Water
Tube well
17. Halal Gaon T2W17 26° 56' 38.8"N 94° 51' 34.0"E
08/04/2016 Ground Water
Tube well
18. Mohangaon T2W18 26° 55' 14.4"N 94° 49' 11.7"E
08/04/2016 Ground Water
Tube well
19. ChengdharaGaon T2W19 26° 53' 22.1"N 94° 47' 31.4"E
07/04/2016 Ground Water
Tube well
20. Hatipati TG T2W20 26° 50' 38.1"N 94° 44' 22.8"E
07/04/2016 Ground Water
Tube well
21. DeopaniGohainGaon T2W21 26° 48' 59.3"N 94° 39' 44.2"E
05/04/2016 Ground Water
Tube well
22. Basahabi TG T2W22 26° 46' 14.9"N 94° 29' 17.2"E
04/04/2016 Ground Water
Tube well
23. Sonakhati TG T2W23 26° 41' 57.4"N 94° 23' 52.9"E
03/04/2016 Ground Water
Tube well
24. Dihingpar TG T2W24 26° 39' 40.4" N 94° 23' 0.7" E
02/04/2016 Ground Water
Tube well
25. Coal Pit T2W25 27° 8' 31.1" N 95° 21' 57.0" E
16/04/2016 Surface Water
Dikhou river
26. Misajangaon T2W26 27° 09' 15.4"N 95° 15' 32.5"E
15/04/2016 Surface Water
Dikhou Rive
27. Barohar TG T2W27 27° 2' 27.1" N 94° 59' 32.4" E
11/04/2016 Surface Water
Tiyak river
28. Kongargaon No.2 T2W28 26° 58' 05.6"N 94° 51' 40.7"E
09/04/2016 Surface Water
Stream
29. RangagaraGaon T2W29 26° 49' 18.4"N 94° 42' 44.8"E
06/04/2016 Surface Water
Nandang river
30. Dulia Gaon T2W30 26° 48' 34.1"N 94° 37' 38.0"E
05/04/2016 Surface Water
pond
31. Naragaon T2W31 26° 48' 48.7"N 94° 34' 16.7"E
06/04/2016 Surface Water
Pond
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
37
S. No. Name of the Location
Location ID Coordinates Date of
Sampling Type of water
Source of water
Remarks
32. Rangapathar T2W32 27° 00' 4.8"N 94° 57' 37.3"E
10/04/2016 Surface Water
Pond
33. JapihajiaGaon T2W33 26° 48' 16.8"N 94° 31' 00.7"E
04/04/2016 Surface Water
Janji river
34. Gandhia T2W34 26° 43' 29.4"N 94° 26' 36.3"E
03/04/2016 Surface Water
Puthi river
35. Near Mariani SS (Bosagaon)
T2W35 26° 37' 47.1"N 94° 21' 41.6"E
02/04/2016 Surface Water
Stream
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
36. Akabasti T2W36 26° 48' 44.0"N 92° 49' 06.0"E
26/04/2016 Ground Water
Tube Well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
37. Gudamghat T2W37 26°47'51.7"N 92°49'33.7"E
27/04/2016 Surface Water
Mansiri river
132 kV D/C LILO of Depota - Gohpur Line at Sonabil
38. Konnamukh T2W38 26° 48' 28.4"N 92° 49' 46.7"E
27/04/2016 Ground Water
Tube Well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
39. Gudamghat (KosariGaon)
T2W39 26° 47' 51.3" N 92° 49' 35.2" E
28/04/2016 Ground Water
Ring Well
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
40. Govardhan T2W42 26° 14' 28.4"N 92° 00' 39.0"E
25/03/2016 Ground Water
Ring well
Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
41. Chandrapur T2W43 26° 14' 11.9"N 91° 57' 12.5"E
25/03/2016 Ground Water
Ring well
42. Nagabil T2W44 26° 9' 39.4" N 91° 59' 35.1" E
24/03/2016 Ground Water
Tube well
43. Sanarupathar T2W45 26° 8' 15.1" N 91° 59' 25.4" E
26/03/2016 Ground Water
Ring well
44. Keohutuli T2W46 26° 09' 00.0"N 91° 59' 54.5"E
26/03/2016 Surface Water
Kalang river
45. Belguri TG T2W47 26° 10' 53.5" N 91° 59' 37.2" E
24/03/2016 Surface Water
Digaru river
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
38
S. No. Name of the Location
Location ID Coordinates Date of
Sampling Type of water
Source of water
Remarks
132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)
46. Panichakua T2W48 26° 44' 00.1"N 94° 05' 42.8"E
01/04/2016 Ground Water
Tube well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
47. Puranimatisatra T2W49 26° 43' 20.0"N 94° 06' 13.5"E
01/04/2016 Ground Water
Tube well
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi
48. Monkhusi TG T2W50 27° 24' 06.9"N 95° 20' 48.3"E
08/05/2016 Ground Water
Tube well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
49. Borgurigaon No.2 T2W51 27° 23' 15.9"N 95° 19' 48.2"E
09/05/2016 Ground Water
Tube well
132 kV Samaguri - Lanka (Sankardevnagar) Line14
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
50. Balikandi T2W64 24° 42' 18.4"N 92° 31' 45.7"E
27/05/2016 Ground Water
Tube well
Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
51. KhuliChhara T2W65 24° 42' 14.6" N 92° 30' 30.6" E
27/05/2016 Ground Water
Well
52. ChakChandpur T2W66 24° 41' 55.5" N 92° 31' 15.2" E
28/05/2016 Ground Water
Tube well
53. Chandpur T2W67 24° 42' 13.9"N 92° 32' 01.5"E
28/05/2016 Surface Water
Jitha river
132 kV S/C of Agia - Matia Line on D/C Towers
14
Surface and Ground Water Quality Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual
Environmental Safeguard Monitoring Report.
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
39
S. No. Name of the Location
Location ID Coordinates Date of
Sampling Type of water
Source of water
Remarks
54. Ulupara T2W68 26° 05' 46.8"N 90° 33' 55.8"E
24/02/2016 Ground Water
Tube well
Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.
55. Chamaguri T2W69 26° 06' 48.4"N 90° 34' 36.8"E
25/02/2016 Ground Water
Tube well
56. Garokhuta T2W70 26° 06' 39.4"N 90° 36' 41.5"E
21/02/2016 Ground Water
Tube well
57. Garimari T2W71 26° 06' 05.3"N 90° 39' 18.7"E
22/02/2016 Ground Water
Tube well
58. Harimura T2W72 26° 05' 01.2"N 90° 40' 02.4"E
22/02/2016 Ground Water
Tube well
59. Lalabari T2W73 26° 05' 00.6"N 90° 41' 36.3"E
23/02/2016 Ground Water
Tube well
60. Doshikata T2W74 26° 04' 11.8"N 90° 43' 31.9"E
26/02/2016 Surface Water
Krishnai river
61. Domani T2W75 26° 04' 39.9"N 90° 45' 21.0"E
27/02/2016
Surface Water
Dudhnai river
Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
40
Annexure - II (A)
Site Photographs Showing Ambient Air Quality Monitoring Being Undertaken
220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur
KamarpurPahar DhupguriKalangpur
220 kV S/C Mariani - Namrup Line on D/C Towers
ChengdharaGaon Halal Gaon
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
Gudamghat Aka Basti
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
41
132 kV D/C LILO of Depota - Gohpur Line at Sonabil
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
Konnamukh Govardhan
132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi
Panichakua Monkhusi TG
132 kV S/C of Agia - Matia Line on D/C Towers
Lalabari Domani
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
42
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
Chandpur Balikandi
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
43
Annexure - II (B)
Site Photographs Showing Noise Level MonitoringBeing Undertaken
220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur
Buramayong Samotapathar (Near Quarry)
220 kV S/C Mariani - Namrup Line on D/C Towers
Dihingpar DeopaniGohainGaon
220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil
132 kV D/C LILO of Depota - Gohpur Line at Sonabil
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
44
Gudamghat Gudamghat (Kosarigaon)
132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur
132 kV S/C LILO of Jorhat – Bokakhat Line at Jorhat (West)
Chandrapur PuranimatiSatra
132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi
132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi
Monkhusi TG Balikandi
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
45
Annexure - II(C)
Site Photographs Showing Water Quality Monitoring Being Undertaken
Ground Water Monitoring
Sundarpur TG Halal Gaon
Akabasti Gudamghat (Kosarigaon)
KamakhyaDevalaya Govardhan
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
46
Surface Water Monitoring
Misajangaon Gudamghat
Keohutuli ChalchaliJalaharChuk
Dabaka (Sutargaon) Keohutuli
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
47
Annexure - III
Photographs of Site Visits(BilasiparaSubstation and Matia Substation)
132/33kV Bilasipara Substation
Fire Safety Equipment’s (Sand Buckets) Personal Protective Equipment’s
132/33kV Matia Substation
Fire Safety Equipment’s (Fire Extinguisher) Personal Protective Equipment’s
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
48
Annexure - IV
Attendance Sheet of Review Meetings
Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)
Environmental Safeguard Monitoring Report January to June, 2016
49