Environmental Monitoring Report This report has been submitted to ADB by the Assam Power Distribution Company Limited, Guwahati and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 41614-033 May 2017 Period: January 2016 – June 2016 IND: Assam Power Sector Enhancement Investment Program - Tranche 2 Submitted by Assam Power Distribution Company Limited, Guwahati

Upload: buidieu

Post on 31-Jan-2018

228 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Environmental Monitoring Report

This report has been submitted to ADB by the Assam Power Distribution Company Limited, Guwahati and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 41614-033 May 2017 Period: January 2016 – June 2016

IND: Assam Power Sector Enhancement Investment Program - Tranche 2

Submitted by

Assam Power Distribution Company Limited, Guwahati

Page 2: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with
Page 3: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

This environmental safeguard monitoring report is a document of the borrower and made publicly available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff.

Environmental Safeguard Monitoring Report

Reporting Period: January, 2016 to June, 2016

Loan No.:2677 - Tranche 2

Assam Power Sector Enhancement Investment Program

Prepared by the Assam Power Distribution Company Limited for the Asian Development Bank

Page 4: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

TABLE OF CONTENTS SL. NO. ITEMS Page No.

Abbreviations 1 1.0 Introduction 2 1.1 Brief Project Description 2 1.2 Project Progress Status and Implementation Schedule 5

A. Progress Status 5

B. Implementation Schedule 9

2.0 Compliance to National Regulations 13 3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 14 4.0 Compliance to Environmental Management Plan 14 5.0 Safeguards Monitoring Results and Unanticipated Impacts 21

A. Environmental Monitoring Schedule 21 B. Environmental Monitoring Parameters 21 C. Environmental Monitoring Status 22

6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders

22

7.0 Institutional Arrangement 23 8.0 Public Consultation and Site Visits Undertaken 23 9.0 Environmental Review Meetings 24

10.0 Conclusion and Recommendations 24

LIST OF ANNEXURE

Annexure Details Page No.

I(A) Ambient Air Quality Monitoring Locations 25 I(B) Noise Level Monitoring Locations 30 I(C) Water Quality Monitoring Locations 35 II(A) Site Photographs Showing Ambient Air Quality Monitoring Being

Undertaken 40

II(B) Site Photographs Showing Noise Level Monitoring Being Undertaken 43 II(C) Site Photographs Showing Water Quality Monitoring Being Undertaken 45 III Photographs of Site Visits (Bilasipara Substation and Matia Substation) 47 IV Attendance Sheet for Review Meetings 48

LIST OF TABLES

TABLE NO.

ITEMS Page No.

1.0 Sub-Projects under Tranche 2 3 2.0 Project Progress Status(Substations) 5 2.1 Project Progress Status(Transmission Lines) 6 2.2 Project Progress Status(Augmentation, Extension and refurbishment of

existing sub-stations and reactive power compensation)

8

3.0 Package wise Progress Details 10 4.0 Applicable Acts and Legislations to the project 13 5.0 Environmental Covenants 14 6.0 Compliance to Environmental Management Plan (Tranche 2

Subprojects) 15

7.0 Environmental Monitoring Schedule for Tranche 2 21 8.0 Environmental Monitoring Parameters 21

Page 5: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

1

ABBREVIATIONS

ADB Asian Development Bank ADEF Assam Department of Environment and Forest ADH Assam Department of Health AEGCL Assam Electricity Grid Corporation Ltd. APCB Assam Pollution Control Board APDCL Assam Power Distribution Company Limited ASEB Assam State Electricity Board ASI Archeological Survey of India dB Decibels EA Executing Agency EARF Environmental Assessment and Review Framework EIA Environmental Impact Assessment EMA Environment Monitoring Agency EMP Environmental Management Plan ESMC Environmental and Social Management Cell ESMU Environmental and Social Management Unit GHG Greenhouse Gas GOA Government Of Assam GOI Government Of India GRC Grievance Redressal Committee IA Implementing Agency IEE Initial Environmental Examination Ltd. Limited MFF Multi-Tranche Financing Facility NO2 Nitrogen dioxide PM10 Particulate Matter (Size less than 10 µm) PM2.5 Particulate Matter (Size less than 2.5 µm) PMU Project Management Unit ROW Right of Way S/S Sub Station SEIA Summary Environmental Impact Assessment SIEE Summary Initial Environmental Examination SO2 Sulphur dioxide T&D Transmission and Distribution

Electrical Terminology V Volt Unit of Voltage kV Kilovolt 1000 volts W Watt Unit of active power kW Kilowatt 1000 watts MW Megawatt 1000 kW MWh Megawatt hour Unit of energy VA Volt ampere Unit of apparent power MVA Million volt ampere 106 VA Transmission System 400kV, 220kV, 132kV and/or 66kV lines supplying (incoming

& outgoing feeder) grid substations (Substation) with primary voltage of 400kV, 220kV, 132kV, or 66kV

LILO Line – in – Line - Out

Page 6: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

2

1.0 Introduction 1. The Government of India and Government of Assam have requested Asian Development Bank (ADB) to provideUS$200 million loan funding via a Multi-tranche Financing Facility (MFF) to support continued investment in power sector in the state of Assam. 2. The project is implemented in 3 Tranches viz. Tranche 1, Tranche 2 and Tranche 3. The original Loan Agreement (LOAN NUMBER 2592 - IND) for Tranche 1 was signed on 15February 2010 between Government of India and Asian Development Bank (ADB). While the Loan Agreement (LOAN NUMBER 2677 - IND) for Tranche 2 was signed on 17 January 2011 and Loan Agreement (LOAN NUMBER 2800 - IND) for Tranche 3 was signed on 27 February2012 between Government of India and ADB. 3. As per the original Loan Agreement ADB has agreed to make to the Government of India, GOI (Borrower) the loan on the terms and conditions set forth in the Loan Agreement, but only on the condition that the proceeds of the Loan be made available to the State and through the State (Government of Assam, GOA) to Assam State Electricity Board (ASEB). ASEB was the Executing Agency (EA) for all the three tranches. The Borrower in its letter of 11th June 2014has informed ADB of the dissolution of erstwhile EA for the Projects i.e., the ASEB and its place of its successive entities namely the Assam Power Generation Corporation Limited (APGCL), Assam Electricity Grid Corporation Limited (AEGCL) and Assam Power Distribution Company (APDCL). The Borrower further requested ADB to accordingly make the relevant change in the EAs as AEGCL for Tranche 1 and 2, and APDCL for Tranche 3. ADBhas approved the request and communicated to Department of Economic Affairs (DEA), Ministry of Finance, GOI on 5th August 2014 for Amendment related to Minor Change inMFF. 4. Now, as per the amendment Government of Assam (GOA) and Assam Electricity Grid Corporation Ltd. (AEGCL) are the Executing Agencies (EA) and Assam Electricity Grid Corporation Ltd. (AEGCL) is the Implementing Agency (IA) for Tranche 1 and Tranche 2.While Government of Assam (GOA) and Assam Power Distribution Company Ltd. (APDCL) are the Executing Agencies (EA) and Assam Power Distribution Company Ltd. (APDCL) is the Implementing Agency (IA) for Tranche 3. 5. The power sector investments are necessary to support continued investment in the state power sector, which is necessary for economic growth and poverty reduction. The MFF will partly finance the expansion and augmentation of the transmission and distribution (T&D) networks. The proposed investments are necessary to: (i) facilitate increased power transfers to accommodate increased demand and economic growth; (ii) improve supply-side energy efficiency by system de-bottlenecking and reducing technical losses; (iii) reduce the intensity of greenhouse gas (GHG) and other emissions via improved system efficiency; (iv) support expanded private sector participation in distribution system operations and other energy services; and (v) facilitate poverty reduction via improved electricity services and economic growth. 6. These environmental safeguard monitoring report provides information pertaining to Tranche 2 for the period January 2016 to June 2016. 1.1 Brief Project Description 7. The proposed Assam Power Sector Enhancement Investment Program of Assam State Electricity Board (ASEB) which is being processed under ADB’s Multi-tranche Financing Facility (MFF) would have the following components in Tranche 2, namely: Part A: 220/132 kV sub-stations Part B: 132/33 kV sub-stations Part C: 220 kV transmission lines

Page 7: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

3

Part D: 132 kV transmission lines Part E: Augmentation, Extension and refurbishment of existing sub-stations and reactive

power compensation Part F Communication system Part G Capacity Development Program The details of Sub-Projects under Tranche 2are given below in Table No. 1.0:

Table No.1.0: Sub-Projects under Tranche 2 Sl. No. Name of the Sub-Project

Part A: 220/132/33 kV sub-stations MVA

a) 2x100 MVA 220/132/33kV Sonapur Sub Station 200 b) 2x100 MVA 220/132/33kV Sonabil Sub Station 200

Part B: 132/33 kV sub-stations a) 2x40 MVA 132/33kV Kamakhya Sub Station 80 b) 2x40 MVA 132/33kV Jorhat (West) Sub Station 80 c) 2x25 MVA 132/33kV Bordubi Sub Station 50 d) 2x25MVA 132/33kV Matia Sub Station 50 e) 2x16 MVA 132/33kV Bilasipara Sub Station 32 f) 2x16 MVA 132/33kV Hailakandi Sub Station 32

Part C: 220kV transmission lines Length (Km)

a) 220kV D/C LILO of Samaguri - Sarusajai Line at Sonapur

13.4131

b) 220kV S/C Mariani - Namrup Line on D/C Towers 145.9562

c) 220kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

1.5413

Part D: 132 kV transmission lines Length (Km)

a) 132kV D/C LILO of Depota - Gohpur Line at Sonabil

1.2274

b) 132kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

41.3045

c) 132kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)

1.9586

d) 132kV S/C LILO of Namrup - Tinsukia Line at Bordubi

2.4277

e) Stringing of 2nd

Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line

60.4558

f) 132kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

1.2029

g) 132kV S/C of Agia - Matia Line (On D/C Towers) 22.53410

1The line length provided in original IEE Report (April, 2010) was 20 km. There was no change in alignment. However, the final

length after route survey was found to be 13.413 km. 2The line length provided in original IEE Report (April, 2010) was 140 km. Due to realignment the revised length was 145.956 km.

(excluding gantry length). Addendum IEE was prepared in April 2016 and disclosed on ADB website in May 2016. 3The line length provided in original IEE Report (April, 2010) was 2.5 km. There was no change in alignment. However, the final

length after route survey was found to be 1.541 km. 4The line length provided in original IEE Report (April, 2010) was 1.5 km. There was no change in alignment. However, the final

length after route survey was found to be 1.227 km. 5The line length provided in original IEE Report (April, 2010) was 25 km. However, the final length after route survey was 41.304

km. The work is under progress and line length may change further. Addendum IEE is required to be prepared. 6The line length provided in original IEE Report (April, 2010) was 5.0 km. There was no change in alignment. However, the final

length after route survey was found to be 1.958 km. 7The line length provided in original IEE Report (April, 2010) was 6.0 km. There was no change in alignment. However, the final

length after route survey was found to be 2.427 km. 8 The line length for 2nd circuit stringing was not provided in the original IEE Report. The stringing has been done on existing

towers only.Addendum IEE is required to be prepared. 9The line length provided in original IEE Report (April, 2010) was 4.0 km. There was no change in alignment. However, the final

length after route survey was found to be 1.202 km.

Page 8: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

4

Part E:Augmentation, Extension and refurbishment of existing sub-stations and reactive power compensation Augmentation of Transformer Capacity MVA

a) Jagiroad (Baghjap), 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers

b) Gohpur, 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

c) North Lakhimpur, 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

d) Lanka (Sankardevnagar), 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers

e) Margherita (Ledo) 132/33 kV Substation New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

f) Tinsukia, 220/132/33 kV Substation

Addition of new 2x40 MVA 132/33 kV transformers and new 2x100 MVA 220/132 MVA transformers in place of old 2x50 MVA, 220/132 transformers

g) Kahilipara, 132/33 kV Substation

New 2x40 MVA, 132/33 MVA transformers in place of old 2x10 MVA, 132/33/11 kV transformers.

h) Mariani, 220/132/66/33 kV Substation Addition of new 2x25 MVA, 132/33 MVA transformers

i) Boko. 220/132/33 kV Substation Addition of new 1x100 MVA, 220/132 MVA transformers

Extension for Line Bays

a) Mariani 220/132/66/33 kV Substation Two numbers of 220 kV Line Bays for Mariani - Namrup 220 kV S/C transmission Line on D/C towers.

b) Namrup, 220/132/33 kV Substation Two numbers of 220 kV Line Bay for Mariani - Namrup 220 kV S/C transmission Line.

c) Tinsukia, 220/132/33 kV Substation One number of 132 kV Line Bays for Tinsukia - Rupai 132 kV S/C Transmission Line

d) Agia, 220/132/33 kV Substation One number of 132 kV Line Bays for Agia - Matia 132 kV S/C Transmission Line

Installation of 33 kV Capacitor Banks MVAR

a) Pailapool 132/33 kV Substation

2x5 MVAR

b) Gohpur 132/33 kV Substation 2x5 MVAR c) Jorhat (Gormur) 132/33 kV Substation

2x10 MVAR

d) Sishugram 132/33 kV Substation 2x10 MVAR e) Nazira 132/33 kV Substation 2x5 MVAR f) Panchgram 132/33 kV Substation 2 x 5 MVAR g) Chandrapur 132/33 kV Substation 2 x 5 MVAR h) Barnagar 132/33 kVSubstation 2x10 MVAR

Replacement of Old & Obsolete Equipment

a) Circuit Breakers 220 kV: 12 nos., 132 kV: 66 nos., 33 kV: 61 nos

b) Current Transformers 220 kV: 6 nos., 132 kV: 69 nos., 33 kV: 42 nos

c) Potential Transformers 132 kV: 9 nos., 33 kV: 9 nos

10

The line length provided in original IEE Report (April, 2010) was 35.0 km. There was no change in alignment. However, the final

length after route survey was found to be 22.534 km.

Page 9: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

5

d) Isolators 220 kV: 6 nos., 132 kV: 26 nos

e) Relay and Control Panels

220 kV Line Panel: 2 nos., 132 kV Line panel: 15 nos., 132 kV Transformer Panel: 2 nos., 132 kV Bus Coupler Panel: 8 nos.

f) Numerical Relays Distance Relays Distance Relay: 3 nos., Differential Relay: 2nos

g) Battery Bank 220 volt system: 1 no., 110 volt system: 5 nos.

Part G: Capacity Development Program: Training program to enhance the capacity building for EA/IA officials conducted on 21

st November, 2014 at Guwahati and on 12

th December, 2014 at Jorhat.

1.2 Project Progress Status and Implementation Schedule A. Progress Status 8. The updated project progress status for the Substations, Transmission Lines and Augmentation, Extension and Refurbishment of Existing Sub-Stations and Reactive Power Compensation from January to June 2016 under Tranche 2 are given below in Table No. 2.0, Table No. 2.1and Table No. 2.2 respectively:

Table No. 2.0: Project Progress Status (Substations) SI. No.

Name of sub-project Status

1

Construction of 220/132/33 kV Sub Station. (Contractor: M/S NECCON Power & Infra Ltd.)

A. Sonapur Sub Station. (4.29ha of private barren land acquired)

Construction of Boundary wall is in progress (approx. 45%.completed). Top soil is being preserved for reuse in project.

The overall work progress of this Substation is 62.25% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land

No major adverse environmental issues identified

B. Sonabil Sub Station. (7.33 ha of private barren land acquired)

This Substation was commissioned on 18th February 2016

No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

Construction of 132/33 kV Sub Station. (Contractor: Alstom T & D India Ltd.)

2

A. Kamakhya Sub Station (0.4ha of private barren land acquired)

Construction of Boundary wall is in progress (approx. 60%.completed).

The overall progress of this Substation is 51.36% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

B. Jorhat (West) Sub Station. (3.43 ha of private barren land acquired)

This Substation was commissioned on 26th December 2015

No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

C. Bordubi Sub Station. This Substation was commissioned on 20th December 2015

Page 10: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

6

SI. No.

Name of sub-project Status

(2.48 Ha. Private Tea Garden land acquired)

No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

D. Matia Sub Station. (3.33 ha of Govt. land acquired)

Construction of Boundary wall is completed. Switch yard & control room work is completed. Transformer and control room equipment testing is in progress. No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

E. Bilasipara Sub Station. (4.0 ha of Government land acquired)

Construction of Boundary wall is completed. Control room &switch yard works are completed. Land development works within the yard are completed. Equipment testing is in progress No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

F.

Hailakandi Sub Station. (1.81ha of private land acquired)

Construction of Boundary wall is completed. The overall progress of this Substation location is 98.98% No trees falling in substation land No Forest Land acquisition for Sub Station land No Wild life sanctuary involved in Substation land No major adverse environmental issues identified

Table No. 2.1: Project Progress Status (Transmission Lines)

SI. No.

Name of sub-project Status

Construction of 220kV Transmission Lines. (Contractor: M/S NECCON Power & Infra Ltd.)

1.

A.

220 kV D/C LILO of Samaguri - Sarusajai Line at Sonapur. Length – 13.413 kms.

Tower foundation work up to this period completed to 95.35% and tower erection completed to 60.97%

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of March 2016.

B.

220 kV S/C Mariani - Namrup Line on D/C Towers. Length – 145.956kms.

1 Circuit of this line is tested & commissioned No Forest Land and No Wild Life Sanctuary falling in the route

alignment No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of April 2016.

C.

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil. Length – 1.541kms.

This Transmission line was charged on 18th February 2016

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of April 2016.

Construction of 132kV Transmission Lines. (Contractor: M/S Shyama Power India Ltd.)

Page 11: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

7

SI. No.

Name of sub-project Status

2.

A.

132 kV D/C LILO of Depota - Gohpur Line at Sonabil. Length – 1.227 kms.

Line was charged on 31st August 2015

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of April 2016.

B.

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur. Length – 41.304kms.

Tower foundation work up to this period completed to 65.69% and erection completed to 46.71%.

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of March 2016.

C.

132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West). Length – 1.958 kms.

Line was charged on 06th July 2015

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of April 2016.

D.

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi. Length – 2.427 kms.

Line is charged on 13th July 2015.

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of May 2016.

E.

Stringing of 2nd

Circuit of 132 kV Samaguri– Lanka (Sankardevnagar) Line. Length – 60.455 kms.

This line is under operation stage. No Forest Land and No Wild Life Sanctuary falling in the route

alignment No major adverse environmental issues identified.

Air, water and noise monitoring in post construction period was conducted by the Environmental Monitoring Agency in the month of December, 2015.

F.

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi. Length – 1.202kms.

Line is charged on 01st June 2015.

No Forest Land and No Wild Life Sanctuary falling in the route alignment

No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conducted by the Environmental Monitoring Agency in the month of May 2016.

G. 132 kV S/C of Agia - Matia Line (On D/C Towers). Length – 22.534 kms.

All work for this line is completed. No Forest Land and No Wild Life Sanctuary falling in the route

alignment No major adverse environmental issues identified.

Air, water & noise monitoring in post construction period has been conductedby the Environmental Monitoring Agency in the month of February 2016

Page 12: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

8

Table No. 2.2 Project Progress Status (Augmentation, Extension and refurbishment of existing sub-stations and reactive

power compensation)

Name of Subproject Status

Augmentation of Transformer Capacity

MVA

Jagiroad (Baghjap), 132/33 kV Substation

New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers

All works at these Substation locations are completed.

Gohpur, 132/33 kV Substation

New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

North Lakhimpur, 132/33 kV Substation

New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

Lanka (Sankardevnagar), 132/33 kV Substation

New 2x25 MVA 132/33 kV in place of old 2x16 MVA transformers

Margherita (Ledo) 132/33 kV Substation

New 2x25 MVA 132/33 kV in place of old 2x10 MVA transformers

Tinsukia, 220/132/33 kV Substation

Addition of new 2x40 MVA 132/33 kV transformers and new 2x100 MVA 220/132 MVA transformers in place of old 2x50 MVA, 220/132 transformers

Kahilipara, 132/33 kV Substation

New 2x40 MVA, 132/33 MVA transformers in place of old 2x10 MVA, 132/33/11 kV transformers. Mariani,

220/132/66/33 kV Substation Addition of new 2x25 MVA, 132/33 MVA transformers

Boko. 220/132/33 kV Substation

Addition of new 1x100 MVA, 220/132 MVA transformers

Extension for Line Bays

Mariani 220/132/66/33 kV Substation

Two numbers of 220 kV Line Bays for Mariani - Namrup 220 kV S/C transmission Line on D/C towers.

Erection work is Completed. Line Bays are completed and commissioned

Namrup, 220/132/33 kV Substation

Two numbers of 220 kV Line Bay for Mariani - Namrup 220 kV S/C transmission Line.

Earthing System, Cable Trench and stringing work of bus is completed.

Tinsukia, 220/132/33 kV Substation

One number of 132 kV Line Bays for Tinsukia - Rupai 132 kV S/C Transmission Line

All work at this Substation location is completed.

Agia, 220/132/33 kV Substation

One number of 132 kV Line Bays for Agia - Matia 132 kV S/C Transmission Line

All work at this Substation location is completed.

Installation of 33 kV Capacitor Banks

MVAR

Pailapool 132/33 kV Substation:

2x5 MVAR

For Installation of 2 Sets 2x5MVAR Capacitor Bank with NCT, Reactors, BPI and with other associated equipment’s, Bay Steel Structures for extension of 33KV Bus, space and locations at this sub-station are not available/sufficient. This work scope is now diverted to Kahilipara Substation. The work is yet to

Page 13: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

9

commence.

Gohpur 132/33 kV Substation: 2x5 MVAR

The erection of Capacitor Bank and Bus work is completed at this Substation. Commissioning work is in progress

Jorhat (Gormur) 132/33 kV Substation

2x10 MVAR All work at this Substation location is completed.

Sishugram 132/33 kV Substation: 2x10 MVAR

All the equipment’s for Capacitor Bank are now erected. However, due to non-availability of Cables the Capacitor Bank is not commissioned. Erection, Testing & Commissioning of 2 Sets 132KV C.B. completed.

Nazira 132/33 kV Substation: 2x5 MVAR All work at these Substation locations is completed.

Panchgram 132/33 kV Substation 2 x 5 MVAR Chandrapur 132/33 kV Substation 2 x 5 MVAR

Barnagar 132/33 kv Substation 2x10 MVAR It was proposed earlier but actually not required.

Replacement of Old & Obsolete Equipment

Circuit Breakers 220 kV: 12 nos., 132 kV: 61 nos., 33 kV: 61 no’s

All the work are completed under this subproject

Current Transformers 220 kV: 6 nos., 132 kV: 69 nos., 33 kV: 42 no’s

Potential Transformers 132 kV: 9 nos., 33 kV: 9 no’s Isolators 220 kV 6 nos., 132 kV: 26 no’s

Relay and Control Panels

220 kV Line Panel: 2 nos., 132 kV Line panel: 15 nos., 132 kV Transformer Panel: 2 nos., 132 kV Bus Coupler Panel: 8 nos.

Numerical Relays Distance Relays 3 nos., Transformer Differential Relay: 2nos

Battery Bank 220 volt system: 1 no., 110 volt system: 5 Nos.

B. Implementation Schedule 9. The entire works related to tranche 2 were scheduled to be completed within 36 months from effective date of project approval from ADB. Package wise contract details are provided below in Table No. 3.0:

Page 14: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

10

Table No. 3.0: Package Wise Progress Details

Name of the

Packages

Sub projects under this package

Contractor Contract

Award Date

Contract Completion Date

Cumulative % Progress Remarks

A

220/132/33KvSonapur S/S M/S NECCON Infra

& Power Ltd 20.07.2012

31.03.2013 (Original)

30.06.2016 (4th Revision)

88.62%

Sonabil Substation is Commissioned on 18

th February 2016.

Work at Sonapur Substation is in progress.

220/132/33KvSonabil S/S

B

132/33kVKamakhya S/S

M/S Alstom T&D India Ltd

14.09.2012

07.05.2014 (Original)

30.06.2016 (4th Revision)

94.01%

Work is in progress at Kamakhya Substation. Jorhat and Bordubi Substations commissioned in December 2015. At Matia, BilasiparaHailakandi Substations work is near completion.

132/33kV Jorhat (West) S/S 132/33kVBordubi S/S 132/33kVMatia S/S 132/33kVBilasipara S/S 132/33kVHailakandi S/S

C

220kV D/C Sonapur LILO J/V of M/S NECCON Power Infra Ltd and M/S Trans Global Power Ltd

12.11.2011

11.12.2013 (Original)

30.06.2016 (4th Revision)

92.80%

Work in progress at Sonapur LILO Testing and Commissioning ongoing at Mariani-Namrup line Sonabil LILO charged on 18

th February

2016

220kV S/C Mariani–Namrup Line on D/C Towers 220kV D/C Sonabil LILO

D

132kV D/C Sonabil LILO.

M/S Shyama Power India Ltd

21.09.2011

16.11.2013 (Original)

31.03.2016 (2nd Revision)

88.03%

Jorhat (West), Bordubi, Agia-Matia, Hailakandi and Samaguri – Lanka Transmission Line work is completed. Samaguri– Lanka T/L is under operation. Sonapur LILO T/L tower foundation anderection works are in progress.

132kV D/C Sonapur LILO 132kV S/C Jorhat LILO 132kV S/C Bordubi LILO Stringing of 2

nd Circuit of 132

kV Samaguri - Lanka T/L 132kV S/C Hailakandi LILO

132kV S/C of Agia – MatiaT/L

E

Augmentation of Transformer Capacity

M/S NECCON Infra & Power Ltd

03.09.2012

30.04.2014 (Original)

31.03.2016 (2nd Revision)

98.35% Work is completed under this subproject.

Jagiroad (Baghjap), 132/33 kV Substation Gohpur, 132/33 kV Substation North Lakhimpur, 132/33 kV Substation Lanka (Sankardevnagar),

Page 15: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

11

Name of the

Packages

Sub projects under this package

Contractor Contract

Award Date

Contract Completion Date

Cumulative % Progress Remarks

132/33 kV Substation Margherita (Ledo) 132/33 kV Substation Tinsukia, 220/132/33 kV Substation Kahilipara, 132/33 kV Substation Mariani, 220/132/66/33 kV Substation Boko. 220/132/33 kV Substation Extension for Line Bays Erection work is completed at Mariani

substation. Line Bays are Completed and commissioned Earthling System, Cable Trench and Stringing of Bus is Completed at Namrup substation but not connected with existing twin bus. Work is completed for Agia and Tinsukia substation.

Mariani 220/132/66/33 kV Substation Namrup, 220/132/33 kV Substation Tinsukia, 220/132/33 kV Substation Agia, 220/132/33 kV Substation Installation of 33 kV Capacitor Banks Pailapool 132/33 kV Substation

In Sishugram substation all the equipment’s for Capacitor Bank are now erected. However, due to non-availability of cables, the capacitor bank is not commissioned. Erection, Testing& Commissioning of 2 Sets 132KV C.B. completed. The scope of work for Pailapoolsubstation is now diverted to Kahilipara substation. The work is yet to commence.

Gohpur 132/33 kV Substation Jorhat (Gormur) 132/33 kV Substation Sishugram 132/33 kV Substation: Nazira 132/33 kV Substation: Panchgram 132/33 kV Substation Chandrapur

Page 16: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

12

Name of the

Packages

Sub projects under this package

Contractor Contract

Award Date

Contract Completion Date

Cumulative % Progress Remarks

132/33 kV Substation The erection of Capacitor Bank and Bus work is completed at Gohpur substation. Commissioning work is in progress In case of Barnagar substation the work proposed earlier is not required now. Work is completed at Jorhat (Gormur), substation, Nazira substation, Panchgram substation and Chandrapur substation.

Barnagar 132/33 kV Substation

Replacement of Old & Obsolete Equipment

All the work are completed under this subproject

Circuit Breakers Current Transformers Potential Transformers Isolators 220 kV Relay and Control Panels Numerical Relays Distance Relays Battery Bank

Page 17: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

13

2.0 Compliance to National Regulations The relevant applicable Acts and Legislations to the project are given in the Table No.4.0

Table No. 4.0: Applicable Acts and Legislations to the project

Act/Rule/Notification Year Objectives Compliance

Status

The Environment (Protection) Act The Environment (Protection) Rules

1986 1986

To protect and improve the overall environment.

Complied

Indian Forest Act Forest (Conservation) Act Forest (Conservation) Rules

Forest Conservation Rules (Notification)

1927

1980

1981

2003

To consolidate the laws related to forest, the transit of forest produce and the duty levy able on timber and other forest produce. Conservation of Forests, Judicious use of forestland for non-forestry purposes; and to replenish the loss of forest cover by Compensatory Afforestation on degraded forestland and non-forest land. Procedure for submission of the proposals seeking approval for Central Government for diversion of forestland to non-forest purposes.

Not Applicable

No Forest

Land is involved in the project.

Wild Life (Protection) Act

The Wild Life (Protection) Amendment Act

1972

2002

To protect wildlife in general and National Parks and Sanctuaries in particulars. To protect wild animals, birds and plants with a view to ensure the ecological and environmental security of the country

Not Applicable

No Wild Life

Protected area is

involved in the project.

The Water (Prevention and Control of Pollution) Act

1974 To control water pollution by controlling discharge of pollutants as per prescribed standards

Complied

The Air (Prevention and Control of Pollution) Act

1981 To control air pollution by controlling emission of air pollutants as per prescribed standards

Complied

The Noise Pollution (Regulation and Control) Rules The Noise Pollution (Regulation and Control) Amendment Rules

2000

2006

To regulate and control noise producing and generating sources with the objective of maintaining the ambient air quality standards in respect of noise

Complied

The Ancient Monuments and Archaeological Sites and Remain Act

1958

To provide for the preservation of ancient and historical monuments and archaeological sites and remains of national importance and protection sculptures, carvings and other like objects.

Not Applicable No ASI site identified so

far.

The Electricity Act 2003

Although the Act does not explicitly deal with environmental implications of activities related to power generation, transmission and distribution. However, ASEB integrates environment protection as a part of its project activities.

Complied

Page 18: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

14

3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 10. The Table 5.0 shows the applicable Environmental Covenants from the ADB Loan Agreement

Table No.5.0: Environmental Covenants

Product Schedule Para No. Description Remarks/Issues

Loan 2677

5 14

The State through ASEB shall ensure that the Subprojects under the Project are undertaken and that all Project facilities are designed, implemented, operated and maintained in accordance with all applicable laws, and regulations of the Borrower, the State, and ADB's Safeguard Policy Statement (2009), as set out in the EARF. The State shall ensure that all associated projects will be constructed and commissioned in compliance with the laws and regulations of the Borrower.

It is being complied as per ADB's Environment Policy (2002), as set out in the EARF. The EMP is being implemented in accordance with applicable laws and regulations of GOI, GOA, and the ADB guidelines. Further an Environment monitoring agency has been placed to carry out the regular environmental monitoring as set out in the EMP. The environmental monitoring has been carried out in all three phases’ i.e. pre- construction, during construction and post construction phase.

Loan 2677

5 15

For each Subproject, ASEB shall cause the IA to prepare and implement the necessary IEE/EIA as applicable, and EMP (with budget) in accordance with the EARF. For Subprojects, the environmental categorization and assessment procedures defined in the EARF shall be followed. For any environment category A or B sensitive Subproject, a SEIA/SIEE as applicable shall be prepared and made available to the public 120 days before the Subproject is submitted to ADB for approval. ASEB through the IA shall monitor, audit, and report to ADB twice a year on the implementation of the EMPs for each Subproject.

It is being complied. The project falls under category B and IEE for the subprojects has been prepared accordingly. Consultant Supporting ESMU in PMU is internally monitoring the EMP implementation and submitting semi-annually progress reports to PMU which are further being submitted to ADB by PMU. Further an Environment monitoring agency is in place and is carrying out environmental monitoring regularly as set out in the EMP for all three phases i.e. pre- construction, during construction and post construction phase. Since subproject involves no major environmental issues, hence hiring of independent external monitoring agency is not felt by APDCL & AEGCL (EA).

4.0 Compliance to Environmental Management Plan 11. Based on the Environmental Management Plan the Compliance Status on Environmental issues in Tranche 2 Subprojects for ConstructionPhaseand Operation & Maintenance Phase has been prepared and presented in Table No. 6.0

Page 19: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

15

Table No. 6.0: CompliancetoEnvironmental Management Plan (Tranche 2 Subprojects)

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

Construction Stage

Equipment layout and installation

Noise and vibrations

Construction techniques and machinery selection to minimize noise and vibration. Noise to be limited to 70 dB (A) at site boundaries. Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) to conduct periodic spot checks to confirm compliance.

Construction Contractor PMU/ESMC

APCB

Environmental and Social Management Cell (ESMC) of Project Management Unit (PMU) conducted periodic spot check to confirm compliance. Being Complied. The noise level monitoring is being carried by the environment monitoring agency (ENGECORC, Guwahati) on regular basis.

Physical construction (manual labor)

Disturbance of farming activity

Construction activities on cropping land timed to avoid disturbance of field crops (within one month of harvest wherever possible).

Construction Contractor PMU/ESMC

ADEF Being complied. Contractors are avoiding disturbance to field crops

Mechanized construction

Noise, vibration, and operator safety, equipment wear and tear

Construction equipment to be maintained in accordance with GOI standards for noise exposure to workers. Equipment to be shut off when not in use.

Construction Contractor PMU/ESMC

APCB

Being Complied. Noise level monitoring was conducted by environment monitoring agency as per monitoring scheduled agreement.

Substation site clearance

Removal of trees and other vegetation

Marking of trees / vegetation to be removed prior to clearance, and strict control on clearing activities to ensure minimal clearance.

Construction Contractor PMU/ESMC

ADEF

Being complied. Enumeration of trees / vegetation to be removed prior to clearance, to ensure minimal clearance.

Trimming /cutting of trees within Right-of-Way(RoW)

Fire hazards

Trees allowed growing up to a height within the RoW by maintaining adequate clearance between the top of tree and the conductor as per transmission design

Construction Contractor PMU/ESMC

ADEF

Being Complied. Adequate clearance between the top of tree and the conductor as per

Page 20: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

16

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

Temporary loss of vegetation and permanent deforestation

standards. Trees that can survive pruning to comply with vertical and horizontal separation requirements should be pruned instead of cleared. Felled trees and other cleared or pruned vegetation to be disposed of as authorized by ADEF

transmission design standards being maintained within RoW.

Wood /vegetation harvesting

Temporary loss of vegetation and permanent deforestation

Construction workers prohibited from harvesting wood in the project area (apart from locally employed staff continuing current legal activities).

Construction Contractor PMU/ESMC

ADEF Being Complied. Contractors are using gas/ kerosene for cooking.

Temporary encroachment into farmland

Temporary loss of agricultural productivity

Use existing access roads wherever possible. Ensure existing irrigation facilities are maintained in working condition. Protect/preserve top soil and reinstate after construction completed. Repair/reinstate any damaged bunds after construction completed.

AEGCL/PMU APCB

Wherever possible existing access roads are being used. Farmers being compensated wherever temporary lands are being encroached. Top soil are being preserved and being reused for filling.

Social inequities Compensation for temporary loss in agricultural production as per resettlement plan

AEGCL/PMU ADB Being complied.

Ambient air quality and noise level and Water quality

Dust, exhaust, & noise emissions from construction equipment. Noise impacts on nearby communities& construction workers

Controlled construction activities & maintenance of machineries, timely scheduling of construction activities to avoid nuisance to nearby communities. Construction equipment to meet GOI

Construction Contractor

PMU /ESMC APCB

Being Complied. Monitoring of air, water and noise was conducted by the environment monitoring agency as per monitoring scheduled agreement.

Page 21: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

17

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

emissions & noise standards. Water sprays to be used for dust control as necessary.

Storage of chemicals and any hazardous materials

Possible spills resulting in contamination land, water, and air

Fuel and any other hazardous materials will be securely stored to prevent spills. Contractors to provide spill response kit in accordance with Material Safety Data Sheets for chemicals and hazardous materials.

Construction Contractor

PMU /ESMC APCB

Being Complied. Contractors are storing oils and fuels on cemented floor to prevent spills leading to contamination of surface&ground water and land.

Construction equipment maintenance

Industrial waste water from maintenance may cause petroleum and detergent contamination of soil and water

Construction contractor to provide sedimentation and biological treatment if necessary

Construction contractor

PMU/ESMC

APCB

Construction equipment maintenance to prevent soil and water contamination.

Construction schedules

Noise nuisance to neighboring properties

Construction activities only undertaken during the day and local communities informed of the construction schedule.

Construction Contractor

PMU /ESMC APCB

Being Complied. Monitoring of noise levels was undertaken by the environment monitoring agency as per monitoring scheduled agreement.

Health and safety Injury and sickness of workers and members of the public

Contract provisions specifying minimum sanitation, health, and safety requirements for construction camps. Contractor to prepare and implement a health and safety plan including worker training and daily/weekly briefings.

Construction Contractor PMU/ESMC

APCB, ASSAM

DEPARTMET OF HEALTH

Being Complied. Contractors are regularly using Personnel Protective Equipment’s during construction time. First aid box and fire extinguisher are kept at work site.

Provision of Sanitary facilities for construction workers

Potential BOD and fecal coli form contamination

Construction workforce facilities to include proper sanitation, water supply, waste disposal facilities, including primary treatment for domestic sewage and secure disposal of domestic solid wastes.

Construction Contractor

PMU /ESMC APCB

Being Complied. Contractors are providing sanitary and waste disposal facilities at construction camp.

Page 22: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

18

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

Construction waste management

Air, soil, and water pollution due to inadequate management and control

Construction wastes to be managed in accordance with GOI standards & industry best practices. Waste lubricating oils to be disposed or recycled off-site by licensed service companies. Transformer oils to be returned to vendors via existing arrangements for transformer maintenance. Scrap steel & other salvaged materials to be auctioned and disposed / recycled off-site by licensed vendors.

Construction Contractor

PMU /ESMC APCB

ADB Review Mission

Being Complied. Construction waste is being managed properly.

Construction Stage Monitoring

Inadequate Monitoring and Mitigation leading to environmental impairments at and around project sites

Training of AEGCL/PMU/ESMC staff Implementation of effective environmental monitoring and reporting system using checklist of all contractual environmental requirements.

PMU/ESMC and safeguard consultants

APCB

Training of AEGCL/PMU/ESMC staff conducted. Environmental monitoring and reporting was carried out.

Operational And Maintenance Phase

Design and location of substations and transmission towers

Exposure to noise and other safety related risks

Set back of dwellings to overhead line route designed in accordance with transmission design standards Buffer zones and across control at substations. Transmission line design to comply with the limits of electromagnetic interference from overhead power lines

AEGCL/PMU/ ESMC

APCB Being complied Transmission line designs are of desired standards.

Page 23: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

19

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

Provision of staff/workers health and safety during operations

Injury and sickness of staff and other workers Soil and water contamination from domestic wastewater and solid wastes

Best design practices will be followed to minimize hazards. Housekeeping and maintenance at substation in accordance with GOI standards and industry best practices. Safety and awareness for staff. Preparation of fire emergency action plan and relevant staff training Provide adequate sanitation , water supply, wastewater control, and solid waste management facilities

AEGCL/PMU/ ESMU

APCB, Assam

Department Of Health

Being complied Sanitation facilities, Drinking water and Safety facilities are in place. . Housekeeping and maintenance also being done as per guidelines.

Electric shock hazards

Injury/mortality to staff and public

Careful design using appropriate technologies to minimize hazards Barriers to prevent climbing on/dismantling of transmission towers. Appropriate warning signs on facilities. Electricity safety awareness raising in project areas.

AEGCL/PMU/ ESMU

APCB, Assam

Department Of Health

Substations and transmission towers have been designed by using appropriate technologies to minimize hazards. Electrical safety sign boards are installed. Rubber mats, fire extinguisher, sand buckets and PPE are available in substations.

Fire and explosion hazards

Loss of property and health hazards

Maintaining adequate clearance from conductors and ground vegetation, adequate safety design in substations to avoid fire hazards due to flashovers

AEGCL/PMU/ ESMU

APCB

Adequate clearance between the top of tree and the conductor as per transmission design standards being maintained within RoW

Page 24: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

20

Project Activity Environmental Issues Management / Mitigation Measures Responsibility

Compliance Status/ Remarks Planning/

Implementation Monitoring/ Supervision

Industrial waste generation

Potential soil and water contamination

Waste to be managed in accordance with GOI standards and industry best practices. Waste lubrication oils to be disposed or recycled off- site by licensed service companies. Transformer oils to be returned to vendors via existing arrangements for transformer maintenance

AEGCL/PMU/ ESMU

APCB

ADB review Mission

Industrial waste shall be managed properly in accordance with applicable laws.

Transmission line maintenance

Exposure to electromagnetic interference

Transmission line design to comply with the limits of electromagnetic interference from overhead power lines.

AEGCL/PMU/ ESMU

ADEF, APCB Being complied.

Operation and maintenance staff skills

Potential list time accidents and injuries, and possible environmental losses of various types

Adequate training in O&M to all relevant staff of transmission line and substation maintenance crews Preparation and training in the use of O&M manuals and standards operation practices

AEGCL/PMU/ ESMU

APCB, other relevant state

agencies

Being complied.

Periodic environmental monitoring

Inadequate monitoring may result in diminished ecological and social values

AEGCL/PMU staff to receive training in environmental monitoring of project operations and maintenance activities

AEGCL/PMU/ ESMU

ADB review missions

Post construction environmental monitoring conducted for all transmission line between February 2016 to May 2016 expect for Stringing of 2nd Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line where monitoring was conducted in December 2015 .

Page 25: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

21

5.0 Safeguards Monitoring Results and Unanticipated Impacts A. Environmental Monitoring Schedule 12. In order to comply with requirements of Environmental monitoring an external environmental monitoring agency11 (M/s En Geo Consultancy & Research Centre, Guwahati) has been hired by PMU to carry out the environmental monitoring with regards to air quality, water quality and noise levels during preconstruction, construction and post construction stage. The primary responsibility of the environmental monitoring agency are for testing, analysing and reporting impact of transmission lines & substation projects on air, ground/ surface water and noise levels. 13. Since the civil construction works under the project are very meagre, hence, the environmental monitoring for ambient air quality, water quality and noise levels during various stages – pre construction, construction and post construction are being monitored for Tranche 2 as per below schedule. (Refer Table 7.0).

Table No. 7.0: Environmental Monitoring Schedule for Tranche 2

Sl. No.

Parameters Locations Frequency As per IEE

Monitoring Conducted

Construction Period

1 Ambient Air quality monitoring

All substation Sites and selected transmission lines.

Every 6 months, beginning with initial activity, for total of 18 months

At Sub Stations: Twice during construction At Transmission lines: Once during pre-construction; Twice during construction

2 Ambient Noise level monitoring

3 Water quality monitoring

Operation and Maintenance Period

1 Ambient Air quality monitoring All substations

and transmission lines

As necessary based on inspections and complaints

At Transmission lines: Once during post construction 2

Ambient Noise level monitoring

3 Water quality monitoring

B. Environmental Monitoring Parameters 14. The details of parameters for Ambient Air, Water and Noise being monitored by external environmental monitoring agency are given below in Table 8.0.

Table No. 8.0: Environmental Monitoring Parameters Sl. No.

Environmental Parameters

Analytical Parameters

1 Air Quality Monitoring PM10, PM2.5 ,SO2, NO2

2 Ground Water Quality Monitoring

pH, Turbidity (NTU), Specific Conductance (micro mhos/cm), Total Dissolved Solids (TDS), Total Alkalinity (as CaCO3), Total Hardness (as CaCO3), Calcium (as Ca), Magnesium (as Mg), Chlorides (as Cl), Sulphates (as SO4), Nitrates (as NO2), Fluoride (as F), Arsenic (as As), Selenium (as Se), Cadmium (as Cd), Copper (as Cu), Lead (as Pb), Zinc (as Zn).

11

Ref.Contract Agreement No. PMU/03/OF 2011-12 dated June 04, 2012 between Assam State Electricity Board and En-Geo

Consultancy & Research Centre

Page 26: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

22

Sl. No.

Environmental Parameters

Analytical Parameters

3 Surface Water Quality Monitoring

Colour (Hazen Units), Dissolved Oxygen (DO), pH, Iron (as Fe), Chlorides (as Cl), Biological Oxygen Demand (BOD), Total Dissolved Solids (TDS), Copper (as Cu), Total Chromium (as Cr), Sulphate (as SO4), Nitrates (as NO3), Fluoride (as F), Total Coliform (MPN/100ml), Cadmium (as Cd), Selenium (as Se), Arsenic (as As), Lead (as Pb), Zinc (as Zn), Chromium (as Cr+6), Phenolic compounds (as C6,H5OH, Oil & Grease).

4 Noise Level Day and Night time

C. Environmental Monitoring Status 15. The environmental monitoring for ambient air quality, water quality and noise levels have been conducted and details are as under: Substation: Environmental monitoring was conducted twice during construction stage in the month of November 2013 and April 2014. Transmission lines: Environmental monitoring conducted once during preconstruction stage in the month of December 2012/January 2013 and twice during construction stage in the month of November 2013 and April 2014 and once during post construction stage in the period December 2015 to May 2016. Post construction environmental monitoring for ambient air quality, water quality and noise levels along all thetransmission lineswas carried out during this reporting period between February 2016 and May 2016 (expect for Stringing of 2nd Circuit of 132 kV Samaguri - Lanka (Sankardevnagar) Line where monitoringwas completed in December 2015). Monitoring of ambient air quality, noise level and water quality was conducted betweenFebruary 2016 - May 2016 at 61 locations Ref. Annexure – I (A), Annexure – I (B) and Annexure – I (C) respectively. Site photographs showing ambient air quality monitoring, noise level monitoring and Water quality monitoring undertaken during this reporting period are given inAnnexure – II (A), Annexure – II (B) and Annexure – II (C) respectively. The environmental monitoring results are awaited and same shall be provided in next Environmental Safeguard Monitoring Report i.e. July– December, 2016. 6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders 16. There are 5 circles under AEGCL for substations and T/Ls. One Grievance Redressal Committee (GRC) cell at each circles level has been formed (i) to provide support to affected persons (AP’s) on problems arising from the environmental activities. (ii) record grievances of the AP’s and resolve them; and (iii) review grievances involving benefits like compensations for private tree loss and assistance to AP’s. A directive in this regard from Director (PMU), ASEB dated January 19, 2012 have been issued to AEGCL and APDCL, who are the Implementing Agencies of the MFF. GRC at circle levels are formed and Project Authorities are the Chairman of respective circles to comply the grievances in regard to environmental activities if any. The GRC constitutes representatives of

i. Concerned Project Authority (IA) Chairman of the committee

ii. One official from the o/o the concerned

District Magistrate or SDM (Civil) Member

iii. Concerned Circle Officer or his representative Member

iv. Concerned Project Manager (IA) Member

v. Deputy General Manager (PMU), APDCL Member

Page 27: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

23

vi. AGM, Environment & Social Management Unit (ESMU) Member

vii. Land Acquisition Officer (LAO), AEGCL Member

viii. Affected Person(s)/GaonBurha Member

17. Grievance Redress Committee (GRC) set up at circle level to monitor subprojects Implementation for each subproject affected area. The GRC will determine the merit of each grievance, and resolve grievances within an outer time limit of three months of receiving the complaint. The AP has the right to refer the grievances to appropriate courts of law if not satisfied with the redress at any stage of the process. The set up GRC has the system of records keeping, contact details of complainant, date of the complaint received, nature of grievance etc. if any for the ongoing project and taking the necessary action against the complaint. During this reporting period no formal complaint or grievances from have been registered. 7.0 Institutional Arrangement

18. The primary institutions involved in the project are: Assam Electrical Grid Corporation and Assam Power Distribution Company Limited (EA and IA), Project Management Unit (PMU), Environment and Social Management Unit (ESMU) at PMU Level and External Environmental Monitoring Agency. 19. The Assam Electrical Grid Corporation Limited (AEGCL) is the executing agency (EA) for the Tranche-2. The AEGCL functions as the implementing agency (IA) for the project with a dedicated Project Management Unit (PMU). The PMU is assisted by an Environment and Social Management Unit (ESMU) to deal with the environmental and social safeguards issues. 20. The Environment and Social Management Unit (ESMU) has been set up within the PMU/APDCL, along with other engineering units, to address all environmental and social issues of Tranche-2. The ESMU is headed by an Assistant General Manager, who works closely with other staff of the PMU and assists the PMU in getting all necessary clearances and in the implementation of environmental management plan The ESMU coordinates safeguard activities both at headquarter and PIU level. All safeguards activities are managed and supervised by the Assistant General Manager based at the Head Office. The ESMU is assisted by designated site engineers who will be responsible for the field activities 21. To support the ESMU in the PMU has appointed an Environmental Safeguard Consultant. The Consultant’s responsibilities include advising and assisting the EA/IA in mitigating Social and Environmental issues and administration and Implementation of measures in Environmental Management Plan, as required. During the reporting period, Environmental Safeguard Consultant has been deployed on intermittent basis. 22. An external environmental monitoring agency is hired to carry out the monitoring during various phases of project actives in order to implement the environmental monitoring plan. External monitoring agencies carry out monitoring under supervision of the ESMU

8.0 Public Consultation and Site Visits Undertaken 23. A site visit was undertakenby Environmental and Social Expert on 3rd June, 2016 to check environmental compliance status of 2x16 MVA 132/33 kV Bilasipara Substation and 2x25 MVA 132/33 kV Matia Substation. The observations are listed below.

a) 132/33kV Bilasipara (2x16 MVA) substation (3rd June, 2016): The civil work and technical work was already completed and oil filling of transformers was under process. No outstanding social and environmental issues were observed during the site visit. Fire safety equipment’s i.e. Fire extinguisher and sand buckets were available inside the substation

Page 28: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

24

premises. Personal Protective Equipment’s (PPE’s) were available at site and were found to be adequate. Drinking water facility is provided and found adequate.First Aid box was also available at substation site. The precaution sign board near the high voltage machine will be mounted when commissioned will be done.

b) 132/33kV Matia (2x25 MVA) substation (3rdJune, 2016): Civil and technical work has been complete and the substation will be commissioning soon. No outstanding social and environmental issues were observed during the site visit. Tree plantation and water sprinkling was observed along approach road and in open spaces. Personal Protective Equipment’s (PPE’s) were available at substation site and were found to be adequate. Fire safety equipment’s i.e. Fire extinguisher and sand buckets were available in the site. The precaution sign board near the high voltage machine will be mounted when commissioned will be done. The photographs of both the site visit are attached in Annexure - III 9.0 Environmental Review Meetings 24. Environmental review meetings were held with external environmental monitoring agency M/s En Geo Consultancy & Research Centre, Guwahati on 10th March, 2016 and 11th May, 2016 to review the progress regarding the environmental monitoring works during post construction phase. Issues related to monitoring schedule and progress achieved was discussed. Attendance sheets of both the review meets are attached as Annexure - IV. 10.0 Conclusion and Recommendations 25. In order to have a sustainable development in the project the emphasis on the implementation of EMP has been given top most priority. Compliances to National Regulations and to Environmental Covenants as contained in ADB Loan Agreement are being met. Environment and Social Cell is monitoring the implementation of environmental safeguards measures being undertaken by the contractor on regular basis. A Grievance Redressal Committee has been constituted with due representation of the people residing near the project site. Environmental monitoring is being conducted by external environmental monitoring agency for ambient air quality, water quality and noise levels along transmission lines as per the schedule. .

Page 29: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

25

Annexure - I (A) Ambient Air Quality Monitoring Locations

S. No.

Location Name Location ID Coordinates Date of Monitoring Location Type Remarks

220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur

1 Buramayong T2A1 26° 10' 32.2" N 92° 00' 32.1" E

24/03/2016 Rural

Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

2 KamarpurPahar T2A2 26° 13' 22.6" N 92° 01' 50.9" E

23/03/2016 Residential

3 DhupguriKalangpar T2A3 26° 11' 35.9" N 92° 00' 47.3" E

23/03/2016 Residential/ Rural

4 Parakumar (Bejeni) T2A4 26° 10' 18.9" N 92° 00' 07.6" E

22/03/2016 Rural/Silence

5 SamotaPothar (Quarry) T2A5 26° 07' 39.1" N 92° 00' 37.0" E

22/03/2016 Residential/ Rural

220 kV S/C Mariani - Namrup Line on D/C Towers

6 Parbatpur T2A6 27° 10' 47.9"N 95° 22' 16.4"E

16/04/2016 Rural &

Residential

Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

7 Coal Pit T2A7 27° 8' 25.7"N 95° 21' 45.0"E

16/04/2016 Rural &

Residential

8 Nagakatagaon T2A8 27° 9' 13.4"N 95° 18' 45.6"E

15/04/2016 Rural &

Residential

9 Misajangaon T2A9 27° 09' 16.8" N 95° 15' 27.1" E

15/04/2016 Rural &

Residential

10 Sundarpur TG T2A10 27° 8' 29.08" N 95° 13' 13.02"E

14/04/2016 Rural

11 Atal Pathargaon T2A11 27° 08' 25.1" N 95° 10.5' 9.3" E

14/04/2016 Rural &

Residential

12 KathiyaKhunda No.1 T2A12 27° 7' 8.15" N 95° 9' 19.47" E

13/04/2016 Rural &

Residential

13 Rahanshyam T2A13 27° 5' 47.29" N 95° 07' 28.8" E

13/04/2016 Rural &

Residential

14 Ujanlongpatiya T2A14 27° 06' 32.8" N 95° 5' 57.76" E

12/04/2016 Rural &

Residential

15 Changmaigaon T2A15 27° 04' 29.4" N 95° 02' 57.8" E

12/04/2016 Rural &

Residential

Page 30: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

26

S. No.

Location Name Location ID Coordinates Date of Monitoring Location Type Remarks

16 Bagriguri T2A16 27° 03' 40.0" N 95° 01' 35.7" E

11/04/2016 Rural &

Residential

17 Barohar TG T2A17 27° 02' 34.1"N 94° 59' 26.2"E

11/04/2016 Rural &

Residential

18 Rangapathar T2A18 27° 00' 12.5"N 94° 57' 32.2"E

10/04/2016 Rural &

Residential

19 Maibela T2A19 26° 59' 4.4"N 94° 55' 36.2"E

10/04/2016 Rural &

Residential

20 Manuharigaon T2A20 26° 59' 32.2"N 94° 54' 2.1"E

9/04/2016 Rural &

Residential

21 Kongargaon No.2 T2A21 26° 58' 04.5" N 94° 51' 45.5" E

9/04/2016 Rural &

Residential

22 Halal Gaon T2A22 26° 56' 38.8" N 94° 51' 34.4" E

08/04/2016 Rural &

Residential

23 Mohangaon T2A23 26° 55' 14.4" N 94° 49' 13.4" E

08/04/2016 Rural &

Residential

24 ChengdharaGaon T2A24 26° 53' 21.5" N 94° 47' 31.8" E

07/04/2016 Rural &

Residential

25 Hatipati TG T2A25 26° 50' 39.7" N 94° 44' 16.4" E

07/04/2016 Rural &

Residential

26 RangagaraGaon T2A26 26° 49' 15.4" N 94° 42' 39.9" E

06/04/2016 Rural &

Residential

27 DeopaniGohainGaon T2A27 26° 48' 59.3" N 94° 39' 44.4" E

05/04/2016 Rural &

Residential

28 Dulia Gaon T2A28 26° 48' 33.7" N 94° 37' 36.1" E

05/04/2016 Rural &

Residential

29 Naragaon T2A29 26° 48' 41.5" N 94° 34' 15.5" E

06/04/2016 Rural &

Residential

30 JapihajiaGaon T2A30 26° 48' 11.1" N 94° 30' 53.3" E

04/04/2016 Rural &

Residential

31 Basahabi TG T2A31 26° 46' 14.5" N 94° 29' 17.7" E

04/04/2016 Rural &

Residential

32 Gandhia T2A32 26° 43' 49.5" N 94° 26' 35.4" E

03/04/2016 Rural &

Residential

Page 31: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

27

S. No.

Location Name Location ID Coordinates Date of Monitoring Location Type Remarks

33 Sonakhati TG (Triwal TG) T2A33 26° 41' 57.8" N 94° 23' 53.5" E

03/04/2016 Rural &

Residential

34 Dihingpar TG T2A34 26° 39' 41.4" N 94° 23' 01.0" E

02/04/2016 Rural &

Residential

35 Near Mariani SS (Bosagaon) T2A35 26° 37' 45.9" N 94° 21' 44.8" E

02/04/2016 Silence

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

36 Aka Basti T2A36 26° 48' 46.1" N 92° 49' 06.4" E

26/04/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

37 Gudamghat T2A37 26° 47' 41.4" N 92° 49' 30.3" E

27/04/2016 Residential

132 kV D/C LILO of Depota - Gohpur Line at Sonabil

38 Konnamukh T2A38 26° 48' 30.4" N 92° 49' 47.5" E

27/04/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

39 Gudamghat (KosariGaon) T2A39 26° 47' 56.2"N 92° 49' 31.6"E

28/04/2016 Residential

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

40 Chandrapur T2A42 26° 14' 13.1" N 91° 57' 12.2" E

25/03/2016 Silence

Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

41 Govardhan T2A43 26° 14' 08.7" N 91° 58' 23.6" E

25/03/2016 Residential

42 Belguri TG (DigaruparChangbil)

T2A44 26° 11'14.66"N 91° 59' 34.71"E

24/03/2016 Residential

43 Nagabil T2A45 26° 9' 45.7"N 91° 59' 36.9"E

24/03/2016 Residential

44 Keohutuli (Bojrangbosti) T2A46 26° 09' 04.9" N 91° 59' 57.2" E

26/03/2016 Residential

45 Sanarupathar T2A47 26° 08' 15.4" N 91° 59' 32.9" E

26/03/2016 Silence

132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)

46 Panichakua T2A48 26° 44' 02.3" N 94° 05' 41.7" E

01/04/2016 Rural &

Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi 47 PuranimatiSatra T2A49 26° 43' 19.7" N 01/04/2016 Residential

Page 32: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

28

S. No.

Location Name Location ID Coordinates Date of Monitoring Location Type Remarks

94° 06' 13.0" E Annual Environmental Safeguard Monitoring Report.

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi

48 Monkhusi TG T2A50 27° 24' 06.5" N 95° 20' 48.4" E

08/05/2016 Residential Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

49 Borgurigaon No.2 T2A51 27° 23' 16.4" N 95° 19' 46.9" E

09/05/2016 Rural &

Residential

132 kV S/C of Agia - Matia Line on D/C Towers

50 Ulupara T2A52 26° 05' 48.1" N 90° 33' 57.3" E

24/02/2016 Residential

Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

51 Chamaguri (Solamari) T2A53 26° 06' 50.2" N 90° 34' 38.2" E

25/02/2016 Residential

52

Gorokhuta T2A54 26° 06' 38.6" N 90° 36' 40.8" E

21/02/2016 Residential

53 Garimari T2A55 26° 06' 03.6" N 90° 39' 19.3" E

22/02/2016 Residential

54 Harimura T2A56 26° 05' 00.4" N 90° 39' 59.1" E

22/02/2016 Residential

55 Lalabari T2A57 26° 04' 58.7" N 90° 41' 36.7" E

23/02/2016 Residential

56 Doshikata T2A58 26° 04' 38.2" N 90° 43' 19.1" E

26/02/2016 Residential

57 Domani T2A59 26° 04' 26.0" N 90° 45' 44.0" E

27/02/2016 Residential

132 kV Samaguri - Lanka (Sankardevnagar) Line12

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

58 Balikandi T2A72 24° 42' 18.8" N 92° 31' 44.7" E

27/05/2016 Silence Ambient Air Quality Monitoring Results are awaited and shall be provided in next Semi 59 KhuliChhara T2A73 24° 42' 14.5" N 27/05/2016 Rural &Residential

12

Ambient Air Quality Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual Environmental

Safeguard Monitoring Report.

Page 33: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

29

S. No.

Location Name Location ID Coordinates Date of Monitoring Location Type Remarks

92° 30' 32.2" E Annual Environmental Safeguard Monitoring Report.

60 ChakChandpur T2A74 24° 41' 55.3" N 92° 31' 15.8" E

28/05/2016 Rural &

Residential

61 Chandpur T2A75 24° 42' 10.4" N 92° 32' 10.1" E

28/05/2016 Silence

Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016

Page 34: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

30

Annexure - I (B) Noise Level Monitoring Locations

Sl. No. Location Name Location ID Coordinates Date of

Monitoring Category of

Area Remarks

220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur

1. Buramayong N1 26° 10' 32.2" N 92° 00' 32.1" E

24/03/2016 Residential

Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports.

2. KamarpurPahar N2 26° 13' 22.6" N 92° 01' 50.9" E

23/03/2016 Residential

3. DhupguriKalangpar N3 26° 11' 35.9" N 92° 00' 47.3" E

23/03/2016 Residential

4. Parakumar (Bejni) N4 26° 10' 18.9" N 92° 00' 07.6" E

22/03/2016 Residential

5. SamotaPothar (Quarry) N5 26° 07' 39.1" N 92° 00' 37.0" E

22/03/2016 Residential

220 kV S/C Mariani - Namrup Line on D/C Towers

6. Parbatpur N1 27° 10' 47.9"N 95° 22' 16.4"E

16/04/2016 Rural &

Residential

Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

7. Coal Pit N2 27° 8' 25.7"N 95° 21' 45.0"E

16/04/2016 Rural

&Residential

8. Nagakatagaon N3 27° 9' 13.4"N 95° 18' 45.6"E

15/04/2016 Rural &

Residential

9. Misajangaon N4 27° 09' 16.8" N 95° 15' 27.1" E

15/04/2016 Rural &

Residential

10. Sundarpur TG N5 27° 8' 29.08" N 95° 13' 13.02"E

14/04/2016 Rural &

Residential

11. Atal Pathargaon N6 27° 08' 25.1" N 95° 10.5' 9.3" E

14/04/2016 Rural &

Residential

12. KathiyaKhunda No.1 N7 27° 7' 8.15" N 95° 9' 19.47" E

13/04/2016 Rural &

Residential

13. Rahanshyam N8 27° 5' 47.29" N 95° 07' 28.8" E

13/04/2016 Rural &

Residential

14. Ujanlongpatiya N9 27° 06' 32.8" N 95° 5' 57.76" E

12/04/2016 Rural

&Residential

Page 35: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

31

Sl. No. Location Name Location ID Coordinates Date of

Monitoring Category of

Area Remarks

15. Changmaigaon N10 27° 04' 29.4" N 95° 02' 57.8" E

12/04/2016 Rural &

Residential

16. Bagriguri N11 27° 03' 40.0" N 95° 01' 35.7" E

11/04/2016 Rural &

Residential

17. Barohar TG N12 27° 2' 34.1"N 94° 59' 26.2"E

11/04/2016 Rural &

Residential

18. Rangapathar N13 27° 0' 12.5"N 94° 57' 32.2"E

10/04/2016 Rural &

Residential

19. Maibela N14 26° 59' 4.4"N 94° 55' 36.2"E

10/04/2016 Rural &

Residential

20. Manuharigaon N15 26° 59' 32.2"N 94° 54' 2.1"E

09/04/2016 Rural &

Residential

21. Kongargaon No.2 N16 26° 58' 04.5" N 94° 51' 45.5" E

09/04/2016 Rural &

Residential

22. Halal Gaon N17 26° 56' 38.8" N 94° 51' 34.4" E

08/04/2016 Rural &

Residential

23. Mohangaon N18 26° 55' 14.4" N 94° 49' 13.4" E

08/04/2016 Rural &

Residential

24. ChengdharaGaon N19 26° 53' 21.5" N 94° 47' 31.8" E

07/04/2016 Rural &

Residential

25. Hatipati TG N20 26° 50' 39.7" N 94° 44' 16.4" E

07/04/2016 Rural &

Residential

26. RangagaraGaon N21 26° 49' 15.4" N 94° 42' 39.9" E

06/04/2016 Rural &

Residential

27. DeopaniGohainGaon N22 26° 48' 59.3" N 94° 39' 44.4" E

05/04/2016 Rural &

Residential

28. Dulia Gaon N23 26° 48' 33.7" N 94° 37' 36.1" E

05/04/2016 Rural &

Residential

29. Naragaon N24 26° 48' 41.5" N 94° 34' 15.5" E

06/04/2016 Rural &

Residential

30. JapihajiaGaon N25 26° 48' 11.1" N 94° 30' 53.3" E

04/04/2016 Rural &

Residential

31. Basahabi TG N26 26° 46' 14.5" N 94° 29' 17.7" E

04/04/2016 Rural &

Residential

Page 36: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

32

Sl. No. Location Name Location ID Coordinates Date of

Monitoring Category of

Area Remarks

32. Gandhia N27 26° 43' 49.5" N 94° 26' 35.4" E

03/04/2016 Rural &

Residential

33. Sonakhati TG (Triwal TG)

N28 26° 41' 57.8" N 94° 23' 53.5" E

03/04/2016 Rural &

Residential

34. Dihingpar TG N29 26° 39' 41.4" N 94° 23' 01.0" E

02/04/2016 Rural &

Residential

35. Near Mariani SS (Bosagaon) N30 26° 37' 45.9" N 94° 21' 44.8" E

02/04/2016 Silence

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

36. Aka Basti N1 26° 48' 46.1" N 92° 49' 06.4" E

26/04/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

37. Gudamghat N2 26° 47' 41.4" N 92° 49' 30.3" E

27/04/2016 Residential

132 kV D/C LILO of Depota - Gohpur Line at Sonabil

38. Konnamukh N1 26° 48' 30.4" N 92° 49' 47.5" E

27/04/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

39. Gudamghat(KosariGaon) N2 26° 47' 56.2"N 92° 49' 31.6"E

28/04/2016 Residential

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

40. Chandrapur N1 26° 14' 13.1" N 91° 57' 12.2" E

25/03/2016 Silence

Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

41. Govardhan N2 26° 14' 08.7" N 91° 58' 23.6" E

25/03/2016 Residential

42. BeguriTG(DigaruparChangbil) N3 26° 11' 14.66"N 91° 59' 34.71"E

24/03/2016 Residential

43. Nagabil N4 26° 9' 45.7"N 91° 59' 36.9"E

24/03/2016 Residential

44. Keohutuli(Bojrangbosti) N5 26° 09' 04.9" N 91° 59' 57.2" E

26/03/2016

Residential

Page 37: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

33

Sl. No. Location Name Location ID Coordinates Date of

Monitoring Category of

Area Remarks

45. Sanarupathar N6 26° 08' 15.4" N 91° 59' 32.9" E

26/03/2016 Silence

132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)

46. Panichakua N1 26° 44' 02.3" N 94° 05' 41.7" E

01/04/2016 Rural &

Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

47. PuranimatiSatra N2 26° 43' 19.7" N 94° 06' 13.0" E

01/04/2016 Residential

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi

48. Monkhusi TG N1 27° 24' 06.5" N 95° 20' 48.4" E

08/05/2016 Residential Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

49. Borgurigaon No.2 N2 27° 23' 16.4" N 95° 19' 46.9" E

09/05/2016 Rural &

Residential

132 kV S/C of Agia - Matia Line on D/C Towers

50. Ulupara N1 26° 05' 48.1" N 90° 33' 57.3" E

24/02/2016 Residential

Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

51. Chamaguri (Solamari) N2 26° 06' 50.2" N 90° 34' 38.2" E

25/02/2016 Residential

52. Gorokhuta N3 26° 06' 38.6" N 90° 36' 40.8" E

21/02/2016 Residential

53. Garimari N4 26° 06' 03.6" N 90° 39' 19.3" E

22/02/2016 Residential

54. Harimura N5 26° 05' 00.4" N 90° 39' 59.1" E

22/02/2016 Residential

55. Lalabari N6 26° 04' 58.7" N 90° 41' 36.7" E

23/02/2016 Residential

56. Doshikata N7 26° 04' 38.2" N 90° 43' 19.1" E

26/02/2016 Residential

57. Domani N8 26° 04' 26.0" N 90° 45' 44.0" E

27/02/2016

Residential

Page 38: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

34

Sl. No. Location Name Location ID Coordinates Date of

Monitoring Category of

Area Remarks

132 kV Samaguri - Lanka (Sankardevnagar) Line13

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

58. Balikandi N1 24° 42' 18.8" N 92° 31' 44.7" E

27/05/2016 Silence Noise Level Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Reports

59. KhuliChhara N2 24° 42' 14.5" N 92° 30' 32.2" E

27/05/2016 Rural &

Residential

60. ChakChandpur N3 24° 41' 55.3" N 92° 31' 15.8" E

28/05/2016 Rural &

Residential

61. Chandpur N4 24° 42' 10.4" N 92° 32' 10.1" E

28/05/2016 Silence

Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016

13

Noise Level Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual Environmental Safeguard

Monitoring Report.

Page 39: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

35

Annexure - I (C) Water Quality Monitoring Locations

S. No. Name of the Location

Location ID Coordinates Date of

Sampling Type of water

Source of water

Remarks

220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur

1. BuraMayong T2W1 26° 14' 29.4"N 92° 00' 39.4"E

24/03/2016 Ground Water

Ring Well

Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

2. KamarpurPahar T2W2 26° 13' 23.2"N 92° 01' 49.9"E

23/03/2016 Ground Water

Ring Well

3. Parakumar (Bejini) T2W3 26° 10' 18.2"N 92° 00' 06.9"E

22/03/2016 Ground Water

Tara Pump

4. Samotapathar (Quarry)

T2W4 26° 07' 32.8"N 92° 00' 37.6"E

22/03/2016 Ground Water

Ring Well

5. DhupguriKalangpar T2W5 26° 12' 02.3"N 92° 01' 06.5"E

23/03/2016 Surface Water

Kalang River

220 kV S/C Mariani - Namrup Line on D/C Towers

6. Parbatpur T2W6 27° 10' 48.6" N 95° 22' 14.7" E

16/04/2016 Ground Water

Tube well

Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

7. Nagakatagaon T2W7 27° 9' 15.1" N 95° 18' 47.8" E

15/04/2016 Ground Water

Tube well

8. Sundarpur TG T2W8 27°8'27.8"N 95°13'22.8"E

14/04/2016 Ground Water

Tube well

9. Atal Pathargaon T2W9 27° 08' 26.9"N 95° 11' 03.8"E

14/04/2016 Ground Water

Tube well

10. KathiyaKhunda No.1 T2W10 27° 07' 11.1"N 95° 09' 18.4"E

13/04/2016 Ground Water

Tube well

11. Rahanshyam T2W11 27° 06' 32.9"N 95° 07' 32.2"E

13/04/2016 Ground Water

Tube well

12. Ujanlongpatiya T2W12 27° 05' 46.4"N 95° 06' 02.0"E

12/04/2016 Ground Water

Tube well

13. Changmaigaon T2W13 27° 04' 31.0"N 95° 02' 59.3"E

12/04/2016 Ground Water

Tube well

14. Bagriguri T2W14 27° 03' 43.5"N 95° 01' 35.7"E

11/04/2016 Ground Water

Tube well

15. Maibela T2W15 26° 59' 4.6" N 10/04/2016 Ground Tube well

Page 40: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

36

S. No. Name of the Location

Location ID Coordinates Date of

Sampling Type of water

Source of water

Remarks

94° 55' 36.6" E Water

16. Manuharigaon T2W16 26° 59' 27.9" N 94° 54' 7.0" E

9/04/2016 Ground Water

Tube well

17. Halal Gaon T2W17 26° 56' 38.8"N 94° 51' 34.0"E

08/04/2016 Ground Water

Tube well

18. Mohangaon T2W18 26° 55' 14.4"N 94° 49' 11.7"E

08/04/2016 Ground Water

Tube well

19. ChengdharaGaon T2W19 26° 53' 22.1"N 94° 47' 31.4"E

07/04/2016 Ground Water

Tube well

20. Hatipati TG T2W20 26° 50' 38.1"N 94° 44' 22.8"E

07/04/2016 Ground Water

Tube well

21. DeopaniGohainGaon T2W21 26° 48' 59.3"N 94° 39' 44.2"E

05/04/2016 Ground Water

Tube well

22. Basahabi TG T2W22 26° 46' 14.9"N 94° 29' 17.2"E

04/04/2016 Ground Water

Tube well

23. Sonakhati TG T2W23 26° 41' 57.4"N 94° 23' 52.9"E

03/04/2016 Ground Water

Tube well

24. Dihingpar TG T2W24 26° 39' 40.4" N 94° 23' 0.7" E

02/04/2016 Ground Water

Tube well

25. Coal Pit T2W25 27° 8' 31.1" N 95° 21' 57.0" E

16/04/2016 Surface Water

Dikhou river

26. Misajangaon T2W26 27° 09' 15.4"N 95° 15' 32.5"E

15/04/2016 Surface Water

Dikhou Rive

27. Barohar TG T2W27 27° 2' 27.1" N 94° 59' 32.4" E

11/04/2016 Surface Water

Tiyak river

28. Kongargaon No.2 T2W28 26° 58' 05.6"N 94° 51' 40.7"E

09/04/2016 Surface Water

Stream

29. RangagaraGaon T2W29 26° 49' 18.4"N 94° 42' 44.8"E

06/04/2016 Surface Water

Nandang river

30. Dulia Gaon T2W30 26° 48' 34.1"N 94° 37' 38.0"E

05/04/2016 Surface Water

pond

31. Naragaon T2W31 26° 48' 48.7"N 94° 34' 16.7"E

06/04/2016 Surface Water

Pond

Page 41: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

37

S. No. Name of the Location

Location ID Coordinates Date of

Sampling Type of water

Source of water

Remarks

32. Rangapathar T2W32 27° 00' 4.8"N 94° 57' 37.3"E

10/04/2016 Surface Water

Pond

33. JapihajiaGaon T2W33 26° 48' 16.8"N 94° 31' 00.7"E

04/04/2016 Surface Water

Janji river

34. Gandhia T2W34 26° 43' 29.4"N 94° 26' 36.3"E

03/04/2016 Surface Water

Puthi river

35. Near Mariani SS (Bosagaon)

T2W35 26° 37' 47.1"N 94° 21' 41.6"E

02/04/2016 Surface Water

Stream

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

36. Akabasti T2W36 26° 48' 44.0"N 92° 49' 06.0"E

26/04/2016 Ground Water

Tube Well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

37. Gudamghat T2W37 26°47'51.7"N 92°49'33.7"E

27/04/2016 Surface Water

Mansiri river

132 kV D/C LILO of Depota - Gohpur Line at Sonabil

38. Konnamukh T2W38 26° 48' 28.4"N 92° 49' 46.7"E

27/04/2016 Ground Water

Tube Well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

39. Gudamghat (KosariGaon)

T2W39 26° 47' 51.3" N 92° 49' 35.2" E

28/04/2016 Ground Water

Ring Well

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

40. Govardhan T2W42 26° 14' 28.4"N 92° 00' 39.0"E

25/03/2016 Ground Water

Ring well

Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

41. Chandrapur T2W43 26° 14' 11.9"N 91° 57' 12.5"E

25/03/2016 Ground Water

Ring well

42. Nagabil T2W44 26° 9' 39.4" N 91° 59' 35.1" E

24/03/2016 Ground Water

Tube well

43. Sanarupathar T2W45 26° 8' 15.1" N 91° 59' 25.4" E

26/03/2016 Ground Water

Ring well

44. Keohutuli T2W46 26° 09' 00.0"N 91° 59' 54.5"E

26/03/2016 Surface Water

Kalang river

45. Belguri TG T2W47 26° 10' 53.5" N 91° 59' 37.2" E

24/03/2016 Surface Water

Digaru river

Page 42: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

38

S. No. Name of the Location

Location ID Coordinates Date of

Sampling Type of water

Source of water

Remarks

132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)

46. Panichakua T2W48 26° 44' 00.1"N 94° 05' 42.8"E

01/04/2016 Ground Water

Tube well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

47. Puranimatisatra T2W49 26° 43' 20.0"N 94° 06' 13.5"E

01/04/2016 Ground Water

Tube well

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi

48. Monkhusi TG T2W50 27° 24' 06.9"N 95° 20' 48.3"E

08/05/2016 Ground Water

Tube well Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

49. Borgurigaon No.2 T2W51 27° 23' 15.9"N 95° 19' 48.2"E

09/05/2016 Ground Water

Tube well

132 kV Samaguri - Lanka (Sankardevnagar) Line14

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

50. Balikandi T2W64 24° 42' 18.4"N 92° 31' 45.7"E

27/05/2016 Ground Water

Tube well

Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

51. KhuliChhara T2W65 24° 42' 14.6" N 92° 30' 30.6" E

27/05/2016 Ground Water

Well

52. ChakChandpur T2W66 24° 41' 55.5" N 92° 31' 15.2" E

28/05/2016 Ground Water

Tube well

53. Chandpur T2W67 24° 42' 13.9"N 92° 32' 01.5"E

28/05/2016 Surface Water

Jitha river

132 kV S/C of Agia - Matia Line on D/C Towers

14

Surface and Ground Water Quality Monitoring conducted along this line in December 2015 at 12 locations. Results are awaited and shall be provided in next Semi Annual

Environmental Safeguard Monitoring Report.

Page 43: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

39

S. No. Name of the Location

Location ID Coordinates Date of

Sampling Type of water

Source of water

Remarks

54. Ulupara T2W68 26° 05' 46.8"N 90° 33' 55.8"E

24/02/2016 Ground Water

Tube well

Surface and Ground Water Quality Monitoring Results are awaited and shall be provided in next Semi Annual Environmental Safeguard Monitoring Report.

55. Chamaguri T2W69 26° 06' 48.4"N 90° 34' 36.8"E

25/02/2016 Ground Water

Tube well

56. Garokhuta T2W70 26° 06' 39.4"N 90° 36' 41.5"E

21/02/2016 Ground Water

Tube well

57. Garimari T2W71 26° 06' 05.3"N 90° 39' 18.7"E

22/02/2016 Ground Water

Tube well

58. Harimura T2W72 26° 05' 01.2"N 90° 40' 02.4"E

22/02/2016 Ground Water

Tube well

59. Lalabari T2W73 26° 05' 00.6"N 90° 41' 36.3"E

23/02/2016 Ground Water

Tube well

60. Doshikata T2W74 26° 04' 11.8"N 90° 43' 31.9"E

26/02/2016 Surface Water

Krishnai river

61. Domani T2W75 26° 04' 39.9"N 90° 45' 21.0"E

27/02/2016

Surface Water

Dudhnai river

Source: Environmental Monitoring undertaken by En-Geo Consultancy &Research Centre, Guwahati, February 2016 to May 2016

Page 44: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

40

Annexure - II (A)

Site Photographs Showing Ambient Air Quality Monitoring Being Undertaken

220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur

KamarpurPahar DhupguriKalangpur

220 kV S/C Mariani - Namrup Line on D/C Towers

ChengdharaGaon Halal Gaon

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

Gudamghat Aka Basti

Page 45: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

41

132 kV D/C LILO of Depota - Gohpur Line at Sonabil

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

Konnamukh Govardhan

132 kV S/C LILO of Jorhat - Bokakhat Line at Jorhat (West)

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi

Panichakua Monkhusi TG

132 kV S/C of Agia - Matia Line on D/C Towers

Lalabari Domani

Page 46: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

42

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

Chandpur Balikandi

Page 47: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

43

Annexure - II (B)

Site Photographs Showing Noise Level MonitoringBeing Undertaken

220 KV D/C LILO of Samaguri - Sarusajai Line at Sonapur

Buramayong Samotapathar (Near Quarry)

220 kV S/C Mariani - Namrup Line on D/C Towers

Dihingpar DeopaniGohainGaon

220 kV D/C LILO of Samaguri - Balipara (PG) Line at Sonabil

132 kV D/C LILO of Depota - Gohpur Line at Sonabil

Page 48: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

44

Gudamghat Gudamghat (Kosarigaon)

132 kV D/C LILO of Chandrapur - Kahilipara Line at Sonapur

132 kV S/C LILO of Jorhat – Bokakhat Line at Jorhat (West)

Chandrapur PuranimatiSatra

132 kV S/C LILO of Namrup - Tinsukia Line at Bordubi

132 kV S/C LILO of Panchgram - Dullavcherra Line at Hailakandi

Monkhusi TG Balikandi

Page 49: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

45

Annexure - II(C)

Site Photographs Showing Water Quality Monitoring Being Undertaken

Ground Water Monitoring

Sundarpur TG Halal Gaon

Akabasti Gudamghat (Kosarigaon)

KamakhyaDevalaya Govardhan

Page 50: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

46

Surface Water Monitoring

Misajangaon Gudamghat

Keohutuli ChalchaliJalaharChuk

Dabaka (Sutargaon) Keohutuli

Page 51: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

47

Annexure - III

Photographs of Site Visits(BilasiparaSubstation and Matia Substation)

132/33kV Bilasipara Substation

Fire Safety Equipment’s (Sand Buckets) Personal Protective Equipment’s

132/33kV Matia Substation

Fire Safety Equipment’s (Fire Extinguisher) Personal Protective Equipment’s

Page 52: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

48

Annexure - IV

Attendance Sheet of Review Meetings

Page 53: IND: Assam Power Sector Enhancement Investment · PDF fileThis report has been submitted to ADB by the Assam Power Distribution Company Limited, ... grid substations (Substation) with

Assam Power Sector Enhancement Investment Program Loan No. 2677 (Tranche – 2)

Environmental Safeguard Monitoring Report January to June, 2016

49