Social Monitoring Report
September 2013
IND: Railway Sector Investment Program-Project 1
Prepared by Ministry of Railways for the Government of India and the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Indian Government
Ministry of Railways
Asian Development Bank
Multitranche Financing Facility No. 0060-IND
Loan No. 2793-IND
Railway Sector Investment Program
Track Doubling and Electrification on Critical Routes
R&R Implementation Status
September 2013
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 1
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Document Identification
Project Name : Railway Sector Investment Program
ADB MFF no. 0060-IND
ADB Loan no. 2793-IND
Track Doubling and Electrification on Critical Routes
Report Name : GENERAL CONSULTANT Half yearly R&R Report No.2, September 2013
Reference R&R_September2013
Preparation, Review and Authorisation
Prepared by : Dr. Sudesh Kaul Signature :
Organisation : General Consultant
Position : Resettlement Expert Date :
Checked by : Jean-Francois Pinet/ Prem Narayan Shukla Signature :
Organisation : General Consultant
Position : Team Leader/ Dy. Team Leader Date :
Reviewed by : Dimpy Garg Signature :
Organisation : RVNL
Position : General Manager Coordination Date :
Approved by : Vijay Anand Signature :
Organisation : RVNL
Position : Director Projects Date :
Revision, Preparation, Review Issue
Revision Date Subject Prepared by Reviewed by
1.0 02/12/2013 First issue Dr. Sudesh Kaul Dimpy Garg
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 2
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Contents
1. Back Ground .................................................................................................................................... 5
2. Evolution during the relevant period .............................................................................................. 5
3. Status of Current Issues under Social Development ....................................................................... 6
3.1 Sambalpur–Titlagarh project .................................................................................................. 6
3.2 Raipur – Titlagarh project ..................................................................................................... 12
3.3 Daund-Gulbarga project ....................................................................................................... 13
3.4 Hospet – Tinaighat Project .................................................................................................... 13
3.5 Electrification of Pune-Wadi Guntakal project ..................................................................... 13
4. Summary Status of Land Acquisition ............................................................................................ 14
Tables
Table 1: Detail of Projects ....................................................................................................................... 5
Table 2: Summary Subproject Impacts ................................................................................................. 11
Table 3: Summary project Impacts ....................................................................................................... 12
Table 4: Current status of field work of land acquisition ...................................................................... 16
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 3
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Abbreviation
ADB Asian Development Bank
BPL Below Poverty Line
CDM Clean Development Mechanism
CPM Chief Project Manager
CRS Commissioner of Railway Safety
DG Daund – Gulbarga
DM District Magistrate
DPs Displaced Persons
EA Executing Agency
FFA Framework Financing Agreement
FHH Female Headed Household
FIDIC Fédération Internationale Des Ingénieurs Conseils
FY Fiscal Year
GAD General Arrangement Drawing
GC General Consultant
GCC General Conditions of Contract
GRC Grievance Redressal Cell
HT Hospet – Tinaighat
HHs House Holders
IA Implementing Agency
India Indian Government
INR Indian Rupees
IP Indigenous People
IPP Indigenous Peoples Plan
IPPF Indigenous Peoples Planning Framework
IR Inception Report
LAO Land Acquisition Officer
MFF Multitranche Financing Facility
MOR Ministry of Railways
MPR Monthly Progress Report
NGO Non-Governmental Organisation
NHAI National Highways Authority of India
NTH Non-Title Holder
PAP/APs Project Affected Persons
PFR Periodic Financing Request
PG Pune – Guntakal
PMC Project Management Consultant
PWD Public Works Department
QPR Quarterly Progress Report
RAP Resettlement Action Plan
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 4
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
RO Resettlement Officer
ROB Road Over Bridge
ROW Right Of Way
RSIP Railway Sector Investment Program
RT Raipur – Titlagarh
RVNL Rail Vikas Nigam Limited
SC Scheduled Caste
ST Scheduled Tribe
ST Sambalpur – Titlagarh
TH Title Holder
USD United States Dollars
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 5
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Resettlement/Social Half Yearly Report
This half Yearly report up to September 2013 is earmarked with the detailed assessment and
verification of the micro plan containing details of APs, requirement of land size for laying double
track and amount required for compensation to the inhabitants.
1. Back Ground In general, the resettlement planning documents were disclosed in March 2011. Besides two
projects requiring land acquisition, four projects will affect non-titleholders only. For this, field work
for land acquisition is still going on by NGO. The current status of field work of land acquisition of
different projects is provided in Table 1.
S. No Project Name Length
(in Km.) Location (State)
Project
components
1 Daund-Gulbarga 225 Maharashtra, and Karnataka Doubling
2 Sambalpur-Titlagarh 182 Odisha Doubling
3 Raipur-Titlagarh 203 Chhattisgarh and Odisha Doubling
4 Hospet-Tinaighat 245 Karnataka Doubling
5 Pune-Guntakal 641 Maharashtra, Karnataka, and
Andhra Pradesh
Electrification
Table 1: Detail of Projects
2. Evolution during the relevant period As a matter of fact, the assessment during this period related to APs and land occupied by them
was not measured appropriately keeping the actual requirement in view. As a result, the amount
proposed in micro plan submitted by NGO was not correct. In other words, correct assessment is
required for number of APs and optimum requirement of land for fair allocation of social
investment. In this connection, joint site assessment conducted by RVNL, NGO & General Consultant
revealed that number of APs is actually 303 against 829 proposed in micro plan. Further, width of
corridor for proposed railway lines has also been reduced. All this has resulted into significant
reduction in the investment amount from Rs. 105,461,462 to Rs. 27,610,138. However, it will be
appropriate to examine the evidences related to vulnerabilities such a social and economically
marginalization levels and actual displacement to be caused by this intervention as per the existing
criteria and norms laid down in ADB policy document.
During the last six month a major exercise took place regarding verification of large deviation in
number of APs between the RP and the actual condition for the Raipur-Titlagarh (CG) section &
including verification of Micro Plan of NTH of Raipur – Titilagarh & Sambalpur – Titilagarh subproject.
On verification the number of the APs in Raipur – Titlagarh section has reduced from 681 to 265 and
in Sambalpur – Titilagarh from 148 to 38 only, thereby reducing investment of RVNL by 77 % when
compared with proposed amount in the micro plan submitted by the concerned NGO. It shows that
micro plan developed and submitted was exaggerated and was not linked with the real grassroots
situation.
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 6
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
The Micro plan submitted by the NGO for both the packages along with the nos and cost are as
under.
Project APs INR
Raipur-Titlagarh (CG) 681(Nos) Rs.87,386,088
Sambalpur – Titilagarh 148(Nos) Rs.18,075,374
Total 829(Nos) Rs.10,54,61,462
The revised Micro plan and verified by the General Consultant Social expert is as under;
Project APs INR
Raipur-Titlagarh (CG) 265(Nos) Rs.19,714,627
Sambalpur – Titilagarh 38(Nos) Rs.4,429,511
Total 303(Nos) Rs.2,41,44,138
The following table shows the impacts on revised Micro plan after verification are;
Impact % Impact %
As per Micro Plan 829 Rs. 105,461,462
As verified 303 36.6 Rs. 2,41,44,138 22.89
Reduction in nos & saving for RVNL 526 63.4 Rs. 81,317,324 77.11
3. Status of Current Issues under Social Development The current status of field work of land acquisition of different projects is as follows:-
3.1 Sambalpur–Titlagarh project
This project passes through four districts namely Sambalpur, Sonepur/Subarnapur, Bargarh &
Balangir in state of Odisha (previously Orissa).
Scope of Non Title Holders (NTH) and Resettlement Impact
A detailed census was conducted to assess various impacts of the subproject by f o o t b y f oot
s u r v e y along the track. There are only 16 structures displaced due to the doubling (belong to
non-title holders/squatters). The total number of displaced persons (DPs) in these households is
65. The details of the subproject impacts are summarized in the Table 2.
Sl. No. Description No./Unit
1 Total Number of Structures 16
2 Number Private Structures 16
3 Number of Religious Structures 0
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 7
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Sl. No. Description No./Unit
4 Legal Status of Structure Owners 16 Non-titleholders
5 Type of Affected Private Structures 16
6 Total Number of Displaced Households 16
7 Number of ST Households 1
8 Number of Vulnerable Households 14
9 Number of Tenants 0
10 Total Number of Displaced Persons 65
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 8
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
STATUS OF LAND ACQUISITION IN SAMBALPUR - TITLAGARH SECTION
Private Land for District Sambalpur
Sl. No. District
Ta
ha
sil
Village
No
. o
f
plo
ts
Are
a o
f
lan
d
in(a
cre
s)
Requisitions
submitted to Spl.
LAO
Estimated cost
by Spl. SLAO Status Remarks
1 Sambalpur S
am
ba
lpu
r Durgapali 4 4.05
10.05.2013 Rs, 2,64,92,472/-
dt. 28.5.2013
Pending with
Revenue &
DM for
notification
Concerned
dept/BBS has not
revealed the status.
Burla 1 0.06
A.katapali 6 0.34
Total 11 4.45
Government Land for District Sambalpur
Sl. No. District
Ta
ha
sil
Village
No
. o
f p
lots
Are
a o
f
lan
d
in(a
cre
s)
Requisitions
submitted to
Tahasildar
Site selection
meeting in Sub
collector office
Status Remarks
1 Sambalpur
Sa
mb
alp
ur
Durgapali 1 12.059 30.04.2013 20.07.2013 File returned for
regrouping of
requisitions dept.
wise on
14.10.2013
Requisition of
land for lease
to RVNL by
District
Collector is
awaited.
Burla 7 7.061
Kalamati 1 2.306 31.05.2013 Not yet
Total 9 21.426
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 9
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Private Land for District Bargarh
Sl. No. District
Ta
ha
sil
Village
No
. o
f
plo
ts
Are
a o
f
lan
d
in(a
cre
s)
Requisitions
submitted to
Spl. LAO
Estimated cost
by Spl. SLAO Status Remarks
ROR to be
certified by
tahasildar
for further
submission
Under process
Government Land for District Bargarh
Sl. No. District
Ta
ha
sil
Village
No
. o
f
plo
ts
Are
a o
f
lan
d
in(a
cre
s)
Requisitions
submitted to
Tahasildar
Site selection
meeting in Sub
collector office
Status Remarks
1
Bargarh
Att
ab
ira
Kandapali 4 0.07 7.8.2013
Rengalipali 3 0.061
7.8.2013 &
6.9.2013
2
Ba
rga
rh
Barahagoda 1 0.309 7.8.2013
Jarmunda 3 0.057
Dhanger 1 0.020 2.9.2013
3
Ba
rap
ali
Ainthapali 2 0.007
7.8.2013
Kadalipali 6 0.516
Lenda 8 0.339
Barpali 1 0.059
Khemasara 3 0.041
Tingipali 1 0.006
Baraguda 5 0.301
Bhatinga 1 0.078 2.9.2013
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 10
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Khairpali 2 0.422
Total 41 2.286
Private Land for District Sonepur
District T
ah
asi
l Village
No
. o
f p
lots
Are
a o
f la
nd
in(a
cre
s)
Requisitions
submitted to Spl. LAO
Estimated cost by
Spl. SLAO Status Remarks
Sonepur
Ra
mp
ur
Patharkahndi 10 0.291
Sannupari 28 2.008
Khutapali 1 0.002
Dunguripali 6 0.457
Sahale 34 1.881
Fatamunda 13 1.068
Kushmal 14 1.808
Cherupali 12 1.08
Total 118 8.595
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 11
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
District
Ta
ha
sil
Village
No
. o
f p
lots
Are
a o
f la
nd
in(a
cre
s)
Site selection
meeting in Sub
collector office
Status Remarks
Sonepur
Ra
mp
ur
Patharkahndi 4 0.211
Sannupari 4 0.145
Khutapali 1 0.299
Dunguripali 8 0.089
Sahale 14 0.477
Fatamunda 8 0.194
Kushmal 4 0.361
Cherupali 1 0.012
Total 44 1.788
Table 2: Summary Subproject Impacts
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 12
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
The total land acquisition is about 107.869 Acre (Private Land to be acquired: 67.03 Acres, Forest
Land: 12.804 acre, Govt. Land: 27.765 acre). The survey details of the Title holders are under
process. NGO has completed the Verification of NTHs in this stretch. GRC letters issued by DM
concerned.
3.2 Raipur – Titlagarh project
This project passes through two states Chhattisgarh and Odisha. In Chhattisgarh section there are
three districts namely Raipur, Mahasamund and Nawapada. There is no land acquisition in this
project.
Resettlement Impact NTH
The project will not require any land acquisition. A detailed census survey was conducted to
assess various impacts of the project by walking along the track. There are only 249 structures
affected due to the doubling (belonging to non-title holders/squatters). Among the private
structures displaced in the subproject, 112 Nos are total displaced households and remaining
137 Nos. structures will be displaced between 10% to 25%. Only 121 Nos. Boundary walls, 8 Nos.
wells & 72 Nos. WC tanks structures will be affected up to 100%. It is assessed that there will
be 168 vulnerable households displaced in the subproject including 33 Scheduled Tribes (ST),
134 Below Poverty Line (BPL) households. The BPL households include 69 Scheduled Caste (SC)
households also. The total number of displaced persons (DPs) in those households is 468. No
household is losing livelihood through loss of the structure. The details of the project impacts are
summarized in the Table 3.
Sl.No. Description No./Unit
1 Total Number of Structures 249
2 Number Private Structures 249
3 Number of Religious Structures 0
4 Legal Status of Structure Owners 249 Non-titleholders
5 Type of Affected Private Structures 249
6 Total Number of Displaced Households 112
7 Number of ST Households 33
8 Number of Vulnerable Households 210
9 Number of Tenants 0
10 Total Number of Displaced Persons 468
Table 3: Summary project Impacts
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 13
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
There are some changes in proposed alignment of Railway track in Raipur-Titlagarh Project due to fly
over at Parwati Nagar between chainage Ch.3+500 to Ch.13+500, resulting in large deviation of
number of affected persons habiting particularly in the Chhattisgarh section. A joint survey by an
NGO and RVNL along with General Consultant was carried out to assess the total affected NTH in the
project. The valuation of structures and Micro Plan has been submitted by NGO.
An updating of the RP of Raipur-Titlagarh project will be submitted.
3.3 Daund-Gulbarga project
This project passes through two states Karnataka and Maharashtra. There is no Land acquisition in
this project. In Karnataka section there is no presence of TH & NTH.NGO has completed the
Verification of NTHs in Maharashtra section. Micro plan approved for NTH and about 83% amount
has been disbursed. GRC letters issued by DM concerned.
3.4 Hospet – Tinaighat Project
The total land acquisition is about 32.22 Acre in this project. No NTH were found in this section. The
Micro plan approved for 50% of the TH for Rs. 4, 32,000 for 28 HHs. Cheques are under preparation.
GRC letters have been issued by DM concerned. One GRC meeting was held on 6th July, 2013.
3.5 Electrification of Pune-Wadi Guntakal project
No TH & NTH in this section
Field work for land acquisition is still going on. Work is going on only in sections where no R&R is
required.
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 14
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
4. Summary Status of Land Acquisition The current status of Land Acquisition of different projects is as follows:
Sl
No.
Project Name Length
(km) Sub project
Area of
Land to
be
Acquired
in Acre
No. of
HHs/PAPs
Status of R&R
Implementation
1a.
Doubling of Daund-
Gulbarga
section(Karnataka)
224 DG-1:
Bhigwan-
Mohol
DG-2: Hotgi-
Gulbarga
0 0 No TH & NTH in
this section.
1b
Doubling of Daund-
Gulbarga(Maharashtra
Section)
0 22 Micro plan
Approved for NTH
Rs 8, 58,034.
The Final
Instalment of
assistance has
been distributed
on 24.08.2013
2. Doubling of
Sambalpur-Titlagarh
section
182 ST-1: All Major
Bridges
ST-2:
Sambalpur-
Barapali
ST-3: Barapali-
Bolangir
ST-4: Bolangir-
Titlagarh
107.869
Acre
(Private
Land to be
acquired:
67.03
Acres,
Forest
Land:
12.804
acre,
Govt.
Land:
27.765
acre
3441 Land Acquisition to
be done in four
districts.
LAP under process
Verification of TH
under process
LA details:
Sambalpur District:
26.575 Acre
Bargarh District:
20.887 Acre
Subarnapur
District : 17.379
Balangir District :
43.028 acre
(GRC letters
issued by DM
concerned)
The RP is being
updated.
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 15
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Sl
No.
Project Name Length
(km) Sub project
Area of
Land to
be
Acquired
in Acre
No. of
HHs/PAPs
Status of R&R
Implementation
NTH details:
Total 38 NTH has
been verified,
Micro Plan
submitted for
approval for Rs.
4429511 on 11th
November 2013.
3. Doubling of Raipur-
Titlagarh section
203 RT-1:
Titlagarh-
Lakhana
RT-2: Lakhana-
Arand
RT-3: Arand-
Raipur
0 265 NTH 16 (Odisha) +
249
(Chhattisgarh)=
265 NTH verified
and Micro Plan
submitted for
Approval for
Rs.19714627
4. Doubling of Hospet-
Tinaighat section
229 HT-1: Hospet-
Harlapur
HT-2:
Harlapur-
Dharwar
HT-3:
Kambarganavi-
Tinaighat
32.22 Acre 173 The Micro plan
approved for 50%
of the TH for Rs. Rs
5, 64,000/
for 43 HHs.
Total disbursed Rs
nil, No NTH found
in this section.
I.C distributed,
Cheques are under
preparation.
5. Electrification of
Pune-Wadi Guntakal
section
641 PG-1: Pune-
Bhigwan
Gulbarga-
Wadi
PG-2: Wadi-
Raichur
PG-3: Raichur-
Guntakal
0 0 No TH & NTH in
this section.
Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013
ADB Loan No. 0060-IND / 2793-IND 16
Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes
Sl
No.
Project Name Length
(km) Sub project
Area of
Land to
be
Acquired
in Acre
No. of
HHs/PAPs
Status of R&R
Implementation
PG-4:
Bhigwan-
Mohol
PG-5: Mohol-
Gulbarga
Table 4: Current status of field work of land acquisition