ind: railway sector investment program-project 1

18
Social Monitoring Report September 2013 IND: Railway Sector Investment Program-Project 1 Prepared by Ministry of Railways for the Government of India and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 07-Jun-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IND: Railway Sector Investment Program-Project 1

Social Monitoring Report

September 2013

IND: Railway Sector Investment Program-Project 1

Prepared by Ministry of Railways for the Government of India and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: IND: Railway Sector Investment Program-Project 1

Indian Government

Ministry of Railways

Asian Development Bank

Multitranche Financing Facility No. 0060-IND

Loan No. 2793-IND

Railway Sector Investment Program

Track Doubling and Electrification on Critical Routes

R&R Implementation Status

September 2013

Page 3: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 1

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Document Identification

Project Name : Railway Sector Investment Program

ADB MFF no. 0060-IND

ADB Loan no. 2793-IND

Track Doubling and Electrification on Critical Routes

Report Name : GENERAL CONSULTANT Half yearly R&R Report No.2, September 2013

Reference R&R_September2013

Preparation, Review and Authorisation

Prepared by : Dr. Sudesh Kaul Signature :

Organisation : General Consultant

Position : Resettlement Expert Date :

Checked by : Jean-Francois Pinet/ Prem Narayan Shukla Signature :

Organisation : General Consultant

Position : Team Leader/ Dy. Team Leader Date :

Reviewed by : Dimpy Garg Signature :

Organisation : RVNL

Position : General Manager Coordination Date :

Approved by : Vijay Anand Signature :

Organisation : RVNL

Position : Director Projects Date :

Revision, Preparation, Review Issue

Revision Date Subject Prepared by Reviewed by

1.0 02/12/2013 First issue Dr. Sudesh Kaul Dimpy Garg

Page 4: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 2

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Contents

1. Back Ground .................................................................................................................................... 5

2. Evolution during the relevant period .............................................................................................. 5

3. Status of Current Issues under Social Development ....................................................................... 6

3.1 Sambalpur–Titlagarh project .................................................................................................. 6

3.2 Raipur – Titlagarh project ..................................................................................................... 12

3.3 Daund-Gulbarga project ....................................................................................................... 13

3.4 Hospet – Tinaighat Project .................................................................................................... 13

3.5 Electrification of Pune-Wadi Guntakal project ..................................................................... 13

4. Summary Status of Land Acquisition ............................................................................................ 14

Tables

Table 1: Detail of Projects ....................................................................................................................... 5

Table 2: Summary Subproject Impacts ................................................................................................. 11

Table 3: Summary project Impacts ....................................................................................................... 12

Table 4: Current status of field work of land acquisition ...................................................................... 16

Page 5: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 3

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Abbreviation

ADB Asian Development Bank

BPL Below Poverty Line

CDM Clean Development Mechanism

CPM Chief Project Manager

CRS Commissioner of Railway Safety

DG Daund – Gulbarga

DM District Magistrate

DPs Displaced Persons

EA Executing Agency

FFA Framework Financing Agreement

FHH Female Headed Household

FIDIC Fédération Internationale Des Ingénieurs Conseils

FY Fiscal Year

GAD General Arrangement Drawing

GC General Consultant

GCC General Conditions of Contract

GRC Grievance Redressal Cell

HT Hospet – Tinaighat

HHs House Holders

IA Implementing Agency

India Indian Government

INR Indian Rupees

IP Indigenous People

IPP Indigenous Peoples Plan

IPPF Indigenous Peoples Planning Framework

IR Inception Report

LAO Land Acquisition Officer

MFF Multitranche Financing Facility

MOR Ministry of Railways

MPR Monthly Progress Report

NGO Non-Governmental Organisation

NHAI National Highways Authority of India

NTH Non-Title Holder

PAP/APs Project Affected Persons

PFR Periodic Financing Request

PG Pune – Guntakal

PMC Project Management Consultant

PWD Public Works Department

QPR Quarterly Progress Report

RAP Resettlement Action Plan

Page 6: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 4

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

RO Resettlement Officer

ROB Road Over Bridge

ROW Right Of Way

RSIP Railway Sector Investment Program

RT Raipur – Titlagarh

RVNL Rail Vikas Nigam Limited

SC Scheduled Caste

ST Scheduled Tribe

ST Sambalpur – Titlagarh

TH Title Holder

USD United States Dollars

Page 7: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 5

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Resettlement/Social Half Yearly Report

This half Yearly report up to September 2013 is earmarked with the detailed assessment and

verification of the micro plan containing details of APs, requirement of land size for laying double

track and amount required for compensation to the inhabitants.

1. Back Ground In general, the resettlement planning documents were disclosed in March 2011. Besides two

projects requiring land acquisition, four projects will affect non-titleholders only. For this, field work

for land acquisition is still going on by NGO. The current status of field work of land acquisition of

different projects is provided in Table 1.

S. No Project Name Length

(in Km.) Location (State)

Project

components

1 Daund-Gulbarga 225 Maharashtra, and Karnataka Doubling

2 Sambalpur-Titlagarh 182 Odisha Doubling

3 Raipur-Titlagarh 203 Chhattisgarh and Odisha Doubling

4 Hospet-Tinaighat 245 Karnataka Doubling

5 Pune-Guntakal 641 Maharashtra, Karnataka, and

Andhra Pradesh

Electrification

Table 1: Detail of Projects

2. Evolution during the relevant period As a matter of fact, the assessment during this period related to APs and land occupied by them

was not measured appropriately keeping the actual requirement in view. As a result, the amount

proposed in micro plan submitted by NGO was not correct. In other words, correct assessment is

required for number of APs and optimum requirement of land for fair allocation of social

investment. In this connection, joint site assessment conducted by RVNL, NGO & General Consultant

revealed that number of APs is actually 303 against 829 proposed in micro plan. Further, width of

corridor for proposed railway lines has also been reduced. All this has resulted into significant

reduction in the investment amount from Rs. 105,461,462 to Rs. 27,610,138. However, it will be

appropriate to examine the evidences related to vulnerabilities such a social and economically

marginalization levels and actual displacement to be caused by this intervention as per the existing

criteria and norms laid down in ADB policy document.

During the last six month a major exercise took place regarding verification of large deviation in

number of APs between the RP and the actual condition for the Raipur-Titlagarh (CG) section &

including verification of Micro Plan of NTH of Raipur – Titilagarh & Sambalpur – Titilagarh subproject.

On verification the number of the APs in Raipur – Titlagarh section has reduced from 681 to 265 and

in Sambalpur – Titilagarh from 148 to 38 only, thereby reducing investment of RVNL by 77 % when

compared with proposed amount in the micro plan submitted by the concerned NGO. It shows that

micro plan developed and submitted was exaggerated and was not linked with the real grassroots

situation.

Page 8: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 6

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

The Micro plan submitted by the NGO for both the packages along with the nos and cost are as

under.

Project APs INR

Raipur-Titlagarh (CG) 681(Nos) Rs.87,386,088

Sambalpur – Titilagarh 148(Nos) Rs.18,075,374

Total 829(Nos) Rs.10,54,61,462

The revised Micro plan and verified by the General Consultant Social expert is as under;

Project APs INR

Raipur-Titlagarh (CG) 265(Nos) Rs.19,714,627

Sambalpur – Titilagarh 38(Nos) Rs.4,429,511

Total 303(Nos) Rs.2,41,44,138

The following table shows the impacts on revised Micro plan after verification are;

Impact % Impact %

As per Micro Plan 829 Rs. 105,461,462

As verified 303 36.6 Rs. 2,41,44,138 22.89

Reduction in nos & saving for RVNL 526 63.4 Rs. 81,317,324 77.11

3. Status of Current Issues under Social Development The current status of field work of land acquisition of different projects is as follows:-

3.1 Sambalpur–Titlagarh project

This project passes through four districts namely Sambalpur, Sonepur/Subarnapur, Bargarh &

Balangir in state of Odisha (previously Orissa).

Scope of Non Title Holders (NTH) and Resettlement Impact

A detailed census was conducted to assess various impacts of the subproject by f o o t b y f oot

s u r v e y along the track. There are only 16 structures displaced due to the doubling (belong to

non-title holders/squatters). The total number of displaced persons (DPs) in these households is

65. The details of the subproject impacts are summarized in the Table 2.

Sl. No. Description No./Unit

1 Total Number of Structures 16

2 Number Private Structures 16

3 Number of Religious Structures 0

Page 9: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 7

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Sl. No. Description No./Unit

4 Legal Status of Structure Owners 16 Non-titleholders

5 Type of Affected Private Structures 16

6 Total Number of Displaced Households 16

7 Number of ST Households 1

8 Number of Vulnerable Households 14

9 Number of Tenants 0

10 Total Number of Displaced Persons 65

Page 10: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 8

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

STATUS OF LAND ACQUISITION IN SAMBALPUR - TITLAGARH SECTION

Private Land for District Sambalpur

Sl. No. District

Ta

ha

sil

Village

No

. o

f

plo

ts

Are

a o

f

lan

d

in(a

cre

s)

Requisitions

submitted to Spl.

LAO

Estimated cost

by Spl. SLAO Status Remarks

1 Sambalpur S

am

ba

lpu

r Durgapali 4 4.05

10.05.2013 Rs, 2,64,92,472/-

dt. 28.5.2013

Pending with

Revenue &

DM for

notification

Concerned

dept/BBS has not

revealed the status.

Burla 1 0.06

A.katapali 6 0.34

Total 11 4.45

Government Land for District Sambalpur

Sl. No. District

Ta

ha

sil

Village

No

. o

f p

lots

Are

a o

f

lan

d

in(a

cre

s)

Requisitions

submitted to

Tahasildar

Site selection

meeting in Sub

collector office

Status Remarks

1 Sambalpur

Sa

mb

alp

ur

Durgapali 1 12.059 30.04.2013 20.07.2013 File returned for

regrouping of

requisitions dept.

wise on

14.10.2013

Requisition of

land for lease

to RVNL by

District

Collector is

awaited.

Burla 7 7.061

Kalamati 1 2.306 31.05.2013 Not yet

Total 9 21.426

Page 11: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 9

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Private Land for District Bargarh

Sl. No. District

Ta

ha

sil

Village

No

. o

f

plo

ts

Are

a o

f

lan

d

in(a

cre

s)

Requisitions

submitted to

Spl. LAO

Estimated cost

by Spl. SLAO Status Remarks

ROR to be

certified by

tahasildar

for further

submission

Under process

Government Land for District Bargarh

Sl. No. District

Ta

ha

sil

Village

No

. o

f

plo

ts

Are

a o

f

lan

d

in(a

cre

s)

Requisitions

submitted to

Tahasildar

Site selection

meeting in Sub

collector office

Status Remarks

1

Bargarh

Att

ab

ira

Kandapali 4 0.07 7.8.2013

Rengalipali 3 0.061

7.8.2013 &

6.9.2013

2

Ba

rga

rh

Barahagoda 1 0.309 7.8.2013

Jarmunda 3 0.057

Dhanger 1 0.020 2.9.2013

3

Ba

rap

ali

Ainthapali 2 0.007

7.8.2013

Kadalipali 6 0.516

Lenda 8 0.339

Barpali 1 0.059

Khemasara 3 0.041

Tingipali 1 0.006

Baraguda 5 0.301

Bhatinga 1 0.078 2.9.2013

Page 12: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 10

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Khairpali 2 0.422

Total 41 2.286

Private Land for District Sonepur

District T

ah

asi

l Village

No

. o

f p

lots

Are

a o

f la

nd

in(a

cre

s)

Requisitions

submitted to Spl. LAO

Estimated cost by

Spl. SLAO Status Remarks

Sonepur

Ra

mp

ur

Patharkahndi 10 0.291

Sannupari 28 2.008

Khutapali 1 0.002

Dunguripali 6 0.457

Sahale 34 1.881

Fatamunda 13 1.068

Kushmal 14 1.808

Cherupali 12 1.08

Total 118 8.595

Page 13: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 11

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

District

Ta

ha

sil

Village

No

. o

f p

lots

Are

a o

f la

nd

in(a

cre

s)

Site selection

meeting in Sub

collector office

Status Remarks

Sonepur

Ra

mp

ur

Patharkahndi 4 0.211

Sannupari 4 0.145

Khutapali 1 0.299

Dunguripali 8 0.089

Sahale 14 0.477

Fatamunda 8 0.194

Kushmal 4 0.361

Cherupali 1 0.012

Total 44 1.788

Table 2: Summary Subproject Impacts

Page 14: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 12

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

The total land acquisition is about 107.869 Acre (Private Land to be acquired: 67.03 Acres, Forest

Land: 12.804 acre, Govt. Land: 27.765 acre). The survey details of the Title holders are under

process. NGO has completed the Verification of NTHs in this stretch. GRC letters issued by DM

concerned.

3.2 Raipur – Titlagarh project

This project passes through two states Chhattisgarh and Odisha. In Chhattisgarh section there are

three districts namely Raipur, Mahasamund and Nawapada. There is no land acquisition in this

project.

Resettlement Impact NTH

The project will not require any land acquisition. A detailed census survey was conducted to

assess various impacts of the project by walking along the track. There are only 249 structures

affected due to the doubling (belonging to non-title holders/squatters). Among the private

structures displaced in the subproject, 112 Nos are total displaced households and remaining

137 Nos. structures will be displaced between 10% to 25%. Only 121 Nos. Boundary walls, 8 Nos.

wells & 72 Nos. WC tanks structures will be affected up to 100%. It is assessed that there will

be 168 vulnerable households displaced in the subproject including 33 Scheduled Tribes (ST),

134 Below Poverty Line (BPL) households. The BPL households include 69 Scheduled Caste (SC)

households also. The total number of displaced persons (DPs) in those households is 468. No

household is losing livelihood through loss of the structure. The details of the project impacts are

summarized in the Table 3.

Sl.No. Description No./Unit

1 Total Number of Structures 249

2 Number Private Structures 249

3 Number of Religious Structures 0

4 Legal Status of Structure Owners 249 Non-titleholders

5 Type of Affected Private Structures 249

6 Total Number of Displaced Households 112

7 Number of ST Households 33

8 Number of Vulnerable Households 210

9 Number of Tenants 0

10 Total Number of Displaced Persons 468

Table 3: Summary project Impacts

Page 15: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 13

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

There are some changes in proposed alignment of Railway track in Raipur-Titlagarh Project due to fly

over at Parwati Nagar between chainage Ch.3+500 to Ch.13+500, resulting in large deviation of

number of affected persons habiting particularly in the Chhattisgarh section. A joint survey by an

NGO and RVNL along with General Consultant was carried out to assess the total affected NTH in the

project. The valuation of structures and Micro Plan has been submitted by NGO.

An updating of the RP of Raipur-Titlagarh project will be submitted.

3.3 Daund-Gulbarga project

This project passes through two states Karnataka and Maharashtra. There is no Land acquisition in

this project. In Karnataka section there is no presence of TH & NTH.NGO has completed the

Verification of NTHs in Maharashtra section. Micro plan approved for NTH and about 83% amount

has been disbursed. GRC letters issued by DM concerned.

3.4 Hospet – Tinaighat Project

The total land acquisition is about 32.22 Acre in this project. No NTH were found in this section. The

Micro plan approved for 50% of the TH for Rs. 4, 32,000 for 28 HHs. Cheques are under preparation.

GRC letters have been issued by DM concerned. One GRC meeting was held on 6th July, 2013.

3.5 Electrification of Pune-Wadi Guntakal project

No TH & NTH in this section

Field work for land acquisition is still going on. Work is going on only in sections where no R&R is

required.

Page 16: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 14

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

4. Summary Status of Land Acquisition The current status of Land Acquisition of different projects is as follows:

Sl

No.

Project Name Length

(km) Sub project

Area of

Land to

be

Acquired

in Acre

No. of

HHs/PAPs

Status of R&R

Implementation

1a.

Doubling of Daund-

Gulbarga

section(Karnataka)

224 DG-1:

Bhigwan-

Mohol

DG-2: Hotgi-

Gulbarga

0 0 No TH & NTH in

this section.

1b

Doubling of Daund-

Gulbarga(Maharashtra

Section)

0 22 Micro plan

Approved for NTH

Rs 8, 58,034.

The Final

Instalment of

assistance has

been distributed

on 24.08.2013

2. Doubling of

Sambalpur-Titlagarh

section

182 ST-1: All Major

Bridges

ST-2:

Sambalpur-

Barapali

ST-3: Barapali-

Bolangir

ST-4: Bolangir-

Titlagarh

107.869

Acre

(Private

Land to be

acquired:

67.03

Acres,

Forest

Land:

12.804

acre,

Govt.

Land:

27.765

acre

3441 Land Acquisition to

be done in four

districts.

LAP under process

Verification of TH

under process

LA details:

Sambalpur District:

26.575 Acre

Bargarh District:

20.887 Acre

Subarnapur

District : 17.379

Balangir District :

43.028 acre

(GRC letters

issued by DM

concerned)

The RP is being

updated.

Page 17: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 15

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Sl

No.

Project Name Length

(km) Sub project

Area of

Land to

be

Acquired

in Acre

No. of

HHs/PAPs

Status of R&R

Implementation

NTH details:

Total 38 NTH has

been verified,

Micro Plan

submitted for

approval for Rs.

4429511 on 11th

November 2013.

3. Doubling of Raipur-

Titlagarh section

203 RT-1:

Titlagarh-

Lakhana

RT-2: Lakhana-

Arand

RT-3: Arand-

Raipur

0 265 NTH 16 (Odisha) +

249

(Chhattisgarh)=

265 NTH verified

and Micro Plan

submitted for

Approval for

Rs.19714627

4. Doubling of Hospet-

Tinaighat section

229 HT-1: Hospet-

Harlapur

HT-2:

Harlapur-

Dharwar

HT-3:

Kambarganavi-

Tinaighat

32.22 Acre 173 The Micro plan

approved for 50%

of the TH for Rs. Rs

5, 64,000/

for 43 HHs.

Total disbursed Rs

nil, No NTH found

in this section.

I.C distributed,

Cheques are under

preparation.

5. Electrification of

Pune-Wadi Guntakal

section

641 PG-1: Pune-

Bhigwan

Gulbarga-

Wadi

PG-2: Wadi-

Raichur

PG-3: Raichur-

Guntakal

0 0 No TH & NTH in

this section.

Page 18: IND: Railway Sector Investment Program-Project 1

Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 2 Sep 2013

ADB Loan No. 0060-IND / 2793-IND 16

Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes

Sl

No.

Project Name Length

(km) Sub project

Area of

Land to

be

Acquired

in Acre

No. of

HHs/PAPs

Status of R&R

Implementation

PG-4:

Bhigwan-

Mohol

PG-5: Mohol-

Gulbarga

Table 4: Current status of field work of land acquisition