Index Isolated Phase Bus Duct 132 KV Cable Tunnel UAT 7 General Step Up Transformer Platform Erection Ongoing GT 8 Air Intake Erection GT 8 Air Intake Steel Structure Erection Platform Erection Ongoing Cabling for GT Auxiliaries PCC # 8 Exhaust Diffuser # 8 Lube Oil Cooler # 8 Gas Turbine Hall GT 7 Air Intake Erection Gt 7 Air Intake Steel Structure Erection PCC # 7; SFC/SEE TRANSFORMER # 7 Forwarding Building Pump Skid Piping Ongoing Swithgear building Auxiliary Transformers Exhaust Diffuser # 7 Lube Oil Cooler # 7

Upload: imrozkhan1

Post on 25-Jan-2016

212 views

Category:

Documents


0 download

DESCRIPTION

Index

TRANSCRIPT

Page 1: Index

Index

Isolated Phase Bus Duct

132 KV Cable Tunnel

UAT 7

General Step Up Transformer

Platform Erection Ongoing

GT 8 Air Intake Erection

GT 8 Air Intake Steel Structure Erection

Platform Erection Ongoing

Cabling for GT Auxiliaries

PCC # 8

Exhaust Diffuser # 8

Lube Oil Cooler # 8

Gas Turbine Hall

GT 7 Air Intake Erection

Gt 7 Air Intake Steel Structure Erection

PCC # 7; SFC/SEE TRANSFORMER # 7

Forwarding Building

Pump Skid Piping Ongoing

Swithgear building

Auxiliary Transformers

Exhaust Diffuser # 7