index
DESCRIPTION
IndexTRANSCRIPT
Index
Isolated Phase Bus Duct
132 KV Cable Tunnel
UAT 7
General Step Up Transformer
Platform Erection Ongoing
GT 8 Air Intake Erection
GT 8 Air Intake Steel Structure Erection
Platform Erection Ongoing
Cabling for GT Auxiliaries
PCC # 8
Exhaust Diffuser # 8
Lube Oil Cooler # 8
Gas Turbine Hall
GT 7 Air Intake Erection
Gt 7 Air Intake Steel Structure Erection
PCC # 7; SFC/SEE TRANSFORMER # 7
Forwarding Building
Pump Skid Piping Ongoing
Swithgear building
Auxiliary Transformers
Exhaust Diffuser # 7
Lube Oil Cooler # 7