1 2 3 4 5 6-7 8 9-10 KEY SHEET GENERAL NOTES SWPPP NOTES GRADING PLAN DAM CROSS-SECTIONS SPILLWAY CROSS SECTIONS DAM TYPICAL SECTION ARTICULATED CONCRETE BLOCK DETAILS ESCAMBIA COUNTY, FLORIDA PLANS PROPOSED FOR INDEX OF ROADWAY PLANS VICINITY MAP ENGINEERING DEPARTMENT SHEET NO. SHEET DESCRIPTION WILLOWBROOK LAKE DAM REPAIR & IMPROVEMENTS BOARD OF COUNTY COMMISSIONERS DISTRICT TWO DISTRICT ONE DISTRICT FIVE DISTRICT FOUR DISTRICT THREE COMMISSIONERS DOUG UNDERHILL JEFF BERGOSH (VICE CHAIRMAN) STEVEN BARRY ROBERT BENDER (CHAIRMAN) LUMON MAY PROJECT MANAGER: PROJECT ENGINEER: Mr. John Rosenau Jason L. Lashley, P.E. SECTION / TOWNSHIP / RANGE: SIGNATURE: DISTRICT: REG FLA ENG NO: 57353 22 / T-1-N / R-30-W V DATE: PROJECT SITE KINGSFIELD ROAD FINAL PLANS FOR BIDDING PURPOSES JULY 2021 CHEMSTRAND ROAD TEN MILE ROAD US HWY 29 PRELIMINARY ESCAMBIA COUNTY PROJECT: ENGSALLY 0920-63 NRCS-EWP PROJECT: DSR-SAL-ESC-001

Upload: others

Post on 14-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

1

2

3

4

5

6-7

8

9-10

KEY SHEET

GENERAL NOTES

SWPPP NOTES

GRADING PLAN

DAM CROSS-SECTIONS

SPILLWAY CROSS SECTIONS

DAM TYPICAL SECTION

ARTICULATED CONCRETE BLOCK DETAILS

ESCAMBIA COUNTY, FLORIDA

PLANS PROPOSED FOR

INDEX OF ROADWAY PLANS

VICINITY MAP

ENGINEERING DEPARTMENT

SHEET NO. SHEET DESCRIPTION

WILLOWBROOK LAKE DAMREPAIR & IMPROVEMENTS

BOARD OF COUNTY COMMISSIONERS

DISTRICT TWO

DISTRICT ONE

DISTRICT FIVE

DISTRICT FOUR

DISTRICT THREE

COMMISSIONERS

DOUG UNDERHILL

JEFF BERGOSH (VICE CHAIRMAN)

STEVEN BARRY

ROBERT BENDER (CHAIRMAN)

LUMON MAYPROJECT MANAGER:

PROJECT ENGINEER:

Mr. John Rosenau

Jason L. Lashley, P.E.

SECTION / TOWNSHIP / RANGE:

SIGNATURE:

DISTRICT:

REG FLA ENG NO:57353

22 / T-1-N / R-30-W V

DATE:

PROJECT SITE

KINGSFIELD ROAD

FINAL PLANSFOR

BIDDING PURPOSESJULY 2021

CH

EM

STR

AN

D R

OA

D

TEN MILE ROAD

US H

WY

29

PRELIMINARY

ESCAMBIA COUNTY PROJECT: ENGSALLY 0920-63NRCS-EWP PROJECT: DSR-SAL-ESC-001

AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
CSX
AutoCAD SHX Text
CSX
AutoCAD SHX Text
SS
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
SEABOARD
AutoCAD SHX Text
ST. L.S.F. RY.
AutoCAD SHX Text
RY.
AutoCAD SHX Text
L
AutoCAD SHX Text
ST
AutoCAD SHX Text
SF
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
IL
AutoCAD SHX Text
RA
AutoCAD SHX Text
RY
AutoCAD SHX Text
.
AutoCAD SHX Text
SF
AutoCAD SHX Text
L
AutoCAD SHX Text
ST.
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RAILWAY
AutoCAD SHX Text
FRANCISCO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
AND
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
BASE
AutoCAD SHX Text
LINE
AutoCAD SHX Text
8
AutoCAD SHX Text
20
AutoCAD SHX Text
22
AutoCAD SHX Text
19
AutoCAD SHX Text
21
AutoCAD SHX Text
9
AutoCAD SHX Text
23
AutoCAD SHX Text
18
AutoCAD SHX Text
CSX
AutoCAD SHX Text
RR
AutoCAD SHX Text
186
AutoCAD SHX Text
749
AutoCAD SHX Text
psco
AutoCAD SHX Text
Big
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text
THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
AutoCAD SHX Text
57353
Page 2: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

1. THE CONTRACTORS SHALL NOTIFY THE COUNTY DESIGN ENGINEER OR DESIGNEE 48 HOURS PRIOR TO CONSTRUCTION.

2. ALL CONDITIONS AND STIPULATIONS OF THE CONSTRUCTION PERMITS AND THE APPROVALS ISSUED BY THE ESCAMBIA COUNTY ENGINEER SHALL BE

COMPLIED WITH IN EVERY DETAIL.

3. ALL ROADS DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE PATCHED OR RECONSTRUCTED AS DIRECTED BY THE COUNTY ENGINEER OR

DESIGNEE.

4. THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO PREVENT EROSION AND ANY OFF SITE SEDIMENT TRANSPORT RESULTING FROM INCREASED

RUNOFF DURING CONSTRUCTION BY PROVIDING SILT FENCE AND/OR STAKED HAY BALES AS REQUIRED BY THE FLORIDA STORMWATER EROSION AND

SEDIMENT CONTROL INSPECTOR'S MANUAL, 2008 EDITION, OR AS INDICATED ON THE PLANS. ALL EROSION CONTROL MEASURES SHALL REMAIN IN

PLACE UNTIL ASSOCIATED DISTURBED AREAS ARE STABILIZED AS TO REDUCE SEDIMENT RUNOFF, UNLESS OTHERWISE DIRECTED BY THE ENGINEER OR

DESIGNEE.

5. ANY NECESSARY PERMITS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ESCAMBIA COUNTY OR ITS DESIGNEE WILL ASSIST CONTRACTOR WITH

REQUIRED PERMITS.

6. THE CONTRACTOR IS CAUTIONED TO VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE PROJECT PRIOR TO BIDDING AND/OR CONSTRUCTION.

7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PRESERVE OR RELOCATE ALL BENCHMARKS (VERTICAL CONTROL) AS NEEDED DURING

CONSTRUCTION. ALL PUBLIC OR PRIVATE CORNER MONUMENTATION SHALL BE PROTECTED. IF A PUBLIC OR PRIVATE CORNER MONUMENTATION IS IN

DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR DESIGNEE

IMMEDIATELY. ANY ESCAMBIA COUNTY HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS WITHIN

THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK

MONUMENTS ARE DISTURBED OR DESTROYED THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OF THE MONUMENTS AND HAVE THE

MONUMENTS POSITION DETERMINED BY A FLORIDA LICENSED PROFESSIONAL SURVEYOR AND MAPPER USING GUIDELINES AS ESTABLISHED BY

NATIONAL GEODETIC SURVEY FOR BLUE BOOKING AND APPROVAL.

8. EXISTING DRAINAGE FEATURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.

9. THE CONTRACTOR SHALL MATCH EXISTING CONDITIONS AT THE BEGINNING AND END OF CONSTRUCTION AS DIRECTED BY THE COUNTY ENGINEER OR

DESIGNEE.

10. EXISTING STREETS AND DRIVES SHALL BE MAINTAINED TO LOCAL TRAFFIC AND PROPERTY OWNERS.

11. ALL ROADWAY CONSTRUCTION SHALL COMPLY WITH THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS, LATEST EDITION.

12. ALL MATERIALS, TESTING AND CONSTRUCTION METHODS SHALL CONFORM TO THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS, LATEST EDITION.

13. ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS

AND COVENANTS, SHALL BE EXCLUDED AND NOT APPLICABLE TO ANY SPECIFICATION REFERRED HEREIN OR OTHERWISE LISTED IN THESE PLANS OR

RELATED DOCUMENTS OR THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.

14. EXISTING STREET AND ROAD NAME SIGNS ON THE PROJECT SHALL BE KEPT VISIBLE AT ALL TIMES FOR THE FACILITATION OF ACCESS BY EMERGENCY

VEHICLES. ALL OTHER EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION OPERATIONS SHALL BE TAKEN DOWN AND STOCKPILED WITHIN THE R/W

LIMITS BY THE CONTRACTOR AS DIRECTED BY THE COUNTY ENGINEER OR DESIGNEE. ANY EXISTING SIGNS THAT ARE TO BE RELOCATED AND ARE

DAMAGED BEYOND USE BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT HIS EXPENSE.

15. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE 10' OPEN LANE AT ALL TIMES. NO OPEN EXCAVATION SHALL REMAIN OVER NIGHT. CONTRACTOR

SHALL RESTORE ROAD TO TWO LANES OF TRAFFIC AT THE END OF EACH WORK DAY.

16. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.

17. ONLY ACCESS TO THE ROAD R/W AS SHOWN IS GUARANTEED BY THE COUNTY. PRIVATE R/W REQUIRED BY THE CONTRACTOR TO FACILITATE

CONSTRUCTION SHALL BE ACQUIRED BY THE CONTRACTOR WITH NO ADDITIONAL COMPENSATION OR ASSISTANCE FROM THE COUNTY.

18. IN THE EVENT THAT SURVEY MONUMENTATION OR REFERENCE POINTS ARE MISSING OR HAVE BEEN DESTROYED, PLEASE CONTACT:

MR. JOE BARRETT, PLS MR. BRADLEY J. ROBERTS, PLS

ESCAMBIA COUNTY SURVEYOR SIGMA CONSULTING GROUP, INC.

3363 WEST PARK PLACE 10305 AIRLINE HIGHWAY

PENSACOLA, FLORIDA 32505 PH (850) 595-3427 BATON ROUGE, LOUISIANA PH (225) 485-2419

19. VEGETATION ON R/W AND EASEMENTS SHALL BE RESTORED TO ORIGINAL CONDITION UNLESS OTHERWISE NOTED ON THE PLAN SHEETS. COST OF SAID

RESTORATION SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS.

20. GRADED AGGREGATE BASE SHALL BE REQUIRED WHERE THE SEASONAL HIGH GROUND WATER ENCROACHES WITHIN TWO (2) FEET OF THE BOTTOM OF

BASE.

21. ALL TREES WITHIN LIMITS OF CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE NOTED IN PLANS.

22. ALL COMPACTED FILL SHALL BE PLACED IN 4" LIFTS FOR HAND POWERED TAMPERS AND 8" LIFTS FOR HEAVY EQUIPMENT OPERATED TAMPERS.

23. MAINTENANCE OF TRAFFIC AS PER FDOT INDEX 600.

24. ALL EXISTING MAILBOXES INTERFERING WITH NEW CONSTRUCTION SHALL BE RELOCATED OR REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH

POSTAL REQUIREMENTS AND IN ACCORDANCE WITH ESCAMBIA COUNTY TECHNICAL SPECIFICATION, FDOT DESIGN STANDARDS AND UNITED POSTAL

REQUIREMENTS. ALL EXISTING BRICK MAILBOXES WITHIN LIMITS OF CONSTRUCTION OR COUNTY RIGHT OF WAY SHALL BE REMOVED AND PLACED ON

THE PROPERTY LINE OF THE OWNER. CONTRACTOR SHALL REPLACE EXISTING BRICK MAILBOX WITH APPROVED PLASTIC BREAK AWAY MAILBOX.

25. THE CONTRACTOR SHALL, AT A MINIMUM, MATCH EXISTING SIGNING AND PAVEMENT MARKINGS. ALL SIGNING AND PAVEMENT MARKINGS SHALL BE

PLACED IN ACCORDANCE WITH THE LATEST FDOT SPECIFICATIONS AND STANDARD PLANS.

26. WHERE UNSUITABLE MATERIAL, AS DEFINED BY THE COUNTY SPECIFICATIONS SECTION 02300, 1.3(I), IS ENCOUNTERED IN THE AREAS PROPOSED FOR

PAVING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COUNTY ENGINEER OR DESIGNEE PRIOR TO ANY EXCAVATION.

27. PIPE LENGTHS SHOWN IN THE PLANS DO NOT INCLUDE THE LENGTH OF PIPE THAT MUST BE INSTALLED WITH THE MITERED END SECTION. THEREFORE,

ALL PIPES LENGTHS ASSOCIATED WITH MITERED END SECTIONS SHALL BE PAID FOR IN THE UNIT COST OF THE MITERED END SECTION.

GENERAL NOTES:

UTILITY NOTES:

29. IF ARCHAEOLOGICAL MATERIAL/PREHISTORIC ARTIFACTS SUCH AS POTTERY OR CERAMICS, STONE TOOLS OR METAL IMPLEMENTS, OR ANY

OTHER PHYSICAL REMAINS THAT COULD BE ASSOCIATED WITH NATIVE AMERICAN CULTURES, OR EARLY COLONIAL OR AMERICAN SETTLEMENT

ARE ENCOUNTERED AT ANY TIME, THE PROJECT SHOULD CEASE ALL ACTIVITIES INVOLVING SUBSURFACE DISTURBANCE IN THE IMMEDIATE

VICINITY OF SUCH DISCOVERIES. THE APPLICANT/RECIPIENT, OR OTHER DESIGNEE, SHOULD CONTACT THE FLORIDA DEPARTMENT OF STATE,

DIVISION OF HISTORICAL RESOURCES, THE STATE HISTORIC PRESERVATION OFFICER (SHPO) AND THE DSH/FEMA REGION IV ENVIRONMENTAL

OFFICER AND FDEM STATE ENVIRONMENTAL LIAISON OFFICER FOR FURTHER GUIDANCE. PROJECT ACTIVITIES SHOULD NOT RESUME WITHOUT

VERBAL AND/OR WRITTEN AUTHORIZATION FROM THE DIVISION OF HISTORICAL RESOURCES.

30. IN THE EVENT THAT UNMARKED HUMAN REMAINS ARE ENCOUNTERED DURING PERMITTED ACTIVITIES, ALL WORK MUST STOP IMMEDIATELY AND

THE PROPER AUTHORITIES NOTIFIED IN ACCORDANCE WITH F.S. 872.05.

1. THE LOCATION SHOWN FOR EXISTING UNDERGROUND UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF

ALL EXISTING UTILITIES BEFORE COMMENCING WORK IN EACH AREA. THE CONTRACTOR AGREES TO BE COMPLETELY RESPONSIBLE FOR ALL

DAMAGES WHICH MIGHT OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UTILITIES.

2. UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION SO THAT THE UTILITY OWNER CAN SPOT VERIFY AND/OR

EXPOSE THEIR UTILITIES. KNOWN UTILITIES OWNERS INCLUDE:

SEWER/WATER - EMERALD COAST UTILITY AUTHORITY ELECTRIC - NEXTERA ENERGY

MR. BRANDON KNIGHT, P.E MR. SCOTT LEE

P.O. BOX 15311 5120 DOGWOOD DRIVE

PENSACOLA, FL. 32514 PH: (850) 969-6650 MILTON, FL. 32570 PH: (850) 444-6420

[email protected] [email protected]

NATURAL GAS - PENSACOLA ENERGY CABLE - COX CABLE

MS. DIANE MOORE MR. RICHARD KOESTER

1625 ATWOOD DRIVE 3405 MCLEMORE DRIVE

PENSACOLA, FL. 32514 PH: (850) 479-5319 PENSACOLA, FL. 32514 PH: (850) 602-2182

[email protected] [email protected]

TELEPHONE - AT&T FLORIDA SUNSHINE STATE ONE-CALL

MR. ROB ST. PIERRE 7200 LAKE ELLENOR DRIVE, SUITE 200

605 W GARDEN ST 2ND FLOOR ORLANDO, FL. 32809 PH: (800) 432-4770

PENSACOLA, FL. 32502 PH: (850) 623 -3811

[email protected]

TRAFFIC DEPARTMENT - ESCAMBIA COUNTY PUBLIC WORKS

MR. JOHNNY COX

3363 WEST PARK PLACE

PENSACOLA, FL. 32505 PH:(850) 595-3404

3. AT&T FLORIDA WILL COMPLETE ALL WORK DURING THE HOURS OF 7:30 AM - 4:30 PM, MONDAY THRU FRIDAY. NO NIGHT OR WEEKEND WORK.

4. ALL CABLE DAMAGE MUST BE REPORTED TO THE ATT FLORIDA REPAIR SERVICE DEPARTMENT AT 611 FROM A LAND LINE OR 877-737-2478 IF USING

A CELL PHONE.

5. ALL VEHICLE LOOP INSTALLATION SHALL BE DONE AS PER FDOT INDEX 660-001.

6. CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION LINES AND UNDERGROUND UTILITIES.

7. UTILITIES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. NECESSARY REPAIRS SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY

ITEMS AND SHALL BE TO THE SATISFACTION OF UTILITY OWNERS.

DEWATERING NOTES:

1. DEWATERING IS EXPECTED FOR THE CONSTRUCTION OF THIS PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE DAM

EMBANKMENT IS CONSTRUCTED IN DRY CONDITIONS. CONSTRUCTION AND DEMOLITION OF TEMPORARY DEWATERING SYSTEM, INCLUDING ALL

MATERIALS, LABOR, AND OTHER WORK EFFORT ANCILLARY TO THE SUCCESSFUL COMPLETION OF THIS CONSTRUCTION ACTIVITY SHALL BE

INCLUDED IN THE CONTACT UNIT PRICE FOR DEWATERING, LUMP SUM. FOR ADDITIONAL SOILS INFORMATION AND SUBGRADE PREPARATION

REFER TO PROJECT GEOTECHNICAL REPORT PREPARED BY: NOVA ENGINEERING AND ENVIRONMENTAL DATED JULY 12, 2016 (NOVA PROJECT

NUMBER: 8216027)

2. DEWATERING MAY INCLUDE BUT NOT BE LIMITED TO COFFER DAM, WELL POINT SYSTEM, OR BYPASS METHODOLOGIES.

3. ALL DEWATERING COSTS ASSOCIATED WITH THE PERMITTING, INSTALLATION, MAINTENANCE AND CONSTRUCTION OF THE PROPOSED

DEWATERING SYSTEM SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR DEWATERING, LUMP SUM. THE CONTRACTOR SHALL SUBMIT FOR

PERMITS REQUIRED FOR DEWATERING ACTIVITIES.

4. THE CONTRACTOR SHALL PROVIDE A DEWATERING/ DIVERSION PLAN TO ESCAMBIA COUNTY FOR REVIEW PRIOR TO THE START OF ANY

CONSTRUCTION.

GE

NE

RA

L N

OT

ES

S

HE

ET

2

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

3298 S

UM

MIT

B

OU

LE

VA

RD

, S

UIT

E 32

PE

NS

AC

OLA

, F

LO

RID

A 32503

PH

ON

E: (850) 332-7912

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N #26889

210201

JULY 2021

F.E.A.

F.E.A.

J.L.L.

WIL

LOW

BR

OO

K L

AK

E D

AM

REP

AIR

& IM

PRO

VEM

ENTS

BO

AR

D O

F C

OU

NTY

CO

MM

ISSI

ON

ERS

ESC

AM

BIA

CO

UN

TY, F

LOR

IDA

ENG

INEE

RIN

G D

EPA

RTM

ENT

AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 3: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

3

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

3298 S

UM

MIT

B

OU

LE

VA

RD

, S

UIT

E 32

PE

NS

AC

OLA

, F

LO

RID

A 32503

PH

ON

E: (850) 332-7912

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N #26889

210201

JULY 2021

F.E.A.

F.E.A.

J.L.L.

WIL

LOW

BR

OO

K L

AK

E D

AM

REP

AIR

& IM

PRO

VEM

ENTS

BO

AR

D O

F C

OU

NTY

CO

MM

ISSI

ON

ERS

ESC

AM

BIA

CO

UN

TY, F

LOR

IDA

ENG

INEE

RIN

G D

EPA

RTM

ENT

DETAIL OF PROPERLY INSTALLED STRAW BALESILT FENCE DETAIL

SW

PP

P N

OT

ES

AutoCAD SHX Text
2.C OTHER CONTROLS: 2.C.1 WASTE DISPOSAL: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS TO PREVENT THE DISCHARGE OF SOLID MATERIALS, INCLUDING BUILDING MATERIALS, TO WATERS OF THE UNITED STATES. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER: * PROVIDING LITTER CONTROL AND COLLECTION WITHIN THE PROJECT DURING CONSTRUCTION ACTIVITIES. * DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER. * DISPOSING OF SOLID MATERIALS INCLUDING BUILDING AND CONSTRUCTION MATERIALS OFF THE PROJECT SITE BUT NOT IN SURFACE WATERS, OR WETLANDS. 2.C.2 OFF-SITE VEHICLE TRACKING & DUST CONTROL: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS FOR MINIMIZING OFFSITE VEHICLE TRACKING OF SEDIMENTS AND GENERATING DUST. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER. * COVERING LOADED HAUL TRUCKS WITH TARPAULINS. * REMOVE EXCESS DIRT FROM ROADS DAILY. * STABILIZING CONSTRUCTION ENTRANCES ACCORDING TO FDOT DESIGN STANDARD 106. * USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES SUCH AS EXCAVATION AND HAULING OPERATIONS. 2.C.3 STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC TANK REGULATIONS: IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED PROCEDURES TO COMPLY WITH APPLICABLE STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, AND SANITARY SEWER OR SEPTIC SYSTEMS. 2.C.4 FERTILIZERS AND PESTICIDES: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROCEDURES FOR APPLYING FERTILIZERS AND PESTICIDES. THE PROPOSED PROCEDURES SHALL COMPLY WITH APPLICABLE SUBSECTIONS OF SECTION 570 OF THE SPECIFICATIONS. 2.C.5 TOXIC SUBSTANCES: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES. 2.D.4 APPROVED STATE AND LOCAL PLANS AND PERMITS: * SEE CONSTRUCTION DOCUMENTS 3.0 MAINTENANCE: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. THE MAINTENANCE PLAN SHALL AT A MINIMUM, COMPLY WITH THE FOLLOWING: * SILT FENCE: MAINTAIN PER SECTION 104. THE CONTRACTOR SHOULD ANTICIPATE REPLACING SILT FENCE ON 12 MONTH INTERVALS. * SEDIMENT BARRIERS : REMOVE SEDIMENT AS PER MANUFACTURER'S RECOMMENDATIONS OR WHEN WATER PONDS IN UNACCEPTABLE AMOUNTS OR AREAS. 4.0 INSPECTIONS: QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.50 INCHES OR GREATER. TO COMPLY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER POLLUTION PREVENTION PLAN. * POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM DRAIN SYSTEMS. * DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED. * AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION. * STRUCTURAL CONTROLS. * STORMWATER MANAGEMENTS SYSTEMS. * LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER. IF INSPECTIONS INDICATE THAT THE INSTALLED STABILIZATION AND STRUCTURAL PRACTICES ARE NOT SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES, AS APPROVED BY THE ENGINEER. 5.0 NON-STORMWATER DISCHARGES: IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY ALL ANTICIPATED NON-STORMWATER DISCHARGES (EXCEPT FLOWS FROM FIRE FIGHTING ACTIVITIES). THE CONTRACTOR SHALL DESCRIBE THE PROPOSED MEASURES TO PREVENT POLLUTION OF THESE NON-STORMWATER DISCHARGES. IF THE CONTRACTOR ENCOUNTERS CONTAMINATED SOIL OR GROUNDWATER, CONTACT ESCAMBIA COUNTY ENGINEERING.
AutoCAD SHX Text
1.F. RECEIVING WATERS: SEE ITEM 1.D FOR THE OUTFALL LOCATIONS AND RECEIVING WATER NAMES. THERE ARE JURISDICTIONAL WETLANDS ON THE PROJECT SITE. 2.0 CONTROLS: 2.A. EROSION AND SEDIMENT CONTROLS: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED STABILIZATION AND STRUCTURAL PRACTICES. THE FOLLOWING RECOMMENDED GUIDELINES ARE BASED ON THE GRADING PLAN OUTLINED IN THE CONSTRUCTION PLANS. THE CONTRACTOR MAY CHOOSE TO ACCEPT THE FOLLOWING GUIDELINES OR MODIFY THEM IN THE SEDIMENT AND EROSION CONTROL PLAN, SUBJECT TO APPROVAL BY THE ENGINEER. AS WORK PROGRESSES, THE CONTRACTOR SHALL MODIFY THE PLAN TO ADAPT TO SEASONAL VARIATION, CHANGES IN CONSTRUCTION ACTIVITIES, AND THE NEED FOR BETTER PRACTICES. FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED. 2.A.1 STABILIZATION PRACTICES: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL EROSION. THE CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. THE STABILIZATION PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER. THE PARAGRAPH ABOVE REFERS TO A 7 DAY LIMIT BEFORE INITIATING STABILIZATION. THE DEP GENERIC PERMIT SPECIFIES 7 DAYS, BUT STRICTER REQUIREMENTS FROM OTHER PERMITTING AGENCIES WILL OFTEN APPLY AND SHOULD BE NOTED. TEMPORARY: * ARTIFICIAL COVERINGS IN ACCORDANCE WITH SPECIFICATION SECTION 104. * TURF AND SOD IN ACCORDANCE WITH SPECIFICATION SECTION 104. PERMANENT: * SOD IN ACCORDANCE WITH SPECIFICATION SECTION 570. 2.A.2 STRUCTURAL PRACTICES: IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT AND OTHERWISE PREVENT THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE. SEDIMENT CONTROLS SHALL BE IN PLACE BEFORE DISTURBING SOIL UPSTREAM OF THE CONTROL. THE STRUCTURAL PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER: TEMPORARY: * SEDIMENT BARRIERS IN ACCORDANCE WITH DESIGN STANDARD 102 AND SPECIFICATION SECTION 104. * INLET PROTECTION IN ACCORDANCE WITH DESIGN STANDARD 102 AND SPECIAL DETAILS SHOWN IN THE TTC PLAN. * SEDIMENT CONTAINMENT SYSTEM: SILT FENCE, HAY BALES, AND FLOATING/STAKED TURBIDITY BARRIER WILL BE UTILIZED AS THE TEMPORARY SEDIMENT CONTAINMENT SYSTEM. PERMANENT: * SOD. 2.B STORMWATER MANAGEMENT: ARMORED SWALE AND STORM DRAIN PIPE WILL BE CONSTRUCTED TO CONVEY RUNOFF TO THE STORMWATER SYSTEM.
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
AutoCAD SHX Text
FILTERED RUNOFF
AutoCAD SHX Text
BINDING WIRE OR TWINE
AutoCAD SHX Text
SEDIMENT LADEN RUNOFF
AutoCAD SHX Text
PREVENT PIPING
AutoCAD SHX Text
STAKED AND ENTRENCHED
AutoCAD SHX Text
COMPACTED SOIL TO
AutoCAD SHX Text
STRAW BALE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
FIBERTEX (OR APPROVED EQUAL)
AutoCAD SHX Text
MATERIAL ATTACHED TO WIRE FENCE
AutoCAD SHX Text
COMPACTED SOIL
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
TOE OF FABRIC
AutoCAD SHX Text
WIRE FENCE
AutoCAD SHX Text
POST @ 6 FT. O.C. (TYP.)
AutoCAD SHX Text
2" x 4" OR 3" 0 TREATED TIMBER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
THE FOLLOWING NARRATIVE OF THE STORMWATER POLLUTION PREVENTION PLAN CONTAINS REFERENCES
AutoCAD SHX Text
TO THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, THE DESIGN STANDARDS, AND
AutoCAD SHX Text
OTHER SHEETS OF THESE CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS
AutoCAD SHX Text
(CALLED THE KEY SHEET) CONTAINS AN INDEX TO THE OTHER SHEETS. THE COMPLETE STORMWATER
AutoCAD SHX Text
POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS: THIS NARRATIVE DESCRIPTION, THE DOCUMENTS
AutoCAD SHX Text
REFERENCED IN THIS NARRATIVE, THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN REQUIRED BY
AutoCAD SHX Text
SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING CONSTRUCTION.
AutoCAD SHX Text
1.0 SITE DESCRIPTION:
AutoCAD SHX Text
1.A. NATURE OF CONSTRUCTION ACTIVITY:
AutoCAD SHX Text
1.B. SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:
AutoCAD SHX Text
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A DETAILED SEQUENCE
AutoCAD SHX Text
OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE
AutoCAD SHX Text
OF MAJOR ACTIVITIES DESCRIBED BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE
AutoCAD SHX Text
THAT IS EQUAL OR BETTER AT CONTROLLING EROSION AND TRAPPING SEDIMENT AND IS APPROVED BY
AutoCAD SHX Text
THE ENGINEER.
AutoCAD SHX Text
FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING
AutoCAD SHX Text
NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE
AutoCAD SHX Text
CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE
AutoCAD SHX Text
STABILIZED.
AutoCAD SHX Text
2. CLEARING AND GRUBBING, EARTHWORK FOR DEWATERING ACTIVITIES.
AutoCAD SHX Text
1.C. AREA ESTIMATES:
AutoCAD SHX Text
TOTAL SITE AREA: 1.40 ACRES.
AutoCAD SHX Text
TOTAL AREA TO BE DISTURBED: 1.40 ACRES.
AutoCAD SHX Text
1.D. RUNOFF DATA:
AutoCAD SHX Text
RUNOFF COEFFICIENTS:
AutoCAD SHX Text
BEFORE: 0.35
AutoCAD SHX Text
DURING: 0.35
AutoCAD SHX Text
AFTER: 0.35
AutoCAD SHX Text
SOILS DATA: SILT / LOAM / UNSUITABLE MATERIALS AND DEWATERING IS ANTICIPATED
AutoCAD SHX Text
OUTFALL INFORMATION:
AutoCAD SHX Text
THERE IS 1 EXISTING OUTFALL:
AutoCAD SHX Text
OUTFALL #1 DESCRIPTION: DAM REPLACEMENT LOCATION
AutoCAD SHX Text
LOCATION: CHEMSTRAND ROAD APPROXIMATELY 3,300 FEET SOUTH OF KINGSFIELD ROAD (CR 186)
AutoCAD SHX Text
DRAINAGE AREA: 1,900 ACRES
AutoCAD SHX Text
RECEIVING WATER(S): CLEAR CREEK -> ESCAMBIA RIVER -> ESCAMBIA BAY
AutoCAD SHX Text
1.E. SITE MAP:
AutoCAD SHX Text
THE CONSTRUCTION PLANS ARE BEING USED AS THE SITE MAPS. THE LOCATION OF THE REQUIRED
AutoCAD SHX Text
INFORMATION IS DESCRIBED BELOW. THE SHEET NUMBERS FOR THE PLAN SHEETS REFERENCED ARE
AutoCAD SHX Text
IDENTIFIED ON THE KEY SHEET OF THESE CONSTRUCTION PLANS.
AutoCAD SHX Text
* DRAINAGE PATTERNS: THE DRAINAGE BASIN DIVIDES AND FLOW DIRECTIONS ARE SHOWN ON THE
AutoCAD SHX Text
DRAINAGE MAP.
AutoCAD SHX Text
* APPROXIMATE SLOPES: THE SLOPES OF THE SITE CAN BE SEEN IN PLAN/PROFILE.
AutoCAD SHX Text
* AREAS OF SOIL DISTURBANCE: THE AREAS TO BE DISTURBED ARE INDICATED ON THE PLAN/
AutoCAD SHX Text
PROFILE SHEETS. ANY AREAS WHERE PERMANENT FEATURES ARE SHOWN TO BE CONSTRUCTED
AutoCAD SHX Text
ABOVE OR BELOW GROUND WILL BE DISTURBED.
AutoCAD SHX Text
* AREAS NOT TO BE DISTURBED: ESSENTIALLY THE ENITIRE PROJECT SITE WILL BE DISTURBED.
AutoCAD SHX Text
* LOCATIONS OF TEMPORARY CONTROLS: TO BE SHOWN ON THE CONTRACTORS APPROVED EROSION CONTROL PLAN.
AutoCAD SHX Text
SEDIMENTATION BASIN AND FLOATING / STAKED TURBIDITY BARRIER ARE SUGGESTED
AutoCAD SHX Text
* AREAS TO BE STABILIZED: ROADSIDE SWALES/DITCHES, LATERAL CULVERT DITCH SLOPES,
AutoCAD SHX Text
AND AT FURTHEST DOWNSTREAM DITCH SECTION AT LOWER END OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
CHEMSTRAND ROAD (CR 749) AT CLEAR CREEK
AutoCAD SHX Text
FOR ADDITIONAL SOILS DATA AND CULVERT BASE PREPARATION SEE PROJECT GEOTECHNICAL REPORT
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
* LOCATIONS OF PERMANENT CONTROLS: SOD ALL DISTURBED NON-PAVED AREAS (EXCLUDING DITCH BOTTOM)
AutoCAD SHX Text
1. CLEARING AND GRUBBING, EARTHWORK FOR EMBANKMENT DEMOLITION.
AutoCAD SHX Text
3. CLEARING AND GRUBBING, EARTHWORK FOR EMBANKMENT CONSTRUCTION.
AutoCAD SHX Text
THE PROJECT CONSISTS OF REMOVAL OF EXISTING EMBANKMENT SECTION AND DAMAGED SPILLWAY, DEWATERING, CONSTRUCTION OF ROADSIDE GRADING, CONSTRUCTION OF DITCH AND STORM DRAIN SYSTEMS, CONSTRUCTION OF CULVERT WINGWALLS, AND CONSTRUCTION OF PROPOSED DAM EMBANKMENT SECTION AND SPILLWAY.
AutoCAD SHX Text
NOVA ENGINEERING AND ENVIRONMENTAL DATED JULY 12, 2016 (NOVA PROJECT NUMBER: 8216027).
Page 4: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

13+50 14+50 15+50

13+00 14+00 15+00

11+00 12+00 13+00

21+

00

22+

00

22+

18

20+

50

21+

50

10+50 11+50 12+50

61

61

61

62

62

63

64

60

59

58

64

53

5

4

5

5

5

6

57

58

59

60

61

52

51

50

6

3

6

2

6

1

6

0

5

9

5

8

5

7

5

6

5

5

5

4

5

3

5

2

62.5

62.5

62

63

64

62.5

62

5

5

6

0

6

5

5

3

5

4

5

6

5

7

5

8

5

9

6

1

6

2

6

3

6

4

6

6

5

5

60

5

1

5

1

5

2

5

2

5

3

5

4

56

57

58

59

61

62

63

5

1

52

53

65

6

1

6

2

63

64

66

67

65

61

62

63

64

55

6

0

60

5

1

5

2

5

3

54

5

6

5

7

58

59

6

1

61

60

56

57

58

59

61

62

62

63

63

64

64

60

56

56

57

57

58

59

6

1

61

61

6

2

6

3

6

4

60

65

5

6

57

58

59

6

1

6

2

6

3

64

66

60

56

56

57

57

58

59

61

6

1

61

6

2

6

3

64

64

6

4

60

5

5

5

3

55

58

5

2

5

5

5

3

6

0

5

4

55

56

5

6

57

58

5

9

5

5

5

3

5

4

5

6

5

7

5

8

5

9

5

5

5

5

60

5

3

5

3

54

5

4

5

6

5

6

5

7

5

7

57

5

8

5

9

61

5

2

6

3

60

4

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

WIL

LO

WB

RO

OK

L

AK

E

DA

M R

EP

AIR

S &

IM

PR

OV

EM

EN

TS

F.E.A.

210201

F.E.A.

JULY 2021

JLL

GR

AD

IN

G P

LA

N

EPOXY/SEAL LEAKING PRIMARY

OVERFLOW STRUCTURE JOINTS

(INSIDE & OUTSIDE)

(WITH ENGINEER APPROVED PRODUCT)

EXISTING OVERFLOW STRUCTURE

(TO BE PROTECTED)

DEWATER OVERFLOW STRUCTURE &

INSPECT 3x66 = 198 LF OF PIPE JOINTS

WITH ESCAMBIA COUNTY PERSONNEL

SELECT FILL & GRADE (87 CY, 77 SY)

FILL (15 CY, 1' DEPTH), REGRADE AND RIP-RAP

SIDE SLOPES (79 SY TOTAL)

EXISTING (2) 8'X7' BOX CULVERT

(TO BE DESILTED, 79 CY)

NORTH

Feet

40200

CONSTRUCT 24" M.E.S.

PER FDOT INDEX NO 430-021

INV EL: 50.00

EXISTING ARMORED DITCH

(TO BE PROTECTED)

EXISTING CHAINLINK FENCE

(TO BE REMOVED AND REPLACED

114 LF, IF NECESSARY)

EXISTING CHAINLINK FENCE

(TO BE PROTECTED)

EXISTING WATER'S EDGE

SAWCUT (8 LF) & REMOVE EXISTING WINGWALL

EPOXY SEAL EXPOSED ENDS OF REBAR

(WITH ENGINEER APPROVED PRODUCT)

REMOVE 72 CY OF

SEDIMENT FROM U-WALL

BY HAND

EXISTING OVERFLOW STRUCTURE

TO BE DESILTED (7 CY)

CUT (78 CY, 3' DEPTH)

& GRADE (78 SY)

PROJECT SPECIFIC NOTE:

1. CONTRACTOR SHALL REMOVE DEBRIS BY HAND, A

DISTANCE OF 50' DOWNSTREAM OF EXISTING BOX

CULVERT ON CHEMSTRAND ROAD. (50'x30', 167 SY)

CONSTRUCT

DOGHOUSE

MANHOLE WITH SUMP

PER FDOT

INDEX NO 425-001

(INV EL: 51.00)

CONSTRUCT

17 LF OF 6"

UNDERDRAIN

CONSTRUCT 27 LF OF 6"

UNDERDRAIN

CONSTRUCT 22 LF OF 6"

ADS PIPE

CONSTRUCT 6" M.E.S.

WITH ANIMAL GUARD

CONSTRUCT

CLEANOUT

INV EL: 53.00

CONSTRUCT CLEANOUT

INV EL: 53.00

LEGEND:

CUT AREA

FILL AREA

REMOVE ARTICULATED BLOCK

PROPOSED ARTICULATED BLOCK

PROPOSED RIP-RAP

CONSTRUCT 1757 SY OF ARTICULATED CONCRETE BLOCK

(SEE DETAIL SHEETS 9 & 10 FOR A.C.B. CLASS 40T

INSTALLATION GUIDE)

REMOVE 205 SY OF EXISTING ARTICULATED CONCRETE BLOCK

REMOVE

15 LF OF 6"

UNDERDRAIN

SELECT FILL & GRADE

(87 CY, 81 SY)

REMOVE

UNDERDRAIN

INSPECTION BOX

CHEMSTRAND ROAD

CONTRACTOR SHALL REMOVE & REPLACE

EXISTING SEAL ALONG THE TOP

OF U-WALL STRUCTURE (60 LF)

(WITH ENGINEER APPROVED PRODUCT)

21+

00

SELECT FILL (133 CY) BEHIND U-WALL

SAWCUT (8 LF) & REMOVE EXISTING WINGWALL

EPOXY SEAL EXPOSED ENDS OF REBAR

(WITH ENGINEER APPROVED PRODUCT)

EXISTING CHAINLINK FENCE

(TO BE REMOVED AND REPLACED

60 LF, IF NECCESSARY)

EXISTING PIPE

SYSTEM TO

BE VIDEO

INSPECTED

AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS ESCAMBIA COUNTY, FLORIDA ENGINEERING DEPARTMENT
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 5: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

11+42

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

11+55

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

11+76

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

12+03

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

12+12

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

12+26

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 700-10-20-30-40-50

5

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

WIL

LO

WB

RO

OK

L

AK

E

DA

M R

EP

AIR

S &

IM

PR

OV

EM

EN

TS

F.E.A.

210201

F.E.A.

JULY 2021

JLL

DA

M C

RO

SS

-S

EC

TIO

NS

C

L

C

L

C

L

C

L

C

L

C

L

PROPOSED GRADE

PROPOSED GRADE

PROPOSED GRADE

PROPOSED GRADE

PROPOSED GRADE

PROPOSED GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING GRADE

HORIZONTAL SCALE: 1"=20'

VERTICAL SCALE = 1"=10'

EXISTING U-WALL

AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS ESCAMBIA COUNTY, FLORIDA ENGINEERING DEPARTMENT
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 6: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

20+89

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150

21+13

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150

21+15

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 6

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

WIL

LO

WB

RO

OK

L

AK

E

DA

M R

EP

AIR

S &

IM

PR

OV

EM

EN

TS

F.E.A.

210201

F.E.A.

JULY 2021

JLL

SP

ILLW

AY

C

RO

SS

-S

EC

TIO

NS

HORIZONTAL SCALE: 1"=20'

VERTICAL SCALE = 1"=10'

C

L

PROPOSED SPILLWAY GRADE

EXISTING GRADE

C

L

C

L

PROPOSED SPILLWAY GRADE

PROPOSED SPILLWAY GRADE

EXISTING GRADE

EXISTING GRADE

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS ESCAMBIA COUNTY, FLORIDA ENGINEERING DEPARTMENT
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 7: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

21+20

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150

21+38

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150

21+50

40

50

60

70

40

50

60

70

0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 7

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

WIL

LO

WB

RO

OK

L

AK

E

DA

M R

EP

AIR

S &

IM

PR

OV

EM

EN

TS

F.E.A.

210201

F.E.A.

JULY 2021

JLL

SP

ILLW

AY

C

RO

SS

-S

EC

TIO

NS

HORIZONTAL SCALE: 1"=20'

VERTICAL SCALE = 1"=10'

C

L

PROPOSED SPILLWAY GRADE

EXISTING GRADE

C

L

C

L

PROPOSED GRADE

PROPOSED GRADE

EXISTING GRADE

EXISTING GRADE

EXISTING U-WALL

EXISTING RIP-RAP

EXISTING RIP-RAP

EXISTING GRADE

PROPOSED GRADE

EXISTING

ARMORED

SWALE

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

NO

RT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

SO

UT

H L

IM

IT

S O

F C

ON

ST

RU

CT

IO

N

CUT AREA

CUT AREA

PROPOSED ARMORING

PROPOSED ARMORING

AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS ESCAMBIA COUNTY, FLORIDA ENGINEERING DEPARTMENT
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 8: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR

PROPOSED GRADE

EXISTING GRADE

BREAKPOINT

VARIES

3

1

VARIES

1

VARIES

1

EXISTING

ESCAMBIA COUNTY

DRAINAGE EASEMENT

℄ CHEMSTRAND ROAD

DRAINAGE EASEMENT

VARIES 125' - 160'

EXISTING R/W

50'

2

1

1

1

1

1

1

1

81' - 82'

3

1

℄ CONST.

*CLAY

CORE

8'

6'

KEYWAY TRENCH

L

L/3TOE DRAIN

20'

CREST WIDTH

*SHELL

*SHELL

CREST ELEVATION 64.5

VARIES

0' - 35'

TEMPORARY

CONSTRUCTION

EASEMENT

TY

PIC

AL S

EC

TIO

N

8

* NOTES

1. CLAY CORE AND SHELL MATERIAL SHALL CONFORM TO THE GEOTECHNICAL REQUIREMENTS SPECIFIED IN

THE GEOTECHNICAL REPORT PREPARED BY NOVA ENGINEERING & ENVIRONMENTAL DATED JULY 12, 2016

(PROJECT #8216027)

Project Number:

Date:

Drawn By:

Sheet:

RE

VIS

ION

DA

TEN

O.

Designed By:

Checked By:

WILLO

WB

RO

OK

LA

KE

DA

M R

EP

AIR

S &

IM

PR

OV

EM

EN

TS

F.E.A.

210201

F.E.A.

JULY 2021

JLL

AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS ESCAMBIA COUNTY, FLORIDA ENGINEERING DEPARTMENT
AutoCAD SHX Text
3298 SUMMIT BOULEVARD, SUITE 32 PENSACOLA, FLORIDA 32503 PHONE: (850) 332-7912 CERTIFICATE OF AUTHORIZATION #26889
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
Page 9: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR
FAvera
Text Box
9
FAvera
Text Box
10
FAvera
Text Box
9
FAvera
Text Box
10
Page 10: INDEX OF ROADWAY PLANS WILLOWBROOK LAKE DAM REPAIR
FAvera
Text Box
10
FAvera
Text Box
10