india smart grid weekindiasmartgrid.org/event2017/09-03-2017/5. 2nd- sweden smart grid...sl-a 10 min...
TRANSCRIPT
INDIA Smart GRID WEEK
Puneet Harminder Singh
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 2
Metering as a servicemanagement model
Governance model› Three-level governance model:
– Level 1: Performance review
– Level 2: Business Development
– Level 3: Strategy
SLAs & reporting› KPIS/SLAs to be agreed between both parties,
including severity level, description, type & threshold
› Reports include:
– Quarterly Service Performance Report
(scorecard & quality indicators, KPI trends,
Procedure Manual Reviews, and proposals for
strategy changes)
– Monthly Service Performance Reports (status
report, forecast, Service Quality & SLA fulfilment,
complaints, etc.)
– Incident / Service Fault Reports
Operational model› Industrialized processes and
procedures
› Combination of local dedicated,
local/global dedicated/shared
resources
› Based on Ericsson Managed Services
Blueprint
Responsibility matrix› RASCI (Responsible, Accountable, Support,
Consult, Inform) matrix covering all service
domains (Service Management & Service
Operations) according to MSTOP framework:
– Delivery management (service
strategy)
– Planning & Engineering
– Deployment & Integration
– Service Operations
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 3
WE deliver dataas defined in Service level agreement (*SLA Example)
SLAGate 1
(95%)
Gate 2
(100%)Comment
SL-1 - 20 min Request for single updated meter reading
SL-2 4 hours 52 hours Prioritized meters
SL-3 6 hours 104 hours Large production site facility meters
SL-4 8 hours 104 hours Mid-sized production site facility meters
SL-5 10 hours 120 hours Household meters- High Consumption
SL-6 24 hours 120 hours Household meters- Standard Consumption
SL-A 10 min 120 hours Alarms and Events
Day 1 00.00
Each day, collection from meters begins
Day 1 24.0095% of meter data should be collected.
Measured on a monthly average
Day 2-5Troubleshooting
Remote and in field
Day 5 (120 hours) 24.00100% of Meter data should be sent to “Utility”
If no or old meter value, appropriate status code should be tagged.
- (Example: Power outage, comms. network down,...)
Gate 1
Gate 2
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 4
Utility Network
MetraNet for Utilitiesbilling on cloud
Spending / Balance
Alerts
MetraNet for Utilities
› Rate Plan Definition
› Customer Information
› Charging / Balance Management
› Customer Communication
MetraCare
&
MetraView
with NowCast Usage Patterns
Manual / Auto PayRate Plan Selection
Meter Control
Usage, Meter Parameters
Maximizing Customer Experience Increasing Business Innovation & Operational Efficiency
Meter
Data
Management
System
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 5
Data centric Security enable secure utility communication
Utility control
centre
Communication Network 101010101010101010101010101010101010101010101010101010101010101010
Ericsson
KSI Infrastructure
eNodeB
KSI GW
101010101010101010101010101010101010101010101010101010101010101010
Smart meter
2.
3.
4.
KSI signature & data
KSI client
Publication key
KSI signature & data
KSI GW
Ericsson Data Centric Security enables authenticity of crucial data
For power grid state estimation and voltage control applications
1.
KSI client
Smart meter computes hash
for a new smart meter data and
requests KSI signature.
The KSI signature is associated with
a smart meter reading
Meter data is delivered to utility
control centre through insecure
communication channel
Utility download publication key in
order to verify authenticity of smart
meter data
Utility verifies the authenticity
of collected smart meter reading using
the publication keys
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 6
LoRaWAN™ communication network
6*Source: LoRa Alliance
Controller
Class A: Smart Meters – Water &
Electric
Report status a few times per day
No planned actuation required
Extremely low energy
Class C: Smart
LightingConstantly listens for
network «ping» for low-
latency actuation
Class B: IrrigationTurn valves on or off
with a few minutes
latency
Extremely low energy
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 7
HV power line monitoring SolutionConnected energy Solution
ESCM/GUI
NOC
4G /Wifi
Battery
ESC
Temp sensor
Smoke sensor (Fire detection)
Wind, humidity, lux ThunderStrike sensor
Camera with motion detection
Typical challenges
– Remote locations;
– Severe weather conditions;
– No LV power availability;
– No available communication.
Android app
Tamperingsensors
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 8
Ericsson Hyper scale Datacenter System(HDS) 8000DRIVE HYPERSCALE WITH REDUCED TCO
Up to 55% Capex Savings
CPU
RAM
NIC
Disc
Disaggregated Hardware
› Increased utilization
› Component-level life-cycle
management
vPOD 1
vPOD 2
vPOD 3
Full Optical Interconnect
› Software-defined infrastructure
› Multi-VIM support on pooled H/W
› Enabling hyperscale
› Futureproof
UP TO 75% Opex Savings
Compared to traditional DC Hardware
HDS Command Center
› Seamless management and
integration of Ericsson and 3PP
infrastructure
› Advanced analytics, automation,
orchestration and asset mgmt.
Worlds first Disaggregated DC Solution, using Intel Rack Scale Architecture
Meeting with Kahramaa | Commercial in confidence | © Ericsson AB 2015 | October 2015 | Page 9