1 NOTES: upstream check dam. at the same elevation as the toe of the adjacent that the top of the downstream check dam is Riprap ditch check dams shall be spaced such INDIANA DEPARTMENT OF TRANSPORTATION STANDARD DRAWING NO. STATE OF No. A A D I N I N P R O F E S O I S N L A N E I G E N R E R G E I S T E R D E R I C H A R D L . V a n C L E A V E 9750 09/04/12 09/04/12 DATE CHIEF ENGINEER DATE SUPERVISOR, ROADWAY STANDARDS /s/ Mark A. Miller E 205-TECD-01 REVETMENT RIPRAP TEMPORARY CHECK DAM SEPTEMBER 2012 /s/ Richard L. Van Cleave 4" 3'-0" Revetment Riprap 6 " Compacted #5 or #8 Stone 1'-0" Min. Flow 2 : 1 2 : 1 3' Dam - 12' Min. 2' Dam - 8' Min. a t C e n t e r 2 ' - 0 "o r 3 ' - 0 " Geotextile Temporary Geotextile Temporary CHECK DAM MODIFIED Existing Ground 4" at center 2'-0" or 3'-0" 1 ' - 0 " 4 " 1 Revetment Riprap Revetment Riprap Temporary Geotextile Temporary Geotextile Min. 1'-0" 3 ' - 0 " 3 ' - 0 " 1 ' - 0 " 3 ' D a m - 12 ' M i n . 2 ' D a m - 8 ' M i n . 3 ' D a m - 12 ' M i n . 2 ' D a m - 8 ' M i n . Compacted #5 or #8 Stone Compacted #5 or #8 Stone 2 : 1 2 : 1 2 : 1 2 : 1 ELEVATION Min. 1'-0" FLOW A 3'-0" Min. Compacted #5 or #8 Stone Geotextile Apron Channel Bottom A Revetment Riprap PLAN Min. 1'-0" 1 b c 1 a Temporary Geotextile Temporary Geotextile 1 ' - 0 " SECTION A-A

Upload: vanmien

Post on 03-May-2019

223 views

Category:

Documents


0 download

TRANSCRIPT

1

NOTES:

upstream check dam.

at the same elevation as the toe of the adjacent

that the top of the downstream check dam is

Riprap ditch check dams shall be spaced such

INDIANA DEPARTMENT OF TRANSPORTATION

STANDARD DRAWING NO.

STATE OF

No.

AADIN I N

PR

OFE

S

OIS

N LANE

I

G

EN

RE

RGEISTER

DE

RIC

HA

RD L. VanCLE

AVE

9750

09/04/12

09/04/12

DATECHIEF ENGINEER

DATESUPERVISOR, ROADWAY STANDARDS

/s/ Mark A. Miller

E 205-TECD-01

REVETMENT RIPRAP

TEMPORARY CHECK DAM

SEPTEMBER 2012

/s/ Richard L. Van Cleave

4"3'-0"

Revetment Riprap

6"

Compacted #5 or #8 Stone

1'-0" Min.

Flow

2:1

2:1

3' Dam - 12' Min.2' Dam - 8' Min.

at

Center

2'-0" or 3'-0"

Geotextile

Temporary

Geotextile

Temporary

CHECK DAM MODIFIED

Existing Ground

4"

at center2'-0" or 3'-0"

1'-0"

4"

1

Revetment Riprap

Revetment Riprap

Temporary Geotextile

Temporary Geotextile

Min.1'-0"

3'-0"

3'-0"

1'-0"

3' Dam - 12'

Min.2' Dam - 8' M

in.

3' Dam - 12'

Min.2' Dam - 8' M

in.

Compacted #5 or #8 Stone

Compacted #5 or #8 Stone

2:1

2:1

2:1

2:1

ELEVATION

Min.1'-0"

FLOW

A

3'-0" Min.

Compacted #5 or #8 Stone

Geotextile Apron Channel Bottom

A

Revetment Riprap

PLAN

Min.1'-0"

1

b c

1

a

Temporary Geotextile

Temporary Geotextile

1'-0"

SECTION A-A

STATE OF

No.

AADIN I N

PR

OFE

S

OIS

N LANE

I

G

EN

RE

RGEISTER

DE

RIC

HA

RD L. VanCLE

AVE

9750

09/04/12

E-205-TECD-02

09/04/12

INDIANA DEPARTMENT OF TRANSPORTATION

STANDARD DRAWING NO.

/s/ Mark A. Miller

DATECHIEF ENGINEER

DATESUPERVISOR, ROADWAY STANDARDS

FOR CLEAR ZONE

TEMPORARY CHECK DAM, TRAVERSABLE

SEPTEMBER 2012

of the adjacent upstream check dam.

downstream check dam is at the same elevation as the toe

Ditch check dams shall be spaced such that the top of the 1.

NOTES:

/s/ Richard L. Van Cleave

Min.1'-6"

2" x 2" x 2'-6" Min.

Wood Stakes

Straw Bales

4" Typ.

STRAW BALE INSTALLATION

SIDE ELEVATION

Min.1'-2"

6'-0" Min.

Flow

the embedment

and no higher than

w/ face of strawbale

Geotextile flush

downstream

straw bales extended

Geotextile 6' x 9' under

Flow

8" Min.

2" x 2" x 2'-6" min.

Wood Stakes

Temporary Geotextile

Min.1'-3"

6'-0" Min.

ROLLED EROSION CONTROL PRODUCT OPTION

SIDE ELEVATION

4"

4"

prevent undercutting

compacted to

set on geotextile

#5 or #8 Stone wedge

Filter Socks, Fiber Rolls or Wattle Installation

Stacking Method:

Direction of flo

w

Spillway Low Point

Slope VariesSlope Varies

6'-0"

6'-0"

adjacent rows of bales.

Stagger joints between

soil conditions permit

Stakes driven flush where

4" Typ.

Temporary Geotextile

PLAN VIEW

TRAVERSABLE CHECK DAM

FRONT ELEVATION

TRAVERSABLE CHECK DAM

than spillway low point.

shall be equal to or higher

Bottom elevation of traversable dam

straw bales extended down stream

Temporary geotextile under

Fiber Rolls or Wattles

Straw Bales, Filter Socks,

A

A

Min.

1'-6"

Min.5'-0"

Matc

h Line

Min. Apron5'-0"

Max.

5'-0"

6" ±

Matc

h Line

ELEVATION VIEW

2'-0"

1

2

12'-0" Min.

to Stream

Stable Outlet

Riprap

Revetment

Slope

Weir

Revetment Riprap

Compacted #5 or #8 Stone

Slope

Flood Pool

Ditch Grade (%)

Flood Pool

Ditch Grade (%)

Temporary GeotextileTemporary Geotextile

1

R/W line

SECTION A-A

Spillw

ay H

eig

ht

Varies

Ditch

Temporary Geotextile

Width

Weir

Min.

2'-0"

3

Foreslo

pe Ma

x. 3:1

Min.

1'-6"

Min.

6"temporary seeding

with permanent or

Stable embankmentsettlement

overfilled 6" for

sediment trap,

Temp. berm for

Max.

Backslope 2:1

temporary seeding

with permanent or

Stable embankmentRevetment Riprap

temporary seed

with permanent or

Stable embankment

E 205-TECD-03

09/16/16DETAILS PLACED IN THIS FORMAT

INDIANA DEPARTMENT OF TRANSPORTATION

STANDARD DRAWING NO.

DATECHIEF ENGINEER

DATEDESIGN STANDARDS ENGINEER

Weir width equals ditch bottom width, min. 2ft.3

count toward trap capacity of 2-year 24-hour storm event.

elevation of sediment trap riprap. However, over-excavation does not

sediment trap capacity. It shall not be excavated to below the bottom

This area may be excavated below planed ditch grade to achieve 2

direction of traffic while the far side slope may be 2:1 maximum.

Slope should be 3:1 maximum on the near side with respect to the 1

NOTES:

TEMPORARY SEDIMENT TRAP

SEPTEMBER 2012

IR

C

R

AH

ESIE

TD

RED

AEL

V

9750

E

C.L naV

G

RP

N

O

S

EF

I A

No.

STATE OF

ANI D

O

E

G

IN

R

ER

ENSI N

AL

/s/ Richard L. Van Cleave 09/04/12

/s/ Mark A. Miller 09/04/12