Indigenisation of Russian Make Waste Heat Boilers System
Our Experience
1. Salim G Purushothaman, AGM, Vizag Steel
2. B. Ravishankar, Manager, Vizag Steel
3. Jeevan Kumar, Assistant Manager, Vizag Steel
![Page 3: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/3.jpg)
3
Waste Heat
Heat Evolved from Dry Quenching of Metallurgical Coke Produced In House
Quenching Medium – Circulating Nitrogen
Before Recovery - 800 Deg C
After Recovery - 160 Deg C
9 x 80,000 N Cu M/Hr
TOTAL Net HEAT AVAILABILITY = 124 G Cal/Hr
![Page 4: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/4.jpg)
4
Metallurgical Coke
Required for Smelting Iron Ore in Blast Furnace
Each Ton of Hot Metal Produced needs Half Ton Coke
We make Aprox 8500 Tons a Day
![Page 5: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/5.jpg)
5
COKE MAKING
Destructive Distillation of Low Ash Coal
- Heating Coal in the absence of Air to 1100 Deg C
Thus expelling all volatiles
To obtain Porous Carbon Concentrate, COKE
Made in Coke Ovens
![Page 6: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/6.jpg)
6
Coke Ovens
Coal Charged
Part of A Battery – Coke Ovens
Coking Time /Oven - 16 Hours
1 Battery – 67 Ovens
Batteries - 4
Rated Production– 100Pushings/Day/Battery
1 Oven – 32 Ton Coal to 25 Tons Coke
![Page 7: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/7.jpg)
7
Our Coke Oven Battery
Total Such Batteries in VSP – 4 Numbers
![Page 8: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/8.jpg)
8
Coke Produced
Collected In Buckets, 1 Pushout = 25Tons Coke
Temperature = 1000 to 1100 Deg C
Nature - Incandescent
![Page 9: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/9.jpg)
9
Need to Quench Coke
Coke to be Shipped to Blast Furnace
Shipment through Conveyors
Temperatures above 180Degrees Burns Conveyor
For Safety of Conveyor and Handling
Coke to be Quenched to 160 Deg C
Implication:
350 M Cal Heat /Ton Coke to be Removed
![Page 10: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/10.jpg)
10
Types of Quenching
Cooling Water
Coke Car
1.WET Quenching
All Heat – Lost
Pollution - Severe
![Page 11: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/11.jpg)
11
Types of Quenching
2. DRY Quenching
All Heat –Recovered
Pollution- Eliminated
![Page 12: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/12.jpg)
12
DRY vs WET (Quenching)
![Page 13: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/13.jpg)
13
CDCP Blocks of VSP
![Page 14: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/14.jpg)
14
RUSSIAN BOILERS OF CDCP
• Commissioned in 1986-87
• Make: Belgorod Power , Russia (Erstwhile USSR)
• Model : KCTK 39/440
• Type : Drum, Forced Circulation
• Rating : 39 Bar, 440 Deg C , 25.5 TPH MCR
• Gas Flow Rate : 80 000 N CuM/Hr
• Hot Gas Inlet : 800 Deg C
• Cooled Gas Outlet : 160 Deg C
• Construction : Twin Shaft , Refractory walled , Counter Flow Eco, & Evap
![Page 15: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/15.jpg)
15
RUSSIAN BOILERS OF CDCP
![Page 16: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/16.jpg)
16
SIDE VIEW
To Drum
From
Circulation Pump
Output
SH
Steam,
39 Bar
![Page 17: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/17.jpg)
17
RUSSIAN BOILERS OF CDCP
![Page 18: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/18.jpg)
18
Problems Faced • Heavy Erosion – at Riser Tubes
-- at Evaporator side Bends
• Bi Metallic Corrosion – Bracket Area of Evap Top Bundle
• 2 Days Cooling Time for shutdown inspections
• No access to inspect Sides of Bundles
• Frequent damages to Refractory lining due to cyclic stresses, causing forced outages
![Page 19: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/19.jpg)
19
Problems Faced • Heavy Erosion – at Riser Tubes
-- at Evaporator side Bends
• Bi Metallic Corrosion – Bracket Area of Evap Top Bundle
• 2 Days Cooling Time for shutdown inspections
• No access to inspect Sides of Bundles
• Frequent damages to Refractory lining due to cyclic stresses, causing forced outages
![Page 20: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/20.jpg)
20
Gas Erosion • Evaporator Cross Section = 3.8 x 3.66 = 13.9 sqM
• Projected Area of Tubes =
100 Nos x 28mm x 3.6 M long = 10.1 sq M
NET FLOW AREA = 3.8 sq M
Gas Flow Rate = 80,000 NCuM/Hr
Gas Velocity = 80000/3.8/3600 = 5.85 m/Sec Dust Loading = 5-10 gm/N CuM of Gas
![Page 21: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/21.jpg)
21
RISER TUBES
![Page 22: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/22.jpg)
22
SIDE BENDS
SIDE WALL
![Page 23: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/23.jpg)
23
Erosion – of Evaporator side Bends
![Page 24: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/24.jpg)
24
Improvement Plan
• Immediate:
1. Baffled the Bends to protect them
2. Shielded the Riser tubes by providing Armour plate upstream
• Long Term:
1. Monitor Tube Thinning & Schedule for Phased Replacement
2. Indigenisation of tubes with Erosion Resistant Indian Makes
• Futuristic:
Future Boilers for Plant Expansion to have lesser gas
Velocity.
![Page 25: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/25.jpg)
25
SIDE BENDS
SIDE WALL
Side Baffles
![Page 26: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/26.jpg)
26
Trigger For Tube Replacement
• Annual Tube Thickness Survey with D Meter
• Monitoring of Thinning Trend with recorded D Meter Readings
• Forecasting Thinning Rate and Procurement of Spare Tubes
• Determined value of Residual thickness to replace Tubes as
- 1.9 to 2.0 mm for Straight Part
- 1.8 mm at Bends ( Based on IBR Regn 338)
Tubes = OD 28 mm , Seamless Original Thickness = 3mm Nominal with +0 , -10% Tolerance (GOST) Calculated Thickness for Working Pr of 47 Bar as per GOST = 0.64 mm Calculated Thickness for Working Pr of 47 Bar as per IBR = 1.31mm, But Required Minimum Thickness for Coil Tubes, For Forced Circulation and Tube OD < 29 mm = 1.62 mm (IBR Reg 338, b)
![Page 27: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/27.jpg)
27
Towards Indigenisation
• Evaporator Top Coils – 15 XM (GOST)
• Evaporator Other Coils – Steel 20 (GOST)
•Evaporator Service Conditions:
Water Temp – 270 Deg Max,
Pressure 47 Bar Max (Excess Condition)
MCR: Inlet 46 Bar, Outlet 43 Bar
Outside Temp – 800 Deg Max
Material Testing Done in our own Laboratory – QATD Dept of VSP
•Hardness
Brinnell Hardness value Varied
from 130 to 135 sample to
sample
ie Rockwell B (HRB) 72 to 75
![Page 28: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/28.jpg)
28
Material Selection
• Involved Plant Design Dept , & QATD Dept of VSP
• Consulted Dy Chief Inspector of Boilers , Visakhapatnam
• Furnished Sample tubes to BHEL
• Advice of Design Engineers from BHEL
Objectives # Medium Carbon Steel for Evaporator service ; C = 0.2 to 0.25 % range # Hardness to be around 80 HRB to be more resistant to Erosion # At the same time % Elongation to be minimum 27% - Bends to be safe in repeated Thermal Cycling (Bend R = 2D) # Economy
![Page 29: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/29.jpg)
29
Material Selection
• SA 192
SA 210 Gr A1
SA 210 Gr C
SA 213 T11
Selected SA 210 Gr A1- CDS
• Hardness > 75 HRB; CDS will have more due
to work hardening.
• % Elongation = 30% Better Flexibility for Bends
• Thickness : Always > 3mm (as Tol = +20%, - 0%)
• Easy Availability, Weldability
Considered
Plant Design Dept of VSP Developed Tender Drawings accordingly
for Procurement of Spares from Indian Market
![Page 30: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/30.jpg)
30
Bundle Replacement
• Thickness Reduction found reaching Threshold in
Two Boilers during Annual Thickness Survey
(Residual thickness, 2.2 mm against Normal 3 mm)
• Procurement Action Initiated . Planned to Replace next Year
Year : 2000
![Page 31: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/31.jpg)
31
Bundle Replacement
• Residual Thickness varied from 1.9 to 2.1- Time to Replace!
• Dy Chief Inspector of Boilers advised Evaporator Bundle Replacement
• Replacement Program was approved by DOB , Hyderabad
• First Indegeneous Coil Bundle Erected in one of the Boilers in 2001
Erosion Rate Drastically Reduced in that Boiler Ever since
Thereafter All Russian Boilers underwent Indigenisation of Coils
Including Economiser Coils
Over a 10 Year Period
Year : 2001
![Page 32: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/32.jpg)
32
New CDCP Boiler Installation
• 2002-03 Planning for Capacity Expansion involving new Coke Oven Battery
• Plan Entailed 4 More CDCP Boilers with similar Capacity
• Desired to have Design Gas Velocity as minimum as possible
• Thermax Pune Introduced the idea of Single Shaft CDCP Boilers – As Working in Vental Steel Plant,Russia - Designed by a Finnish
Corporation Rautaruukki
– Thermax offering such CDCP Boilers to Neelanchal Ispat, Orissa
![Page 33: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/33.jpg)
33
Rautaruukki Design • Retains the Elevation of Gas Entry Axis; Overall
Height increased • Water Wall with Natural Circulation and Evaporators
with Forced Circulation. • Overall Foot Print within Russian CDCP Boiler’s • Bigger Tubes • Bigger Pitches –Longitudinal & Transverse • Cross Section Area gets doubled almost but Projected
area of Coils is reduced by reduction in tubings ( HSA requirement curtailed by Water Wall).
• Marginal increase only in Overall HSA
CIRCULATING GAS VELOCITY REDUCTION OF 30 %
![Page 34: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/34.jpg)
34
New CDCP Boiler Installation • Thermax designed Single Shaft CDCP Boiler for NINL
• We inspected Thermax Boilers at NINL : During their Erection & Commissioning (Consultant MECON)
• Their Operation was found satisfactory
• Decided to Opt for Single Shaft Boilers; Made Specs accordingly , under Consultancy of MECON, & Tendered out.
• Thermal Systems, Hyderabad Bagged the Order (L-1) for Design ,Supply & Erection of Single Shaft CDCP Boilers.
![Page 35: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/35.jpg)
35
Thermal Systems Boiler
![Page 36: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/36.jpg)
36
Thermal Systems Boiler Cross Section Area = 5.2 M x 4.8 M = 24.96 sq M
Total Projected area for Coils and Hanger Tubes
(46 Tubes x 44.5mm x 5.2 M) + 15% =12.25 sq M
Net Flow Area = 24.96 – 12.25 = 12.71 sq M
Max Gas Velocity at MCR = 80000/12.71/3600
=1.75 m/Sec
Reduction in Velocity = (5.85-1.75)/5.85
=70.1% Reduction
4 Such Boilers in service since 2008 No Erosion Mark Reported yet
![Page 37: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/37.jpg)
37
![Page 38: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/38.jpg)
38
Problems Faced • Heavy Erosion – at Riser Tubes
-- at Evaporator side Bends
• Bi Metallic Corrosion – Bracket Area of Evap Top Bundle
• 2 Days Cooling Time for shutdown inspections
• No access to inspect Sides of Bundles
• Frequent damages to Refractory lining due to cyclic stresses, causing forced outages
![Page 39: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/39.jpg)
39
Bi Metallic Corrosion
BRACKETS
![Page 40: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/40.jpg)
40
Bi Metallic Corrosion
Tube Material - Alloy Steel ( 15 XM) 1.5 Cr, 0.44 Mo
Clamp Material - Micro Alloy Steel
High apart in Electro chemical Series
During Service Period Coke Dust gets filled between pipe and clamp
During off Service period Coke Dust absorbs Moisture and turns
conductive
Electrolytic Corrosion starts, Anodising the Tube. Pittings formed
![Page 41: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/41.jpg)
41
Improvement Plan
• Immediate:
1. Stopped Water Washing
2. Placement of Silica Gel Bags inside Shaft during down period
• Long Term:
Specified Safe material for Clamp while ordering for indigeneous tubes
• Futuristic:
Future Boilers for Plant Expansion to have this angle considered during design phase .(Included in Specification)
![Page 42: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/42.jpg)
42
Problems Faced • Heavy Erosion – at Riser Tubes
-- at Evaporator side Bends
• Bi Metallic Corrosion – Bracket Area of Evap Top Bundle
• 2 Days Cooling Time for shutdown inspections
• No access to inspect Sides of Bundles
• Frequent damages to Refractory lining due to cyclic stresses, causing forced outages
Reason: Thick Refractory Walls
![Page 43: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/43.jpg)
43
Refractory Walls
HEAT
Wall thickness = 410 mm
![Page 44: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/44.jpg)
44
Improvement Plan
• Frequent Damages: 1. Refractory Engg Dept of VSP selected better materials to resist Cyclical Changes 2. Improved Re inforcement with steel wire nets • Long Term: Planned Replacement of Refractory Lining in all Boilers
undergoing • Futuristic: Future Boilers for Plant Expansion not to have Refractory Walls
, but to have water walls instead
![Page 45: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/45.jpg)
45
Results of Indigenisation
• Russian Boilers: 1. Mitigating the Erosion Problem with Indigeneous Coils 2. Eliminated Bi Metallic Corrosion Altogether 3. Eliminated Refractory Damage related Outages 4. Sustained the OEM Norms of Output and Efficiency • Expansion Boilers: 1. Indigenised Sourcing. 2. Proven Freedom from all problems faced in Russian Boilers 3. Improved Energy Efficiency : 5 TPH extra steam production per Boiler with same Heat Input Rate 4. Improved Service Life ; Reliablitiy, Availability
![Page 46: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/46.jpg)
46
Our Enablers
Directors of Boilers, AP
Dy Chief Inspectors of Boilers, Visakhapatnam # Technical Guidance # Timely Advises # Boundless Co-Operation
We are indeed indebted to them………………………
![Page 47: Indigenization of Russian Make WHR by Vizag Steel](https://reader034.vdocuments.net/reader034/viewer/2022051318/5a65b1677f8b9af2638b49f1/html5/thumbnails/47.jpg)
47
1. Salim G Purushothaman AGM, Thermal Power Plant 2. B Ravishankar
Manager, Thermal Power Plant 3. Jeevan Kumar
Asst. Manager, Thermal Power Plant