indonesia hydro consult 2 about our services indonesia hydro consult® is one of the fastest growing...
TRANSCRIPT
Company
Profiles
H y d r o E n g i n e e r i n g C o n s u l t i n g
INDONESIA HYDRO CONSULT®
Consulting
Services
Site identification and
reconnaissance studies
Preliminary site
assessments
Feasibility studies
Basic and detailed designs
Site surveys and
investigations
Construction assistances
Project management
Construction management
Due diligences
Project proposal
evaluations
Bankability assessments
Page 2
About Our Services
INDONESIA HYDRO CONSULT® is one of the fastest growing hydro engineering consulting service companies in
Indonesia. We are leading providers of hydro project solutions. We provide high quality on-site and remote consulting
services for growing hydro developers nationwide and give them a significant development benefit. Our objective is to
enhance the success of our clients by providing solutions for projects and cost-effective consulting services for their
business needs.
INDONESIA HYDRO CONSULT® has expertise in the field of hydro engineering nationwide. The experience gained from
site reconnaissance, planning and studies, design and design reviews, and construction assistances have made us capable to
offer comprehensive consultancy services. Our benefits from the previous projects enable us to offer improvement at every
step of the project. Our experience and resources enable innovative development to assemble project teams quickly, based on
the technical requirements of each project.
Scope of Services
INDONESIA HYDRO CONSULT® provides consulting service at every step of hydro development projects.
Site identification and reconnaissance studies - Site identification of potential sites and reconnaissance studies of cost-
effectiveness of sites.
Preliminary site assessments - Preliminary assessments of sites to estimate the site potential, preliminary estimate of
project cost and preliminary feasibility of project sites.
Feasibility studies - Feasibility assessments of project sites including hydrological data analysis, site surveys and
investigations, project layout and basic design, project cost estimates and project financial feasibility.
Basic and detailed designs - Basic and detailed design of project sites including preparation of engineering calculations
and analysis, basic and detailed drawings, bill of quantities, project cost estimates, technical specifications and bid
documents.
Site surveys and investigations - Site surveys and investigations to support project preparations including topographic
surveys, geological and geotechnical investigations, construction material surveys and hydrological observations.
Construction assistances - Engineering assistances to support procurement and construction activities of projects.
Project management - Management of projects including initiation, planning and design, execution and construction,
monitoring and controlling systems, and completion of projects.
Construction management - Management in construction works to optimize use of available funds, control the scope of
the work, control the project schedule, optimize use of design and construction firms' skills and talents, avoid delays,
changes and disputes, enhance project design and construction quality, optimize flexibility in contracting and
procurement., manage project cash flow.
Page 3
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Adipasir Satu
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banjarnegara, Central
Java, Indonesia
Net head: 5.45 m
Design discharge: 7.69 m3/s
Installed capacity: 340 kW
Turbine type: Vertical axis Kaplan
C o o p er at ed F i r m s
Project owner: PT Daya Tirta
Banjarnegara
Associated
consultant: PT Naluritama
Engineering &
Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Adipasir Dua
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banjarnegara, Central
Java, Indonesia
Net head: 5.45 m
Design discharge: 7.69 m3/s
Installed capacity: 340 kW
Turbine type: Vertical axis Kaplan
C o o p er at ed F i r m s
Project owner: PT Daya Tirta
Banjarnegara
Associated
consultant: PT Naluritama
Engineering &
Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Adipasir Tiga
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banjarnegara, Central
Java, Indonesia
Net head: 6.00 m
Design discharge: 6.40 m3/s
Installed capacity: 320 kW
Turbine type: Vertical axis Kaplan
C o o p er at ed F i r m s
Project owner: PT Daya Tirta
Banjarnegara
Associated
consultant: PT Naluritama
Engineering &
Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2010
Page 4
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Kincang
Hydropower Pro ject
P r o j ect F eat ur es
Location: Banjarnegara, Central
Java, Indonesia
Net head: 5.00 m
Design discharge: 8.29 m3/s
Installed capacity: 320 kW
Turbine type: Vertical axis Kaplan
C o o p er at ed F i r m s
Project owner: PT Naluri Energi Utama
Associated
consultant: PT Satyakarsa Mudatama
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2010
Singgi
Hydropower Pro ject
P r o j ect F eat ur es
Location: Banjarnegara, Central
Java, Indonesia
Net head: 8.25 m
Design discharge: 3.25 m3/s
Installed capacity: 220 kW
Turbine type: Vertical axis Kaplan
Penstock length: 14.2 m
C o o p er at ed F i r m s
Project owner: PT Naluri Energi Utama
Associated
consultant: PT Satyakarsa Mudatama
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2010
Sunyalangu
Hydropower Pro ject
P r o j ect F eat ur es
Location: Banyumas, Central Java,
Indonesia
River: Logawa
Net head: 59.65 m
Design discharge: 1.60 m3/s
Installed capacity: 2 × 760 kW
Turbine type: Horizontal axis Francis
Headrace channel: 464.2 m
Penstock length: 188.2 m
C o o p er at ed F i r m s
Project owner: PT Naluri Energi Utama
Associated
consultant: PT Satyakarsa Mudatama
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2010
Weir Headpond Powerhouse
Page 5
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Baseh
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banyumas, Central Java,
Indonesia
River: Logawa
Net head: 67.24 m
Design discharge: 3.44 m3/s
Installed capacity: 2 × 930 kW
Turbine type: Horizontal axis Francis
Headrace channel: 1023.3 m
Penstock length: 528.9 m
C o o p er at ed F i r m s
Project owner: PT Rumeksa Power
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Babakan
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banyumas, Central Java,
Indonesia
River: Logawa
Net head: 47.8 m
Design discharge: 3.50 m3/s
Installed capacity: 2 × 670 kW
Turbine type: Horizontal axis Francis
Headrace channel: 732.4 m
Penstock length: 275.1 m
C o o p er at ed F i r m s
Project owner: PT Rumeksa Power
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Banja ran
Hydropower Pro ject
P r o j ect F eat u r es
Location: Banyumas, Central Java,
Indonesia
River: Banjaran
Net head: 68.25 m
Design discharge: 4.00 m3/s
Installed capacity: 2 × 1100 kW
Turbine type: Horizontal axis Francis
Headrace channel: 1655.2 m
Penstock length: 151.9 m
C o o p er at ed F i r m s
Project owner: PT Rumeksa Power
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Weir Headpond Powerhouse Weir Headpond Powerhouse Weir Headpond Powerhouse
Page 6
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Ambal
Hydropower Pro ject
P r o j ect F eat ur es
Location: Banjarnegara, Central
Java, Indonesia
River: Urang
Net head: 79.50 m
Design discharge: 3.27 m3/s
Installed capacity: 2 × 1050 kW
Turbine type: Horizontal axis Francis
Headrace channel: 1259.9 m
Penstock length: 473.4 m
C o o p er at ed F i r m s
Project owner: PT Nureco Tirta
Banjarnegara
Associated PT Naluritama Engineering
consultant: & Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Sambirata
Hydropower Pro ject
P r o j ect F eat ur es
Location: Banyumas, Central Java,
Indonesia
River: Prukut
Net head: 137.56 m
Design discharge: 1.35 m3/s
Installed capacity: 2 × 750 kW
Turbine type: Horizontal axis Pelton
Headrace channel: 1158.3 m
Penstock length: 605.8 m
C o o p er at ed F i r m s
Project owner: PT Rumangsa Energi
Banyumas Utama
Associated PT Naluritama Engineering
consultant: & Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Cicatih
Hydropower Pro ject
P r o j ect F eat ur es
Location: Sukabumi, West Java,
Indonesia
River: Cicatih
Net head: 25.55 m
Design discharge: 30.00 m3/s
Installed capacity: 2 × 3200 kW
Turbine type: Vertical axis Kaplan
Headrace channel: 2306.7 m
Penstock length: 44.9 m
C o o p er at ed F i r m s
Project owner: PT Bias Petrasia Persada
Associated
consultant: PT Naluritama Engineering
& Construction
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2011
Intake Generating Area Weir Headpond Powerhouse Weir Headpond Powerhouse
Page 7
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Lae Ordi 2
Hydropower Pro ject
P r o j ect F eat u r es
Location: Pakpak Barat, North
Sumatera, Indonesia
River: Lae Ordi
Net head: 100.02 m
Design discharge: 9.50 m3/s
Installed capacity: 2 × 3800 kW
Turbine type: Horizontal axis Francis
Headrace channel: 3266.9 m
Penstock length: 561.6 m
C o o p er at ed F i r m s
Project owner: PT Bakara Bumi Energi
Associated
consultant: PT Wiratman & Associates
Ser v i ces
Scope of services: Basic design, detailed
design
Year: 2010
Tornauli
Hydropower Pro ject
P r o j ect F eat u r es
Location: Humbang Hasundutan,
North Sumatera, Indonesia
River: Simonggo
Net head: 85.21 m
Design discharge: 11.50 m3/s
Installed capacity: 2 × 4000 kW
Turbine type: Horizontal axis Francis
Headrace channel: 2522.2 m
Penstock length: 727.7 m
C o o p er at ed F i r m s
Project owner: PT Northsum Hydro
Ser v i ces
Scope of services: Feasibility study, basic
design
Year: 2010 - 2011
nambadia
Hydropower Pro ject
P r el i m i n ar y P r o j ect F eat u r es
Location: Humbang Hasundutan,
North Sumatera, Indonesia
River: Simonggo
Net head: 66.36 m
Design discharge: 18.60 m3/s
Installed capacity: 2 × 4950 kW
Turbine type: Horizontal axis Francis
Headrace channel: 1862.8 m
Penstock length: 251.1 m
C o o p er at ed F i r m s
Project owner: PT Northsum Hydro
Ser v i ces
Scope of services: Feasibility study, basic
design
Year: 2010 - 2011
Weir Headpond Powerhouse Weir Penstock and Powerhouse Weir Headpond Powerhouse
Page 8
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Parduaan
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Humbang Hasundutan,
North Sumatera, Indonesia
River: Simonggo
Net head: 123.40 m
Design discharge: 10.00 m3/s
Installed capacity: 2 × 5000 kW
Headrace channel: 2550 m
Penstock length: 520 m
C o o p er at ed F i r m s
Project owner: PT Northsum Hydro
Ser v i ces
Scope of services: Feasibility study
Year: 2010
Pusuk
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Humbang Hasundutan,
North Sumatera, Indonesia
River: Sisira
Net head: 180 m
Design discharge: 4.63 m3/s
Installed capacity: 2 × 3110 kW
Headrace channel: 1200 m
Penstock length: 591 m
C o o p er at ed F i r m s
Project owner: PT Northsum Hydro
Ser v i ces
Scope of services: Feasibility study
Year: 2010
Air Meo
Hydropower Pro ject
P r o j ect F eat ur es
Location: Muaraenim, South
Sumatera, Indonesia
River: Air Meo
Net head: 25.95 m
Design discharge: 13.00 m3/s
Installed capacity: 2 × 1450 kW
Turbine type: Horizontal axis Kaplan
Headrace channel: 579.2 m
Penstock length: 506.1 m
C o o p er at ed F i r m s
Project owner: PT Ulu Enerindo Jaya
Associated
consultant: PT Naluritama Engineering
& Construction
Ser v i ces
Scope of services: Feasibility study, basic
design
Year: 2011
Weir Headpond Powerhouse
Page 9
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Palumbungan
Hydropower Pro ject
P r o j ect F eat u r es
Location: Purbalingga, Central Java,
Indonesia
River: Klawing
Net head: 42.5 m
Design discharge: 5.00 m3/s
Installed capacity: 1 × 1660 kW
Turbine type: Crossflow
Headrace channel: 142.5 m
Penstock length: 867.9 m
C o o p er at ed F i r m s
Project owner: PT Purbalingga Energi
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2009 - present
Panyairan
Hydropower Pro ject
P r o j ect F eat u r es
Location: Garut, West Java, Indonesia
River: Cibatarua
Net head: 180.7 m
Design discharge: 5.6 m3/s
Installed capacity: 8.23 MW
Headrace channel: 1404.9 m
Penstock length: 302.1 m
C o o p er at ed F i r m s
Project owner: PT Tirta Energindo
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design,
construction assistance
Year: 2012
Weir Headpond Powerhouse Weir Headpond Powerhouse
8 Hydropower Projects
in West Ja va and BAnten
P r el i m i n ar y P r o j ect F eat u r es
Projects, locations: Cibalapulang 1, Curug
Citambur (Cianjur),
Cileteuh, Cisereuh
(Sukabumi), Curug
Malela (West Bandung),
Cibareno, Cisiih Leutik,
Cisimeut (Lebak)
C o o p er at ed F i r m s
Project owner: PT Medco Power
Indonesia
Associated
consultant: PT Naluritama Engineering
& Construction
Ser v i ces
Scope of services: Feasibility study review
Year: 2011
Page 10
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Malabar
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Bandung, West Java,
Indonesia
River: Cilaki
Net head: 108.8 m
Design discharge: 0.9 m3/s
Installed capacity: 800 kW
Headrace tunnel: 1530 m
Penstock length: 260 m
C o o p er at ed F i r m s
Project owner: PT Trimulia Makmur
Sejati
Associated
consultant: PT Naluritama Engineering
& Construction
Ser v i ces
Scope of services: Pre-feasibility study
Year: 2012
CibalapuLang 1
Hydropower Pro ject
P r o j ect F eat ur es
Location: Cianjur, West Java,
Indonesia
River: Cibalapulang
Net head: 89.0 m
Design discharge: 12.95 m3/s
Installed capacity: 3 × 3.385 MW
Turbine type: Horizontal axis Francis
Headrace channel: 903 m
Penstock length: 340 m
C o o p er at ed F i r m s
Project owner: PT Bio Jatropha
Indonesia
Funder: PT Bank Mandiri, Tbk
Ser v i ces
Scope of services: Feasibility study, basic
design and construction
preparation review
Year: 2012
Muaralangkap
Hydropower Pro ject
P r o j ect F eat ur es
Location: North Bengkulu,
Bengkulu, Indonesia
River: Air Belimbing
Net head: 24.3 m
Design discharge: 7.4 m3/s
Installed capacity: 1.52 MW
Turbine type: Francis
Headrace channel: 2300 m
Penstock length: 46 m
C o o p er at ed F i r m s
Project owner: PT Mukes Energy
Associated
consultant: PT Naluritama Engineering
& Construction
Ser v i ces
Scope of services: Feasibility study and
detailed design
Year: 2012
Page 11
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Kerpap
Hydropower Pro ject
P r o j ect F eat u r es
Location: Central Aceh, Aceh,
Indonesia
River: Kerpap
Net head: 56.5 m
Design discharge: 4.7 m3/s
Installed capacity: 2.25 kW
Turbine type: Horizontal Francis
Headrace channel: 142 m
Penstock length: 321 m
Tailrace channel: 157 m
C o o p er at ed F i r m s
Project owner: PT Kamigayo Kerpap
Energi
Ser v i ces
Scope of services: Feasibility study, basic
design, detailed design
Year: 2012
Silinda
Hydropower Pro ject
P r el i m i n ar y P r o j ect F eat u r es
Location: Serdangbedagai, North
Sumatera, Indonesia
River: Buaya
Net head: 39.9 m
Design discharge: 11.0 m3/s
Installed capacity: 3.6 MW
Headrace channel: 1787 m
Penstock length: 149 m
C o o p er at ed F i r m s
Task owner: PT Medco Power
Indonesia
Ser v i ces
Scope of services: Due diligence
Year: 2012
Weir Headpond Powerhouse
Ketol
Hydropower Pro ject
P r o j ect F eat u r es
Location: Central Aceh, Aceh,
Indonesia
River: Peusangan
Net head: 84.0 m
Design discharge: 14.3 m3/s
Installed capacity: 10 MW
Turbine type: Horizontal Francis
Headrace channel: 5290 m
Penstock length: 490 m
C o o p er at ed F i r m s
Project owner: PT Pacific Artha
Nusantara
Associated
Consultant: PT AECOM Indonesia
Ser v i ces
Scope of services: Feasibility study review
Year: 2012
Page 12
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Pusaka 1
Hydropower Pro ject
P r o j ect F eat ur es
Location: Cianjur, West Java,
Indonesia
River: Cibuni
Net head: 150.4 m
Design discharge: 7.9 m3/s
Installed capacity: 2 × 5 MW
Turbine type: Vertical axis Francis
Headrace channel: 3880 m
Penstock length: 316 m
C o o p er at ed F i r m s
Task owner: PT Medco Power
Indonesia
Ser v i ces
Scope of services: Due diligence
Year: 2012
Pusaka 3
Hydropower Pro ject
P r o j ect F eat ur es
Location: Cianjur, West Java,
Indonesia
River: Cibuni
Net head: 49.5 m
Design discharge: 7.5 m3/s
Installed capacity: 2 × 1.6 MW
Turbine type: Horizontal axis Francis
Headrace channel: 740 m
Penstock length: 260 m
C o o p er at ed F i r m s
Task owner: PT Medco Power
Indonesia
Ser v i ces
Scope of services: Due diligence
Year: 2012
Dominanga
Hydropower Pro ject
P r o j ect F eat ur es
Location: Bolaang Mongondow,
North Sulawesi,
Indonesia
River: Dominanga
Net head: 90.8 m
Design discharge: 1.8 m3/s
Installed capacity: 1.3 MW
Turbine type: Horizontal axis Francis
Headrace channel: 1748 m
Penstock length: 405 m
C o o p er at ed F i r m s
Project owner: PT Sulawesi Hydro
Energy
Associated
consultant: PT AECOM Indonesia
Ser v i ces
Scope of services: Feasibility study review
Year: 2012
Page 13
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Datara
Hydropower Pro ject
P r o j ect F eat u r es
Location: Gowa, South Sulawesi,
Indonesia
River: Karaloe
Net head: 100.1 m
Design discharge: 10.5 m3/s
Installed capacity: 9 MW
Turbine type: Horizontal axis Francis
Headrace channel: 3528 m
Penstock length: 251 m
C o o p er at ed F i r m s
Project owner: PT Prisma Karun Energy
Associated
consultant: PT AECOM Indonesia
Ser v i ces
Scope of services: Feasibility study review
Year: 2012
Rongkong
Hydropower Pro ject
P r o j ect F eat u r es
Location: North Luwu, South
Sulawesi, Indonesia
River: Rongkong
Net head: 85.2 m
Design discharge: 13.2 m3/s
Installed capacity: 2 × 4.8 MW
Turbine type: Horizontal axis Francis
Headrace channel: 5810 m
Penstock length: 203 m
C o o p er at ed F i r m s
Task owner: PT Sangsaka Hidro
Kasmar
Associated
Consultant: PT Brantas Energi
Ser v i ces
Scope of services: Feasibility study review,
detailed design
Year: 2013
Baliase
Hydropower Pro ject
P r o j ect F eat u r es
Location: North Luwu, South
Sulawesi, Indonesia
River: Baliase
Net head: 90.5 m
Design discharge: 14.2 m3/s
Installed capacity: 2 × 5 MW
Turbine type: Horizontal axis Francis
Headrace channel: 3600 m
Penstock length: 100 m
C o o p er at ed F i r m s
Project owner: PT Sangsaka Hidro
Kasmar
Associated
consultant: PT Brantas Energi
Ser v i ces
Scope of services: Feasibility study review,
detailed design
Year: 2013
Page 14
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Bayangnyalo
Hydropower Pro ject
P r o j ect F eat ur es
Location: Pesisir Selatan, West
Sumatera, Indonesia
River: Bayangnyalo
Net head: 115.7 m
Design discharge: 7.3 m3/s
Installed capacity: 2 × 3.63 MW
Turbine type: Horizontal axis Francis
Headrace channel: 1765 m
Penstock length: 141 m
C o o p er at ed F i r m s
Project owner: PT Bayang Nyalo Hidro
Ser v i ces
Scope of services: Feasibility study, detailed
design
Year: 2013
Lhoksandeng 3
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Pidie Jaya, Aceh
Indonesia
River: Meureudu
Net head: 65.4 m
Design discharge: 9.4 m3/s
Installed capacity: 2 × 2.7 MW
Turbine type: Horizontal axis Francis
Headrace channel: 2140 m
Penstock length: 205 m
C o o p er at ed F i r m s
Task owner: PT Bumiku Hijau Sinergi
Ser v i ces
Scope of services: Pre feasibility study
Year: 2013
Palasa
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Parigi Moutong, Central
Sulawesi, Indonesia
River: Palasa
Net head: 45.6 m
Design discharge: 11.6 m3/s
Installed capacity: 2 × 2.25 MW
Turbine type: Horizontal axis Francis
Headrace channel: 2410 m
Penstock length: 207 m
C o o p er at ed F i r m s
Project owner: PT Potensia Tomini
Energi
Ser v i ces
Scope of services: Feasibility study, detailed
design
Year: 2013
Weir Headpond Powerhouse
Page 15
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Tinombo
Hydropower Pro ject
P r o j ect F eat u r es
Location: Parigi Moutong, Central
Sulawesi, Indonesia
River: Tinombo
Net head: 57.9 m
Design discharge: 3.5 m3/s
Installed capacity: 2 × 0.86 MW
Turbine type: Horizontal Francis
Headrace channel: 1829 m
Penstock length: 164.6 m
C o o p er at ed F i r m s
Project owner: PT Potensia Tomini
Energi
Ser v i ces
Scope of services: Topographic survey,
geological investigations
and detailed design
Year: 2013
Komering
Hydropower Pro ject
P r o j ect F eat u r es
Location: East Ogan Komering
Ulu, South Sumatera,
Indonesia
River: Komering Irrigation
Channel
Net head: 5.85 m
Design discharge: 51 m3/s
Installed capacity: 3 × 0.86 MW
Turbine type: Vertical Kaplan
C o o p er at ed F i r m s
Project owner: PT Bumiloka Tegar
Perkasa
Ser v i ces
Scope of services: Topographic survey and
detailed design
Year: 2013
10 Hydropower Projects
in Southeast Sulawesi
P r el i m i n ar y P r o j ect F eat u r es
Projects, locations: Lasusua 1, Lasusua 2,
Ranteangin 1, Ranteangin 2,
Ranteangin 3, Ranteangin 4,
Ranteangin 5, Ranteangin 6,
Ranteangin 7, Ranteangin 8
C o o p er at ed F i r m s
Project owner: PT Brantas Energi
Ser v i ces
Scope of services: Due Diligence
Year: 2013
Page 16
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Limbangan
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Banjarnegara, Central Java,
Indonesia
River: Tulis
Net head: 56.7 m
Design discharge: 10.4 m3/s
Installed capacity: 2 × 2.5 MW
Turbine type: Horizontal axis Francis
Headrace channel: 1434 m
Penstock length: 161 m
C o o p er at ed F i r m s
Project owner: PT Bumiloka Tegar
Perkasa
Ser v i ces
Scope of services: Preliminary site
assessment
Year: 2013
Windusari
Hydropower Pro ject
P r el i m i nar y P r o j ect F eat ur es
Location: Banjarnegara, Central
Java Indonesia
River: Tulis
Net head: 66.7 m
Design discharge: 6.9 m3/s
Installed capacity: 2 × 12 MW
Turbine type: Horizontal axis Francis
Headrace channel: 2474 m
Penstock length: 416 m
C o o p er at ed F i r m s
Task owner: PT Bumiloka Tegar
Perkasa
Ser v i ces
Scope of services: Preliminary site
assessment
Year: 2013
Pusaka 1 and 3
Hydropower Pro jects
P r o j ect F eat ur es
Location: Cianjur, West Java,
Indonesia
River: Cibuni
Net head: 150.4 and 49.5 m
Design discharge: 7.9 and 7.5 m3/s
Installed capacity: 2 × 5 and 2 × 1.6 MW
Turbine type: Vertical axis Francis
Headrace channel: 3880 and 740 m
Penstock length: 316 and 260 m
C o o p er at ed F i r m s
Task owner: PT Pembangkitan Pusaka
Parahyangan
Funder: PT Bank Mandiri, Tbk
Ser v i ces
Scope of services: Bankability assessments
Year: 2014
Page 17
P r o j e c t s U n d e r t a k e n
C o m p a n y E x p e r i e n c e
Cibalapulang 2 and 3
Hydropower Pro jects
P r o j ect F eat u r es
Location: Cianjur, West Java,
Indonesia
River: Cibalapulang
Net head: 58.4 and 57.8 m
Design discharge: 14.5 and 13.3 m3/s
Installed capacity: 2 × 3.25 and 2 × 3 MW
Turbine type: Horizontal Francis
Headrace channel: 1698 and 1698 m
Penstock length: 465 and 296 m
C o o p er at ed F i r m s
Task owner: PT Sangsaka Hidro Barat
Funder: PT Bank Mandiri, Tbk
Ser v i ces
Scope of services: Bankability assessments
Year: 2014
Bayang
Hydropower Pro ject
P r o j ect F eat u r es
Location: Pesisir Selatan, West
Sumatera, Indonesia
River: Batang Bayang
Net head: 46.4 m
Design discharge: 14.5 m3/s
Installed capacity: 2 × 2.9 MW
Turbine type: Horizontal Francis
Headrace channel: 1789 m
Penstock length: 183 m
C o o p er at ed F i r m s
Project owner: PT Bumiloka Tegar
Perkasa
Ser v i ces
Scope of services: Preliminary site
assessments
Year: 2014
Ketela ng
Hydropower Pro ject
P r el i m i n ar y P r o j ect F eat u r es
Location: Lebong, Bengkulu,
Indonesia
River: Ketelang
Net head: 168 m
Design discharge: 1.8 m3/s
Installed capacity: 2 × 1.3 MW
Turbine type: Horizontal Francis
Headrace channel: 2580 m
Penstock length: 773 m
C o o p er at ed F i r m s
Project owner: PT Green Investments
Ser v i ces
Scope of services: Feasibility Study
Year: 2014
H y d r o E n g i n e e r i n g C o n s u l t i n g
I N D O N E S I A H Y D R O C O N S U L T ®
Office Address: Bukit Golf Riverside II Block B01 No 46
Gunungputri, Bogor 16963, Indonesia
Phone: +62 21 84303098
Fax: +62 21 84303064
Email: [email protected]
Website: www.indonesia-hydro.com Renewable energy saves our earth!
Why you need us?
Hydro projects are considered as having high risk in costs and revenues
since they highly dependent on water resources availability and site specific
structures. Comprehensive planning, engineering, procurement,
construction and operation as well as skilled and experienced personnel are
highly required to minimize the risk. Failures in employing each of them
may cause whole project failures.
Cost effectiveness and risk are key points of a success developer, achieving
them requires comprehensive, efficient and optimized planning, surveys,
investigations, analysis, design, project management and project supervision.
We have experience gained from every step of the projects undertaken that
made us capable to offer comprehensive consultancy services emerging in
efficient and cost-effective solutions for your business needs.