indonesia’s 35 gw program: investment opportunities, … · 2016. 3. 3. · pln’s balance sheet...

15
BUKU STATISTIK Dr. Agung Wicaksono, Vice Chairman of PMO for 35 GW – Ministry of Energy & Mineral Resources IAEE Asian Conference - Perth, 16 February 2016 INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, FINANCING NEEDS AND CHALLENGES

Upload: others

Post on 08-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

BUKU STATISTIK Dr. Agung Wicaksono, Vice Chairman of PMO for 35 GW – Ministry of Energy & Mineral Resources IAEE Asian Conference - Perth, 16 February 2016

INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, FINANCING NEEDS AND CHALLENGES

Page 2: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

ELECTRIFYING THE WHOLE INDONESIA SO FAR? 2

•  Electrification ratio in 2014 is 84.35%. •  Electrification ratio target in 2019: 97.35%

Page 3: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

3

Kal$mra467MW0,9%

Aceh-Sumut1788MW

-9%Sulu;enggo520MW-6,8%

Bangka130MW-10,8%

Sumbar-Riau

1194MW-2,7%

Sumbagsel1493MW-4,1%

Kalbar406MW-8,4% Kalselteng

543MW-0,2%

Papua205MW5,8%

Maluku140MW-3,8%

Sulselbar1024MW21,6%

NTT141MW9,9%

Jawa-Bali23900MW

31%

Government must take corrective measures required in energy crisis and emergency (Law on Energy No. 30/2007, Article 6 (3))

31,951 MW power system 24,924 MW sufficient 813 MW deficit 6,214 MW crisis! (8 systems)

POWER DEFICIT ACROSS NATION: CRISIS IS LOOMING

Page 4: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

35 GW PROGRAM FOR INDONESIA – 72.9 BILLION $ INVESTMENT

PT PLN (Persero)

4

MW: Megawatt kms: Kilometer-circuit

MVA: Mega-volt ampere Legend:

Total Indonesia Mio USD

42,940 MW 291 Powerplant 53,663

46,597 kms 732 Transmission 10,893 108,789

MVA 1.375 Substation 8,386

Total 72,942*

Jawa-Bali Mio USD

23,863 MW 49 Powerplant 28,955

11,185 kms 349 Transmission 4,615

66,083 MVA 672 Substation 5,114

Sumatera Mio USD

11,327 MW 76 Powerplant 14,282

19,305 kms 210 Transmission 3840

32,406 MVA 398 Substation 2475

Kalimantan Mio USD

2,852 MW 40 Powerplant 4000

7,883 kms 68 Transmission 1122

3,910 MVA 115 Substation 324

Sulawesi & Nusa Tenggara

Mio USD

4,159 MW 83 Powerplant 5434

7,207 kms 90 Transmission 1169

5,620 MVA 165 Substation 412

Maluku & Papua Mio USD

739 MW 43 Powerplant 992

1,017 kms 15 Transmission 148

770 MVA 25 Substation 61 *not incl. land acquisition, interest during construction (IDC) and taxes

Page 5: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

ECONOMIC SCALE OF 35,000 MW PROGRAM

PT PLN (Persero)

5

732transmissionlines(75,000settower)

1,375unitSubsta9ons

301,300kmaluminiumconductor2,600settrafo

3.5milliontonssteel

291powerplants

EmploymentDIrect:650,000Indirect:3million

LocalIndustry~40%frominvestment(~29.2BillionUSD)

Investment : 72.9 Billion USD**

*Es9mate**excl.land,InterestDuringConstruc9on(IDC)andtaxes

Page 6: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

6 PROGRESS TO DATE: 17.3 GW OUT OF 35 GW CONTRACTED

PLN’s EPC:

2883 MW

IPP: 14453 MW

Total by end 2015: 17336 MW

source: PLN’s report

Page 7: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

No Country of Origin Capacity (MW)

Percentage

1 China 8008 46% 2 Japan 5195 30% 3 Korea 1490 9% 4 Malaysia 1390 8% 5 Indonesia 1078 6% 6 Turkey 120 1% 7 USA 120 1%

TOTAL 17331 100%

INVESTORS VARIED, THOUGH TWO COUNTRIES DOMINATE 7

source: PLN’s report

Page 8: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

Under Procurement

8368 MW (19 projects)

New Procurement

7165 MW (18 projects)

2016 total: 15533 MW (37 projects)

TARGET PENANDATANGAN PPA S.D JUNI 2016 15.533 MW; 37 PROYEK

8 THE REMAINING TO BE PROCURED THIS YEAR

source: PLN’s report

Page 9: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

A TOTAL OF ALMOST 100 BILLION US$* REQUIRED 9

(Figures in million US$) Total Financing Needs

Power plant US$ 53,663

Transmission US$ 10,893

Substation US$ 8,386

Distribution US$ 7,355

IDC US$ 5,319

Land US$ 7,291

Total US$ 92,907

IPP’s Financing Needs Power plant US$ 37,454

Transmission US$ 680

Substation US$ 249

Land US$ 4,055

Total US$ 42,438

PLN’s Financing Needs Power plant US$ 16,209

Transmission US$ 10,213

Substation US$ 8,137

Distribution US$ 7,355

IDC US$ 5,319

Land US$ 3,236

Total US$ 50,469

Spent US$ 6.654

Will be spent US$ 43.815

* incl. IDC and land

Page 10: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

FINANCING STRATEGY USING MULTIPLE SOURCE FOR MULTIPLE USE 10

Export credit agency scheme and bilateral loans from Asian countries willing to finance

Multilateral loans available for gas and renewables power plant

Coal-fired power plants

Renewables and gas power plants

Transmission Multilateral and bilateral loans based on result-based lending (RBL) scheme

Substation, distribution and land Acquisition

Bond and syndicated loans to finance substation and land acquisition, while RBL scheme can be potentially used for distribution.

*) Source: EY analysis

Page 11: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

FINANCING CHALLENGE: DEBT COVENANT OF PLN 11

Covenant Limit 2014

Debt Service Coverage Ratio (DSCR)

Min. 1.5x 1.35

Consolidated Interest Coverage Ratio (CICR)

Min. 2.0x 3.49

Interest Bearing Debt-to-Equity (DER)

Max. 3.0x 2.02

PLN’s ratio of interest-bearing-debt to equity is higher than similar companies such as Kepco (Korea), TNB (Malaysia), and EGAT (Thailand). Its capital structure dominated by debt is very sensitive to interest rate fluctuation.

A 55% B

18%

C 27%

PLN Capital Structure per 31 December 2014

Debt Covenant PLN

PLN would require equity injection to maintain healthy capital structure

D/E ratio of PLN is higher than its peers

PLN’s DSCR covenant was breached in 2014

Rising interest rate has caused interest debt to also rise, surpassing the minimum limit of DSCR. This has the potential for default and cross-default, which could lead to further cost in the future.

A Interest Bearing Debt

B Non Interest-Bearing Debt

C Ekuitas

* EY Analysis, based on audited financial report 2013 for EGAT and 2014 for others

IPP’s debt consolidated in PLN’s balance sheet

Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further weakening its debt covenant positions.

0.59 0.67 1.18

2.02

0 0.5

1 1.5

2 2.5

Tenaga Nasional Berhad

EGAT Kepco PLN

Interest Bearing Debt-to-Equity Ratio

FY 2013/2014*

Page 12: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

NOT ONLY FINANCIAL, BUT ALSO NON-TECHNICAL CHALLENGES ARE COMPLEX

No Challenges Solution Progress 1. Land Acquisition Applying Law No 2/2012

2. Tariff Negotiation Setting up ceiling tariff for IPP and Excess Power (Minister’s Decree No. 3/2015)

3. Selection and Appointment of IPP

Acceleration by direct appointment and direct selection for Mine Mouth, Marginal Gas, Expansion, and Excess Power (Minister’s Decree No. 3/2015)

4. Permit Issuance One Stop Service (PTSP) at BKPM

5. Performance of Contractor and Developer

Due Dilligence by Independent Procurement Agent (Minister’s Decree No. 3/2015)

6. Project Management Capacity

Establishment of PMO (Project Management Office), both at GOI and PLN

7. Cross-Sectoral Coordination

KPPIP led by Coordinating Minister for Economy

8. Legal Issues Issuance of Presidential Decree No. 4 / 2016

12

Page 13: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

13

13

CHANGE IN ENERGY MIX REQUIRED IN FUTURE PLANNING

35,000 MW

PLN: 10,233 MW 25,305 MW

5,000 MW IPP: 30,000 MW

IPP

from

to……..

Gas 32%

Coal 63%

NRE 5%

RUPTL 2014-2019

from……..

Energy Mix Target 2025

Gas 25%

Coal 50%

NRE 25%

Energy Mix Target for Electricity (GR No. 79/2014)

to……..

Page 14: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

Kapasitaslitbang,industri&infrastrukturbelumop$mal

AS THE NEXT STEPS, 35 GW SHOULD CALL FOR…… 14

1. more IPP participation than PLN

2. more renewables & gas, with a revised plan underway

3. support on government’s capex & special accounting treatment

Page 15: INDONESIA’S 35 GW PROGRAM: INVESTMENT OPPORTUNITIES, … · 2016. 3. 3. · PLN’s balance sheet Asset and liabilities of IPP are consolidated to PLN’s balance sheet, further

BTATISTIK Contact: [email protected] / [email protected]

TERIMA KASIH

THANK YOU