A Set Of Case Studies for a proposed food & beverage plant at Gbagada industrial estate, Lagos, NigeriaTRANSCRIPT
Floor Plan
The WBF Complex by Flad ArchitectsCASE STUDY 1
Brewing Science Laboratory
CASE STUDY 1
Teaching & Research Winery
CASE STUDY 1
Food Science Laboratory
CASE STUDY 1
Sustainable Highlights
CASE STUDY 1
Floor Plan
CASE STUDY 2Pack Line by Lea Katz ArchitectureLocation: Industrial Zone Holon, Tel Aviv, Israel.Project Area: 2,400 sqm (Production Area), 620sqm (Administrative Area), 2,500 sqm (yard, Parking and Loading Bays)
Spatial Arrangement and Flow
CASE STUDY 2
SOUTHEAST FAÇADE FACTORY BUILDING
SECTION SHOWING DOOR AND DUCT DETAILSTEEL ROOF TYPE AND ARRANGEMENT
CASE STUDY 2
CASE STUDY 2
A. EXTERIOR VIEWB. SECTIONSC. INSULATIN G ALUMINIUM PANELS D. INTERIOR HALL
CASE STUDY 4NESTLE NIG. LTD
AGBARA MANUFACTURING COMPLEX
SONGIUM MALT EXTRACT PLANT AGBARA
ENZYMATIC HYDROLIZED PLANT PROTEIN MIX FACTORY
EHPM PLANT, AGBARA
NESTLE WATER PLANT, AGBARA FACTORY ROAD CONSTRUCTION
CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX
NESTLE WATER PLANT, AGBARA
INTERIOR- NESTLE WATER PLANT, AGBARA
CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX
INTERIOR- NESTLE WATER PLANT, AGBARA
NESTLE WATER PLANT, AGBARA
Jumbo Roller Dryer for All Family Cereals Plant
CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX
INTERIOR- NESTLE WATER PLANT, AGBARA
NESTLE WATER PLANT, AGBARA NESTLE WASTE WATER PLANT, AGBARA
Vacuum Band Dryer for Nestle MILO Production
Ware House for Raw Material
Wrapping Machine for MAGGI production
CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX
Walk Way
Agbara Factory Clinic Agbara Factory Canteen
Agbara Factory Generator Plant
TRI GENERATOR PLANT, AGBARA
Agbara Factory Fuel and Diesel Dump
CASE STUDY 5NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE
SITE FEATURESThe site is located close to Shagamu in Ogun State. It sits on a 36 Hectare Plot and has facilities that are separated by different structures spread across the site. The site is connected by roads, rails and walkways that connects humans and vehicles through the various facilities on the site
SITE FEATURESThe factory has a start up staff strength of 180 staffs but the number has consistently increased over time. A huge parking space and greenery are strong features of the site
RAW MATERIAL STORAGE
CASE STUDY 5NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE
Cooling Towers at Watergate Factory
MAGGI PRESSING AND WRAPPING
CASE STUDY 5NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE
MIXING TOWER
INDUSTRIAL SERVICE BUILDING
CASE STUDY 5NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE
Cooling Towers at Watergate Factory
Chillers at Watergate Factory
CASE STUDY 5NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE