November 25, 2019
Justin J. KringstadGeological Engineer
Director
North Dakota Pipeline Authority
Industrial Commission Update
2
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 2
Cushing $58.33
Brent $63.62WTI + $5.29
Crude Oil Prices – Nov. 21, 2019
3JJ Kringstad - North Dakota Pipeline Authority
Pricing Data: Bloomberg &
CME (LLS-Argus)LLS (Argus)WTI + $4.58
JJ Kringstad - North Dakota Pipeline Authority 3
EIA Forecasted Oil Price (October 2019)
44JJ Kringstad - North Dakota Pipeline Authority 4
5
Statewide oil Performance
JJ Kringstad - North Dakota Pipeline Authority 5Average BKN/TF Well Performance Statewide
~4% Improvement
Over 2018
66JJ Kringstad - North Dakota Pipeline Authority 6
North Dakota Oil Production Forecast Assumes Current Technology – Enhanced Oil Recovery Not Included
7
Statewide Gas Performance
JJ Kringstad - North Dakota Pipeline Authority 7Average BKN/TF Well Performance Statewide
~10% Improvement
Over 2018
8
Statewide Gas-Oil Ratio
JJ Kringstad - North Dakota Pipeline Authority 8Average BKN/TF Well Performance Statewide
NDPA North Dakota Gas Production ForecastAssumes Current Technology – Enhanced Oil Recovery Not Included
99JJ Kringstad - North Dakota Pipeline Authority 9
10
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 10
Simple Terms
Blue – Lack of pipelines
Orange – Challenges on existing
infrastructure
GREEN – % of gas captured and sold
Blue – % flared from zero sales wells
Orange – % flared from wells with at
least one mcf sold.
Sep. 2019 Data – Non-Confidential WellsStatewide
Solving the Flaring Challenge
JJ Kringstad - North Dakota Pipeline Authority 11
12JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge
JJ Kringstad - North Dakota Pipeline Authority 12
13JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge – Gas Connections
JJ Kringstad - North Dakota Pipeline Authority 13
14
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 14
Gas Processing Expansions
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 15
Recent Gas Processing Expansions
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 16
Planned Gas Processing Expansions
670 MMCFD
625 MMCFD
17JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 17
18JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Future OutlookAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 18
Historical
Historical
Expected Capacity
& Production
Expected Capacity
& Capture Targets
19JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 19
HistoricalExpected Capacity
& Capture Targets
20JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 20
Historical
9%
24%
Expected Capacity
& Capture Targets
21JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 21
HistoricalExpected Capacity
& Capture Targets
9%
22JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 22
23
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 23
24JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 24
Major Gas Pipeline and
Processing Infrastructure
WBI Transmission
Whiting
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 25
WBI Energy – North
Bakken Expansion Project
JJ Kringstad - North Dakota Pipeline Authority 26
Project Highlights
• 67 Miles - 20” Pipeline
• 20 Miles - 12” Pipeline
• $220+ Million
• At least 250,000 MCFD Capacity (expandable)
• Expandable to 375,000 MCFD
• End of 2021 Proposed Completion
• Residue Gas Service From North of Lake
Sakakawea to Northern Border Pipeline in
McKenzie County
JJ Kringstad - North Dakota Pipeline Authority 27
Northern Border Pipeline
*Data Source: Northern Border IPS
Northern Border BTU at Glen Ullin, ND
JJ Kringstad - North Dakota Pipeline Authority 28*Data Source: Northern Border IPS
JJ Kringstad - North Dakota Pipeline Authority 29
Northern Border Pipeline Market Share
NDPA Calculations Using Northern Border IPS
~1,150+ BTU
~1,035 BTU
JJ Kringstad - North Dakota Pipeline Authority 30
NB Pipeline Interconnects With Known BTU Limits
JJ Kringstad - North Dakota Pipeline Authority 31Map Source: TC Energy Website
JJ Kringstad - North Dakota Pipeline Authority 32Map Source: TC Energy Website
JJ Kringstad - North Dakota Pipeline Authority 33
Northern Border – BTU Calculations*
*Assumes Equivalent Net Replacement of 1,035 Canadian Gas
34JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 34
Bakken Natural Gas Infrastructure
3535JJ Kringstad - North Dakota Pipeline Authority 35
Northern Border Proposed Expansion Options
JJ Kringstad - North Dakota Pipeline Authority 36
Two Proposed Options:
Stateline/Watford City to Ventura
-580 Mdth Incremental (~525 MMCFD)
-Phase 1: Q3 2021
-Phase 2: Q4 2023
Stateline/Watford City to Cheyenne
-430 Mdth Incremental (~390 MMCFD)
-Phase 1: Q3 2021
-Phase 2: Q4 2022
Residue Gas Storage Update – WBI Baker
3737JJ Kringstad - North Dakota Pipeline Authority 37Data Source: WBI Energy
Regional NGL Infrastructure
Kinder
JJ Kringstad - North Dakota Pipeline Authority 38
Ma
rath
on
Pe
tro
leu
m
North Dakota Captured* NGL’s
3939JJ Kringstad - North Dakota Pipeline Authority 39*Non-flared NGL’s & Assumes 10 GPM
NGL Pipeline Takeaway Options
40
4040JJ Kringstad - North Dakota Pipeline Authority 40
Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840
Phone: (701)220-6227Fax: (701)328-2820
E-mail: [email protected]
Websites: www.pipeline.nd.gov
www.northdakotapipelines.com
Contact Information
JJ Kringstad - North Dakota Pipeline Authority 41