Summary of MARTA’s Upcoming Rail Car Programs
July 12, 2016
INDUSTRY DAY
![Page 2: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/2.jpg)
INTRODUCTIONS&
OPENING REMARKS1
![Page 3: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/3.jpg)
MARTA’S KEY PERSONNEL
• Keith T. Parker, AICP, General Manager/CEO
• Richard Krisak, Chief Operating Officer
• Gordon Hutchinson, Chief Financial Officer
• David Springstead, Assistant General Manager, Capital Programs and Development
• Joseph Erves, Senior Director, Operations
• Kevin Hurley, Senior Director, Capital Programs and Treasury
• Douglas Miller, Director, Rail Car Maintenance
• Lisa DeGrace, Chief Contracts Officer
• Antoine Smith, Manager, Economic Opportunity
• Nicholas Waters, Contract Specialist II
• Ray Carini, LTK2
![Page 4: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/4.jpg)
AGENDA
• Welcome Richard Krisak
• Introductions Richard Krisak
• Finance – State of MARTA Gordon Hutchinson
• Financing Rail Cars Gordon Hutchinson
• Rail Car Program Raymond Carini
• Contracts and Procurement Nicholas Waters
• D&I Requirements Antoine Smith
• Questions & Answers
• Armour Yard Site Visit Douglas Miller3
![Page 5: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/5.jpg)
IF YOU HAVE QUESTIONS
• Please ask them today.
• If you have follow-up questions, please direct them to Nicholas Waters ([email protected]) 404-848-4119.
4
![Page 6: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/6.jpg)
SUMMARY OF THE TWO PROGRAMS
5
• New Rail Car Procurement
– Buy 250 new rail cars
– Will replace the entire existing fleet
– Rescue and crashworthiness compatibility with existing fleet
– Procurement Type: RFP
– Expected NTP: 2018
• Rail Car Life Extension Work
– Contract out work on 2/3 of MARTA’s fleet
– Prescriptive overhaul of components
– Expected bid award: 2017
![Page 7: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/7.jpg)
PROCUREMENT APPROACH
6
![Page 8: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/8.jpg)
NEW RAIL CAR PROCUREMENT
• RFP – Request for Proposals
• Award is based on best value to the Authority which includes price and other determining factors
• Anticipated RFP release date: Dec 2016
7
![Page 9: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/9.jpg)
• Issue RFP• Pre-Proposal Conference• Inquiry Period (Q&A)• Submittal of Proposals• Evaluation of Proposals• Determination of a Competitive Range• Invitation for Oral Presentations to firms within the Competitive
Range• Request for Best and Final Offer (BAFO)• Negotiations• Selection of a firm• Award
RFP PROCESS
![Page 10: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/10.jpg)
LIFE EXTENSION PROGRAM -- IFB
• IFB – Invitation for Bids
• Award is based on the lowest responsive and responsible bidder
• To include defined Technical Specifications
9
![Page 11: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/11.jpg)
RFI
• Request For Information
• Provide feedback on several technical and commercial issues
• Issue: Late July 2016
• Responses Due: August 30, 2016
• An RFI will be issued for both procurements
10
![Page 12: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/12.jpg)
PROCUREMENT RULES OF ENGAGEMENT
• No discussions with MARTA Board of Directors, Executives or Staff
• Firms can participate in both procurements
• Consultants currently providing services to MARTA are prohibited from partnering with potential firms
• Contact Nicholas Waters, Contract Specialist II, for all matters relating to both procurements
11
![Page 13: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/13.jpg)
DIVERSITY & INCLUSION
• Life Extension Program: DBE Goal
• New Rail Car Program: TVM FTA Requirements
12
![Page 14: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/14.jpg)
BUY AMERICA
• Seeking input (RFI)
• Preference for easy, efficient access to replacement parts
• Preference for local sourcing; not a requirement
13
![Page 15: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/15.jpg)
FUNDING14
![Page 16: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/16.jpg)
Prior Year Carryover $123.0M(31%) Sales Tax
$210.6M(52%)
Interest & Other Capital $0.5M(0%)
State Grants $1.0M(0%)
Federal Grants $55.0M(14%)
Financing $13.0M (3%)
FY17 Capital Revenue($403.1M)
Not anticipating using Federal Funds for these procurements
![Page 17: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/17.jpg)
RAIL CAR REHABILITATION COST AVOIDANCE
0
10
20
30
40
50
60
70
80
90
FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27
Projections in 2016 $ in millions
16
ACTUAL
![Page 18: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/18.jpg)
17FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42
MARTA’s Capital Program (including the two Rail Car Programs)
Current CIP FY16 - FY42 250 New Rail Cars Net
Capital Improvement Program (CIP)
Life Extension +
250 New Cars BuyLCARE
![Page 19: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/19.jpg)
MARTA’s RAIL SYSTEM18
![Page 20: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/20.jpg)
MARTA’S ROUTES
• 48 route miles
• 750 VDC third rail
• Double-track
• 70 mph top speed
• Max grade of 4.5%
• Operates daily: 4:45 am to 1:00 am
19
![Page 21: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/21.jpg)
MARTA’S RAIL STATIONS
• 38 stations
• All with high-level platforms for level boarding
• Fully ADA-compliant
• Cars have load leveling system
20
![Page 22: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/22.jpg)
MARTA’S RAIL SERVICE
• Automatic Train Operation
• Operators control doors
• Direct view of side of train through cab window
21
![Page 23: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/23.jpg)
DIRECT SERVICE TO WORLD’S BUSIEST AIRPORT
• MARTA has direct service into airport
• This means there’s a fair amount of luggage on board
22
![Page 24: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/24.jpg)
MARTA’S RAILS
• Mainline Track: 104 mi
– 46 mi Ballasted
– 52 mi Concrete/ DF
– 5 mi Resilient Supported
– 0.1 mi Embedded
• Track Miles
– 21 miles in tunnel
– 24 miles on overhead structure
– 58 miles at grade
• Rail
– 115 lb RE, with 1:40 cant
23
![Page 25: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/25.jpg)
DAILY SERVICE PATTERNS
• North-South: 20 six-car trains
• East-West: 8 six-car trains
• Bankhead Line: 5 two-car trains
• Ready reserve: 5 six-car trains
• Headways:
– 5 minutes, peak
– 7.5 minutes, off-peak 24
![Page 26: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/26.jpg)
WITH 250 CARS, MARTA WILL AVERAGE
90,000+ ANNUAL MILES/CAR(SOURCE: NATIONAL TRANSIT DATABASE, FY2013)
25
0
20,000
40,000
60,000
80,000
100,000
Annual Miles per Car
Projected mileage, based on 250
cars, 23.6m car-miles/year
![Page 27: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/27.jpg)
Meet Fleet
26
TH
E
![Page 28: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/28.jpg)
FLEET AGE SUMMARY
Car
SeriesCarbuilder Quantity
Year
BuiltAge Mid-Life OH
CQ310 Franco-
Belge
96 1979-81 34-36 yrs 2006-2008
CQ311 Hitachi 120 1984-88 27-31 yrs 2005-2008
CQ312 Breda 100 2000-05 10-15 yrs Now due
Total 316
27
![Page 29: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/29.jpg)
0
10
20
30
40
50
2015 2016 2017 2018 2019 2020 2021
CQ310 End of Life
CQ311 End of Life
CQ312 Due forRehab @ 15 Years
MARTA’S RAIL CARS ARE REACHING END OF LIFE
![Page 30: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/30.jpg)
96 cars
36 years old
Carbuilder: Franco-Belge
Contain asbestos
Aluminum carbody
Cast trucks (Rockwell)
29
CQ310 Cars
![Page 31: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/31.jpg)
CQ311 CARS
120 cars
Carbuilder: Hitachi
31 years old
Stainless steel carbody
Weld fabricated Breda trucks
30
![Page 32: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/32.jpg)
100 cars
Carbuilder: Breda
13 years old
Stainless steel carbody
Weld fabricated Breda trucks
31
CQ312 Cars
![Page 33: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/33.jpg)
RAIL CAR CONFIGURATION
• 316 rail cars – all married-pairs
• Drawbar between pairs
• Operator’s cab:
– Two cabs per pair
– Full-width cab
– Inactive cabs
permit walk-
through32
![Page 34: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/34.jpg)
RAIL CAR DIMENSIONS
• 75’ long
• 10’-6” wide
• Floor height: 44” ATOR
• 34.5” wheels
• 79” door height
• 80” min ceiling height
33
![Page 35: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/35.jpg)
RAIL CAR INTERIOR
• Seats
– 64 seats per car
– 1 mobility device
berthing areas
– 4 priority seats
• Baggage storage
• Windscreens
• No floor-to-ceiling poles
34
![Page 36: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/36.jpg)
SOME OFFSET WINDSCREENS
35
![Page 37: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/37.jpg)
MAINTENANCE FACILITIES
• Armour: Inspection, Heavy Maintenance
• Avondale: Running repairs
• South: Campaigns by vendors
36
![Page 38: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/38.jpg)
37
![Page 39: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/39.jpg)
LIFE EXTENSION PROGRAM
38
![Page 40: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/40.jpg)
LIFE EXTENSION PURPOSE
• Keep the fleet in service until it can be replaced
• Prescriptive heavy maintenance, per MARTA procedures or maintenance manuals
39
![Page 41: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/41.jpg)
LIFE EXTENSION SCHEDULE
• Invitation to Bid: 2016
• Bids Due: Early 2017
• Award: June 2017
• Work Performed: 2017 to 2020
40
![Page 42: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/42.jpg)
LIFE EXTENSION CONTRACT CONDITIONS
• Work must be done off-site
• Up to 216 cars
• CQ310s to be done first
• Can bid/propose on both programs
41
![Page 43: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/43.jpg)
LIFE EXTENSION SCOPE OF WORK
• Couplers/Draft Gear
• Trucks/Suspension
• Auxiliary Electric
• Propulsion
• Friction Brakes
• Cab Signal/ATC
• Comms
• Doors
• HVAC
• Carbody
42
![Page 44: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/44.jpg)
LIFE EXTENSION SCOPE OF WORK
• Carbody
• Couplers/Draft Gear
• Trucks/Suspension
• Auxiliary Electric
• Propulsion
• Friction Brakes
• Cab Signal/ATC
• Comms
• Doors
• HVAC43
![Page 45: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/45.jpg)
SAMPLE WORK ON AUXILIARY ELECTRIC
• Replace …
– Batteries
– Capacitors
– Contactors
– Surge arrestors
• Option to replace …
– Rolls Royce APS on
CQ311s
44
![Page 46: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/46.jpg)
SAMPLE WORK ON DOORS
• Replace …
– Weather seals
– Sensing switches
• Rebuild …
– Door operators
– Crew switches
– Emergency release assemblies
– Door Hangers
– Door check assemblies
– Actuating pin/bracket
• Upgrade HAFCO hangers to
Vapor hangers (<30% of fleet) 45
![Page 47: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/47.jpg)
SAMPLE WORK ON HVAC
• Replace …
– Weather seals
– Mounting isolators
– Pressure switches
• Rebuild …
– Compressor/condenser
– Evaporator
– Control unit
46
![Page 48: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/48.jpg)
NEW RAIL CAR PROGRAM47
![Page 49: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/49.jpg)
NEW RAIL CAR PROGRAM PURPOSE
• Replace aging fleet
• Improve reliability
• Enhanced customer features
• Serve MARTA’s passengers for next 30+ years
48
![Page 50: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/50.jpg)
TARGET AREAS FOR IMPROVEMENT
• Reliability
• Interior Layout
• Better communication
– Signage
– Maps/Information
– Public Announcements
• Security
• Luggage space
49
![Page 51: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/51.jpg)
NEW RAIL CAR PROGRAM SPECIAL EMPHASIS
• Key piece of making MARTA a world class system
• Community involvement in design features
• Industrial designer
50
![Page 52: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/52.jpg)
NEW RAIL CAR PROGRAM SCHEDULE
• Request for Proposals: Dec 2016
• Proposals Due: ~Apr 2017
• Award: ~Nov 2017
• New Car Deliveries: 2020 to 2026
51
![Page 53: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/53.jpg)
NEW RAIL CAR CONTRACT TERMS
• Heavy emphasis on:
– Schedule
performance
– Reliability
52
![Page 54: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/54.jpg)
NEW RAIL CAR SCOPE OF WORK
• 250 new cars
• Training
• Manuals
• Spare Parts
• STTE
• Reliability Program
• Warranty
• Scrapping existing cars53
![Page 55: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/55.jpg)
SOME DESIRED RAIL CAR FEATURES
WITH A
FOCUS ON THE CUSTOMER
54
![Page 56: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/56.jpg)
RAIL CAR CONFIGURATION
55
• Currently: all married-pairs
• MARTA runs 6-car trains
• Shops are generally configured for married-pairs
• Little capability to turn cars
• MARTA interested in hearing about alternative configurations …
– Triplets?
– Open gangways?
– Other alternatives, and their benefits
![Page 57: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/57.jpg)
TRI-POD STANCHIONS AND GRAB HANDLES
56
• Newly added features for consideration:
– Floor-to-ceiling tri-pod
stanchions in door vestibules
– Grab handles
![Page 58: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/58.jpg)
ADA PROVISIONS
57
• 2 mobility aid berthing spots per car
• Color-coded priority seating
• Induction loop system for hearing impaired
• Consider the proposed new ADA regulations, especially for communication
![Page 59: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/59.jpg)
INTERIOR LAYOUT CONCEPTS
58
• Full ADA accessibility end-to-end, and car-to-car
• Slightly reduced seat width
• Separate operator cab door
• Gathering area
• Priority seating in the same place, no matter what door entered
![Page 60: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/60.jpg)
SEATING CONCEPTS
59
• Community focus groups to help with seating design
• Priority seating …
– Color-coded?
– Always on left as you enter?
• Existing seats have worked well, although backs are ‘thick’
• Cantilevered seating
• Easy to maintain
• Eliminate tight knee room
![Page 61: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/61.jpg)
SIGNAGE
60
• Interior:
– Ceiling mounted destination
– Side-mounted destination
– Large, variable message
– Speakers
• Exterior
– Ends of trains
– Along side of train
– Color-coded lighting on side of car to
indicate route
– Speakers
![Page 62: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/62.jpg)
REQUESTS FOR INFORMATION
61
![Page 63: INDUSTRY DAY - MARTA...17 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 MARTA’s …](https://reader034.vdocuments.net/reader034/viewer/2022050222/5f68096c820f5264382f9ae9/html5/thumbnails/63.jpg)
REQUESTS FOR INFORMATION
• Buy America
• Alternate car configuration
– Open gangway between cars
– Minimal shop changes
• Unattended train operation
• How many life extension cars needed for float
62