Fig.! INFLATION GAUGE BOARD 1. 1111 I. HOSE REEL Ii Inflatable Packers and Grouting Grouting with inflatable packers is an important part of the water well, oil & gas industries with a wide variety of uses including but not limited to cement grouting for structural reasons, to prevent exterior casing corrosion, well abandonment or to stabilise rock or soil formations. Cement is the most common type of grout used however other types are used such as bentonite, epoxy and other special agents used for waterproofing and greater penetrability etc. Grout may be pumped at low, medium or high pressures also other factors such as fluid used, ground conditions, injection pth will determine the pressure required and the type of grout used. Deployment is verylUnple through the use of drill ro s with an appropriate crossover thread to packer. A wireline or a e may be used in conjunction with a grout hose fin ad of rods) however you are lim ed to shallow depths, grouting pressures, how self supportive the hose/ fittings are. ing drill rods or rigid pipe is a slower process but offers support for the running gear, push down force on the packers, support for the inflation tube and in most cases tis is the most suitable option. Grout pa inflation m e via water or gas and equires the following ancillary equipent for reliable operation: (See fig.1). 1. Inflation gauge board: S4itable press r ragge for accur t packer inflation. rr trogen regulator (g s inflation only 3. a r pump/ hand pump (water infla ion only). 4. P c e inflation line: Working pressure m t exceed that of the packer. 5 G g uge saver: Ruir-lin e\with the gr ut line to prevent gauge damage. Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 i njection grout packer, grouting inflatable packers equipment, systems and services. . .

Upload: ripe-packers

Post on 28-Sep-2015

221 views

Category:

Documents


23 download

DESCRIPTION

Replacement Inflatable Packers and Elements is a Western Australian based manufacturer and supplier of inflatable packers and elements, with more than 25 years’ experience in designing and building inflatable packers. RIPE supply standard and custom built inflatable packers, repair or replace inflatable packers from other manufacturers worldwide, test all inflatable packers and equipment with NATA certified equipment.RIPE Packers offer an extensive range of products and services which include but are not limited to:- Grouting Packers - Water Well Casing Grout Shoes- Mini Hydro-Frac Packers- K Packers- Slipover Packers- PVC Blind Packers- Bridge Plug Inflatable Packers - Cement Retaining Bridge Plugs- Casing Plugs, Swage Patches & Patch Seals- Decommissioning Water Well Packers- Hydraulic Fracturing Inflatable Packers- Standard Wireline Permeability Packer System- External Casing Inflatable Packers- Casing Retrieval Fishing Tools- Multi-Port Straddle Packer Systems- Preconditioning and Block Caving Packers- Ancillary EquipmentOur customers’, both local and international come from diverse industries such as Environmental Investigations, Water Bores, Water Wells, Oil/Gas, Exploration, Civil and Mining, Conservation, extraction Industries, Drilling and Construction.You can check out our website at www.ripe-packers.com

TRANSCRIPT

  • Fig.!

    INFLATION GAUGE BOARD

    1. 1111 I.

    HOSE REEL

    Ii

    Inflatable Packers and Grouting Grouting with inflatable packers is an important part of the water well, oil & gas industries with a wide variety of uses including but not limited to cement grouting for structural reasons, to prevent exterior casing corrosion, well abandonment or to stabilise rock or soil formations.

    Cement is the most common type of grout used however other types are used such as bentonite, epoxy and other special agents used for waterproofing and greater penetrability etc. Grout may be pumped at low, medium or high pressures also other factors such as fluid used, ground conditions, injection pth will determine the pressure required and the type of grout used.

    Deployment is verylUnple through the use of drill ro s with an appropriate crossover thread to packer. A wireline or a e may be used in conjunction with a grout hose fin ad of rods) however you are lim ed to shallow depths, grouting pressures, how self supportive the hose/ fittings are. ing drill rods or rigid pipe is a slower process but offers support for the running gear, push down force on the packers, support for the inflation tube and in most cases tis is the most suitable option. Grout pa inflation m e via water or gas and equires the following ancillary equipent for reliable operation: (See fig.1).

    1. Inflation gauge board: S4itable press r ragge for accur t packer inflation. rr trogen regulator (g s inflation only

    3. a r pump/ hand pump (water infla ion only). 4. P c e inflation line: Working pressure m t exceed that of the packer. 5 G g uge saver: Ruir-lin e\with the gr ut line to prevent gauge damage.

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 injection grout packer, grouting inflatable packers equipment, systems and services. . .

  • Sliding End

    Inflatable Packers and Grouting Fixed end packer systems and sliding end packer systems (moving end) are both used though more commonly fixed end packer systems. Sliding end packers become very useful when large diameters need to be achieved and where there may be restrictions downhole. Sliding end packers can support extreme pressure up to 12,000psi and are used for hydraulic fracturing world wide. (See fig.2).

    Fig.2

    Fixed End

    a cer systems arelitised for a multitu of ap ions including tremie tub5 maiit*tte, relining bores, pile grouting and well abandonment.

    Single acker systems are easilyleployed on rods or wireli e, lowered to the desired depth,, d inflated. Groutjs then iDumped t rough the ce re of the packer and exits out the ottom with no restriction or thro gh a TAM valve (explained below). The packer is then retrieved or abandoned d wnhole completely application specific.

    11111111 High press wing borehol List be approached differently. The use of sliding !Li, end packer a ause es where the slidiipee pushed up by the water pressure cau ing the becom ' i g - d end packers do not have this problem and recen 's fixeend cker ere used to plug and decommission boreholes flowing at ove 37 litre c nd.

    Decommissioning boreholes through the use of cost effective fixed end grout packers which incorporate the use of a TAM valve at the base of the packer. The TAM valve works as a rubber one way check valve preventing back flow of grout. These packers are usually cemented in and abandoned downhole, though retrieval is simple and required sometimes. TAM valves also allow the rods and lines to be flushed before retrieval for easy redeployment.

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com Australian supplier and Manufacturers of Inflatable cement grouting packers, pressure injection grout packer, grouting inflatable packers equipment, systems and services.

  • Inflatable Packers and Grouting Similar packer constructions without a TAM valve do not allow sufficient flushing before retrieval. If undesired conditions after drilling arise a packer made from drill- able material is used, the hole is grout injected and redrilled with the packer decom- missioned down hole. (See fig.3).

    Fig. 3

    TOP CONNECT ION

    NFLAT I ON LINE

    Straddle Packterms

    (

    EMENT GROUT

    _

    ROUTING TAM

    ACKER ELEMENT

    Straddle packer systems sometimes referr uble packer' are a useful tool suitable for targertinTspecific zones dow o Gesing installation at depth, high pressure grouting applications and casing installation in medium to deep bores. The zone between two packers is known as the straddle, the straddle is typically lm in length ranging up to 6m, however all lengths may be manufactured for specific ap- plications or on request.

    Straddle packer systems are generally manufactured to be as close to hole size as pos- sible to prevent grout build up around the packers and straddle sub (where grout passes out into the zone) which could impede injection of grout and affect removal or redeployment of the packer system.

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com Australian supplier and manufacturers of Inflatable cement grouting packers, pressure injection grout packer, grouting inflatable packers equipment, systems and services.

  • Inflatable Packers and Grouting Fixed or sliding end packers may be employed with either one common inflation line or two separate inflation lines. Two inflation lines allow grout to be pumped into a specific zone (determined where the packer straddle is set), the top packer is deflated and the hole can be flushed while the bottom packer remains inflated preventing any grout or fluids passing which may contaminate aquifers. If multiple areas are to be treated start at the lowest zone and raise the packe stem towards the surface as grouting is completed at a lower zone.

    Tube a Manchette (TAM) grouting involves the use of a stra e packer system lowered inside casing to straddle a TAM valve built on the casing itself. As mentioned earlier a TAM valve is one way valve which prevents backflow of the pumped fluid. Used extensively for foundation improvement as TAM valves can be placed on casing at any select interval/s. between the casing a inflated, this pr downhole with the packer straddle zone placed over then inflated and grout injected. This method allows m is suited for medium depth holes (See fig.4, 5 & 6 for exa

    packer defined to inflate and form a seal formation is installe elow the lowest TAM valve and

    nts grout from passing by. A st die packer system is lowered e TAM valve. The packers are

    tiple levels of treatment and les).

    r-C AS ING PACKER INFLATION GAUGE BORD

    Asing installation , (Shallow)

    TREMIE CEMENT

    GROUT LINE

    ACKER INFLAT ION LINE

    wouting refers tcasing installation. A fixed end inflatable pack r is built on the same casing s the borehole casing and installed to t desired epth, a tremie grout line is run down with the casi g. Once the casing has been installed the

    actrer I then inflated reventing concrete passing between the sing and formation, grout is pumped and rises the surface to complete a shallow depth casing installation. Bore relining is performed the same way however instead of the

    acker inflati o open hole it is inflaternside the existing (See fig.4).

    External Casing Inflatable Packers

    STA INLESS SCREEN

    Shallow Fig. 4 Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com Australian supplier and manufacturers of Inflatable cement grouting packers, pressure injection grout packer, grouting inflatable packers equipment, systems and services.

  • Fig.5

    STRADLE GROUT INJECTION

    BOTTOM STRADLE PACKER

    Medium

    UNDUE TOR SURFACE CASING ASING CENTRAL ISER

    ROUT INJECTION TAM VALVE

    ACKER INFLATION CKECK VALVE PACKER INFLATION GROUTING TOOL

    Fig. 6

    Deep

    Inflatable Packers and Grouting Casing Installation (Medium) Casing installation into medium depth boreholes is a simple process. Firstly a casing packer is built on the same casing as the borehole, just above the packer built into the casing is a TAM valve. The casing packer is inflated from the surface to form a seal between the casing and formation. A straddle packer system is lowered down- hole with the straddle assembly located over the TAM valve. The straddle packers are inflated (common line or two separate lines) which allows direct access to the TAM valve. Grout is then pumped where it will directed thr ugh the TAM valve and to the surface. (See fig.5).

    Casing Installation (Deep) Deep borehol inflation tub

    a problem where it becomes inefficient to run down packer stead a spin off from the above installation method is implemented.

    with some minor alterations ction through a common

    f a mechanical packer s the packer inflation/ e casing packer (seals

    re is reached a pin wi

    A casing packer much like the above method is installe to the valve to allow inflation of the packer and grout in line. Another implementation in deep boreholMis the use system that seal grout inject'

    een c allowing flow into the annulus, grout can then be injected. Casing packer

    res ur is maintained through the use of two in-line check valves preventing efl n. A wiper tool below the mechanical packers is used for sufficient flushing ith t ontamination. (See fig.14.

    a reduced sectiof casing that straddl 43.%,1 valve. Water is pumps, 'IlAtnhol(inflating t

    sing and formation) when a pre-determ ined pres

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com Australian supplier and manufacturers of Inflatable cement grouting packers, pressure injection grout packer, grouting inflatable packers equipment, systems and services.

  • Inflatable Packers and Grouting

    Other Grouting Applications

    The history of grouting is an extensive one, with different techniques utilised in each and every country some of which are more developed that others, for example grout injection techniques for tunneling in Europe is far more advanced than Australia.

    Tunnel grouting is extensively use t ro hout the world for consolidation of rock mass, waterproofing and to provide a co act between the tunnel lining and rock mass. Pre-treatment may be required in some situations before tunneling can proceed. Many applications exist for post tunnel trc ialwent including permeation grouting which involves 9 o res and any cavities within the rock or soil formation, helps i ground stability #K1 co olidation and when properly executed, soil structure is not disturbed.

    Compensation grouting for adjusting ground levels in sivations where soil ma need to be consolidated, this is a very specific process invaving an array of drille horizontal holes e surface small quantities of gro injected at defined

    locations.

    e rock permeability to Iso serves to fill in void

    rti s which increase the strength of r ck formations and consolidates the eneath structures.

    routing is often carried out prior to am development to limit water se e underground. Curtain grouting does not provide a 100% water tight barr it is

    wever a highly effective method.

    Jet Grouting is frequent! used in underground construction and is also known as very high pressure r ground conclti n the soil with high pr properties than the

    Earth nails or soil nails are implemented for additional strength and structural support of slopes and walls. Earth nails are installed through the use of a reinforced bar which is grouted into place at specific intervals, installation may be temporary or permanent.

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia

    Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 [email protected] www.ripe-packers.com Australian supplier and manufacturers of Inflatable cement grouting packers, pressure injection grout packer, grouting inflatable packers equipment, systems and services.

    Roc gro, wat r

    nd ro

    1161\

    ting is a ighlyuAd application Mcally to de the stallation of tunnels and dam Rock groutin

    Desi ned to form stabile anivreduced permeability mg or supporting strut res. This tee 9r7F.-lue erodes

    rout leavi jet grouted column with better

  • Inflatable Packers and Grouting Fixed End vs. Sliding End for Grouting

    Fixed end inflatable packers do not move or shrink in length on inflation they simply radially expand, this creates a problem when encountering large diameter boreholes. Inflatable packers enjoy a balanced trade off between inflation pressure and the amount the packer can inflate before rupture. Incorporating a fully reinforced packer element with a sliding end design pern'ileturther expansion and higher pressures. Whilst pumping grout below a sliding end packer the rnning mandrel becomes exposed to the cement possibly causing damage to the mandrel or the o-rings/ seals.

    li

    Factors such as high inflation ratios, small run in diame e s, borehole specifics and the application itself will determine a suitable syste

    ed en Sliding end Borehole conditions/ criteri

    Flowing high pressure bore High prcsiiire inflations

    all On-in diameters ghifnflation ratio a houts

    I lbandonmen rievable

    Even though these factor do contribute a choice between fixed and sliding e packers it is possible to push engineerin extremes for each type and almost anything is possible! Consult your inflatable packer plier for a custom made solution.

    Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, Perth Western Australia