INFORMATION DOCUMENT
Application for the amendment of The Hills
Estate Environmental Authorisation
Portions 72 and 73 of the Farm Rietfontein No. 375 JR
006/13-14/E0113
Applicant:
FEBRUARY 2015
2
TABLE OF CONTENTS
1. BACKGROUND ............................................................................................................... 3
2. THE PROPOSED AMENDMENTS ...................................................................................... 6
3. INFRASTRUCTURE SERVISES ............................................................................................ 8
3.1 Roads and stormwater .............................................................................................. 8
3.2 Sewer ........................................................................................................................... 8
3.3 Water ........................................................................................................................... 8
3.4 Electricity ..................................................................................................................... 8
4. ENVIRONMENTAL IMPACTS ......................................................................................... 10
4.1 Potential negative environmental impacts ......................................................... 10
4.2 Potential positive environmental impacts ........................................................... 11
5. CONCLUDING COMMENTS ......................................................................................... 11
LIST OF FIGURES
Figure 1: Locality Map ............................................................................................................. 3
Figure 2: Approved Layout .................................................................................................... 4
Figure 3: Township Extensions ................................................................................................. 5
Figure 4: Proposed layout ....................................................................................................... 6
Figure 5: Water supply............................................................................................................. 9
Figure 6: Sewer infrastructure ............................................................................................... 10
LIST OF TABLES
Table 1: Summary of the Proposed Land Uses .................................................................... 7
3
1. BACKGROUND
The Hills Township was issued with an Environmental Authorised (EA) in terms of sub-
regulation 2c, 1(o) and 1(n) of Government Notice R1182 promulgated under sections
26 and 28 of Act 73 of 1989 in 2006 on the Farm Rietfontein 373 JR (see Fig.1 locality
map). The authorisation allowed for the development of a golf estate comprising a golf
course, club house, private resort, hotel with time sharing units, eco-residential and golf
villages, maintenance and workshop area, sewage works, residential and commercial
development, see Fig. 2. The township was subsequently phased into six different
extensions, see Fig.3. An application for amendment of EA referenced 006/13-14/E0113
was submitted to the Gauteng Department of Agriculture and Rural Development on
10 March 2014 and approved on 2 July 2014.
Figure 1: Locality Map
An appeal was, however, lodged against the approval. The MEC;s decision was to refer
the matter back to the Department for reconsideration subject to, among other things, a
public participation process being repeated and relevant information made available
to Interested and Affected Parties, refer to Annexure 1. This document has been
prepared to provide Interested & affected parties with information on the nature of
amendments applied for (Refer to Annexure 2 for the Application Form).
4
Figure 2: Approved Layout
5
Figure 3: Township Extensions
The intention of the application was to amend certain conditions in the ROD owing to
the changed focus of the project. As the development scheme has been acquired by
Century Property Developments PL, there is no intention to develop a golf course. As a
result the conditions in the EA that related to the golf course development need to be
removed/amended, the holder of authorisation need to be updated and the layout
pertaining to The Hills Proper which previously provided for the golf course need to be
amended to provide for new uses as shown in Fig 4.
6
Figure 4: Proposed layout
2. THE PROPOSED AMENDMENTS
The developer seeks to, in the main, convert the area which was previously set aside
for an 18 hole golf course and related uses into a mixed use township. The new
township will comprise mostly of high density residential erven, with various open
spaces and a commercial component, including offices and shops. Given the
alignment of the K147 Road through the site, it is proposed to introduce higher density
residential units with supporting non-residential uses along the K147 Road as well as
within the main access from the K147 into The Hills Proper. Higher intensity land uses
along the k147 are in keeping with the provisions of the municipal spatial plans and
they allow for lower intensity uses to be located away from the road towards adjacent
properties. Refer to Fig 4 and Annexure 3 (Town Planning Motivation) for the allocation
7
of various land uses on site. The table below presents a summary of the proposed land
use. Other amendments requested are captured in the application form.
Table 1: Summary of the Proposed Land Uses
No. of
Erven
Proposed Zoning Density
(units/ha)
Area
(ha)
No. of Units
3 Residential 3 80 19,5111 1 190 2 Residential 3 60 13,9227 835 5 Residential 3 40 48,7040 1 947 2 Residential 2 20 9,4503 189 1 Special- Place of Instruction and Dwelling
Units
20 9,8948 100
1 Business 1 5,6293 6 Private Open Space 30,6117 4 Special for Access 8,6413 1 Special for Gatehouse 0,0700
Streets 11,7622
25 158,1974 4 261
A number of factors have informed the proposed layout. Key among these includes:
the provisions of the municipal spatial plans for the area;
plans and provisions for infrastructure services (roads, sewer and water);
changing spatial economy of the area; and
discussions with Interested and Affected Parties following the amendment to
the environmental authorisation and the appeal that was noted.
According to the Town Planning Memorandum, the property is located within the
Tshwane Regional Spatial Development Framework for Region 6. The site is within the
Suburban Densification Zone. Although the proposed density of 26.9 units per hectare
is slightly above the policy guidelines, the proposed land use rights are supported by
the development guidelines of the Region 6 Regional Spatial Development
Framework. Consequently, the CTMM indicated previously its support for the proposed
densification of the site, see Annexure 4.
Some of the key issues raised by adjacent landowners relate to the densities and visual
impact of the proposed development. As a result, the layout had been amended to
ensure that higher densities are mostly away from adjacent estates and located closer
to the K147 which is in the middle of the estate. Further, the amount of
business/commercial space has been reduced compared to the provisions in the
previous layout. A highlight on the provisions of infrastructure services is below.
8
3. INFRASTRUCTURE SERVISES
In order to ensure adequate provision of infrastructure services relevant studies are
either underway or have been completed. The recent report by the engineers that
act on behalf of the municipality (GLS) indicates the required upgrades, additions
and or adjustments to the existing network to accommodate the development. Figs
5 and 6 are excerpts from the GLS report which is attached as Annexure 5.
3.1 Roads and stormwater
Important to note is that the applicant has already submitted applications and
made a commitment of close to R100m for upgrades and/or provision of
infrastructure to service the broader area including the proposed development.
Included among these is the upgrade/extension of the Atterbury Road (for which
authorisation has been received) and the construction of the K147 from the Hills
Proper to Garsfontein Road. An application for authorisation for the latter has
already been submitted to GDARD. The stormwater master has already been
developed.
3.2 Sewer
Due to lack reticulated sewer system in the area, the applicant will be constructing
the Swavelpoort outfall sewer and rising main for the area. This system which is in
accordance with the City of Tshwane master plan will serve the broader
Zwavelpoort area and not only the proposed development. The application for
authorisation for this development has already been submitted.
3.3 Water
The GLS report (Annexure 5) provides the upgrades for both sewer and water
services required. The applicant is in the process of submitting an application for the
construction of the pipeline from the Grootfontein Reservoir to service the township.
3.4 Electricity
Eskom has confirmed the availability of capacity to accommodate the proposed
development. According to the letter from Eskom (Annexure 6) there will be no
upgrades required as the existing equipment can accommodate the required
capacity. The applicant will be required to pay for the connection charges.
9
Figure 5: Water supply
10
Figure 6: Sewer infrastructure
4. ENVIRONMENTAL IMPACTS
The information presented in this section is taken from the application in the
Application Form submitted to GDARD.
4.1 Potential negative environmental impacts
Possible increase in light pollution- the development will result in the installation
of lights on roads and within the township. Care must be taken that lighting is
focussed on roads and internally so as not to cause light pollution for the
surrounding areas.
Possible dust pollution and emissions- due to movement of trucks during
construction on site, there will be dust generated. Dust suppression measures
will, however be implemented. Further, compliance to emission standards is
emphasised.
Visual impact- the development is likely to increase viewing distances.
However, the subject site is located in a low lying area which reduces visual
intrusion. Further, the design and finishes of the buildings will be contemporary
and will generate a sense of progress and growth, improving the general
11
character of the area. Should the proposed amendment not be granted
certain negative environmental, social and economic impacts will occur:
Parts of the site will be left undeveloped causing management problems.
Dumping or general disuse may occur.
Denied employment opportunities- A negative decisions means the status as
per the previous approval will continue. It will mean that potential
employment opportunities (both permanent and construction related)
associated with the proposed development will not be created.
Integrated development- There is strong emphasis on correcting the legacy
of apartheid planning by encouraging integrated development. The
proposed development will result in integrated development
4.2 Potential positive environmental impacts
The amended offers substantial benefits in as far as the impacts on environment,
economic and social aspects are concerned. The footprint of the proposed
development will utilise areas already approved for development.
The following benefits are envisaged:
The proposed development will be more beneficial compared to a golf
course development;
It will lead to more permanent and temporary employment opportunities
created;
It will results in densification within the urban fabric in line with the municipal
spatial plans;
As a mixed use development it will be supportive of government policy and
the principles of integrated development;
The provision a new school for the estate and surrounding communities;
Improved Road infrastructure reduces traffic congestion and promotes ease
of movement and more through routes;
Further, road upgrades will improve circulation in this and surrounding areas;
Associated infrastructure provisions will improve services in the area.
5. CONCLUDING COMMENTS
From the assessment conducted, the proposed development is in line with
municipal spatial plans. Considering the proposed infrastructure and services
upgrades/provisions and the envisaged environmental, asocial and economic
impacts, it can be concluded that the proposed amendment will be more
beneficial than the approved uses.
12
ANNEXURES
13
Annexure 1: Letter from GDARD on Public Participation Process
to be followed following the MEC’s decision on the appeal
14
15
Annexure 2: The Application Form
16
Annexure 3: Town Planning Motivation
17
Annexure 4: Comments from The City of Tshwane Metropolitan
Municipality in support of the proposed densification
18
Annexure 5: GLS Engineering Services Report
19
Annexure 6: Confirmation of availability of capacity- Eskom