information set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72...

20
+ 32. 06, 34. 46' POST + 76. 27, 55. 30' POST + 72. 91, 54. 15' POST + 76. 39, 51. 86' MANHOLE + 35. 12, 48. 08' PWP + 26. 47, 84. 07' PWP + 55. 99, 48. 70' GUY WI RE + 73. 33, 50. 09' GUY WI RE + 35. 06, 36. 01' GUY WI RE + 25. 86, 55. 22' GUY WI RE + 25. 83, 57. 01' GUY WI RE + 17. 64, 46. 93' SI GN + 76. 31, 66. 00' MANHOLE + 95. 89, 35. 84' PI PE + 99. 74, 47. 88' PWP + 22. 17, 28. 03' SI GN + 81. 31, 48. 47' PWP + 36. 35, 35. 32' PI PE + 60. 68, 48. 02' PWP + 82. 67, 28. 09' SI GN + 51. 72, 63. 50' T REE + 99. 06, 63. 75' T REE + 46. 34, 48. 00' PWP + 72. 45, 47. 35' GUY WI RE + 72. 53, 48. 39' GUY WI RE + 78. 42, 59. 62' GUY WI RE + 77. 66, 76. 50' GUY WI RE + 77. 00, 84. 18' GUY WI RE + 77. 93, 48. 36' PWP + 33. 61, 63. 15' PWP + 72. 29, 52. 07' T REE + 69. 94, 16. 31' T REE + 70. 00, 31. 28' T REE + 29. 34, 98. 53' T REE + 43. 50, 27. 56' T REE + 06. 95, 25. 76' T REE + 11. 04, 64. 56' T REE + 11. 88, 103. 92' T REE + 38. 47, 114. 94' T REE + 12. 09, 124. 38' T REE INFORMATION DETAILS FOR ROUNDABOUT SEE INTERSECTION M M W GRA SS M A T CHL I NE - ST A 66+ 00. 00 " B" 51 1" = 50' 1' = 5' 580 570 560 580 570 560 JACKSON COUNTY JACKSON TWP. SEC. 30, T-6-N, R-6-E JACKSON COUNTY JACKSON TWP. SEC. 25, T-6-N, R-5-E LINE "B" EXCEPT AS NOTED ALL R/W DESCRIBED FROM FROM LINE "B" EXCEPT AS NOTED ALL TOPOGRAPHY DESCRIBED STA 1+00.00 "G" TO 66+00.00 "B" PLAN & PROFILE SHEET 60 + 00 65 + 00 200' V.C. ELEV. 568.94 P.V.I. 64+00.00 "B" JACKSON COUNTY JACKSON TWP. SEC. 25, T-6-N, R-5-E JACKSON COUNTY JACKSON TWP. SEC. 30, T-6-N, R-6-E 200' V.C. ELEV. 567.74 P.V.I. 60+00.00 "B" 555 565 575 585 555 565 575 585 E = 43236.89' N = 98449.09' STA. 302+08.38 "PR-A" BEGIN CONSTRUCTION 570.03 +00.00 570.28 +30.92 P.O.T. 58+30.97 LINE "B" EAST 43235.3494 NORTH 98687.9339 FIRE HYD NE BOLT 66. 97' 49 . 11 ' 46 . 42 ' "STOP" CL Sign MAG NAIL T "STOP" CL Sign T 15+00 14+00 13+00 12+00 11+00 10+00 563.21 +00.00 560.26 +05.00 559.58 +00.00 PROPOSED GRADE LINE "G" 1 . 500 % 0 . 146 % ELEV. = 566.90 STA. 12+10.85 "G" BEGIN PROJECT STA. 11+58.85 "G" CONSTRUCTION BEGIN INCIDENTAL 4 ' B O TT O M D I T C H R T . @ S = 1 . 000 % 4' BOTTOM DITCH RT. @ S=0.648% ALONG LINE "G" EXISTING GROUND STA. 11+58.85 "G" CONSTRUCTION BEGIN INCIDENTAL E = 42946.31' N = 98671.91' STA. 12+10.85 "G" BEGIN PROJECT 567. 0 567. 1 567. 1 559. 58 567. 1 559. 90 566. 9 560. 23 567. 0 560. 71 566. 9 561. 21 566. 9 561. 71 566. 9 562. 21 566. 9 562. 71 567. 4 563. 21 150' V.C. ELEV. 567.03 P.V.I. 13+00.00 "G" P.I. 10+50.09 "G" P.I. 11+65.02 "G" 10 + 00 1: 50 2: 19: 55 PM 9/18/2017 W:\Se y m ou r \2015- 161 Se y m ou r - Sou t h e r n Byp a ss \De s i gn \Pub li c I n f o r m a ti on Mee ti ng \2017- 09- 20\PP100- 6600. dgn DEPARTMENT OF TRANSPORTATION INDIANA DESIGN ENGINEER DATE DESIGNED: CHECKED: CHECKED: DRAWN: HORIZONTAL SCALE VERTICAL SCALE SURVEY BOOK CONTRACT PROJECT of SHEETS DESIGNATION BRIDGE FILE FOR APPROVAL RECOMMENDED i ndo t . t b l PDF Co l o r . p lt c f g REV I SI ON 3. 0 1600743 1600743 HDP LWR HDP RSH R-40004 C HMA SHOULDER J K F CONCRETE, CURB & GUTTER 22 26 NURSERY SODDING TYPE CONCRETE CENTER CURB, O R MILL & RESURFACE T S SAW CUT FULL DEPTH HMA TRAIL U UNDERDRAIN, 6" 15 PCCP FOR APPROACHES, 9 IN. SIDEWALK, CONCRETE, 4 IN. FULL DEPTH HMA PAVEMENT COMPACTED AGGREGATE NO. 53 14 CONCRETE ROLLED CURB 27 SEEDING TRUCK APRON 17 13 CONCRETE CURB 6" P.O.T. 304+47.24 "PRA" P.O.T. 58+30.97 "B" = L I N E " B " CULVERT #1 CULVERT #2 +59 "G", STR. NO. 103 +26 "G", STR. NO. 100 +22 "G", STR. NO. 101 +71 "G", STR. NO. 102 +66 "G", STR. NO. 106 +54 "G", STR. NO. 107 +53 "B", STR. NO. 104 +94 "B", STR. NO. 105 +71 "B", STR. NO. 110 +08 "B", STR. NO. 109 +52 "B", STR. NO. 108 +94 "B", STR. NO. 111 T T J J K W = 24' +02 "B" CLASS IV DRIVE K FUTURE TURNING LANE 15 15 15 15 K K K 15 K BM 11.DNR_BM_JAC62_1992 PROPOSED GRADE LINE "B" ALONG LINE "B" EXISTING GROUND 563.08 +50.33 4 ' B O TT O M D I T C H LT . @ S = 0 . 299 % P L O T TE D 10 ' A B OV E DA T U M 4 ' B O TT O M D I T C H R T . @ S = 0 . 302 % 563.50 +60.00 - 0 . 300 % - 1 . 500 % 0 . 300 % 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 567. 0 566. 2 566. 0 566. 0 566. 0 566. 2 566. 5 566. 4 566. 6 566. 9 567. 4 567. 4 567. 1 567. 0 567. 2 567. 2 569. 99 569. 24 568. 60 568. 19 568. 00 568. 04 568. 19 568. 34 568. 49 568. 64 568. 75 568. 79 568. 75 568. 64 568. 49 568. 34 A I RPORT RD. 1ST AV E 2ND AV E G AV E . G & S Leasing Board of Education Dave O'Mara Contractor, Inc. Seymour Aviation Commission Seymour Aviation Commission Commission Aviation Seymour B U R KA R T B L V D . Services, Inc. Developmental Commission Seymour Aviation L I N E " G " P.I. = 10+50.09 P.I. = 11+65.02 CURVE DATA CURVE DATA P.C. 404+91.32 "PRT1" P.O.T. 59+72.03 "PRT2"= CURVE DATA P.I. = 62+70.72 "PRT2" P.I. 62+70.72 "PRT2" LINE "PRT2" L I NE " PRT 1 " For Information Only

Upload: others

Post on 19-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+32.0

6,

34.4

6'

PO

ST

+76.2

7,

55.3

0'

PO

ST

+72.9

1,

54.1

5'

PO

ST

+76.3

9,

51.8

6'

MA

NH

OLE

+35.1

2,

48.0

8'

PW

P

+26.4

7,

84.0

7'

PW

P

+55.9

9,

48.7

0'

GU

Y

WIR

E

+73.3

3,

50.0

9'

GU

Y

WIR

E

+35.0

6,

36.0

1'

GU

Y

WIR

E

+25.8

6,

55.2

2'

GU

Y

WIR

E

+25.8

3,

57.0

1'

GU

Y

WIR

E

+17.6

4,

46.9

3'

SIG

N

+76.3

1,

66.0

0'

MA

NH

OLE

+95.8

9,

35.8

4'

PIP

E

+99.7

4,

47.8

8'

PW

P

+22.1

7,

28.0

3'

SIG

N

+81.3

1,

48.4

7'

PW

P

+36.3

5,

35.3

2'

PIP

E

+60.6

8,

48.0

2'

PW

P

+82.6

7,

28.0

9'

SIG

N

+51.7

2,

63.5

0'

TR

EE

+99.0

6,

63.7

5'

TR

EE

+46.3

4,

48.0

0'

PW

P

+72.4

5,

47.3

5'

GU

Y

WIR

E

+72.5

3,

48.3

9'

GU

Y

WIR

E

+78.4

2,

59.6

2'

GU

Y

WIR

E

+77.6

6,

76.5

0'

GU

Y

WIR

E

+77.0

0,

84.1

8'

GU

Y

WIR

E

+77.9

3,

48.3

6'

PW

P

+33.6

1,

63.1

5'

PW

P

+72.2

9,

52.0

7'

TR

EE

+69.9

4,

16.3

1'

TR

EE

+70.0

0,

31.2

8'

TR

EE

+29.3

4,

98.5

3'

TR

EE

+43.5

0,

27.5

6'

TR

EE

+06.9

5,

25.7

6'

TR

EE

+11.0

4,

64.5

6'

TR

EE

+11.8

8,

103.9

2'

TR

EE

+38.4

7,

114.9

4'

TR

EE

+12.0

9,

124.3

8'

TR

EE

INFORMATIONDETAILS FOR ROUNDABOUTSEE INTERSECTION

M

M

W

GR

AS

S

MA

TC

HLIN

E -

ST

A 66

+00.0

0 "B"

51

1" = 50'

1' = 5'

580

570

560

580

570

560

JACKSON COUNTY

JACKSON TWP.

SEC. 30, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 25, T-6-N, R-5-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

STA 1+00.00 "G" TO 66+00.00 "B"

PLAN & PROFILE SHEET

60

+00

65

+00

200' V.C.

ELEV. 568.94

P.V.I. 64+00.00 "B"

JACKSON COUNTY

JACKSON TWP.

SEC. 25, T-6-N, R-5-E

JACKSON COUNTY

JACKSON TWP.

SEC. 30, T-6-N, R-6-E

200' V.C.

ELEV. 567.74

P.V.I. 60+00.00 "B"

555

565

575

585

555

565

575

585

E = 43236.89'

N = 98449.09'

STA. 302+08.38 "PR-A"

BEGIN CONSTRUCTION

570.03

+00.00

570.28

+30.92

P.O.T. 58+30.97

LINE "B"

EAST 43235.3494

NORTH 98687.9339

FIRE HYD

NE BOLT

66.9

7'

49.11'

46.42'"STOP"

CL SignMAG NAIL

T "STOP"

CL Sign

T

15+0014+0013+0012+0011+0010+00

563.21

+00.00

560.26

+05.00

559.58

+00.00

PROPOSED GRADE LINE "G"

1.500%

0.146%

ELEV. = 566.90

STA. 12+10.85 "G"

BEGIN PROJECT

STA. 11+58.85 "G"

CONSTRUCTION

BEGIN INCIDENTAL

4' BOTTOM DITCH RT. @ S=1.000%4' BOTTOM DITCH RT. @ S=0.648%

ALONG LINE "G"

EXISTING GROUND

STA. 11+58.85 "G"

CONSTRUCTION

BEGIN INCIDENTAL

E = 42946.31'

N = 98671.91'

STA. 12+10.85 "G"

BEGIN PROJECT

567.0

567.1

567.1

559.5

8

567.1

559.9

0

566.9

560.2

3

567.0

560.7

1

566.9

561.2

1

566.9

561.7

1

566.9

562.2

1

566.9

562.7

1

567.4

563.2

1

150' V.C.

ELEV. 567.03

P.V.I. 13+00.00 "G"

P.I. 10+50.09 "G"

P.I. 11+65.02 "G"

10

+00

1:5

0

2:1

9:5

5

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

100-

6600.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

P.O.T. 304+47.24 "PRA"

P.O.T. 58+30.97 "B" =

LINE "B"

CULVERT #1

CULVERT #2

+59 "G", STR. NO. 103

+26 "G", STR. NO. 100

+22 "G", STR. NO. 101

+71 "G", STR. NO. 102

+66 "G", STR. NO. 106

+54 "G", STR. NO. 107

+53 "B", STR. NO. 104

+94 "B", STR. NO. 105

+71 "B", STR. NO. 110

+08 "B", STR. NO. 109

+52 "B", STR. NO. 108

+94 "B", STR. NO. 111

T

T

J

J

K

W = 24'

+02 "B" CLASS IV DRIVE

K

FUTURE TURNING LANE

15

15

15

15 K

K

K

15

K

BM 11.DNR_BM_JAC62_1992

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

563.08

+50.33

4' BOTTOM DITCH LT. @ S=0.299%

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.302%

563.50

+60.00

-0.300%

-1.500%

0.300%

58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00

567.0

566.2

566.0

566.0

566.0

566.2

566.5

566.4

566.6

566.9

567.4

567.4

567.1

567.0

567.2

567.2

569.9

9

569.2

4

568.6

0

568.1

9

568.0

0

568.0

4

568.1

9

568.3

4

568.4

9

568.6

4

568.7

5

568.7

9

568.7

5

568.6

4

568.4

9

568.3

4

AIR

PO

RT

RD.

1S

T

AV

E 2N

D

AV

E

G AVE.

G & S Leasing

Board of Education

Dave O'Mara Contractor, Inc.

Seymour Aviation Commission

Seymour Aviation Commission

Commission

Aviation

Seymour

BURKART BLVD.

Services, Inc.

Developmental

Commission

Seymour Aviation

LINE "G"

P.I. = 10+50.09

P.I. = 11+65.02

CURVE DATA

CURVE DATA

P.C. 404+91.32 "PRT1"

P.O.T. 59+72.03 "PRT2"=

CURVE DATA

P.I. = 62+70.72 "PRT2"

P.I. 62+70.72 "PRT2"

LINE "PRT2"

LIN

E "P

RT1"

For Inf

ormati

on O

nly

Page 2: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+12.1

1,

46.0

0'

PO

ST

+25.6

6,

44.8

0'

PO

ST

+10.4

4,

48.0

7'

PO

ST

+03.7

3,

44.5

6'

GU

AR

DR

AIL

+37.3

4,

52.0

9'

GU

AR

DR

AIL

+69.6

0,

30.8

9'

FIR

E

HY

DR

AN

T

+02.5

5,

45.2

9'

GA

TE

+46.1

2,

45.1

6'

GA

TE

+38.3

5,

62.6

7'

TR

EE

+37.2

9,

73.8

2'

TR

EE

+52.6

4,

40.4

3'

PW

P

+66.8

8,

7.1

5'

PW

P

+68.6

4,

5.5

9'

SIG

N

+99.6

3,

17.2

7'

LIG

HT

PO

LE

+69.7

1,

32.8

9'

LIG

HT

PO

LE

+26.7

0,

23.7

6'

PO

ST

+29.2

2,

23.6

4'

PO

ST

+29.3

2,

26.0

9'

PO

ST

+27.2

3,

26.2

7'

PO

ST

+23.1

3,

26.9

3'

SIG

N

+50.2

4,

8.3

4'

SIG

N

+13.3

1,

38.6

2'

SIG

N

+91.2

4,

29.8

2'

SIG

N

+24.7

2,

38.5

7'

PIP

E

+24.8

1,

1.9

2'

PIP

E

Ele

v 565.87 F

T 68

+00.37, 60.99'

Ele

v 566.92 F

T 73

+00.49, 60.59'

Ele

v 567.35 F

T 73

+00.49, 30.59'

Ele

v 566.02 F

T 67

+99.94, 31.

00'

MA

TC

HLIN

E -

ST

A 66

+00.0

0 "B"

52

1" = 50'

1' = 5'

STA 66+00.00 TO 80+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 80

+00.0

0 "B"

560

570

580

560

570

580

JACKSON COUNTY

JACKSON TWP.

SEC. 30, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

200' V.C.

ELEV. 567.74

P.V.I. 68+00.00"B"

200' V.C.

ELEV. 570.25

P.V.I. 75+00.00"B"

300' V.C.

ELEV. 574.26

P.V.I. 80+00.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 30, T-6-N, R-6-E

555

565

575

585

565

555

575

585

CL GATE POST

SJCA CAPPED REBAR

FIRE HYD

47.7

0'

66.9

4'

152.46'

LINE "B"

EAST 44233.3211

NORTH 98702.0899

P.C. 68+29.04

NE BOLT

T

"30 MPH"

CL Sign

1:5

0

2:2

1:0

2

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

6600-

8000.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

70

+00

75

+00

80

+00

LINE "B"

P.C. 68+29.04 "B"

PROPOSED 30'-0" DITCH

T

T

JJ

J

J

J

K

K

W = 17'

+23 "B" STREET APPROACH

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

567.65

+75.00

4' BOTTOM DITCH LT. @ S=0.707%

572.07

+00.00

4' BOTTOM DITCH LT. @ S=0.299%

PLOTTED 10' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.974%

567.25

+00.00569.05

+00.00571.97

+00.00-0.300%

0.359%

0.802%

4' BOTTOM DITCH RT. @ S=0.302%4' BOTTOM DITCH RT. @ S=0.300%

567.87

+00.00

PROPOSED 30'-0" DITCH

566.92

+00.00

66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00

567.2

567.0

566.9

566.9

566.8

566.6

566.9

567.4

567.5

567.6

567.7

568.0

568.3

568.1

568.3

567.9

568.2

568.9

569.5

569.8

570.2

570.4

570.8

570.9

571.8

573.1

572.4

573.0

573.7

568.3

4

568.1

9

568.0

4

567.9

3

567.9

0

567.9

6

568.1

0

568.2

8

568.4

6

568.6

4

568.8

2

568.9

9

569.1

7

569.3

5

569.5

3

569.7

1

569.8

9

570.1

0

570.3

6

570.6

8

571.0

5

571.4

5

571.8

5

572.2

5

572.6

6

573.0

6

573.4

1

573.6

7

573.8

5

3R

D

AV

E

Dave O'Mara Contractor, Inc.

Seymour Aviation Commission

Board of Education

Board of Education

BURKART BLVD.

BURKART BLVD.

P.C. 68+29.10 "PRT2"

LINE "PRT2"

CURVE DATA

P.I. 80+07.66 "PRT2"

E = 163.20'

L = 2297.31'

T = 1178.56'

R = 4174.00'

P.I. = 80+07.66 "PRT2"

For Inf

ormati

on O

nly

Page 3: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+03.5

3,

102.1

4'

PW

P

+67.8

0,

31.4

7'

PW

P

+32.3

5,

7.0

1'

GU

Y

WIR

E

+39.0

3,

5.0

4'

PIP

E

+56.7

2,

231.3

9'

LIG

HT

PO

LE

+22.2

6,

221.7

9'

PW

P

+86.7

0,

104.8

7'

SIG

N

+79.4

6,

131.4

0'

SIG

N

Ele

v 571.

95 F

T 85

+00.00, 61.

00'

Ele

v 571.

31

FT 85

+00.00, 31.

00'

Ele

v 571.

31

FT 88

+49.92, 61.

03'

Ele

v 571.

44 F

T 88

+50.28, 31.

03'

Ele

v 571.

06

FT 87

+49.51, 38.23'

Ele

v 571.

11 F

T 87

+49.32, 53.23'

Ele

v 574.01

FT 93

+30.19, 40.00'

Ele

v 574.99 F

T 93

+30.19, 55.00'

2.3'

1.4'

53

1" = 50'

1' = 5'

STA 80+00.00 TO 94+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 80

+00.0

0 "B"

MA

TC

HLIN

E -

ST

A 94

+00.0

0 "B"

560

570

580

560

570

580

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

300' V.C.

ELEV. 574.26

P.V.I. 80+00.00"B"

300' V.C.

ELEV. 572.01

P.V.I. 87+50.00"B"

350' V.C.

ELEV. 579.80

P.V.I. 93+50.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

555

565

575

585

555

565

575

585

1:5

0

2:2

9:4

9

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

8000-

9400.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

80

+00

85

+00

90

+00

LINE "B"

CURVE DATA

P.I. 84+40.39 "B"

E = 305.28'

L = 3070.64'

T = 1611.35'

R = 4100.00'

P.I. = 84+40.39 "B"

CULVERT #3

CULVERT #4

K

KJ

JJ

J

TT

E=45443.28'

N=98407.69'

STA. 80+92.29 "B"

E=45443.28'

N=98407.69'

STA. 80+92.29 "B"

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

572.63

+00.00

569.63

+00.00572.07

+00.00

4' BOTTOM DITCH LT. @ S=-0.305% 4' BOTTOM DITCH LT. @ S=0.749%

571.23

+00.00

PLOTTED 10' ABOVE DATUM PLOTTED 10' ABOVE DATUM

S=0.301%

DITCH RT. @ 4' BOTTOM

571.97

+00.00

569.53

+00.00571.98

+00.00

570.92

+12.00

-0.267%

CULVERT #3

CULVERT #4

-0.300%

1.298%

PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=-0.700%

RT. @ S=-0.500%

4' BOTTOM DITCH 4' BOTTOM DITCH RT. @ S=0.816%

4' BOTTOM DITCH RT. @ S=-0.305%

80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00

573.7

572.9

572.6

572.4

572.1

571.5

571.2

571.3

571.3

571.0

571.2

571.5

571.8

571.7

571.4

571.0

571.2

571.6

571.4

571.7

571.8

572.4

572.9

573.7

574.4

574.2

573.1

575.4

576.2

573.8

5

573.9

3

573.9

1

573.8

1

573.6

6

573.5

1

573.3

6

573.2

1

573.0

6

572.9

1

572.7

6

572.6

1

572.4

6

572.3

8

572.4

3

572.6

1

572.9

3

573.3

7

573.9

6

574.6

1

575.2

6

575.9

0

576.5

5

577.2

0

577.8

4

578.3

8

578.8

0

579.1

2

579.3

2

C

AVE

G AVEBoard of Education

Board of Education

BURKART BLVD.BURKART BLVD.

Marketing, LLC

Kocolene

PCC91+26.41 "PRT2"

LINE "PRT2"

P.T. 91+62.93 "PRT2"

P.C. 92+32.99 "PRT2"

PRC92+66.28 "PRT2"

P.I. 92+49.79 "PRT2"

CURVE DATA

E = 1.40'

L = 33.29'

T = 16.80'

R = 100.00'

P.I. = 92+49.79 "PRT2"

CURVE DATA

P.I. 91+44.88 "PRT2"

E = 1.69'

L = 36.52'

T = 18.47'

R = 100.00'

P.I. = 91+44.88 "PRT2"

E = 14.34'

L = 687.94'

T = 344.77'

R = 4138.00'

E = 46809.79

N = 97904.02

P.I. = 96+11.05 "PRT2"

P.I. 96+11.05 "PRT2"

For Inf

ormati

on O

nly

Page 4: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+51.9

2,

71.0

2'

LIG

HT

PO

LE

+34.2

5,

78.0

7'

SIG

N

+76.4

5,

105.0

3'

SIG

N

+96.0

4,

106.5

4'

SIG

N

+62.2

2,

68.5

5'

SIG

N

+04.0

0,

107.1

7'

SIG

N

+00.1

6,

69.8

6'

SIG

N

+98.4

1,

111.2

0'

LIG

HT

PO

LE

+94.9

7,

118.0

4'

GU

Y

WIR

E+

94.5

0,

126.9

2'

GU

Y

WIR

E+

94.7

7,

131.1

7'

GU

Y

WIR

E

+94.9

1,

147.6

5'

PW

P

+40.1

9,

127.4

3'

PW

P+

41.4

5,

128.7

6'

PO

ST

+42.8

9,

144.5

6'

GU

Y

WIR

E+

42.2

9,

152.2

5'

GU

Y

WIR

E

+42.8

8,

155.1

1'

SIG

N

+25.0

7,

121.5

5'

GU

Y

WIR

E

+21.7

5,

120.9

0'

GU

Y

WIR

E

+16.1

6,

129.5

5'

CA

TC

H

BASIN

+08.8

8,

142.6

2'

CA

TC

H

BASIN

+09.1

3,

136.4

0'

SIG

N

+12.8

7,

130.2

2'

SIG

N

+68.3

2,

122.4

5'

PW

P

+28.7

0,

49.5

3'

CO

NT

RO

L

POIN

T

+86.7

7,

102.4

5'

SIG

N

+11.5

7,

76.0

9'

SIG

N

+98.1

2,

111.0

9'

SIG

N

+23.3

2,

131.6

0'

LIG

HT

PO

LE

+24.1

4,

74.8

9'

SIG

N

+29.2

3,

118.2

4'

TR

EE

+99.0

5,

116.9

0'

TR

EE

+05.6

0,

116.9

0'

TR

EE

+74.9

4,

120.8

8'

TR

EE

+33.4

3,

128.4

0'

TR

EE

+74.8

9,

126.7

7'

PIP

E

+57.6

4,

130.0

2'

PIP

E

+76.3

4,

118.0

3'

PIP

E

+19.4

6,

114.4

2'

PIP

E

MM

CB

CB

CB

2.8'

54

1" = 50'

1' = 5'

MA

TC

HLIN

E -

ST

A 94

+00.0

0 "B"

MATC

HLIN

E -

ST

A 108

+00.0

0 "B"

STA 94+00.00 TO 108+00.00 "B"

PLAN & PROFILE SHEET

560

570

580

590

560

570

580

590

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

TO REMAIN AT GRADE

EXISTING RAILROAD CROSSING

TO REMAIN AT GRADE

EXISTING RAILROAD CROSSING

350' V.C.

ELEV. 578.10

P.V.I. 99+86.88"B"

565

575

585

565

575

585

LINE "B"

EAST 47040.1288

NORTH 97644.6873

P.T. 98+99.68

106.8

1'

70.26'

41.9

1'

"SCHOOL ZONE"

CL Sign

SJCA CAPPED REBAR

T

T

"STOP"

CL Sign

T"RR-XING"

CL Sign

LINE "B"

EAST 47272.8260

NORTH 97434.4422

P.C. 102+13.29

T

SJCA CAPPED REBAR

T

172.9

7'

T

119.3

1'

110.8

1'

"RR-XING"

CL Sign

ARROW"

"LEFT TURN

CL Sign

"30 MPH"

CL Sign

1:5

0

2:2

9:2

4

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

9400-

10800.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

95

+00

100

+00

105

+00

110+

00

LINE "B"

LINE "B"

CURVE DATA

E = 91.04'

L = 906.69'

T = 476.22'

R = 1200.00'

P.I. = 106+89.51 "B"

P.T. 98+99.68 "B"

P.I. 106+89.51 "B"

P.C. 102+13.29 "B"

CULVERT #5

CULVERT #6

CULVERT #7

J

J J

J

J

T

T

K

K

W = 24'

+62 "B" STREET APPROACH

W = 26'

+58 "B" STREET APPROACH

E=46866.92'

N=97997.89'

STA. 95+47.80 "B"

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

575.20

+90.00

571.23

+00.00

4' BOTTOM DITCH LT. @ S=0.576%

4' BOTTOM DITCH LT. @ S=0.500%

PLOTTED 10' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.439%

4' BOTTOM DITCH RT. @ S=0.301%

S=0.301%

DITCH RT. @ 4' BOTTOM

575.00

+90.00

CULVERT #5

-0.267%0.318%

573.08

+50.00

94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00

576.2

575.0

576.4

576.4

576.1

576.4

576.8

576.9

577.4

577.8

577.0

577.0

577.0

577.7

577.3

577.0

578.0

578.3

578.8

579.4

579.6

579.1

579.4

579.9

579.9

579.6

579.5

579.6

580.0

579.3

2

579.4

1

579.3

9

579.2

7

579.1

3

579.0

0

578.8

6

578.7

3

578.6

0

578.4

8

578.3

9

578.3

6

578.3

6

578.4

0

578.4

9

578.6

2

578.7

7

578.9

3

579.0

9

579.2

5

579.4

1

579.5

7

579.7

3

579.8

9

580.0

4

580.2

0

580.4

1

580.7

0

581.0

8

B

AV

E

C

AVE

6TH AVE

B

AV

E

A

AV

E

Kocolene Marketing, LLC

Board of Education

Robert E. GoeckerNancy Faye Hoffar

Nancy Faye Hoffar

Seymour Aviation Commission

Nancy Faye Hoffar

Seymour Aviation Commission

BURKART BLVD.

BURKART BLVD.

LLC

Marketing,

Kocolene

P.T. 99+54.22 "PRT2"

CURVE DATA

E = 14.34'

L = 687.94'

T = 344.77'

R = 4138.00'

E = 46809.79

N = 97904.02

P.I. = 96+11.05 "PRT2"

P.C. 102+67.83 "PRT2"

P.I. 107+41.04 "PRT2"

LINE "PRT2"

CURVE DATA

E = 92.66'

L = 898.75'

T = 473.21'

R = 1162.00'

P.I. = 107+41.04 "PRT2"

P.I. 96+11.05 "PRT2"

For Inf

ormati

on O

nly

Page 5: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

SEE INTERSECTION DETAILS FOR ROUNDABOUT INFORMATION

55

1" = 50'

1' = 5'

MA

TC

HLIN

E -

ST

A 108

+00.0

0 "B"

STA 108+00.00 TO 122+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 122

+00.0

0 "B"

580

590

600

580

590

600

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

300' V.C.

ELEV. 581.00

P.V.I. 108+00.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

585

575

595

605

585

575

595

605

585.46

+45.00 586.79

+05.00

1:5

0

2:3

1:4

3

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

10800-

12200.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

110

+00

115

+00

120

+00

LINE "B"

CURVE DATA

P.T. 111+19.98 "B"

P.C. 116+45.94 "B"

P.I. 121+94.44 "B"

E = 54.17'

L = 1082.78'

T = 548.50'

R = 2750.00'

P.I. = 121+94.44 "B"

+116 "PRT3", STR. NO. 113

J

JK

K

K

T

T

T

T

K

K

T

J

J

K

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

579.65

+80.00

4' BOTTOM DITCH LT. @ S=0.650%

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.677%

S=0.439%

4' BOTTOM DITCH RT. @

578.91

+80.00

0.730%

1.387%

4' BOTTOM DITCH LT. @ S=0.500%

PLOTTED 10' ABOVE DATUM

108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00

580.0

580.3

580.6

580.8

581.3

582.1

583.1

584.0

584.3

584.8

585.2

584.8

584.5

584.6

585.1

585.1

585.5

586.1

586.5

586.9

587.4

587.9

588.4

588.9

589.5

590.4

590.6

590.7

590.5

581.0

8

581.5

5

582.1

1

582.7

6

583.4

5

584.1

5

584.8

4

585.5

3

586.1

4

586.6

2

586.9

5

587.1

5

587.2

2

587.1

4

586.9

3

586.6

7

586.4

9

586.5

2

586.7

6

587.1

2

587.4

8

587.8

5

588.2

1

588.5

8

588.9

4

589.3

1

589.6

7

590.0

4

590.4

0

SR11/

WA

LN

UT

ST

SR11/

WA

LN

UT

ST

Seymour Aviation Commission

Seymour Aviation Commission

Indian Creek Acres, L.L.C.

Indian Creek Acres, L.L.C.

BURKART BLVD.

PCC111+66.59 "PRT2"

P.T. 111+81.42 "PRT2"

P.I. 111+74.02 "PRT2"

CURVE DATA

P.C. 115+50.27 "PRT3"

P.T. 116+09.25 "PRT3"

P.I. 115+80.64 "PRT3"

CURVE DATA

PCC116+95.28 "PRT3"

E = 4.51'

L = 58.98'

T = 30.38'

R = 100.00'

P.I. = 115+80.64 "PRT3"

CURVE DATA

P.I. 116+63.82 "PRT3"

LINE "PRT2"

LINE "PRT3"

E = 5.59'

L = 65.35'

T = 33.89'

R = 100.00'

P.I. = 116+63.82 "PRT3"

E = 0.28'

L = 14.84'

T = 7.43'

R = 100.00'

P.I. = 111+74.02 "PRT2"P.C. 116+29.93 "PRT3"

For Inf

ormati

on O

nly

Page 6: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

FARM FIELD

FARM FIELD

FARM FIELD

FARM FIELD

FARM FIELD

FARM FIELDFARM FIELD

2.5'

56

1" = 50'

1' = 5'

STA 122+00.00 TO 136+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 122

+00.0

0 "B"

MA

TC

HLIN

E -

ST

A 136

+00.0

0 "B"

580

590

600

580

590

600

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

600' V.C.

ELEV. 598.43

P.V.I. 133+00.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

585

575

595

610

585

575

595

605

AP

P.

PL

610

605

1:5

0

2:3

2:1

8

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

12200-

13600.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

125

+00

130

+00

135

+00

LINE "B"

CURVE DATA

P.T. 127+28.72 "B"

P.C. 130+13.64 "B"

P.I. 134+00.54 "B"

E = 37.08'

L = 764.36'

T = 386.90'

R = 2000.00'

P.I. = 134+00.54 "B"

CULVERT #8

J

J

J

J

K

K

T

T

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

593.23

+00.00

592.90

+30.00

593.82

+60.00

4' BOTTOM DITCH LT. @ S=0.650%

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.677%593.26

+00.00

592.11

+30.00

592.59

+90.00

-0.685%

CULVERT #8

0.730%

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH LT. @ S=-0.500%

PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=0.471%

PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=-0.540%

@ S=-0.500%

4' BOTTOM DITCH RT.

@ S=0.300%

4' BOTTOM DITCH RT.

@ S=-0.500%

4' BOTTOM DITCH RT.

122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00

590.5

590.8

591.4

591.6

591.8

591.7

592.1

592.2

592.5

593.1

593.1

593.5

593.6

593.8

593.9

594.1

594.3

594.9

595.7

595.7

594.3

593.3

593.3

593.4

593.6

593.8

593.5

593.2

593.0

590.4

0

590.7

7

591.1

3

591.5

0

591.8

6

592.2

3

592.5

9

592.9

6

593.3

2

593.6

9

594.0

5

594.4

2

594.7

8

595.1

5

595.5

1

595.8

8

596.2

4

596.5

8

596.8

5

597.0

7

597.2

3

597.3

3

597.3

7

597.3

5

597.2

7

597.1

4

596.9

4

596.6

9

596.3

8

Indian Creek Acres, L.L.C.

Indian Creek Acres, L.L.C.Rust Farms, LLC

Rust Farms, LLC

BURKART BLVD.

BURKART BLVD.

P.T. 127+33.13 "PRT3"

P.C. 128+24.53 "PRT3"

P.I. 128+47.66 "PRT3"

P.T. 128+70.00 "PRT3"

P.T. 129+51.17 "PRT3"

P.C. 129+05.70 "PRT3"

P.C. 130+24.78 "PRT3"

P.I. 129+28.83 "PRT3"

CURVE DATA

E = 48.36'

L = 1037.85'

T = 524.85'

R = 2824.00'

P.I. = 122+20.13 "PRT3"

P.I. = 122+20.13 "PRT3"

E = 2.64'

L = 45.47'

T = 23.14'

R = 100.00'

P.I. = 129+28.83 "PRT3"

E = 2.64'

L = 45.47'

T = 23.14'

R = 100.00'

P.I. = 128+47.66 "PRT3"

CURVE DATACURVE DATA

P.I. 133+14.47 "PRT3"

E = 21.27'

L = 575.22'

T = 289.69'

R = 1962.00'

P.I. = 133+14.47 "PRT3"

CURVE DATA

LINE "PRT3"

For Inf

ormati

on O

nly

Page 7: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

P.C. 143+10.96 "B"

P.T. 137+78.00 "B"

P.T. 150+79.30 "B"

P.I. 147+13.24 "B"

LINE "B"

N89°28'10"E

CURVE DATA

Δ = 41°55'34" LT.R = 1050.00'T = 402.28'L = 768.34'E = 74.42'Se = 4.0%

P.I. 147+13.24 Line "B"

APP. P.L.

APP. EXIST. R/W & P.L.

APP. EXIST. R/W & P.L.

APP. EXIST. R/W

&

P.L.

COUNTY ROAD 340

20+

00

P.I. 17+92.23 "PR-O"

P.O.T. 140+40.30 "B"=

P.O.T. 18+92.19 "PR-O"

+50 "PR-O"

40'

See Geometric

Detail Sheet

L

I

N

E

"

B

-

2

"

P.O.C. 136+45.68 "B-1"=

O.P.O.C. 136+45.68 "B", 2.00' Rt.

See Geometric Detail Sheet

P.O.C. 138+32.45 "B-2"=

O.P.O.C. 143+56.61 "B", 2.00' Lt.

L

I

N

E

"

B

-

1

"

Str. No. 11C

141 Lft. of 15" Pipe

with 2 End Sections

Req'd.

+43 Rt.,

Str. No. 11B

114 Lft. of 15" Pipe

with 2 End Sections

Req'd.

+91 Lt.,

MSE WALL

MSE WALL

P.O.C. 144+09.71 "PRT4"=

O.P.O.C. 143+56.61 "B", 38.00' Lt.

P.I. 144+54.74 "PRT4" =

O.P.O.T. 144+03.31 "B", 37.00' Lt.

LIN

E "

PRT4"

N86°18'0

4"E

P.I. 145+97.40 "PRT4"=

O.P.O.C. 145+50.00 "B", 25.83' Lt.

S 8

6°5

8'4

2"

W

N

8

1

°

5

2

'5

7

" E

P.I. 148+61.18 "PRT4" =

O.P.O.T. 148+14.65 "B", 7.71' Rt.

CURVE DATA

Δ = 28°55'10"R = 1022.93'T = 263.78'L = 516.31'E = 33.46'

P.I. 148+61.18 Line "PRT4"

CURVE DATA

Δ = 5°05'45"R = 1012.00'T = 45.03'L = 90.01'E = 1.00'

P.I. 144+54.74 Line "PRT4"

P.I. 144+99.72 "PRT4"=

O.P.O.C. 144+50.00 "B", 38.00' Lt.

N

7

6

°

2

7

'1

2

"

E

N

4

7

°

3

2

'

3

6

"

E

Str. No. 11A

32 Lft. of 15" Pipe

with 2 End Sections

Req'd.

+88 Lt.,

Str. No. 12

88 Lft. of 132"x48"

Box Structure

+42 Lt.,

580

585

590

595

600

605

610

615

580

585

590

595

600

605

610

615

136+00

592.8

596.38

592.7

596.03

137+00

592.8

595.69

593.0

595.39

138+00

592.9

595.14

593.2

594.95

139+00

593.1

594.82

592.8

594.74

140+00

592.5

594.71

593.2

594.75

141+00

593.1

594.84

593.2

594.98

142+00

593.6

595.18

593.8

595.44

143+00

593.8

595.76

593.4

596.13

144+00

592.8

596.52

592.4

596.92

145+00

592.2

597.32

592.0

597.72

146+00

592.0

598.11

591.9

598.55

147+00

591.6

599.08

591.6

599.69

148+00

591.4

600.38

591.3

601.16

149+00

591.4

602.02

591.7

602.97

150+00

591.6

604.00

591.4

605.12

151+00

591.6

606.32

P.V.I. 140+20.00

ELEV = 593.50

V.C. = 660'

P.V.I. 149+00.00

ELEV = 600.50

V.C. = 600'

+

0.80%

PROPOSED PROFILE GRADE

EXISTING GROUND

ALONG LINE "B"

-0.17%

+

1.04%

592.00

+ 18.2

591.08

+ 72.3

593.44

+ 00.0

GRADE OF SPL. DITCH, RT.

GRADE OF SPL. DITCH, LT.

(PLOTTED 10' ABOVE DATUM)

GRADE OF SPL. DITCH, RT.

-0.21%

-0.09%

593.47

+ 45.0

592.99

+ 77.0

592.92

+ 62.5

GRADE OF SPL. DITCH, LT.

(PLOTTED 10' ABOVE DATUM)

SEE PROFILE LINE "B-1" ON

ALIGNMENT PROFILE SHEET

FOR PROPOSED GRADE

SEE PROFILE LINE "B-2" ON

ALIGNMENT PROFILE SHEET

FOR PROPOSED GRADE

STR. NO. 11A

STR. NO. 11A

STR. NO. 12

STR. NO. 12

+0.20%

STA = 136+46 "B-1"

ELEV = 596.06

-0.6

8%

STA = 143+57 "B-2"

ELEV = 596.18

-0.13%

+ 45.0

593.67

+ 62.5

593.25

-0.12%

+

0.81%

+ 18.2

591.85

+ 25.1

591.24

+ 97.5

593.44

STR. NO. 11B

STR. NO. 11C

+ 18.2

591.85

+ 25.1

591.24

+ 97.5

593.44

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

57

1600743

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

CONCRETE, SIDEWALK, 4 IN.F

HMA SHOULDERJ

FULL DEPTH HMA PAVEMENTK

FULL DEPTH HMA TRAILT

WIDENING WITH HMA, TYPEW

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

STA. 136+00.00 TO 151+00.00 LINE ''B''

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:09 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_B_50_02.D

WG

PRIN

T D

ATE: 9/18/17

140+

00

145+

00

150+

00

SEC. 29, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Rust Farms, LLCSilgan Plastics Corp

Rennekmap, Paul D & Angela DGillaspy - Rennekamp

Rennekmap, Paul D & Angela DGillaspy - Rennekamp

Bridge, Elke S

Silgan Plastics Corp

Rust Farms, LLC

ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

948.26 LFT. OF MSE WALL REQ'D. RT. & LT.

(SEE MSE WALL DETAIL SHEETS)

+97.74

PROPOSED PROFILE AND ELEVATIONS FOR LINE "B" THROUGH THE ROUND-A-BOUT AREA ARE FOR DESIGN PURPOSES ONLY.

SEE SPOT ELEVATION DETAILS

937.50 LFT. OF W-BEAM GUARDRAIL

@ 6'-3" POST SPACING REQ'D. RT.

+22.92

GUARDRAIL END TREATMENT

TYPE "OS" REQ'D., RT.

1325.00 LFT. OF W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. LT.

+44.76

GUARDRAIL END TREATMENT

TYPE "OS" REQ'D., LT.

1

4

'

6

'

1

4

'

6

'

1

2

'

T

K

J

J

+62.47

+18.23

304 SYS. OF SODDING FOR DITCHES REQ'D., LT.

+72.3

+00.0

1

2

'

1

2

'

For Inf

ormati

on O

nly

AutoCAD SHX Text
15"CMP=592.5'
AutoCAD SHX Text
15"CMP=592.4'
AutoCAD SHX Text
10"CMP=592.2'
AutoCAD SHX Text
30"CMP=591.1'
AutoCAD SHX Text
30"CMP=590.8'
AutoCAD SHX Text
10"CMP=592.7'
AutoCAD SHX Text
TB
AutoCAD SHX Text
TB
AutoCAD SHX Text
F
AutoCAD SHX Text
+58.58, 117.15' PWP
AutoCAD SHX Text
+56.03, 115.05' FIBEROPTIC MARKER
AutoCAD SHX Text
+94.23, 159.37' 30" CMP
AutoCAD SHX Text
+04.36, 126.21' PIPE
AutoCAD SHX Text
+06.72, 127.29' PIPE
AutoCAD SHX Text
+24.76, 138.25' PIPE
AutoCAD SHX Text
+00.30, 123.10' PWP
AutoCAD SHX Text
+23.93, 136.10' PWP
AutoCAD SHX Text
141+08.62, 81.61' PWP
AutoCAD SHX Text
140+94.17, 81.68' GUY WIRE
AutoCAD SHX Text
140+80.95, 86.38' SIGN
AutoCAD SHX Text
140+61.48, 59.67' PWP
AutoCAD SHX Text
140+26.85, 57.76' TELEPHONE BOX
AutoCAD SHX Text
140+21.11, 80.60' 15" CMP
AutoCAD SHX Text
140+76.53, 81.77' 15" CMP
AutoCAD SHX Text
141+05.75, 80.75' TELEPHONE BOX
Page 8: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

P.C. 153+10.23 "B"

P.T. 156+72.74 "B"

P.I. 154+93.31 "B"

L

I

N

E

"

B

"

N

4

7

°

3

2

'

3

6

"

E

CURVE DATA

Δ = 19°46'52" RT.R = 1050.00'T = 183.08'L = 362.51'E = 15.84'Se = 4.0%

P.I. 154+93.31 Line "B"

LINE "B"

N67°19'28"E

A

P

P

.

P

.

L

.

APP. EXIST. R/W

&

P.L.

APP. EXIST. R/W

&

P.L.

APPROXIMATE LOCATION OF

OVERHEAD LINES

Str. No. 13

100 Lft. of 72"x60"

Box Structure

+68 Lt.,

MSE WALL

MSE WALL

MSE WALL

MSE WALL

L

I

N

E

"

P

R

T

4

"

P.I. 155+32.21 "PRT4" =

O.P.O.T. 154+91.48 "B", 41.98' Lt.

CURVE DATA

Δ = 19°46'52"R = 1075.75'T = 187.57'L = 371.40'E = 16.23'

P.I. 155+32.21 Line "PRT4"

P.C. 153+44.64 "PRT4"

LINE "PRT4" N 67°19'13" E

N

4

7

°

3

2

'

3

6

"

E

SEE SHEET NO. 78 FOR GRADING PLAN

P.T. 157+16.04 "PRT4"

585

590

595

600

605

610

615

620

625

630

585

590

595

600

605

610

615

620

625

630

151+00

591.6

606.32

591.6

607.61

152+00

591.5

608.98

591.2

610.39

153+00

591.5

611.81

591.9

613.22

154+00

592.5

614.63

593.3

616.05

155+00

593.0

617.46

591.8

618.87

156+00

591.3

620.29

590.7

621.68

157+00

590.6

622.83

590.4

623.69

158+00

590.4

624.27

590.2

624.55

159+00

590.3

624.55

589.8

624.25

160+00

589.7

623.67

589.7

622.80

161+00

589.9

621.64

590.0

620.21

162+00

590.1

618.73

590.1

617.25

163+00

590.1

615.78

586.4

614.30

164+00

587.8

612.82

589.1

611.34

165+00

589.0

609.86

588.7

608.38

166+00

588.4

606.90

+

2

.

8

3

%

-

2

.

9

6

%

P.V.I. 158+80.00

ELEV = 628.20

V.C. = 500'

PROPOSED PROFILE GRADE

EXISTING GROUND

ALONG LINE "B"

GRADE OF SPL. DITCH, RT.

+0.20%

+ 19.5

595.25

-

2

.

8

2

%

-0.28%

+ 40.5

593.66

+ 00.0

586.35

+ 00.0

585.50

-0.17%

1

.4

4

%

GRADE OF SPL. DITCH, LT.

(PLOTTED 10' ABOVE DATUM)

STR. NO. 13

STR. NO. 13

GRADE OF SPL. DITCH, RT.

-

2

.

9

6

%

593.73

+ 40.5

586.05

+ 00.0

585.65

+ 35.0

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

58

1600743

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

CONCRETE, SIDEWALK, 4 IN.F

HMA SHOULDERJ

FULL DEPTH HMA PAVEMENTK

FULL DEPTH HMA TRAILT

WIDENING WITH HMA, TYPEW

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

STA. 151+00.00 TO 166+00.00 LINE ''B''

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:09 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_B_50_02.D

WG

PRIN

T D

ATE: 9/18/17

155+

00

160+

00

165+

00

Silgan Plastics Corp

Keyser, Warren& Doris A

Otte, GlennaSEC. 29, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Keyser, Warren& Doris A

Silgan Plastics Corp

Otte, Glenna

Con

rail

(Lou

isvi

lle a

nd

Indi

ana

Rai

lroa

d)

ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

LIMITS OF PAVING

EXCEPTION

+19.50

+40.50

W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. RT. & LT. (SEE PREVIOUS SHEET)

W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. RT. & LT. (SEE NEXT SHEET)

BRIDGE RAILING &

+35.06

+24.33

+24.94

+35.67

+99.94

+60.06

TRANSITIONS REQ'D.

RT. & LT.

GUARDRAIL TRANSITION

TYPE "TGB" REQ'D. RT. & LT.

GUARDRAIL TRANSITION

TYPE "TGB" REQ'D. RT. & LT.

847.25 LFT. OF MSE WALL REQ'D. RT. & LT. (SEE MSE WALL DETAIL SHEETS)948.26 LFT. OF MSE WALL REQ'D. RT. & LT. (SEE MSE WALL DETAIL SHEETS)

+46.00

+14.00

+74.94

25'-0" OF W-BEAM GUARDRAIL @

3'-1

1

2

" POST SPACING REQ'D. RT. & LT.

+85.06

25'-0" OF W-BEAM GUARDRAIL @

3'-1

1

2

" POST SPACING REQ'D. RT. & LT.

1

4

'

1

0

'

1

2

'

1

4

'

K

14'

14'

12'

K

T

T

10'

11.8'

1

1

.

7

'

Jackson - 00359

Des. No. 1601943

SEE BRIDGE PLANS FOR DETAILS.

TO BE BUILT IN COMBINATION

WITH ROAD CONTRACT.

346 SYS. OF SODDING FOR DITCHES REQ'D., LT. & RT.

+40.5

+00.0

SODDING FOR DITCHES REQ'D., LT.

(SEE NEXT SHEET)

+35.0

SODDING FOR DITCHES

REQ'D., RT.

(SEE NEXT SHEET)

+00.0

For Inf

ormati

on O

nly

AutoCAD SHX Text
F
AutoCAD SHX Text
+20.52, 105.34' TREE
AutoCAD SHX Text
+63.34, 92.31' TREE
AutoCAD SHX Text
+80.81, 74.06' TREE
AutoCAD SHX Text
+87.10, 72.57' TREE
AutoCAD SHX Text
+94.14, 67.54' TREE
AutoCAD SHX Text
+97.79, 67.82' TREE
AutoCAD SHX Text
+26.11, 53.31' TREE
AutoCAD SHX Text
+31.96, 51.75' TREE
AutoCAD SHX Text
+37.48, 49.11' TREE
AutoCAD SHX Text
+44.62, 40.03' TREE
AutoCAD SHX Text
+60.98, 40.55' TREE
AutoCAD SHX Text
+79.46, 40.83' TREE
AutoCAD SHX Text
+83.07, 40.69' TREE
AutoCAD SHX Text
+35.86, 20.19' 9" PVC
AutoCAD SHX Text
+13.62, 23.81' 9" PVC
AutoCAD SHX Text
+14.68, 20.94' 36" CMP
AutoCAD SHX Text
+34.39, 17.85' 36" CMP
AutoCAD SHX Text
+68.23, 176.69' 30" CMP
AutoCAD SHX Text
+98.90, 177.69' 30" CMP
AutoCAD SHX Text
+68.71, 189.47' FIBEROPTIC MARKER
Page 9: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

P.C. 168+04.16 "B"

L

I

N

E

"

B

"

N

6

7

°

1

9

'

2

8

"

E

N

6

7

°

1

9

'

2

8

"

E

CURVE DATA

Δ = 62°03'49" LT.R = 2000.00'T = 1203.23'L = 2166.43'E = 334.04'Se = 3.0%

P.I. 180+07.39 Line "B"

S

E

C

T

I

O

N

L

I

N

E

A

P

P

.

P

.

L

.

A

P

P

.

P

.

L

.

Str. No. 14

110 Lft. of 96"x48"

Box Structure

+40 Lt.,

MSE WALL

MSE WALL

P.I. 169+45.77 "PRT4" =

O.P.O.T. 169+03.67 "B", 23.39' Lt.

CURVE DATA

Δ = 5°41'33"R = 1977.36'T = 98.31'L = 196.45'E = 2.44'

P.I. 169+45.77 Line "PRT4"

P.I. 170+60.48 "PRT4"=

O.P.O.C. 170+20.00 "B", 25.83' Lt.

P.I. 172+38.23 "PRT4"=

O.P.O.C. 172+00.00 "B", 45.00' Lt.

L

I

N

E

"

P

R

T

4

"

L

I

N

E

"

B

"

N

52°22'4

9" E

N

53°11'4

8" E

P.I. 174+33.73 "PRT4"=

O.P.O.C. 174+00.00 "B", 45.00' Lt.

P.I. 173+36.07 "PRT4" =

O.P.O.T. 173+00.00 "B", 42.55' Lt.

P.I. 175+27.30 "PRT4" =

O.P.O.T. 174+95.29 "B", 37.97' Lt.

+52 Lt.,

STR. NO. 15A

Inlet Type "E-7"

and 33' of 12" Pipe

Req'd.

Str. No. 15B

34 Lft. of 24" Pipe

with 2 End Sections

Req'd.

+24 Lt.,

Str. No. 15C

25 Lft. of 12" Pipe

with 2 End Sections

Req'd.

+75 Lt.,

P.C. 168+47.46 "PRT4"

P.R.C. 170+43.92 "PRT4"

P.T. 170+76.18 "PRT4"

P.C. 175+16.86 "PRT4"

P.T. 175+37.72 "PRT4"

570

575

580

585

590

595

600

605

610

570

575

580

585

590

595

600

605

610

166+00

588.4

606.90

588.5

605.42

167+00

588.8

603.94

588.9

602.46

168+00

589.0

600.98

589.1

599.50

169+00

589.5

598.03

589.3

596.55

170+00

588.9

595.07

588.5

593.72

171+00

588.3

592.62

588.0

591.79

172+00

588.1

591.21

588.0

590.88

173+00

587.7

590.81

587.8

590.96

174+00

588.2

591.12

588.5

591.29

175+00

588.5

591.45

588.6

591.62

176+00

588.8

591.78

589.0

591.94

177+00

589.2

592.11

589.1

592.27

178+00

589.2

592.44

589.0

592.60

179+00

589.0

592.76

588.8

592.93

180+00

588.8

593.09

588.7

593.26

181+00

588.6

593.38

+0.33%

P.V.I. 171+60.00

ELEV = 590.33

V.C. = 320'

PROPOSED PROFILE GRADE

EXISTING GROUND

ALONG LINE "B"

GRADE OF SPL. DITCH, RT.

(PLOTTED 10' BELOW DATUM)

GRADE OF SPL. DITCH, LT.

STR. NO. 14

STR. NO. 14

1

.4

4

%

-

1

.8

7

%

+0.30%

+

0.97%

+ 62.8

586.60

+ 88.0

587.58

+ 61.3

590.36

+ 50.0

590.12

-

1

.

9

5

%

+0.3

5%

-0.39%

589.27

+ 61.3

586.28

+ 14.2

589.56

+ 50.0

STR. NO. 15A

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

59

1600743

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

CONCRETE, SIDEWALK, 4 IN.F

HMA SHOULDERJ

FULL DEPTH HMA PAVEMENTK

FULL DEPTH HMA TRAILT

WIDENING WITH HMA, TYPEW

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

STA. 166+00.00 TO 181+00.00 LINE ''B''

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:09 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_B_50_02.D

WG

PRIN

T D

ATE: 9/18/17

170+

00

175+

00

180+

00

Fenneberg, Alfred F &Mildred A Fenneberg t/c

Monroe, Lawrence A -Life Estate& Marcia J Monroe

Otte, Glenna

SEC. 29, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

SEC. 28, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Fenneberg, Alfred F &Mildred A Fenneberg t/c

ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

847.25 LFT. OF MSE WALL REQ'D. RT. & LT.

(SEE MSE WALL DETAIL SHEETS)

+61.25

818.75 LFT. OF W-BEAM GUARDRAIL

@ 6'-3" POST SPACING REQ'D. RT.

1137.50 LFT. OF W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. LT.

+03.81

GUARDRAIL END TREATMENT

TYPE "OS" REQ'D., RT.

+25.78

GUARDRAIL END TREATMENT

TYPE "OS" REQ'D., LT.

1

4

'

1

4

'

1

2

'

1

0

'

K

T

T

K

J

J

1

4

' 1

4

'

6

'

6

'

1

2

'

K

J

J

T

704 SYS. OF SODDING FOR DITCHES REQ'D., LT.

+62.8

553 SYS. OF SODDING FOR DITCHES REQ'D., RT.

+14.2 For

Inform

ation

Only

AutoCAD SHX Text
XX"XXP=586.2'
AutoCAD SHX Text
+38.49, 174.47' PIPE
Page 10: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

P.C. 193+43.08 "B"

P.T. 189+70.59 "B"

N 5°15'39" ELINE "B"

N5°15'39"E

A

PP. P.L.

A

P

P

. P

.L

.

A

P

P

. P

.L.

A

P

P

. P

.L.

A

P

P

. P

.L.

S

E

C

T

IO

N

LIN

E

APPROXIMATE LOCATION OF

OVERHEAD LINES

Str. No. 16A

109 Lft. of 24" Pipe

with 2 End Sections

Req'd.

+00 Lt.,

Str. No. 16B

103 Lft. of 18" Pipe

with 2 End Sections

Req'd.

+88 Lt.,

CURVE DATA

Δ = 41°57'34"R = 1962.00'T = 752.34'L = 1436.83'E = 139.30'

P.I. 182+90.06 Line "PRT4"

P.I. 182+90.06 "PRT4" =

O.P.O.T. 182+38.26 "B", 101.30' Rt.

L

I

N

E

"

P

R

T

4

"

LINE "PRT4"

N5°15'39"E

L

I

N

E

"

B

"

580

585

590

595

600

605

610

615

580

585

590

595

600

605

610

615

181+00

588.6

593.38

588.7

593.43

182+00

588.0

593.40

589.4

593.29

183+00

589.7

593.10

589.8

592.83

184+00

591.3

592.52

593.8

592.21

185+00

595.3

591.90

597.3

591.60

186+00

597.9

591.29

595.3

590.98

187+00

591.7

590.68

588.3

590.37

188+00

588.3

590.06

586.8

589.75

189+00

586.4

589.44

586.3

589.14

190+00

586.2

588.83

586.2

588.52

191+00

586.1

588.24

585.6

587.99

192+00

585.6

587.78

585.7

587.61

193+00

586.0

587.49

586.2

587.40

194+00

586.0

587.33

585.5

587.26

195+00

585.4

587.20

585.6

587.13

196+00

585.7

587.06

P.V.I. 182+00.00

ELEV = 593.75

V.C. = 300'

-0.6

1%

PROPOSED PROFILE GRADE

EXISTING GROUND

ALONG LINE "B"

+0.30%

-1

.2

6

%

GRADE OF SPL. DITCH, LT.

(PLOTTED 20' ABOVE DATUM)

GRADE OF SPL. DITCH, RT.

STR. NO. 16A

STR. NO. 16A

STR. NO. 16B

STR. NO. 16B

-0.30%

-0.6

0%

-0.2

6%

-1

.3

1

%

591.02

+ 00.0

584.73

+ 81.6

+ 21.9

588.09

+ 90.0

588.91

+ 93.9

583.83

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

60

1600743

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

CONCRETE, SIDEWALK, 4 IN.F

HMA SHOULDERJ

FULL DEPTH HMA PAVEMENTK

FULL DEPTH HMA TRAILT

WIDENING WITH HMA, TYPEW

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

STA. 181+00.00 TO 196+00.00 LINE ''B''

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:09 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_B_50_02.D

WG

PRIN

T D

ATE: 9/18/17

185+

00

190+

00

195+

00

Ruddick,James F. &Sherrye R.

Fenneberg, Alfred F &Mildred A Fenneberg t/c

Parkland Inc

Surenkamp, MariettaSEC. 28, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

SEC. 21, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Parkland Inc

Fenneberg, Alfred F &Mildred A Fenneberg t/c

ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

1

4

'

1

4

'

6

'

6

'

1

2

'

T

K

J

J

14'

14'

6'

6'

12'

K

J

J

T

392 SYS. OF SODDING FOR DITCHES REQ'D., RT.

+00.0

+93.9For

Inform

ation

Only

AutoCAD SHX Text
+94.18, 73.54' TREE
AutoCAD SHX Text
+28.70, 183.29' TREE
AutoCAD SHX Text
+69.34, 177.78' TREE
AutoCAD SHX Text
+13.06, 172.90' TREE
AutoCAD SHX Text
+70.81, 107.96' TREE
AutoCAD SHX Text
+25.66, 291.97' TREE
Page 11: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

P.T. 201+11.79 "B"

LINE "B"

N1°30'54"W

CURVE DATA

Δ = 6°46'34" LT.R = 6500.00'T = 384.80'L = 768.71'E = 11.38'Se = NC

P.I. 197+27.88 Line "B"

P.I. 197+27.88 "B"

APP. P.L.

APP. P.L.

APP. P.L.

APP. P.L.

LINE "PRT4"

N1°30'54"W

P.I. 197+29.60 "PRT4" =

O.P.O.T. 197+27.43 "B", 26.69' Lt.

P.O.T. 209+99.47 "PRT4"=

O.P.O.T. 210+00.00 "B", -38.00' Lt.

CURVE DATA

Δ = 6°46'34"R = 6462.00'T = 382.55'L = 764.22'E = 11.31'

P.I. 197+29.60 Line "PRT4"

STR. NO. 17

570

575

580

585

590

595

600

605

570

575

580

585

590

595

600

605

196+00

585.7

587.06

585.7

587.00

197+00

585.6

586.93

585.7

586.86

198+00

586.0

586.80

586.0

586.73

199+00

586.1

586.66

586.3

586.59

200+00

586.1

586.53

586.0

586.46

201+00

586.1

586.39

586.4

586.33

202+00

586.7

586.26

586.9

586.19

203+00

586.6

586.13

586.1

586.06

204+00

585.5

585.99

585.1

585.92

205+00

585.0

585.85

584.7

585.76

206+00

584.5

585.65

584.3

585.53

207+00

584.4

585.39

584.4

585.23

208+00

583.9

585.05

583.5

584.85

209+00

582.8

584.64

581.9

584.44

210+00

580.8

584.23

579.4

584.04

211+00

578.3

583.98

-0.13%

-0.4

2%

P.V.I. 206+60.00

ELEV = 585.64

V.C. = 400'

PROPOSED PROFILE GRADE

EXISTING GROUND

ALONG LINE "B"

GRADE OF SPL. DITCH, LT.

(PLOTTED 20' ABOVE DATUM)

GRADE OF SPL. DITCH, RT.

-

4

.

5

5

%

-0.26%

+ 00.0

573.36

+ 91.9

578.27

-0.30%

-

6

.

3

8

%

578.49

+ 60.0

573.52

+ 38.0

STR. NO. 17

STR. NO. 17

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

61

1600743

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

CONCRETE, SIDEWALK, 4 IN.F

HMA SHOULDERJ

FULL DEPTH HMA PAVEMENTK

FULL DEPTH HMA TRAILT

WIDENING WITH HMA, TYPEW

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

STA. 196+00.00 TO 211+00.00 LINE ''B''

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:09 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_B_50_02.D

WG

PRIN

T D

ATE: 9/18/17

200+

00

205+

00

210+

00

Surenkamp, Marietta

Parkland Inc

Thompson, Mark A & Kathy A (Trustees)Mark & Kathy Thompson Rev Trust

SEC. 21, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Parkland Inc

ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.

K

J

J

T

14'

14'

6'

6'

12'

78 TONS OF REVETMENT RIPRAP

AND 81 SYS. OF GEOTEXTILE

FOR DITCHES

REQ'D., LT.

+60.0

+38.0

+91.9

+00.0

109 TONS OF

REVETMENT RIPRAP

AND 112 SYS. OF

GEOTEXTILE FOR

DITCHES REQ'D., RT.

For Inf

ormati

on O

nly

AutoCAD SHX Text
+08.96, 117.36' TREE
AutoCAD SHX Text
+70.21, 109.74' TREE
AutoCAD SHX Text
+80.26, 105.43' TREE
AutoCAD SHX Text
+99.74, 104.40' TREE
AutoCAD SHX Text
+18.06, 105.17' TREE
AutoCAD SHX Text
+27.06, 100.80' TREE
AutoCAD SHX Text
+74.79, 98.79' TREE
AutoCAD SHX Text
+17.11, 99.93' TREE
AutoCAD SHX Text
+69.13, 100.11' TREE
AutoCAD SHX Text
+79.30, 106.54' TREE
AutoCAD SHX Text
+40.87, 107.24' TREE
AutoCAD SHX Text
+74.07, 124.26' TREE
AutoCAD SHX Text
+93.92, 91.98' CONTROL POINT
AutoCAD SHX Text
+58.74, 123.18' TREE
AutoCAD SHX Text
+84.30, 124.02' TREE
AutoCAD SHX Text
+17.09, 119.86' TREE
AutoCAD SHX Text
+10.01, 132.33' TREE
AutoCAD SHX Text
+13.29, 185.68' TREE
AutoCAD SHX Text
+06.99, 102.02' POLE
AutoCAD SHX Text
+86.53, 203.52' TREE
AutoCAD SHX Text
+87.75, 180.60' TREE
AutoCAD SHX Text
+87.17, 160.80' TREE
AutoCAD SHX Text
+91.46, 129.80' TREE
Page 12: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+58.2

5,

35.5

1'

TR

EE

+78.1

9,

105.7

1'

PW

P

+66.2

8,

139.9

0'

PW

P

4.6'

460 SYS OF SODDING FOR DITCHES REQ'D, LT.

REQ'D, RT.GEOTEXTILE FOR DITCHESRIPRAP AND XXX SYS OFXXX TONS OF REVETMENT

858 SYS OF SODDING FOR DITCHES REQ'D, RT.

62

1" = 50'

1' = 5'

STA 211+00.00 TO STA 225+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 210

+00.0

0 "B"

MA

TC

HLIN

E -

ST

A 225

+00.0

0 "B"

570

580

590

600

570

580

590

600

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

600' V.C.

ELEV. 594.81

P.V.I. 220+00.00"B"

300' V.C.

ELEV. 583.50

P.V.I. 211+75.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

575

585

595

575

585

595

1:5

0

2:3

2:5

4

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

21000-

22500.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

210

+00

215

+00

220

+00

225

+00

LINE "B"

CURVE DATA

P.C. 211+19.75 "B"

P.I. 217+00.29 "B"

P.T. 222+77.75 "B"

P.C. 223+37.56 "B"

E = 25.87'

L = 1158.00'

T = 580.54'

R = 6500.00'

P.I. = 217+00.29 "B"

CULVERT #17

T

T

J

J

J

J

K

K

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

581.50

+50.00

4' BOTTOM DITC

H LT. @

S=2.558%

4' BOTTOM DITCH LT. @ S=0.311%

4' BOTTOM DITCH LT. @ S=0.405%

PLOTTED 1

0' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=0.300%

4' BOTTOM DITCH RT. @ S

=1.829%

573.36

+80.00

576.96

+00.00

587.02

+50.00

-0.300%

-0.416%

1.371%

CULVERT #17

+50.0

+38.0

+50.0

+00.0

573.52

+38.00

582.82

+75.00

PLOTTED 10' ABOVE DATUM

S=-4.542%

DITCH RT. @

4' BOTTOM

@ S=3.6

01%

4' BOTTOM

DITCH

RT.

210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+00 225+00

580.8

580.1

578.6

579.1

580.5

581.5

580.4

582.2

583.3

584.7

585.7

587.0

587.9

588.7

589.2

590.2

591.1

591.1

590.4

590.6

591.0

591.0

590.9

590.4

590.2

590.3

590.4

590.3

590.0

590.0

590.1

584.2

3

584.0

4

583.9

8

584.0

7

584.3

1

584.7

0

585.2

3

585.9

0

586.5

8

587.2

7

587.9

6

588.6

4

589.3

3

590.0

1

590.7

0

591.3

5

591.9

3

592.4

4

592.8

8

593.2

5

593.5

6

593.7

9

593.9

5

594.0

5

594.0

7

594.0

3

593.9

1

593.7

6

593.6

1

593.4

6

593.3

1

Parkland Inc.

Parkland Inc.

Sandra K. Monroe & Marcia J. Monroe (1/2 interest)

Greg Hoevener & Lori Ann Hoevener (1/2 interest)

Robert D. Snider

P.C. 211+19.75 "PRT4"

PRC211+73.38 "PRT4"

P.I. 211+98.46 "PRT4"

PCC212+97.40 "PRT4"

P.C. 212+46.48 "PRT4"

P.T. 212+22.52 "PRT4"

P.I. 211+46.57 "PRT4"

E = 3.10'

L = 49.14'

T = 25.08'

R = 100.00'

P.I. = 211+98.46 "PRT4"

CURVE DATA CURVE DATA

P.I. 212+72.51 "PRT4"

CURVE DATA

E = 3.33'

L = 50.92'

T = 26.03'

R = 100.00'

P.I. = 212+72.51 "PRT4"

E = 0.05'

L = 53.63'

T = 26.81'

R = 6538.00'

P.I. = 211+46.57 "PRT4"

P.I. 217+98.36 "PRT4"

CURVE DATA

P.T. 222+97.38 "PRT4"

P.C. 223+57.19 "PRT4"

LINE "PRT4"

E = 19.06'

L = 999.97'

T = 500.95'

R = 6574.00'

P.I. = 217+98.36 "PRT4"

For Inf

ormati

on O

nly

Page 13: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+84.8

2,

124.4

5'

PW

P

+92.7

7,

108.7

1'

GU

Y

WIR

E

+31.1

6,

121.4

8'

TR

EE

+58.3

6,

126.6

1'

TR

EE

+98.5

3,

138.2

2'

TR

EE

+32.3

5,

118.3

0'

BU

SH

+15.1

8,

126.4

5'

BU

SH

+52.4

3,

138.0

6'

TR

EE

+59.8

8,

122.7

7'

TR

EE

+08.2

8,

126.5

0'

TR

EE

+63.9

1,

128.5

3'

TR

EE

+33.9

5,

115.4

4'

TR

EE

+15.2

1,

113.1

6'

TR

EE

+79.9

5,

110.9

5'

TR

EE

+32.7

6,

109.8

4'

TR

EE

+56.7

3,

106.8

1'

TR

EE

+52.2

4,

125.1

5'

TR

EE

+10.4

2,

106.7

0'

TR

EE

+48.2

7,

115.5

4'

TR

EE

+78.7

9,

139.8

8'

TR

EE

+43.2

6,

137.0

8'

TR

EE

+64.1

3,

144.4

7'

TR

EE

+04.4

4,

144.0

3'

TR

EE

+61.9

3,

138.3

4'

TR

EE

+23.6

9,

152.8

8'

BU

SH

+31.7

5,

153.2

9'

BU

SH

+43.5

7,

153.5

8'

BU

SH

+49.5

2,

153.6

4'

BU

SH

+21.3

2,

152.0

9'

TR

EE

+44.5

6,

113.7

1'

ELE

CT

RIC

ME

TE

R

M

M

M

M

M

M

M

M

M

MMM

M

M

63

1" = 50'

1' = 5'

STA 225+00.00 TO STA 240+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 225

+00.0

0 "B"

MA

TC

HLIN

E -

ST

A 240

+00.0

0 "B"

610

600

590

580

610

600

590

580

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

200' V.C.

ELEV. 591.06

P.V.I. 232+50.00"B"

300' V.C.

ELEV. 593.31

P.V.I. 240+00.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

585

605

595

585

605

595

1:5

0

2:3

3:2

7

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

22500-

24000.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

225

+00

230

+00

235

+00

240

+00

LINE "B"

CURVE DATA

E = 57.21'

L = 1718.46'

T = 864.27'

R = 6500.00'

P.I. = 232+01.83 "B"

P.I. 232+01.83 "B"

+63 "B", STR. NO. 113

K

K

J

J

J

J

T

T

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

589.37

+25.00

587.50

+30.00

4' BOTTOM DITCH RT. @ S=-0.120%

4' BOTTOM DITCH RT. @ S=0.222%

589.27

+00.00

-0.300%0.300%

4' BOTTOM DITCH LT. @ S=0.405%

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH LT. @ S=0.209%

PLOTTED 10' ABOVE DATUMPLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH LT. @ S=-0.500%

587.71

+00.00

225+00 226+00 227+00 228+00 229+00 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00

590.1

590.2

590.0

590.0

590.1

589.9

589.9

589.9

589.3

588.9

589.2

589.2

589.4

589.6

589.7

590.2

590.5

590.6

590.4

590.6

590.4

590.2

589.9

589.9

589.7

589.6

589.5

590.0

590.3

591.0

591.7

593.3

1

593.1

6

593.0

1

592.8

6

592.7

1

592.5

6

592.4

1

592.2

6

592.1

1

591.9

6

591.8

1

591.6

6

591.5

1

591.3

6

591.2

5

591.2

1

591.2

5

591.3

6

591.5

1

591.6

6

591.8

1

591.9

6

592.1

1

592.2

6

592.4

1

592.5

6

592.7

1

592.8

6

592.9

6

592.9

7

592.8

8

BE

EC

HW

OO

D

LN

SYCAMORE RD

SYCAMORE RD

Sandra K. Monroe & Marcia J. Monroe (1/2 interest)

Greg Hoevener & Lori Ann Hoevener (1/2 interest)

Robert D. Snider

Iris E. Fischer

John A., Sr. & Earl & Edna McCammon

Brian J. D'arcoCarol Ann Bobb

Delbert & Hgerian Fields

Joanne R. Marshall

The Revocable Trust of

as Trustee of

Joanne R. Marshall

Donald Gene Combs

Joyce Hamblen

Tim Hamblen &

Thomas William Money,

Tony L. Beatty

Sandra K. Monroe & Marcia J. Monroe (1/2 interest)

Greg Hoevener & Lori Ann Hoevener (1/2 interest)

P.C. 223+57.19 "PRT4"

E = 46.53'

L = 1542.01'

T = 774.72'

R = 6426.00'

P.I. = 231+31.91 "PRT4"

CURVE DATA

P.I. 231+31.91 "PRT4" PRC238+99.19 "PRT4"

P.I. 239+23.54 "PRT4"

P.T. 239+46.95 "PRT4"

P.C. 239+74.28 "PRT4"

P.I. 239+99.59 "PRT4"

LINE "PRT4"

CURVE DATA CURVE DATA

E = 2.92'

L = 47.76'

T = 24.34'

R = 100.00'

P.I. = 239+23.54 "PRT4"

E = 3.15'

L = 49.59'

T = 25.31'

R = 100.00'

P.I. 239+99.59 "PRT4"

For Inf

ormati

on O

nly

Page 14: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+25.1

8,

97.4

1'

PW

P

+32.1

8,

84.0

2'

PW

P

+57.4

4,

104.1

5'

PW

P

+08.4

5,

99.6

5'

GU

Y

WIR

E

+44.5

9,

82.4

7'

GU

Y

WIR

E

+55.5

0,

83.7

2'

GU

Y

WIR

E

+59.7

2,

73.0

5'

CO

NT

RO

L

POIN

T

+48.0

4,

30.9

7'

TR

EE

+50.8

3,

13.7

2'

TR

EE

+52.3

5,

8.7

4'

TR

EE

+54.0

0,

3.9

7'

TR

EE

+54.5

2,

9.1

5'

TR

EE

+67.6

5,

6.8

6'

CO

NT

RO

L

POIN

T

+90.2

8,

8.0

2'

BU

SH

+97.2

2,

13.6

6'

BU

SH

+07.4

5,

15.9

5'

BU

SH

+30.4

9,

33.6

7'

TR

EE

+14.6

1,

34.9

2'

TR

EE

+66.4

0,

24.3

8'

TR

EE

+75.4

5,

39.4

6'

LIG

HT

PO

LE

+32.0

5,

20.2

9'

CO

NT

RO

L

POIN

T

+92.3

3,

25.9

1'

TR

EE

+95.3

8,

32.9

2'

TR

EE

+42.0

6,

54.5

0'

BU

SH

+52.9

6,

51.5

6'

BU

SH

+60.7

9,

53.7

1'

BU

SH

+64.5

9,

57.7

8'

BU

SH

+69.4

1,

57.8

0'

BU

SH

+78.1

3,

57.6

4'

BU

SH

+32.4

5,

12.4

8'

PW

P

+09.6

9,

41.8

8'

PW

P

+21.4

7,

14.1

0'

SIG

N

+30.3

2,

31.3

4'

MAIL

BO

X

+32.2

2,

32.0

2'

MAIL

BO

X

+34.3

0,

32.8

2'

MAIL

BO

X

+96.4

0,

74.8

2'

TR

EE

+49.2

8,

85.8

6'

TR

EE

+74.7

6,

53.9

7'

TR

EE

+05.1

7,

46.1

2'

TR

EE

+34.9

3,

37.7

1'

MA

NH

OLE

+46.8

1,

46.9

1'

LIG

HT

PO

LE

+52.3

7,

40.6

9'

MA

NH

OLE

+70.1

3,

39.1

1'

MA

NH

OLE

+52.3

6,

34.6

7' IN

LE

T

+24.1

9,

62.5

3'

BU

SH

+78.9

6,

45.6

3'

PW

P

+82.7

2,

114.6

8'

PW

P

+31.2

1,

96.5

2'

TR

EE

+46.2

7,

64.6

8'

PW

P

+43.7

9,

54.1

3'

MA

NH

OLE

+39.5

7,

55.0

0'

TR

AFFIC

SIG

NA

L

PO

LE

+10.3

9,

38.9

1' IN

LE

T

+09.5

3,

26.8

0' IN

LE

T

+11.7

2,

26.7

3' IN

LE

T

+52.0

9,

45.9

1'

TR

AFFIC

SIG

NA

L

PO

LE

+57.6

8,

54.5

1'

MA

NH

OLE

+41.2

6,

51.6

1'

LIG

HT

PO

LE

+31.8

5,

39.2

0'

BU

SH

+67.7

6,

47.6

3'

TR

EE

+74.8

3,

42.5

3'

PW

P

+39.0

5,

29.2

4' IN

LE

T

+35.2

2,

37.0

5' IN

LE

T+

29.7

3,

26.7

7'

MA

NH

OLE

+50.3

6,

49.6

0'

BU

SH

+77.4

0,

51.7

1'

SIG

N

+62.5

7,

40.6

2'

SIG

N

+81.1

7,

40.3

4' IN

LE

T

+27.7

5,

48.3

2'

TR

EE

+06.1

2,

70.5

1'

PO

ST

EASEMENT40' PERPETUAL DRAINAGE

EASEMENT40'PERPETUAL DRAINAGE P

OO

L

M

M

M

M

M

MM

MM

CB

S

S

S

3.5'

334 SYS OF SODDING FOR DITCHES REQ'D, LT.

DITCHES REQ'D, LT.250 SYS OF SODDING FOR

406 SYS OF SODDING FOR DITCHES REQ'D, RT.

842 SYS OF SODDING FOR DITCHES REQ'D, RT.

64

1" = 50'

1' = 5'

STA 240+00.00 TO STA 256+00.00 "B"

PLAN & PROFILE SHEET

MA

TC

HLIN

E -

ST

A 240

+00.0

0 "B"

580

590

600

580

590

600

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 16, T-6-N, R-6-E

E 54760.95

N 105610.72

STA 251+61.54 "B"

END PROJECT

LINE "B" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "B" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

300' V.C.

ELEV. 593.31

P.V.I. 240+00.00"B"

300' V.C.

ELEV. 590.25

P.V.I. 243+60.00"B"

150' V.C.

ELEV. 592.00

P.V.I. 249+00.00"B"

JACKSON COUNTY

JACKSON TWP.

SEC. 21, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 16, T-6-N, R-6-E

ELEV. = 595.07

STA 251+61.54 "B"

END PROJECT

585

575

595

605

575

585

595

605

P.T. 249+88.58

LINE "B"

EAST 54759.7483

NORTH 105437.7688

78.1

0'

corner post

Fence

32.9

9'

36.3

3'

"PRIVATE DRIVE"

CL SignT

CAPPED REBAR

HOUSE #511

SW COR

SJCA

x x

P.O.T. 255+87.87

LINE "B"

EAST 54763.9215

NORTH 106037.0410

STRAIN POLE

NW BOLT

CL MANHOLE

MAG NAIL

20.8

7'

57.6

0'

72.2

9'

STRAIN POLE

NE BOLT

1:5

0

2:3

3:5

7

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

24000-

25500.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

240

+00

245

+00

250

+00

255

+00

LINE "B"

CURVE DATA

E = 11.65'

L = 777.60'

T = 389.26'

R = 6500.00'

P.I. = 246+00.25 "B"

P.T. 240+56.02 "B"

P.C. 242+10.98 "B"

P.I. 246+00.25 "B"

P.T. 249+88.58 "B"

CULVERT #20

T

T

K

K

K

J

J

J

R

STA. 255+61.72 "B"

BEGIN PROJECT

PROPOSED GRADE LINE "B"

ALONG LINE "B"

EXISTING GROUND

594.04

+60.00

591.16

+00.00

588.61

+80.00

585.71

+66.00

588.00

+00.00

4' BOTTOM DITCH LT. @ S=-0.861% 4' BOTTOM DITCH LT. @ S=1.358

%

4' BOTTOM DITCH LT. @ S=0.576%

@ S=1.79

9%4' BOTTOM DITCH LT

.

PLOTTED 10' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH RT. @ S=1.003%

4' BOTTOM DITCH RT. @ S=-0.577%

585.13

+60.00

594.06

+60.00

590.55

+00.00

-0.850%

0.324%

1.174%

CULVERT #20

+80.0

+66.0

+60.0

+00.0

+60.0

+00.0

+60.0

PLOTTED 10' ABOVE DATUM

PLOTTED 10' ABOVE DATUM

4' BOTTOM DITCH LT. @ S=-0.500%

586.63

+00.00

4' BOTTOM DITCH RT. @ S=1.350%

240+00 241+00 242+00 243+00 244+00 245+00 246+00 247+00 248+00 249+00 250+00 251+00 252+00 253+00 254+00 255+00

591.7

591.5

591.6

592.1

592.3

590.1

587.8

585.8

586.8

588.3

589.1

589.7

590.0

590.1

590.2

590.3

590.8

591.0

591.4

591.7

592.5

593.5

594.3

595.1

595.1

594.6

593.5

592.3

590.4

588.8

587.7

588.2

592.8

8

592.6

9

592.4

1

592.0

4

591.6

1

591.2

2

590.9

2

590.7

2

590.6

2

590.6

1

590.7

1

590.8

7

591.0

3

591.1

9

591.3

5

591.5

1

591.6

8

591.8

6

592.1

6

592.6

0

593.1

7

593.7

6

594.3

5

594.9

4

4TH STREET RD

N

HIL

LC

RE

ST

DR

ALLE

Y

US50/

TIP

TO

N

ST

Pablo TomasRichard A. & Vickie L. Lewis

Sandra K. Monroe & Marcia J. Monroe (1/2 interest)

Greg Hoevener & Lori Ann Hoevener (1/2 interest)

Robert P. Vondielingen

Robert P. Vondielingen

Robert P. & Theresa F. VonDielingen

Nathan K. Smith & Jason M. Smith

Stephen D. & Lisa B. Hoene

Robert P. Vondielingen

Development Co., LLC

Hampton & Hampton

Carolyna Ivy

Teresa Guadarrama

Dionicio Castelan & PCM Enterprises, Inc.

Robert W. & Willadean D. ToppePatricia Louise Baxter

Revocable Trust Agreement of

Patricia Louise Baxter

Revocable Trust Agreement of

PCC240+23.86 "PRT4"P.C. 242+18.56 "PRT4"

P.I. 244+85.00 "PRT4"

P.O.T. 248+62.72 "PRT4"

PCC247+51.13 "PRT4"

P.T. 247+70.20 "PRT4"

P.I. 247+60.69 "PRT4"

LINE "PRT4"

CURVE DATA CURVE DATA

E = 5.43'

L = 532.57'

T = 266.43'

R = 6538.00'

P.I. = 244+85.00 "PRT4"

E = 0.46'

L = 19.06'

T = 9.56'

R = 100.00'

P.I. = 247+60.69 "PRT4"

For Inf

ormati

on O

nly

Page 15: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

COMMERCIAL BUILDINGAP

P.

SE

CTIO

N

LIN

E

FOR ROUNDABOUT INFORMATIONSEE INTERSECTION DETAILS

GV

M

M

M

MM

F

F

F

WV

W

21+

96.03, 30.41'

N 99307.28 F

T

E 43232.47 F

T 18

+99.32, 35.37'

JACKSON COUNTY

JACKSON TWP.

SEC. 30, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 25, T-6-N, R-5-E

MA

TC

HLIN

E -

ST

A 415

+00.0

0 "T1"

STA 301+00.00 "PRA" TO STA 415+00.00 "T1"

PLAN & PROFILE SHEET 65

N/A

1" = 50'

JACKSON COUNTY

JACKSON TWP.

SEC. 24, T-6-N, R-5-E

JACKSON COUNTY

JACKSON TWP.

SEC. 19, T-6-N, R-6-E

580

570

560

580

570

560

LINE "PRA" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "PRA" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

415

+00

P.O.T. 58+30.97 "B"

P.O.T. 304+46.00 "PRA" =

Seymour Aviation Commission

Commission

Aviation

Seymour

Chickamauga Properties, Inc.

Max & Connie Pollert

G

AV

E

G

AV

E

1ST AVE

AIRPORT RD.

Education

Board of

CULVERT #2

100' V.C.

ELEV. 567.32

P.V.I. 302+50.00 "PR-A"

120' V.C.

ELEV. 568.36

P.V.I. 305+75.00 "PR-A"

120' V.C.

ELEV. 567.74

P.V.I. 307+00.00 "PR-A"

150' V.C.

ELEV. 569.10

P.V.I. 309+00.00 "PR-A"

E 43236.89

N 98449.09

STA. 302+08.38 "PR-A"

BEGIN CONSTRUCTION

555

585

575

565

555

585

575

565

568.15

+75.00570.28

+30.92

"PR-A"

STA. 301+52.38

CONSTRUCTION

BEGIN INCIDENTAL

STA. 312+00.00 "PR-A"

BEGIN CONSTRUCTION

STA. 312+92.31 "PR-A"

BEGIN INCIDENTAL CONSTRUCTION

E 43236.89

N 98449.09

STA. 302+08.38 "PR-A"

BEGIN CONSTRUCTION

STA. 301+52.38 "PR-A"

BEGIN INCIDENTAL CONSTRUCTION

Commission

Seymour Aviation

G & S Leasing

P.O.T. 14+35.93 "G"

P.O.T. 304+54.41 "PRA" =

STA. 312+00.00 "PR-A"

BEGIN CONSTRUCTION

STA. 312+92.31 "PR-A"

BEGIN INCIDENTAL CONSTRUCTION

1:5

0

2:3

4:5

2

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

30100-

41500.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

K

15

15

15

15

T T

K

K

K

15 K

15 KK

K

ALONG LINE "PRA"

EXISTING GROUND

PROPOSED GRADE LINE "PR-A"

-0.500% 0.682% -0.283% 0.005%

567.6

567.4

567.3

567.3

567.4

567.4

567.5

567.6

567.5

567.8

567.9

568.2

568.3

568.1

568.4

568.6

568.5

568.5

568.5

568.5

568.5

568.6

567.5

9

567.5

7

568.0

7

568.8

2

569.5

7

570.2

4

569.4

9

568.7

9

568.2

9

567.9

9

567.9

1

568.0

8

568.4

2

568.7

4

568.9

2

568.9

4

568.8

2

568.6

8

568.5

3

568.5

4

302+00301+00 303+00 304+00 305+00 306+00 307+00 308+00 309+00 310+00 311+00 312+00

LIN

E "G"

305

+00

310

+00

P.C.

306

+82.8

0

P.T.

308

+83.3

3

P.I.

312

+00.0

0

P.I.

307

+83.4

0

P.I.

309

+50.3

1

P.C.

309

+01.7

3

P.T.

309

+98.5

9

E = 5.05'

L = 200.53'

T = 100.60'

R = 1000.00'

P.I. = 307+83.40

E = 2.35'

L = 96.86'

T = 48.58'

R = 500.00'

P.I. = 309+50.31

E = 43195.26

N = 99439.30

P.I. = 312+00.00

CURVE DATA CURVE DATA CURVE DATA

P.C. 404+91.32

P.T. 406+06.88

P.C. 406+08.26

P.T. 406+74.99

P.C. 409+96.71

P.T. 410+47.64P.I. 406+41.94

P.I. 410+22.20

LINE "PRT1"

P.I. 405+56.52

E = 19.38'

L = 115.56'

T = 65.20'

R = 100.00'

P.I. = 405+56.52

E = 2.82'

L = 66.74'

T = 33.68'

R = 200.00'

P.I. = 406+41.94

CURVE DATA CURVE DATA

E = 0.65'

L = 50.94'

T = 25.49'

R = 500.00'

P.I. = 410+22.20

CURVE DATA

For Inf

ormati

on O

nly

Page 16: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+89.9

2,

96.4

2'

TR

EE

+73.9

3,

57.7

8'

PW

P

+93.1

8,

59.2

5'

PW

P

+00.8

4,

59.3

8'

PW

P

+16.0

6,

61.0

3'

PW

P

+31.3

3,

60.1

3'

PW

P

+62.3

1,

59.8

6'

PW

P

+45.6

8,

63.8

3'

PW

P

+38.9

8,

53.3

2'

MA

NH

OLE

+43.5

6,

51.0

6'

FIB

ER

OP

TIC

MA

RK

ER

+86.9

9,

62.8

0'

FIR

E

HY

DR

AN

T

+93.5

3,

58.9

2'

FIB

ER

OP

TIC

MA

RK

ER

+87.8

3,

65.9

2'

WA

TE

R

VA

LV

E

+93.5

3,

60.3

4'

MA

NH

OLE

+51.5

2,

57.8

7'

FIB

ER

OP

TIC

MA

RK

ER

+59.8

6,

57.7

6'

FIB

ER

OP

TIC

MA

RK

ER

+55.0

8,

58.4

9'

MA

NH

OLE

+57.1

9,

58.6

3'

MA

NH

OLE

+46.1

0,

68.9

0'

WA

TE

R

VA

LV

E

+43.0

0,

64.0

3'

CO

NT

RO

L

POIN

T

+81.6

7,

48.9

5'

TB

M

#1

+55.7

1,

49.3

1'

TB

M

#2

+40.5

9,

6.8

4'

35

MP

H

SP

EE

D

SIG

N

+42.5

0,

41.5

3'

35

MP

H

SP

EE

D

SIG

N

+42.9

1,

178.1

4'

TR

EE

+15.5

4,

138.1

6'

TR

EE

+31.9

9,

120.8

2'

TR

EE

+94.4

9,

108.0

5'

TR

EE

+62.5

5,

177.3

2'

TR

EE

+96.7

8,

180.9

4'

TR

EE

+31.2

9,

170.6

9'

TR

EE

+37.6

8,

177.7

5'

TR

EE

+46.5

1,

174.1

4'

TR

EE

+13.2

6,

144.6

9'

TR

EE

+99.3

4,

106.8

9'

TR

EE

+03.1

0,

124.3

4'

TR

EE

+11.6

0,

117.2

5'

TR

EE

+38.5

6,

123.4

9'

TR

EE

+35.7

3,

106.3

6'

TR

EE

+25.6

0,

84.6

6'

TR

EE

+20.9

4,

93.8

2'

TR

EE

+20.8

0,

102.5

0'

TR

EE

+20.5

2,

105.6

9'

TR

EE

+54.3

4,

93.6

2'

TR

EE

+55.3

3,

81.5

9'

TR

EE

+03.4

4,

138.7

3'

TR

EE

+28.3

9,

186.1

6'

TR

EE

+29.4

9,

67.8

4'

TR

EE

+68.2

8,

15.2

5'

PW

P

+67.3

5,

49.2

2'

PW

P

+62.4

8,

18.9

0'

PW

P

+59.8

2,

18.0

7'

PW

P

+55.3

5,

18.0

1'

PW

P+

52.9

2,

49.3

3'

PW

P

+01.4

8,

75.3

4'

PW

P

+58.5

0,

48.5

2'

PW

P

+73.1

9,

18.7

7'

PW

P

+46.0

7,

14.3

4'

PW

P

+07.3

6,

18.4

6'

PW

P

+61.3

1,

16.8

6'

PW

P

+39.0

7,

110.0

0'

PW

P

+55.5

0,

63.2

0'

CO

NT

RO

L

POIN

T

+70.3

4,

42.6

5' IN

LE

T

+93.6

9,

104.4

9'

MAIL

BO

X

+03.4

4,

60.2

6'

GU

Y

WIR

E

+03.0

4,

55.8

7'

GU

Y

WIR

E

+39.2

0,

68.7

6'

GU

Y

WIR

E

+40.4

4,

74.3

6'

GU

Y

WIR

E

+39.3

2,

80.2

9'

GU

Y

WIR

E

+58.2

2,

14.1

4'

MO

NU

ME

NT

+09.4

1,

51.7

4'

GU

Y

WIR

E+

10.2

7,

51.1

4'

GU

Y

WIR

E

+12.6

1,

51.3

4'

GU

Y

WIR

E

+18.6

3,

51.3

3'

GU

Y

WIR

E

+41.1

8,

111.6

4'

PO

ST

+48.6

1,

111.5

8'

PO

ST

+48.0

8,

118.3

0'

PO

ST

+40.9

3,

118.1

2'

PO

ST

+40.9

2,

122.0

9'

PO

ST

+98.9

4,

12.5

1'

ST

RE

ET

SIG

N

+96.3

3,

13.2

3'

ST

OP

SIG

N

FF

F

F

M

F

F

FF

WV

WV

GRASS

GRASS

GRASS

ASPHALT

GRASS ASPHALT

MA

TC

HLIN

E -

ST

A 415

+00.0

0 "T1"

66

N/A

1" = 50'

MA

TC

HLIN

E -

ST

A 428

+00.0

0 "T1"

JACKSON COUNTY

JACKSON TWP.

SEC. 24, T-6-N, R-5-E

JACKSON COUNTY

JACKSON TWP.

SEC. 19, T-6-N, R-6-E

LINE "T1" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "T1" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

STA 415+00.00 TO STA 428+00.00 "T1"

PLAN SHEET

415

+00

1:5

0

2:3

5:5

4

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

41500-

42800.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

Max & Connie Pollert

Thomas R. Bollinger (5/16 Interest)

Richard A. Temple

Chickamauga Properties, Inc.

Juan Mateo Tomas Juan

Nicolas Tomas Baltazar &

Juan Mateo Tomas Juan

Nicolas Tomas Baltazar &

CO

LO

NIA

L

DR

315

+00

315

+00

315

+00

P.O.T.

315

+00.0

0

415

+00

420

+00

425

+00

LINE "PRT1"

For Inf

ormati

on O

nly

Page 17: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+00.4

8,

70.4

5'

NO

TR

UC

KS

ALL

OW

ED

SIG

N

+60.4

3,

49.5

3'

ST

RE

ET

SIG

N

+80.8

3,

97.7

6'

TR

EE

+29.6

7,

16.4

3'

PW

P

+79.4

7,

14.7

7'

PW

P+

80.6

9,

14.9

4'

PW

P

+03.5

2,

15.6

7'

PW

P+

04.7

3,

15.0

1'

GAS

MA

RK

ER

+16.8

8,

15.7

6'

PW

P

+94.1

9,

76.9

1'

PW

P

+15.9

5,

49.0

7'

PW

P

+13.5

4,

49.3

8'

PW

P

+44.1

1,

45.9

4'

PW

P

+11.0

2,

14.7

6'

PW

P

+84.4

0,

48.2

8'

PW

P

+44.4

8,

14.3

4'

PW

P

+43.7

1,

13.6

9'

PW

P

+92.9

5,

14.9

1'

PW

P

+26.4

4,

119.5

7'

SIG

N

+93.8

1,

64.9

8'

GU

Y

WIR

E

+93.5

5,

66.7

5'

GU

Y

WIR

E

+42.6

5,

16.8

2'

GU

Y

WIR

E

+44.4

9,

16.6

9'

GU

Y

WIR

E+

50.7

9,

16.5

4'

GU

Y

WIR

E

+19.7

9,

12.2

3'

FIB

ER

OP

TIC

MA

RK

ER

+19.7

1,

14.5

6'

FIB

ER

OP

TIC

MA

RK

ER

+11.5

7,

20.9

3'

CO

NT

RO

L

POIN

T

+15.8

7,

17.3

6'

SIG

N

+57.0

4,

52.8

7'

SIG

N

+60.8

0,

19.5

5'

CO

NT

RO

L

POIN

T

+74.0

5,

48.7

3'

GU

Y

WIR

E

+64.4

5,

16.8

8'

ST

OP

SIG

N

+55.3

5,

94.5

4'

TR

EE

+45.2

6,

92.1

5'

TR

EE

+12.6

6,

90.8

9'

TR

EE

+30.5

2,

158.0

6'

TR

EE

+65.3

3,

234.7

1'

TR

EE

+72.0

7,

233.2

4'

TR

EE

+69.7

5,

188.1

6'

TR

EE

+67.0

8,

198.9

9'

TR

EE

+68.7

7,

176.9

4'

TR

EE

+67.4

0,

142.5

1'

TR

EE

+72.1

0,

130.1

1'

TR

EE

+66.7

8,

119.3

3'

TR

EE

+42.7

4,

204.7

0'

TR

EE

+61.1

8,

225.3

1'

TR

EE

+69.0

3,

199.4

8'

TR

EE

+32.7

7,

124.2

4'

TR

EE

+44.1

1,

111.2

7'

TR

EE

+93.7

0,

133.6

3'

FL

AG

PO

LE

+33.0

4,

93.6

2'

PO

ST

+25.6

2,

61.5

5'

PW

P

+11.2

4,

60.2

6'

PW

P

+98.6

2,

60.6

4'

PW

P

+84.9

7,

61.3

5'

PW

P

+93.5

7,

61.6

9'

PW

P

+23.0

4,

61.5

7'

PW

P

+64.0

0,

61.4

3'

PW

P

+90.6

8,

93.8

2'

PW

P

+50.7

3,

166.7

3'

PW

P

+69.5

8,

59.7

5'

PW

P

+69.9

0,

59.1

9'

PW

P

+22.2

7,

116.4

5'

PW

P

+57.0

2,

195.4

6'

LIG

HT

PO

LE

+08.1

8,

185.5

0'

CA

TC

H

BASIN

+38.0

7,

185.0

0'

CA

TC

H

BASIN

+68.5

7,

186.3

1'

CA

TC

H

BASIN

+97.6

8,

187.1

9'

CA

TC

H

BASIN

+80.4

3,

157.8

1'

LIG

HT

PO

LE

+19.6

3,

227.8

4'

LIG

HT

PO

LE

+41.1

9,

227.3

3'

LIG

HT

PO

LE

+49.1

0,

227.4

4'

LIG

HT

PO

LE

+94.7

1,

92.4

9'

GU

Y

WIR

E

+95.2

5,

88.9

6'

GU

Y

WIR

E

+29.9

1,

98.8

6'

GU

Y

WIR

E+

30.2

1,

97.7

6'

GU

Y

WIR

E

+84.2

7,

120.7

7'

SIG

N

+75.4

5,

80.8

4'

SIG

N

+74.9

4,

76.7

8'

SIG

N

+75.3

3,

72.5

8'

SIG

N

+56.0

6,

5.5

4'

SIG

N

+56.6

4,

5.0

8'

SIG

N

+45.5

0,

44.0

2'

SIG

N

+45.2

9,

43.8

0'

SIG

N

+37.2

0,

6.7

2'

GAS

MA

RK

ER

+70.7

9,

8.6

7'

GAS

MA

RK

ER

+65.1

4,

8.6

4'

GAS

MA

RK

ER

+13.0

3,

4.2

7'

GU

AR

DR

AIL

+64.1

9,

4.6

3'

GU

AR

DR

AIL

+59.1

9,

67.7

1'

GU

AR

DR

AIL

+52.4

9,

45.1

1'

GU

AR

DR

AIL

+42.7

0,

58.3

8'

PW

P

+00.4

8,

70.4

5'

SIG

N

+54.0

2,

48.9

7'

FIB

ER

OP

TIC

MA

RK

ER

+13.7

5,

55.4

8'

MA

NH

OLE

+97.1

4,

59.2

6'

MA

NH

OLE

+92.3

3,

57.6

1'

MA

NH

OLE

+91.8

9,

57.9

2'

MA

NH

OLE

+96.7

2,

59.2

2'

MA

NH

OLE

+88.6

6,

58.8

2'

TE

LE

PH

ON

E

BO

X

+58.3

5,

50.3

0'

MA

NH

OLE

+23.3

9,

60.1

4'

TE

LE

PH

ON

E

BO

X

+48.3

2,

78.8

8'

TE

LE

PH

ON

E

BO

X

+47.6

1,

74.5

7'

TE

LE

PH

ON

E

BO

X

+10.5

9,

53.3

7'

FIB

ER

OP

TIC

MA

RK

ER

+38.2

8,

46.4

4'

MA

NH

OLE

+65.0

3,

42.4

6'

MA

NH

OLE

+10.1

4,

52.6

3'

FIB

ER

OP

TIC

MA

RK

ER

+95.9

1,

46.7

0'

TB

M

#1

+83.4

7,

6.4

7'

TB

M

#2

+87.6

8,

40.7

6'

35

MP

H

SP

EE

D

SIG

N

+85.1

5,

4.1

9'

35

MP

H

SP

EE

D

SIG

N

+60.4

3,

49.5

3'

ST

RE

ET

SIG

N

+17.5

5,

71.0

0'

NO

TR

UC

KS

ALL

OW

ED

SIG

N

+42.9

6,

70.0

6'

NO

TR

UC

KS

ALL

OW

ED

SIG

N

+64.1

7,

79.1

0'

ST

OP

SIG

N

+07.4

7,

41.6

9'

35

MP

H

SP

EE

D

SIG

N

F

FF

TB

TB

F

CB

CB

CBCB

F

FF

F

F

F

F

36

+03.9

3,

0.0

1'

46

+87.8

8,

54.4

8'

44

+90.75, 21.

72'

48

+78.27, 31.

47'

ASPHALT

GRASS

GRASS

ASPHALT

GRASS

GRASS

GRAVELGRASS

GRASS

SUBSTATION

ELECTRIC

67

N/A

1" = 50'

MA

TC

HLIN

E -

ST

A 428

+00.0

0 "T1"

JACKSON COUNTY

JACKSON TWP.

SEC. 24, T-6-N, R-5-E

JACKSON COUNTY

JACKSON TWP.

SEC. 19, T-6-N, R-6-E

LINE "T1" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "T1" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

MA

TC

HLIN

E -

ST

A 441

+00.0

0 "T1"

STA 435+00.00 TO STA 450+00.00 "T1"

PLAN SHEET

1:5

0

2:3

6:3

0

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

42800-

44100.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

TTTT

TTAIRPORT RD.

SC

HLETE

R

RD.

Kocolene Marketing, LLC

Seymour Housewares Corporation

Steven D. & Michael W. Hackman (1/2 interest)

Pauline K. Hackman (1/2 interest)

(1/2 interest)

Michael W. Hackman

Steven D. &

(1/2 interest)

Pauline K. Hackman

of Indiana, Inc.

Public Service Company

Mc

DO

NA

LD

ST

RE

ET

RD

430

+00

435

+00

440

+00

P.I.

436

+85.6

5

LINE "PRT1"

P.I. = 436+85.65

CURVE DATA

For Inf

ormati

on O

nly

Page 18: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

+23.7

8,

73.4

3'

SIG

N

+34.6

4,

16.1

9'

GAS

VA

LV

E

+04.4

5,

4878.5

4'

LIG

HT

PO

LE

+12.1

0,

4866.2

7' IN

LE

T

+01.8

2,

4816.2

9' IN

LE

T

+58.3

0,

4755.0

6'

SIG

N

+23.2

6,

93.0

7'

TR

EE

+22.7

6,

137.7

8'

TR

EE

+53.6

6,

140.6

3'

TR

EE

+16.4

6,

142.3

6'

TR

EE

+02.0

1,

64.5

4'

TR

EE

+72.7

0,

145.5

0'

TR

EE

+86.4

6,

130.3

0'

TR

EE

+91.0

9,

94.8

9'

TR

EE

+23.6

4,

148.3

7'

TR

EE

+36.4

4,

70.9

7'

TR

EE

+39.0

2,

61.1

1'

TR

EE

+19.8

8,

177.6

1'

TR

EE

+19.8

8,

177.6

1'

TR

EE

+17.0

7,

64.5

1'

PW

P

+01.4

0,

65.4

0'

PW

P

+39.0

1,

64.7

4'

PW

P

+64.7

8,

59.4

8'

PW

P

+13.7

7,

37.7

6'

PW

P

+89.1

7,

37.6

3'

PW

P

+37.5

4,

36.8

1'

PW

P

+52.2

5,

13.7

5'

PW

P

+78.6

3,

13.7

2'

PW

P

+16.0

6,

47.5

6'

PW

P

+13.7

0,

53.5

4'

PW

P

+25.8

9,

53.4

6'

PW

P

+74.1

1,

87.7

8'

PW

P

+42.4

7,

67.3

8'

PW

P

+50.8

1,

63.8

9'

PW

P

+52.6

4,

50.0

6'

PW

P

+54.6

3,

66.4

1'

PW

P+

55.5

0,

66.2

8'

PW

P

+20.3

7,

48.2

1'

PW

P

+64.3

9,

7.8

9'

SIG

N

+04.9

6,

64.6

2'

GU

Y

WIR

E

+07.3

1,

64.0

9'

GU

Y

WIR

E

+08.6

5,

64.1

7'

GU

Y

WIR

E

+65.1

0,

155.3

8'

GU

Y

WIR

E

+57.2

8,

83.8

8'

MA

NH

OLE

+65.8

3,

83.8

4'

LIG

HT

PO

LE

+03.7

6,

57.6

5'

TE

LE

PH

ON

E

BO

X

+38.4

9,

66.1

3'

TE

LE

PH

ON

E

BO

X

+57.0

2,

66.2

6'

TE

LE

PH

ON

E

BO

X

+56.3

9,

77.7

9'

PO

ST

+47.8

4,

104.3

5'

GU

AR

DR

AIL

+09.7

1,

48.8

6'

GU

AR

DR

AIL

+13.1

9,

151.8

8'

SIG

N

+10.8

8,

163.2

4'

MA

NH

OLE

+24.1

2,

65.8

0'

GU

Y

WIR

E

+26.3

7,

66.1

9'

GU

Y

WIR

E

+27.3

1,

65.5

0'

GU

Y

WIR

E

+41.4

4,

71.1

2'

ELE

CT

RIC

BO

X

+24.3

4,

43.7

9'

GU

Y

WIR

E

+34.3

2,

4.3

5'

PW

P

+44.8

3,

15.3

5'

MO

NU

ME

NT

+32.4

3,

103.2

1'

PO

ST

+66.3

6,

105.0

0'

PO

ST

+40.7

4,

138.5

1'

PO

ST

+21.9

9,

21.5

8'

MA

NH

OLE

+27.9

7,

24.8

6'

MO

NU

ME

NT

+79.7

5,

10.2

6'

GU

AR

DR

AIL

+89.4

2,

8.4

8'

MA

NH

OLE

+84.3

3,

28.8

9'

TR

AFFIC

SIG

NA

L

PO

LE

+12.8

1,

42.3

1'

LIG

HT

PO

LE

+14.2

9,

42.0

7'

ELE

CT

RIC

ME

TE

R

+96.7

3,

166.3

7'

PW

P

+46.8

2,

4.8

8'

GU

Y

WIR

E

+11.1

9,

9.0

9'

MA

NH

OLE

+44.8

2,

13.0

2'

MO

NU

ME

NT

+53.6

9,

10.5

6'

MA

NH

OLE

+73.7

0,

21.7

8'

ELE

CT

RIC

BO

X

+84.2

5,

35.4

5'

MO

NU

ME

NT

+84.6

1,

32.7

3'

MA

NH

OLE

+78.0

2,

18.3

6'

TR

AFFIC

MA

NH

OLE

+43.3

3,

9.7

1'

TB

M

#1

+27.3

4,

4.0

2'

TR

AFFIC

MA

NH

OLE

+72.9

8,

151.9

5'

TR

EE

+08.7

9,

16.9

7'

ST

OP

SIG

N

+56.7

2,

239.7

2'

TR

EE

+28.4

4,

116.5

3'

BU

SH

+34.1

2,

117.1

8'

BU

SH

+45.1

8,

107.0

4'

BU

SH

+54.3

8,

110.4

0'

BU

SH

+63.0

7,

112.8

6'

BU

SH

+71.7

0,

115.3

5'

BU

SH

+75.7

7,

117.6

2'

BU

SH

+75.9

1,

122.8

1'

BU

SH

+75.2

7,

124.6

3'

BU

SH

+74.1

4,

128.6

8'

BU

SH

+74.7

3,

135.6

9'

BU

SH

+72.6

5,

206.5

0'

BU

SH

+74.9

6,

200.5

3'

BU

SH

+76.1

8,

195.3

1'

BU

SH

+76.9

3,

191.8

1'

BU

SH

+99.3

1,

133.5

8'

BU

SH

+96.9

7,

127.8

2'

BU

SH

+93.1

2,

122.1

3'

BU

SH

+95.2

7,

113.7

8'

BU

SH

+01.8

8,

109.6

0'

BU

SH

+03.1

5,

113.7

9'

BU

SH

+07.3

9,

107.4

6'

BU

SH

+70.8

8,

178.3

6'

BU

SH

+73.6

0,

178.6

7'

BU

SH

+73.1

5,

170.3

2'

BU

SH

+76.9

3,

171.5

1'

BU

SH

+25.2

6,

199.4

1'

BU

SH

+25.0

1,

195.4

4'

BU

SH

+11.8

8,

194.2

9'

BU

SH

+13.0

2,

163.9

3'

BU

SH

+12.8

3,

158.1

3'

BU

SH

+31.2

8,

120.5

4'

BU

SH

+34.2

4,

121.1

7'

BU

SH

+39.0

9,

118.5

3'

BU

SH

+48.2

6,

118.6

5'

BU

SH

+68.0

9,

127.7

5'

BU

SH

+55.7

8,

90.0

3'

BU

SH

+26.3

8,

172.0

9'

BU

SH

+69.4

0,

163.4

8'

BU

SH

+99.3

1,

186.5

8'

BU

SH

+09.8

3,

187.1

3'

BU

SH

+17.4

5,

186.6

9'

BU

SH

+37.3

8,

187.7

4'

BU

SH

+78.8

7,

172.5

7'

TR

EE

+16.9

6,

93.3

4'

TR

EE

+74.4

1,

175.0

6'

TR

EE

+49.5

5,

160.8

7'

TR

EE

+00.0

6,

88.4

5'

TR

EE

+57.3

3,

133.7

3'

TR

EE

+18.7

4,

233.2

0'

PW

P

+48.3

9,

146.4

1'

PW

P

+77.2

6,

62.8

1'

PW

P

+05.3

9,

2.0

6'

PW

P

+43.6

3,

71.7

2'

PW

P

+20.1

9,

60.8

8'

PW

P

+19.8

7,

60.3

7'

PW

P

+73.1

1,

61.0

0'

PW

P

+21.8

1,

5.5

1'

SIG

N

+05.3

6,

80.2

0'

SIG

N

+93.3

0,

69.3

8'

SIG

N

+90.8

5,

183.1

8'

TR

EE

+16.0

7,

59.8

5'

GU

Y

WIR

E

+25.6

1,

59.7

7'

GU

Y

WIR

E

+37.9

6,

60.3

1'

GU

Y

WIR

E

+41.2

5,

59.8

8'

GU

Y

WIR

E

+41.2

5,

59.8

8'

GU

Y

WIR

E

+12.0

9,

66.6

4'

LIG

HT

PO

LE

+51.6

8,

60.1

5'

TE

LE

PH

ON

E

BO

X

+83.1

9,

62.0

2'

TE

LE

PH

ON

E

BO

X

+86.7

6,

70.3

1'

PO

ST

+86.9

0,

75.1

2'

PO

ST

+24.3

0,

62.2

1'

TE

LE

PH

ON

E

BO

X

+39.8

4,

118.2

3'

MAIL

BO

X

+80.6

4,

53.2

9'

FIB

ER

OP

TIC

MA

RK

ER

+84.8

2,

53.0

0'

FIB

ER

OP

TIC

MA

RK

ER

+19.5

1,

46.8

4'

MA

NH

OLE

+83.1

2,

60.1

2'

PW

P

+81.9

1,

54.7

9'

MAIL

BO

X

+71.6

2,

2.1

4'

GU

AR

DR

AIL

+36.4

9,

1.6

6'

GU

Y

WIR

E

+36.3

7,

1.4

7'

GU

Y

WIR

E

+36.4

3,

0.3

9'

GU

Y

WIR

E

+36.5

6,

47.6

5'

MA

NH

OLE

+52.4

1,

57.7

8'

CLE

AN

OU

T

+27.2

2,

61.6

3'

TE

LE

PH

ON

E

BO

X

+54.6

0,

67.7

6'

SIG

N

+53.2

1,

60.9

0'

WA

TE

R

ME

TE

R

+53.3

1,

61.0

7'

WA

TE

R

ME

TE

R

+26.6

9,

164.2

1'

FL

AG

PO

LE

+87.7

2,

11.5

5' IN

LE

T

+45.1

2,

2.9

8'

WA

TE

R

VA

LV

E

+45.7

9,

2.4

6'

FIR

E

HY

DR

AN

T

+11.7

1,

1.3

6'

SIG

N

+79.6

7,

2.0

9'

GU

AR

DR

AIL

+64.5

7,

78.3

7'

SIG

N

+03.5

5,

56.2

9' IN

LE

T

+59.8

2,

71.8

7'

GU

Y

WIR

E

+66.0

7,

72.6

1'

GU

Y

WIR

E

+71.3

5,

72.4

7'

GU

Y

WIR

E

+77.9

9,

72.5

2'

GU

Y

WIR

E

+84.3

9,

72.4

1'

GU

Y

WIR

E

+90.5

5,

72.6

2'

GU

Y

WIR

E

+96.1

8,

72.4

7'

GU

Y

WIR

E

+80.6

3,

103.2

3'

CO

NT

RO

L

POIN

T

+71.1

6,

187.1

4'

CO

NT

RO

L

POIN

T

+74.5

5,

233.9

0' IN

LE

T

+74.2

0,

150.3

0' IN

LE

T

+15.8

5,

94.5

1'

TR

AFFIC

SIG

NA

L

PO

LE

+76.7

9,

14.7

9'

CO

NT

RO

L

POIN

T

+14.5

0,

128.2

4'

TE

LE

PH

ON

E

PO

LE

+56.3

6,

5.3

4'

GU

Y

WIR

E

+64.7

8,

5.2

7'

GU

Y

WIR

E

+72.8

7,

5.4

7'

GU

Y

WIR

E

+77.4

0,

5.1

1'

GU

Y

WIR

E

+01.0

9,

6.3

9'

FIB

ER

OP

TIC

MA

RK

ER

+35.4

0,

6.4

4' IN

LE

T

+77.8

7,

1.9

4'

SIG

N

+08.5

1,

15.9

0'

35

MP

H

SP

EE

D

SIG

N

+17.8

8,

61.1

0'

ST

OP

SIG

N

GV

F

F

EM

FF

TB

TB

TB

TB

TB

F

TB

TB

TB

M

M

F

W

W

W WW

WV

WV

S

54

+38.11, 34.68'

59

+94.99, 58.28'

N 10

3354.70

FT

E 4310

3.68 F

T 59

+48.08, 40.64'

BUILDING

COMMERCIAL

ASPHALT

GRASS

GRASS

ASPHALT ASPHALT ASPHALT

ASPHALT

GRASS

GRASS

ASPHALT

GRASS

FOUNTAIN

GRASS

GRAVEL

GRASSGRASS

CONC

ASPH

COMMERCIAL BUILDING

SAMPLE BUILDINGS

JACKSON COUNTY

JACKSON TWP.

SEC. 24, T-6-N, R-5-E

JACKSON COUNTY

JACKSON TWP.

SEC. 19, T-6-N, R-6-E

LINE "T1" EXCEPT AS NOTED

ALL R/W DESCRIBED FROM

FROM LINE "T1" EXCEPT AS NOTED

ALL TOPOGRAPHY DESCRIBED

1" = 50'

N/A

68

MA

TC

HLIN

E -

ST

A 441

+00.0

0 "T1"

STA 441+00.00 TO STA 453+00.00 "T1"

PLAN SHEET

STA. 452+53.37 "T1"

END CONSTRUCTION

1:5

0

2:3

7:0

2

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP

44100-

45300.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

C

HMA SHOULDERJ

K

F CONCRETE, CURB & GUTTER

22

26 NURSERY SODDING

TYPE

CONCRETE CENTER CURB,

O

R MILL & RESURFACE

T

S SAW CUT

FULL DEPTH HMA TRAIL

U UNDERDRAIN, 6"

15

PCCP FOR APPROACHES, 9 IN.

SIDEWALK, CONCRETE, 4 IN.

FULL DEPTH HMA PAVEMENT

COMPACTED AGGREGATE NO. 53

14 CONCRETE ROLLED CURB

27 SEEDING

TRUCK APRON17

13 CONCRETE CURB 6"

TTTT

TTTTTT

U.S.

HW

Y.

50

U.S.

HW

Y.

50

AIRPORT RD.

CO

RP

OR

ATE

WA

Y

KIM

BE

RL

Y

ST.

Kevana Properties, LLC

John R. Moore

Insurance Company, Inc.

United Farm Bureau Mutual The Peoples Bank

John Richey, Inc.

John Richey, Inc.

Vernon & Wanda Melton

Indiana

State of

445

+00

450

+00

P.I.

449

+30.7

1

P.I.

450

+31.4

4

LINE "PRT1"

P.I. = 449+30.71 P.I. = 450+31.44

CURVE DATA CURVE DATA

For Inf

ormati

on O

nly

Page 19: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

SEE INTERSECTION DETAILS FOR ROUNDABOUT INFORMATION

STA 7+20.00 TO STA 13+00.00 "SR-11"

PLAN & PROFILE SHEET

1" = 50'

N/A

570

580

590

600600

570

580

590

600600

Seymour Aviation Commission

Seymour Aviation Commission

Indian Creek Acres, L.L.C. Indian Creek Acres, L.L.C.

LIN

E "B"

E=48296.48'

N=97429.20'

STA. 103+00.00 "SR-11"

END CONSTRUCTION

ELEV. = 584.62

STA. 103+00.00 "SR-11"

END CONSTRUCTION

NO CURVE

ELEV. 584.59

P.V.I. 102+50.00 "SR-11"

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 28, T-6-N, R-6-E

JACKSON COUNTY

JACKSON TWP.

SEC. 29, T-6-N, R-6-E

466.54

+54.54

440.46

+15.07

69

STA. 103+92.32 "SR-11"

END INCIDENTAL CONSTRUCTION

STA. 103+92.32 "SR-11"

END INCIDENTAL CONSTRUCTION

=48310.18'

N=96850.15'

STA. 97+20.00 "SR-11"

BEGIN CONSTRUCTION

STA. 96+64.77 "SR-11"

CONSTRUCTION

BEGIN INCIDENTAL

ELEV. = 586.50

STA. 97+20.00 "SR-11"

BEGIN CONSTRUCTION

STA. 96+64.77 "SR-11"

CONSTRUCTION

BEGIN INCIDENTAL

P.I. 94+62.06

P.O.T. 94+62.06

P.I. 108+24.72

P.O.T. 108+24.72

1:5

0

2:3

8:3

5

PM

9/

18/

2017

W:\

Sey

mour\

2015-

161

Sey

mour -

Southern

Bypass\

Desig

n\

Public Inform

atio

n

Meetin

g\

2017-

09-

20\

PP-

SR

11.d

gn

DEPARTMENT OF TRANSPORTATION

INDIANA

DESIGN ENGINEER DATE

DESIGNED:

CHECKED: CHECKED:

DRAWN:

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

BRIDGE FILE

FOR APPROVAL

RECOMMENDED

indot.t

bl

PD

F

Color.pltcfg

RE

VISIO

N

3.0

1600743

1600743

HDP LWR

HDPRSHR-40004

P.T.

111

+19.9

8 "B"

+116 "P

RT3",

ST

R.

NO. 113

0.139%

-0.437% 0.059%

100+00 101+00 102+00 103+00 104+00

586.6

586.8

586.9

586.8

586.6

586.1

585.5

585.1

584.8

584.6

584.6

584.6

584.6

586.5

4

586.6

1

586.6

8

586.7

7

586.9

1

587.0

6

586.3

1

585.5

9

585.0

8

584.8

0

584.5

9

584.6

2

97+00 98+00 99+00

SR11/ WALNUT ST

SR11/ WALNUT ST

105

+00

LINE "SR-11"

95

+00

For Inf

ormati

on O

nly

Page 20: Information Set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72 "prt2" p.i. 62+70.72 "prt2" line "prt2" l i n e p r t 1 " for information only + 12.11, 46.00

140+

00

P.I. 17+92.23 "PR-O"

138+

00

139+

00

140+

00

141+

00

142+

00

143+

00

C.R. 340

APP. P.L.

APP. EXIST. R/W & P.L.

APP. EXIST. R/W & P.L.

APP. EXIST. R/W

&

P.L.

APP. EXIST. R/W

&

P.L.

APP. EXIST. R/W & P.L.

APP. EXIST. R/W & P.L.

L

I

N

E

"

O

-

1

"

L

I

N

E

"

O

-

2

"

P.O.T. 16+44.02 "O-2"=

O.P.O.T. 22+47.50 "PR-O", 4.02' Lt.

SEE GEOMETRIC DETAIL

P.O.T. 15+44.81 "O-1"=

O.P.O.T. 15+44.81 "PR-O", 2.22' Rt.

SEE GEOMETRIC DETAILS

LINE "PR-O"

N1°09'16"W

LINE "PR-O"

N1°18'28"W

BEGIN INCIDENTAL CONSTRUCTION

P.O.T. 14+17.00 "PR-O"

END INCIDENTAL CONSTRUCTION

P.O.T. 23+47.50 "PR-O"

P.O.T. 18+92.19 "PR-O"=

P.O.T. 140+40.30 "B"

Str. No. 11B

114 Lft. of 15" Pipe

with 2 End Sections

Req'd.

+22 Rt.,

Str. No. 11C

141 Lft. of 15" Pipe

with 2 End Sections

Req'd.

+43 Rt.,

P.O.T. 15+44.81 "PR-O"

BEGIN CONSTRUCTION

N = 96361.57'

E = 50969.40'

P.O.T. 22+47.50 "PR-O"

END CONSTRUCTION

N = 97064.09'

E = 50954.02'

580

585

590

595

600

605

610

615

580

585

590

595

600

605

610

615

12+00 13+00 14+00 15+00

595.2

16+00

595.3

595.2

17+00

595.1

595.1

18+00

595.3

595.0

19+00

594.8

594.8

20+00

594.9

594.9

21+00

594.9

595.0

22+00

595.0

594.9

23+00

594.4

594.1

24+00

594.4

594.6

25+00 26+00 26+48

SEE PROFILE LINE "O-2" ON

ALIGNMENT PROFILE SHEET

FOR PROPOSED GRADE

SEE PROFILE LINE "O-1" ON

ALIGNMENT PROFILE SHEET

FOR PROPOSED GRADE

EXISTING GROUND ALONG "PR-O"

594.09

+ 24.6

592.53

+ 14.3

-0.5

4%

-0.10%

+0.4

9%

592.77

+ 69.8

592.69

+ 50.0

593.65

+ 47.5

GRADE OF SPL. DITCH, LT.

(PLOTTED 10' ABOVE DATUM)

GRADE OF SPL. DITCH, RT.

STR. NO. 12

STR. NO. 12

ELEV. = 595.24

"PR-O"STA. = 15+44.81,

BEGIN CONSTRUCTION

-0.330%

+ 24.6

593.27

+ 14.3

592.31

+0.100%

+0.7

10%

+0.100%

+0.7

10%

+ 69.8

592.17

+ 50.0

592.25

+ 47.5

593.65

GRADE OF SPL. DITCH, RT.

GRADE OF SPL. DTICH, LT.

(PLOTTED 10' ABOVE DATUM)

STR. NO. 11

STR. NO. 11

ELEV. = 595.00

"PR-O"STA. = 22+47.50,

END CONSTRUCTION

PROJECT

INDIANADEPARTMENT OF TRANSPORTATION

PLAN AND PROFILE

1600743

70

1600743

 

R-40004

SURVEY BOOK

DESIGNATION

BRIDGE FILE

CONTRACT

HORIZONTAL SCALE

VERTICAL SCALE

of

SHEET

DATEDESIGN ENGINEER

FOR APPROVAL

RECOMMENDED

CHECKED:

DESIGNED: DRAWN:

CHECKED:

145

1" = 50'

1" = 5'

R.D.S. K.R.U.

L.L.C.L.L.C.

 

STA. 12+00.00 TO STA. 26+50.00 LINE "PR-O"

PLO

T SCALE: 1:1 ED

IT D

ATE: 7/12/11 - 10:21 AM

ED

ITED

BY: KU

PSH

AW

D

RAW

IN

G FILE: P:\516043-1 BU

RKART\ACAD

\06 PLAN

PRO

F\RD

_PLAN

PRO

FILE SH

EET_O

_50_01.D

WG

PRIN

T D

ATE: 9/18/17

SEC. 29, T6N, R6E

JACKSON TWP.

JACKSON COUNTY

Rust Farms, LLC

Silgan Plastics CorpRennekmap, Paul D & Angela DGillaspy - Rennekamp

Rennekmap, Paul D & Angela DGillaspy - Rennekamp

Ru

st F

arm

s, L

LC

ALL TOPOGRAPHY DESCRIBED FROM LINE "PR-O" EXCEPT AS NOTED.

ALL R/W DESCRIBED FROM LINE "PR-O" EXCEPT AS NOTED.

CURVE DATA

P.I.

=

R =

PROPOSED PROFILE AND ELEVATIONS FOR LINE "PR-O" THROUGH ROUND-A-BOUT AREA ARE FOR DESIGN PURPOSES ONLY

SEE SPOT ELEVATION DETAILS

15+

00

20+

00

25+

00

17+92.23 "PR-O"

0°09'12" LT.

No Curve Run

For Inf

ormati

on O

nly

AutoCAD SHX Text
29
AutoCAD SHX Text
15"CMP=592.5'
AutoCAD SHX Text
15"CMP=592.4'
AutoCAD SHX Text
TB
AutoCAD SHX Text
TB
AutoCAD SHX Text
F
AutoCAD SHX Text
+79.43, 11.70' FIBEROPTIC MARKER
AutoCAD SHX Text
+34.61, 14.23' TELEPHONE BOX
AutoCAD SHX Text
+11.85, 20.28' 15" CMP
AutoCAD SHX Text
+79.00, 97.85' FIBEROPTIC MARKER
AutoCAD SHX Text
+44.42, 18.65' GUY WIRE
AutoCAD SHX Text
+47.74, 18.37' GUY WIRE
AutoCAD SHX Text
+49.51, 18.54' GUY WIRE
AutoCAD SHX Text
+63.14, 18.15' PWP
AutoCAD SHX Text
+50.57, 19.14' FIBEROPTIC MARKER
AutoCAD SHX Text
+32.23, 20.37' PWP
AutoCAD SHX Text
+05.26, 39.47' SIGN
AutoCAD SHX Text
+09.93, 35.12' 15" CMP
AutoCAD SHX Text
+09.78, 52.76' GUY WIRE
AutoCAD SHX Text
+10.55, 64.35' TELEPHONE BOX
AutoCAD SHX Text
+09.66, 67.21' PWP
AutoCAD SHX Text
+07.01, 17.29' FIBEROPTIC MARKER
AutoCAD SHX Text
+09.08, 19.87' PWP