information set 9-20-2017.pdf · p.o.t. 59+72.03 "prt2"= curve data p.i. = 62+70.72...
TRANSCRIPT
+32.0
6,
34.4
6'
PO
ST
+76.2
7,
55.3
0'
PO
ST
+72.9
1,
54.1
5'
PO
ST
+76.3
9,
51.8
6'
MA
NH
OLE
+35.1
2,
48.0
8'
PW
P
+26.4
7,
84.0
7'
PW
P
+55.9
9,
48.7
0'
GU
Y
WIR
E
+73.3
3,
50.0
9'
GU
Y
WIR
E
+35.0
6,
36.0
1'
GU
Y
WIR
E
+25.8
6,
55.2
2'
GU
Y
WIR
E
+25.8
3,
57.0
1'
GU
Y
WIR
E
+17.6
4,
46.9
3'
SIG
N
+76.3
1,
66.0
0'
MA
NH
OLE
+95.8
9,
35.8
4'
PIP
E
+99.7
4,
47.8
8'
PW
P
+22.1
7,
28.0
3'
SIG
N
+81.3
1,
48.4
7'
PW
P
+36.3
5,
35.3
2'
PIP
E
+60.6
8,
48.0
2'
PW
P
+82.6
7,
28.0
9'
SIG
N
+51.7
2,
63.5
0'
TR
EE
+99.0
6,
63.7
5'
TR
EE
+46.3
4,
48.0
0'
PW
P
+72.4
5,
47.3
5'
GU
Y
WIR
E
+72.5
3,
48.3
9'
GU
Y
WIR
E
+78.4
2,
59.6
2'
GU
Y
WIR
E
+77.6
6,
76.5
0'
GU
Y
WIR
E
+77.0
0,
84.1
8'
GU
Y
WIR
E
+77.9
3,
48.3
6'
PW
P
+33.6
1,
63.1
5'
PW
P
+72.2
9,
52.0
7'
TR
EE
+69.9
4,
16.3
1'
TR
EE
+70.0
0,
31.2
8'
TR
EE
+29.3
4,
98.5
3'
TR
EE
+43.5
0,
27.5
6'
TR
EE
+06.9
5,
25.7
6'
TR
EE
+11.0
4,
64.5
6'
TR
EE
+11.8
8,
103.9
2'
TR
EE
+38.4
7,
114.9
4'
TR
EE
+12.0
9,
124.3
8'
TR
EE
INFORMATIONDETAILS FOR ROUNDABOUTSEE INTERSECTION
M
M
W
GR
AS
S
MA
TC
HLIN
E -
ST
A 66
+00.0
0 "B"
51
1" = 50'
1' = 5'
580
570
560
580
570
560
JACKSON COUNTY
JACKSON TWP.
SEC. 30, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 25, T-6-N, R-5-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
STA 1+00.00 "G" TO 66+00.00 "B"
PLAN & PROFILE SHEET
60
+00
65
+00
200' V.C.
ELEV. 568.94
P.V.I. 64+00.00 "B"
JACKSON COUNTY
JACKSON TWP.
SEC. 25, T-6-N, R-5-E
JACKSON COUNTY
JACKSON TWP.
SEC. 30, T-6-N, R-6-E
200' V.C.
ELEV. 567.74
P.V.I. 60+00.00 "B"
555
565
575
585
555
565
575
585
E = 43236.89'
N = 98449.09'
STA. 302+08.38 "PR-A"
BEGIN CONSTRUCTION
570.03
+00.00
570.28
+30.92
P.O.T. 58+30.97
LINE "B"
EAST 43235.3494
NORTH 98687.9339
FIRE HYD
NE BOLT
66.9
7'
49.11'
46.42'"STOP"
CL SignMAG NAIL
T "STOP"
CL Sign
T
15+0014+0013+0012+0011+0010+00
563.21
+00.00
560.26
+05.00
559.58
+00.00
PROPOSED GRADE LINE "G"
1.500%
0.146%
ELEV. = 566.90
STA. 12+10.85 "G"
BEGIN PROJECT
STA. 11+58.85 "G"
CONSTRUCTION
BEGIN INCIDENTAL
4' BOTTOM DITCH RT. @ S=1.000%4' BOTTOM DITCH RT. @ S=0.648%
ALONG LINE "G"
EXISTING GROUND
STA. 11+58.85 "G"
CONSTRUCTION
BEGIN INCIDENTAL
E = 42946.31'
N = 98671.91'
STA. 12+10.85 "G"
BEGIN PROJECT
567.0
567.1
567.1
559.5
8
567.1
559.9
0
566.9
560.2
3
567.0
560.7
1
566.9
561.2
1
566.9
561.7
1
566.9
562.2
1
566.9
562.7
1
567.4
563.2
1
150' V.C.
ELEV. 567.03
P.V.I. 13+00.00 "G"
P.I. 10+50.09 "G"
P.I. 11+65.02 "G"
10
+00
1:5
0
2:1
9:5
5
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
100-
6600.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
P.O.T. 304+47.24 "PRA"
P.O.T. 58+30.97 "B" =
LINE "B"
CULVERT #1
CULVERT #2
+59 "G", STR. NO. 103
+26 "G", STR. NO. 100
+22 "G", STR. NO. 101
+71 "G", STR. NO. 102
+66 "G", STR. NO. 106
+54 "G", STR. NO. 107
+53 "B", STR. NO. 104
+94 "B", STR. NO. 105
+71 "B", STR. NO. 110
+08 "B", STR. NO. 109
+52 "B", STR. NO. 108
+94 "B", STR. NO. 111
T
T
J
J
K
W = 24'
+02 "B" CLASS IV DRIVE
K
FUTURE TURNING LANE
15
15
15
15 K
K
K
15
K
BM 11.DNR_BM_JAC62_1992
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
563.08
+50.33
4' BOTTOM DITCH LT. @ S=0.299%
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.302%
563.50
+60.00
-0.300%
-1.500%
0.300%
58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00
567.0
566.2
566.0
566.0
566.0
566.2
566.5
566.4
566.6
566.9
567.4
567.4
567.1
567.0
567.2
567.2
569.9
9
569.2
4
568.6
0
568.1
9
568.0
0
568.0
4
568.1
9
568.3
4
568.4
9
568.6
4
568.7
5
568.7
9
568.7
5
568.6
4
568.4
9
568.3
4
AIR
PO
RT
RD.
1S
T
AV
E 2N
D
AV
E
G AVE.
G & S Leasing
Board of Education
Dave O'Mara Contractor, Inc.
Seymour Aviation Commission
Seymour Aviation Commission
Commission
Aviation
Seymour
BURKART BLVD.
Services, Inc.
Developmental
Commission
Seymour Aviation
LINE "G"
P.I. = 10+50.09
P.I. = 11+65.02
CURVE DATA
CURVE DATA
P.C. 404+91.32 "PRT1"
P.O.T. 59+72.03 "PRT2"=
CURVE DATA
P.I. = 62+70.72 "PRT2"
P.I. 62+70.72 "PRT2"
LINE "PRT2"
LIN
E "P
RT1"
For Inf
ormati
on O
nly
+12.1
1,
46.0
0'
PO
ST
+25.6
6,
44.8
0'
PO
ST
+10.4
4,
48.0
7'
PO
ST
+03.7
3,
44.5
6'
GU
AR
DR
AIL
+37.3
4,
52.0
9'
GU
AR
DR
AIL
+69.6
0,
30.8
9'
FIR
E
HY
DR
AN
T
+02.5
5,
45.2
9'
GA
TE
+46.1
2,
45.1
6'
GA
TE
+38.3
5,
62.6
7'
TR
EE
+37.2
9,
73.8
2'
TR
EE
+52.6
4,
40.4
3'
PW
P
+66.8
8,
7.1
5'
PW
P
+68.6
4,
5.5
9'
SIG
N
+99.6
3,
17.2
7'
LIG
HT
PO
LE
+69.7
1,
32.8
9'
LIG
HT
PO
LE
+26.7
0,
23.7
6'
PO
ST
+29.2
2,
23.6
4'
PO
ST
+29.3
2,
26.0
9'
PO
ST
+27.2
3,
26.2
7'
PO
ST
+23.1
3,
26.9
3'
SIG
N
+50.2
4,
8.3
4'
SIG
N
+13.3
1,
38.6
2'
SIG
N
+91.2
4,
29.8
2'
SIG
N
+24.7
2,
38.5
7'
PIP
E
+24.8
1,
1.9
2'
PIP
E
Ele
v 565.87 F
T 68
+00.37, 60.99'
Ele
v 566.92 F
T 73
+00.49, 60.59'
Ele
v 567.35 F
T 73
+00.49, 30.59'
Ele
v 566.02 F
T 67
+99.94, 31.
00'
MA
TC
HLIN
E -
ST
A 66
+00.0
0 "B"
52
1" = 50'
1' = 5'
STA 66+00.00 TO 80+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 80
+00.0
0 "B"
560
570
580
560
570
580
JACKSON COUNTY
JACKSON TWP.
SEC. 30, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
200' V.C.
ELEV. 567.74
P.V.I. 68+00.00"B"
200' V.C.
ELEV. 570.25
P.V.I. 75+00.00"B"
300' V.C.
ELEV. 574.26
P.V.I. 80+00.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 30, T-6-N, R-6-E
555
565
575
585
565
555
575
585
CL GATE POST
SJCA CAPPED REBAR
FIRE HYD
47.7
0'
66.9
4'
152.46'
LINE "B"
EAST 44233.3211
NORTH 98702.0899
P.C. 68+29.04
NE BOLT
T
"30 MPH"
CL Sign
1:5
0
2:2
1:0
2
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
6600-
8000.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
70
+00
75
+00
80
+00
LINE "B"
P.C. 68+29.04 "B"
PROPOSED 30'-0" DITCH
T
T
JJ
J
J
J
K
K
W = 17'
+23 "B" STREET APPROACH
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
567.65
+75.00
4' BOTTOM DITCH LT. @ S=0.707%
572.07
+00.00
4' BOTTOM DITCH LT. @ S=0.299%
PLOTTED 10' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.974%
567.25
+00.00569.05
+00.00571.97
+00.00-0.300%
0.359%
0.802%
4' BOTTOM DITCH RT. @ S=0.302%4' BOTTOM DITCH RT. @ S=0.300%
567.87
+00.00
PROPOSED 30'-0" DITCH
566.92
+00.00
66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00
567.2
567.0
566.9
566.9
566.8
566.6
566.9
567.4
567.5
567.6
567.7
568.0
568.3
568.1
568.3
567.9
568.2
568.9
569.5
569.8
570.2
570.4
570.8
570.9
571.8
573.1
572.4
573.0
573.7
568.3
4
568.1
9
568.0
4
567.9
3
567.9
0
567.9
6
568.1
0
568.2
8
568.4
6
568.6
4
568.8
2
568.9
9
569.1
7
569.3
5
569.5
3
569.7
1
569.8
9
570.1
0
570.3
6
570.6
8
571.0
5
571.4
5
571.8
5
572.2
5
572.6
6
573.0
6
573.4
1
573.6
7
573.8
5
3R
D
AV
E
Dave O'Mara Contractor, Inc.
Seymour Aviation Commission
Board of Education
Board of Education
BURKART BLVD.
BURKART BLVD.
P.C. 68+29.10 "PRT2"
LINE "PRT2"
CURVE DATA
P.I. 80+07.66 "PRT2"
E = 163.20'
L = 2297.31'
T = 1178.56'
R = 4174.00'
P.I. = 80+07.66 "PRT2"
For Inf
ormati
on O
nly
+03.5
3,
102.1
4'
PW
P
+67.8
0,
31.4
7'
PW
P
+32.3
5,
7.0
1'
GU
Y
WIR
E
+39.0
3,
5.0
4'
PIP
E
+56.7
2,
231.3
9'
LIG
HT
PO
LE
+22.2
6,
221.7
9'
PW
P
+86.7
0,
104.8
7'
SIG
N
+79.4
6,
131.4
0'
SIG
N
Ele
v 571.
95 F
T 85
+00.00, 61.
00'
Ele
v 571.
31
FT 85
+00.00, 31.
00'
Ele
v 571.
31
FT 88
+49.92, 61.
03'
Ele
v 571.
44 F
T 88
+50.28, 31.
03'
Ele
v 571.
06
FT 87
+49.51, 38.23'
Ele
v 571.
11 F
T 87
+49.32, 53.23'
Ele
v 574.01
FT 93
+30.19, 40.00'
Ele
v 574.99 F
T 93
+30.19, 55.00'
2.3'
1.4'
53
1" = 50'
1' = 5'
STA 80+00.00 TO 94+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 80
+00.0
0 "B"
MA
TC
HLIN
E -
ST
A 94
+00.0
0 "B"
560
570
580
560
570
580
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
300' V.C.
ELEV. 574.26
P.V.I. 80+00.00"B"
300' V.C.
ELEV. 572.01
P.V.I. 87+50.00"B"
350' V.C.
ELEV. 579.80
P.V.I. 93+50.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
555
565
575
585
555
565
575
585
1:5
0
2:2
9:4
9
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
8000-
9400.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
80
+00
85
+00
90
+00
LINE "B"
CURVE DATA
P.I. 84+40.39 "B"
E = 305.28'
L = 3070.64'
T = 1611.35'
R = 4100.00'
P.I. = 84+40.39 "B"
CULVERT #3
CULVERT #4
K
KJ
JJ
J
TT
E=45443.28'
N=98407.69'
STA. 80+92.29 "B"
E=45443.28'
N=98407.69'
STA. 80+92.29 "B"
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
572.63
+00.00
569.63
+00.00572.07
+00.00
4' BOTTOM DITCH LT. @ S=-0.305% 4' BOTTOM DITCH LT. @ S=0.749%
571.23
+00.00
PLOTTED 10' ABOVE DATUM PLOTTED 10' ABOVE DATUM
S=0.301%
DITCH RT. @ 4' BOTTOM
571.97
+00.00
569.53
+00.00571.98
+00.00
570.92
+12.00
-0.267%
CULVERT #3
CULVERT #4
-0.300%
1.298%
PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=-0.700%
RT. @ S=-0.500%
4' BOTTOM DITCH 4' BOTTOM DITCH RT. @ S=0.816%
4' BOTTOM DITCH RT. @ S=-0.305%
80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00
573.7
572.9
572.6
572.4
572.1
571.5
571.2
571.3
571.3
571.0
571.2
571.5
571.8
571.7
571.4
571.0
571.2
571.6
571.4
571.7
571.8
572.4
572.9
573.7
574.4
574.2
573.1
575.4
576.2
573.8
5
573.9
3
573.9
1
573.8
1
573.6
6
573.5
1
573.3
6
573.2
1
573.0
6
572.9
1
572.7
6
572.6
1
572.4
6
572.3
8
572.4
3
572.6
1
572.9
3
573.3
7
573.9
6
574.6
1
575.2
6
575.9
0
576.5
5
577.2
0
577.8
4
578.3
8
578.8
0
579.1
2
579.3
2
C
AVE
G AVEBoard of Education
Board of Education
BURKART BLVD.BURKART BLVD.
Marketing, LLC
Kocolene
PCC91+26.41 "PRT2"
LINE "PRT2"
P.T. 91+62.93 "PRT2"
P.C. 92+32.99 "PRT2"
PRC92+66.28 "PRT2"
P.I. 92+49.79 "PRT2"
CURVE DATA
E = 1.40'
L = 33.29'
T = 16.80'
R = 100.00'
P.I. = 92+49.79 "PRT2"
CURVE DATA
P.I. 91+44.88 "PRT2"
E = 1.69'
L = 36.52'
T = 18.47'
R = 100.00'
P.I. = 91+44.88 "PRT2"
E = 14.34'
L = 687.94'
T = 344.77'
R = 4138.00'
E = 46809.79
N = 97904.02
P.I. = 96+11.05 "PRT2"
P.I. 96+11.05 "PRT2"
For Inf
ormati
on O
nly
+51.9
2,
71.0
2'
LIG
HT
PO
LE
+34.2
5,
78.0
7'
SIG
N
+76.4
5,
105.0
3'
SIG
N
+96.0
4,
106.5
4'
SIG
N
+62.2
2,
68.5
5'
SIG
N
+04.0
0,
107.1
7'
SIG
N
+00.1
6,
69.8
6'
SIG
N
+98.4
1,
111.2
0'
LIG
HT
PO
LE
+94.9
7,
118.0
4'
GU
Y
WIR
E+
94.5
0,
126.9
2'
GU
Y
WIR
E+
94.7
7,
131.1
7'
GU
Y
WIR
E
+94.9
1,
147.6
5'
PW
P
+40.1
9,
127.4
3'
PW
P+
41.4
5,
128.7
6'
PO
ST
+42.8
9,
144.5
6'
GU
Y
WIR
E+
42.2
9,
152.2
5'
GU
Y
WIR
E
+42.8
8,
155.1
1'
SIG
N
+25.0
7,
121.5
5'
GU
Y
WIR
E
+21.7
5,
120.9
0'
GU
Y
WIR
E
+16.1
6,
129.5
5'
CA
TC
H
BASIN
+08.8
8,
142.6
2'
CA
TC
H
BASIN
+09.1
3,
136.4
0'
SIG
N
+12.8
7,
130.2
2'
SIG
N
+68.3
2,
122.4
5'
PW
P
+28.7
0,
49.5
3'
CO
NT
RO
L
POIN
T
+86.7
7,
102.4
5'
SIG
N
+11.5
7,
76.0
9'
SIG
N
+98.1
2,
111.0
9'
SIG
N
+23.3
2,
131.6
0'
LIG
HT
PO
LE
+24.1
4,
74.8
9'
SIG
N
+29.2
3,
118.2
4'
TR
EE
+99.0
5,
116.9
0'
TR
EE
+05.6
0,
116.9
0'
TR
EE
+74.9
4,
120.8
8'
TR
EE
+33.4
3,
128.4
0'
TR
EE
+74.8
9,
126.7
7'
PIP
E
+57.6
4,
130.0
2'
PIP
E
+76.3
4,
118.0
3'
PIP
E
+19.4
6,
114.4
2'
PIP
E
MM
CB
CB
CB
2.8'
54
1" = 50'
1' = 5'
MA
TC
HLIN
E -
ST
A 94
+00.0
0 "B"
MATC
HLIN
E -
ST
A 108
+00.0
0 "B"
STA 94+00.00 TO 108+00.00 "B"
PLAN & PROFILE SHEET
560
570
580
590
560
570
580
590
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
TO REMAIN AT GRADE
EXISTING RAILROAD CROSSING
TO REMAIN AT GRADE
EXISTING RAILROAD CROSSING
350' V.C.
ELEV. 578.10
P.V.I. 99+86.88"B"
565
575
585
565
575
585
LINE "B"
EAST 47040.1288
NORTH 97644.6873
P.T. 98+99.68
106.8
1'
70.26'
41.9
1'
"SCHOOL ZONE"
CL Sign
SJCA CAPPED REBAR
T
T
"STOP"
CL Sign
T"RR-XING"
CL Sign
LINE "B"
EAST 47272.8260
NORTH 97434.4422
P.C. 102+13.29
T
SJCA CAPPED REBAR
T
172.9
7'
T
119.3
1'
110.8
1'
"RR-XING"
CL Sign
ARROW"
"LEFT TURN
CL Sign
"30 MPH"
CL Sign
1:5
0
2:2
9:2
4
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
9400-
10800.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
95
+00
100
+00
105
+00
110+
00
LINE "B"
LINE "B"
CURVE DATA
E = 91.04'
L = 906.69'
T = 476.22'
R = 1200.00'
P.I. = 106+89.51 "B"
P.T. 98+99.68 "B"
P.I. 106+89.51 "B"
P.C. 102+13.29 "B"
CULVERT #5
CULVERT #6
CULVERT #7
J
J J
J
J
T
T
K
K
W = 24'
+62 "B" STREET APPROACH
W = 26'
+58 "B" STREET APPROACH
E=46866.92'
N=97997.89'
STA. 95+47.80 "B"
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
575.20
+90.00
571.23
+00.00
4' BOTTOM DITCH LT. @ S=0.576%
4' BOTTOM DITCH LT. @ S=0.500%
PLOTTED 10' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.439%
4' BOTTOM DITCH RT. @ S=0.301%
S=0.301%
DITCH RT. @ 4' BOTTOM
575.00
+90.00
CULVERT #5
-0.267%0.318%
573.08
+50.00
94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00
576.2
575.0
576.4
576.4
576.1
576.4
576.8
576.9
577.4
577.8
577.0
577.0
577.0
577.7
577.3
577.0
578.0
578.3
578.8
579.4
579.6
579.1
579.4
579.9
579.9
579.6
579.5
579.6
580.0
579.3
2
579.4
1
579.3
9
579.2
7
579.1
3
579.0
0
578.8
6
578.7
3
578.6
0
578.4
8
578.3
9
578.3
6
578.3
6
578.4
0
578.4
9
578.6
2
578.7
7
578.9
3
579.0
9
579.2
5
579.4
1
579.5
7
579.7
3
579.8
9
580.0
4
580.2
0
580.4
1
580.7
0
581.0
8
B
AV
E
C
AVE
6TH AVE
B
AV
E
A
AV
E
Kocolene Marketing, LLC
Board of Education
Robert E. GoeckerNancy Faye Hoffar
Nancy Faye Hoffar
Seymour Aviation Commission
Nancy Faye Hoffar
Seymour Aviation Commission
BURKART BLVD.
BURKART BLVD.
LLC
Marketing,
Kocolene
P.T. 99+54.22 "PRT2"
CURVE DATA
E = 14.34'
L = 687.94'
T = 344.77'
R = 4138.00'
E = 46809.79
N = 97904.02
P.I. = 96+11.05 "PRT2"
P.C. 102+67.83 "PRT2"
P.I. 107+41.04 "PRT2"
LINE "PRT2"
CURVE DATA
E = 92.66'
L = 898.75'
T = 473.21'
R = 1162.00'
P.I. = 107+41.04 "PRT2"
P.I. 96+11.05 "PRT2"
For Inf
ormati
on O
nly
SEE INTERSECTION DETAILS FOR ROUNDABOUT INFORMATION
55
1" = 50'
1' = 5'
MA
TC
HLIN
E -
ST
A 108
+00.0
0 "B"
STA 108+00.00 TO 122+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 122
+00.0
0 "B"
580
590
600
580
590
600
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
300' V.C.
ELEV. 581.00
P.V.I. 108+00.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
585
575
595
605
585
575
595
605
585.46
+45.00 586.79
+05.00
1:5
0
2:3
1:4
3
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
10800-
12200.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
110
+00
115
+00
120
+00
LINE "B"
CURVE DATA
P.T. 111+19.98 "B"
P.C. 116+45.94 "B"
P.I. 121+94.44 "B"
E = 54.17'
L = 1082.78'
T = 548.50'
R = 2750.00'
P.I. = 121+94.44 "B"
+116 "PRT3", STR. NO. 113
J
JK
K
K
T
T
T
T
K
K
T
J
J
K
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
579.65
+80.00
4' BOTTOM DITCH LT. @ S=0.650%
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.677%
S=0.439%
4' BOTTOM DITCH RT. @
578.91
+80.00
0.730%
1.387%
4' BOTTOM DITCH LT. @ S=0.500%
PLOTTED 10' ABOVE DATUM
108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00
580.0
580.3
580.6
580.8
581.3
582.1
583.1
584.0
584.3
584.8
585.2
584.8
584.5
584.6
585.1
585.1
585.5
586.1
586.5
586.9
587.4
587.9
588.4
588.9
589.5
590.4
590.6
590.7
590.5
581.0
8
581.5
5
582.1
1
582.7
6
583.4
5
584.1
5
584.8
4
585.5
3
586.1
4
586.6
2
586.9
5
587.1
5
587.2
2
587.1
4
586.9
3
586.6
7
586.4
9
586.5
2
586.7
6
587.1
2
587.4
8
587.8
5
588.2
1
588.5
8
588.9
4
589.3
1
589.6
7
590.0
4
590.4
0
SR11/
WA
LN
UT
ST
SR11/
WA
LN
UT
ST
Seymour Aviation Commission
Seymour Aviation Commission
Indian Creek Acres, L.L.C.
Indian Creek Acres, L.L.C.
BURKART BLVD.
PCC111+66.59 "PRT2"
P.T. 111+81.42 "PRT2"
P.I. 111+74.02 "PRT2"
CURVE DATA
P.C. 115+50.27 "PRT3"
P.T. 116+09.25 "PRT3"
P.I. 115+80.64 "PRT3"
CURVE DATA
PCC116+95.28 "PRT3"
E = 4.51'
L = 58.98'
T = 30.38'
R = 100.00'
P.I. = 115+80.64 "PRT3"
CURVE DATA
P.I. 116+63.82 "PRT3"
LINE "PRT2"
LINE "PRT3"
E = 5.59'
L = 65.35'
T = 33.89'
R = 100.00'
P.I. = 116+63.82 "PRT3"
E = 0.28'
L = 14.84'
T = 7.43'
R = 100.00'
P.I. = 111+74.02 "PRT2"P.C. 116+29.93 "PRT3"
For Inf
ormati
on O
nly
FARM FIELD
FARM FIELD
FARM FIELD
FARM FIELD
FARM FIELD
FARM FIELDFARM FIELD
2.5'
56
1" = 50'
1' = 5'
STA 122+00.00 TO 136+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 122
+00.0
0 "B"
MA
TC
HLIN
E -
ST
A 136
+00.0
0 "B"
580
590
600
580
590
600
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
600' V.C.
ELEV. 598.43
P.V.I. 133+00.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
585
575
595
610
585
575
595
605
AP
P.
PL
610
605
1:5
0
2:3
2:1
8
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
12200-
13600.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
125
+00
130
+00
135
+00
LINE "B"
CURVE DATA
P.T. 127+28.72 "B"
P.C. 130+13.64 "B"
P.I. 134+00.54 "B"
E = 37.08'
L = 764.36'
T = 386.90'
R = 2000.00'
P.I. = 134+00.54 "B"
CULVERT #8
J
J
J
J
K
K
T
T
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
593.23
+00.00
592.90
+30.00
593.82
+60.00
4' BOTTOM DITCH LT. @ S=0.650%
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.677%593.26
+00.00
592.11
+30.00
592.59
+90.00
-0.685%
CULVERT #8
0.730%
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH LT. @ S=-0.500%
PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=0.471%
PLOTTED 10' ABOVE DATUM4' BOTTOM DITCH LT. @ S=-0.540%
@ S=-0.500%
4' BOTTOM DITCH RT.
@ S=0.300%
4' BOTTOM DITCH RT.
@ S=-0.500%
4' BOTTOM DITCH RT.
122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00
590.5
590.8
591.4
591.6
591.8
591.7
592.1
592.2
592.5
593.1
593.1
593.5
593.6
593.8
593.9
594.1
594.3
594.9
595.7
595.7
594.3
593.3
593.3
593.4
593.6
593.8
593.5
593.2
593.0
590.4
0
590.7
7
591.1
3
591.5
0
591.8
6
592.2
3
592.5
9
592.9
6
593.3
2
593.6
9
594.0
5
594.4
2
594.7
8
595.1
5
595.5
1
595.8
8
596.2
4
596.5
8
596.8
5
597.0
7
597.2
3
597.3
3
597.3
7
597.3
5
597.2
7
597.1
4
596.9
4
596.6
9
596.3
8
Indian Creek Acres, L.L.C.
Indian Creek Acres, L.L.C.Rust Farms, LLC
Rust Farms, LLC
BURKART BLVD.
BURKART BLVD.
P.T. 127+33.13 "PRT3"
P.C. 128+24.53 "PRT3"
P.I. 128+47.66 "PRT3"
P.T. 128+70.00 "PRT3"
P.T. 129+51.17 "PRT3"
P.C. 129+05.70 "PRT3"
P.C. 130+24.78 "PRT3"
P.I. 129+28.83 "PRT3"
CURVE DATA
E = 48.36'
L = 1037.85'
T = 524.85'
R = 2824.00'
P.I. = 122+20.13 "PRT3"
P.I. = 122+20.13 "PRT3"
E = 2.64'
L = 45.47'
T = 23.14'
R = 100.00'
P.I. = 129+28.83 "PRT3"
E = 2.64'
L = 45.47'
T = 23.14'
R = 100.00'
P.I. = 128+47.66 "PRT3"
CURVE DATACURVE DATA
P.I. 133+14.47 "PRT3"
E = 21.27'
L = 575.22'
T = 289.69'
R = 1962.00'
P.I. = 133+14.47 "PRT3"
CURVE DATA
LINE "PRT3"
For Inf
ormati
on O
nly
P.C. 143+10.96 "B"
P.T. 137+78.00 "B"
P.T. 150+79.30 "B"
P.I. 147+13.24 "B"
LINE "B"
N89°28'10"E
CURVE DATA
Δ = 41°55'34" LT.R = 1050.00'T = 402.28'L = 768.34'E = 74.42'Se = 4.0%
P.I. 147+13.24 Line "B"
APP. P.L.
APP. EXIST. R/W & P.L.
APP. EXIST. R/W & P.L.
APP. EXIST. R/W
&
P.L.
COUNTY ROAD 340
20+
00
P.I. 17+92.23 "PR-O"
P.O.T. 140+40.30 "B"=
P.O.T. 18+92.19 "PR-O"
+50 "PR-O"
40'
See Geometric
Detail Sheet
L
I
N
E
"
B
-
2
"
P.O.C. 136+45.68 "B-1"=
O.P.O.C. 136+45.68 "B", 2.00' Rt.
See Geometric Detail Sheet
P.O.C. 138+32.45 "B-2"=
O.P.O.C. 143+56.61 "B", 2.00' Lt.
L
I
N
E
"
B
-
1
"
Str. No. 11C
141 Lft. of 15" Pipe
with 2 End Sections
Req'd.
+43 Rt.,
Str. No. 11B
114 Lft. of 15" Pipe
with 2 End Sections
Req'd.
+91 Lt.,
MSE WALL
MSE WALL
P.O.C. 144+09.71 "PRT4"=
O.P.O.C. 143+56.61 "B", 38.00' Lt.
P.I. 144+54.74 "PRT4" =
O.P.O.T. 144+03.31 "B", 37.00' Lt.
LIN
E "
PRT4"
N86°18'0
4"E
P.I. 145+97.40 "PRT4"=
O.P.O.C. 145+50.00 "B", 25.83' Lt.
S 8
6°5
8'4
2"
W
N
8
1
°
5
2
'5
7
" E
P.I. 148+61.18 "PRT4" =
O.P.O.T. 148+14.65 "B", 7.71' Rt.
CURVE DATA
Δ = 28°55'10"R = 1022.93'T = 263.78'L = 516.31'E = 33.46'
P.I. 148+61.18 Line "PRT4"
CURVE DATA
Δ = 5°05'45"R = 1012.00'T = 45.03'L = 90.01'E = 1.00'
P.I. 144+54.74 Line "PRT4"
P.I. 144+99.72 "PRT4"=
O.P.O.C. 144+50.00 "B", 38.00' Lt.
N
7
6
°
2
7
'1
2
"
E
N
4
7
°
3
2
'
3
6
"
E
Str. No. 11A
32 Lft. of 15" Pipe
with 2 End Sections
Req'd.
+88 Lt.,
Str. No. 12
88 Lft. of 132"x48"
Box Structure
+42 Lt.,
580
585
590
595
600
605
610
615
580
585
590
595
600
605
610
615
136+00
592.8
596.38
592.7
596.03
137+00
592.8
595.69
593.0
595.39
138+00
592.9
595.14
593.2
594.95
139+00
593.1
594.82
592.8
594.74
140+00
592.5
594.71
593.2
594.75
141+00
593.1
594.84
593.2
594.98
142+00
593.6
595.18
593.8
595.44
143+00
593.8
595.76
593.4
596.13
144+00
592.8
596.52
592.4
596.92
145+00
592.2
597.32
592.0
597.72
146+00
592.0
598.11
591.9
598.55
147+00
591.6
599.08
591.6
599.69
148+00
591.4
600.38
591.3
601.16
149+00
591.4
602.02
591.7
602.97
150+00
591.6
604.00
591.4
605.12
151+00
591.6
606.32
P.V.I. 140+20.00
ELEV = 593.50
V.C. = 660'
P.V.I. 149+00.00
ELEV = 600.50
V.C. = 600'
+
0.80%
PROPOSED PROFILE GRADE
EXISTING GROUND
ALONG LINE "B"
-0.17%
+
1.04%
592.00
+ 18.2
591.08
+ 72.3
593.44
+ 00.0
GRADE OF SPL. DITCH, RT.
GRADE OF SPL. DITCH, LT.
(PLOTTED 10' ABOVE DATUM)
GRADE OF SPL. DITCH, RT.
-0.21%
-0.09%
593.47
+ 45.0
592.99
+ 77.0
592.92
+ 62.5
GRADE OF SPL. DITCH, LT.
(PLOTTED 10' ABOVE DATUM)
SEE PROFILE LINE "B-1" ON
ALIGNMENT PROFILE SHEET
FOR PROPOSED GRADE
SEE PROFILE LINE "B-2" ON
ALIGNMENT PROFILE SHEET
FOR PROPOSED GRADE
STR. NO. 11A
STR. NO. 11A
STR. NO. 12
STR. NO. 12
+0.20%
STA = 136+46 "B-1"
ELEV = 596.06
-0.6
8%
STA = 143+57 "B-2"
ELEV = 596.18
-0.13%
+ 45.0
593.67
+ 62.5
593.25
-0.12%
+
0.81%
+ 18.2
591.85
+ 25.1
591.24
+ 97.5
593.44
STR. NO. 11B
STR. NO. 11C
+ 18.2
591.85
+ 25.1
591.24
+ 97.5
593.44
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
57
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
CONCRETE, SIDEWALK, 4 IN.F
HMA SHOULDERJ
FULL DEPTH HMA PAVEMENTK
FULL DEPTH HMA TRAILT
WIDENING WITH HMA, TYPEW
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 136+00.00 TO 151+00.00 LINE ''B''
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:09 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_B_50_02.D
WG
PRIN
T D
ATE: 9/18/17
140+
00
145+
00
150+
00
SEC. 29, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Rust Farms, LLCSilgan Plastics Corp
Rennekmap, Paul D & Angela DGillaspy - Rennekamp
Rennekmap, Paul D & Angela DGillaspy - Rennekamp
Bridge, Elke S
Silgan Plastics Corp
Rust Farms, LLC
ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
948.26 LFT. OF MSE WALL REQ'D. RT. & LT.
(SEE MSE WALL DETAIL SHEETS)
+97.74
PROPOSED PROFILE AND ELEVATIONS FOR LINE "B" THROUGH THE ROUND-A-BOUT AREA ARE FOR DESIGN PURPOSES ONLY.
SEE SPOT ELEVATION DETAILS
937.50 LFT. OF W-BEAM GUARDRAIL
@ 6'-3" POST SPACING REQ'D. RT.
+22.92
GUARDRAIL END TREATMENT
TYPE "OS" REQ'D., RT.
1325.00 LFT. OF W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. LT.
+44.76
GUARDRAIL END TREATMENT
TYPE "OS" REQ'D., LT.
1
4
'
6
'
1
4
'
6
'
1
2
'
T
K
J
J
+62.47
+18.23
304 SYS. OF SODDING FOR DITCHES REQ'D., LT.
+72.3
+00.0
1
2
'
1
2
'
For Inf
ormati
on O
nly
P.C. 153+10.23 "B"
P.T. 156+72.74 "B"
P.I. 154+93.31 "B"
L
I
N
E
"
B
"
N
4
7
°
3
2
'
3
6
"
E
CURVE DATA
Δ = 19°46'52" RT.R = 1050.00'T = 183.08'L = 362.51'E = 15.84'Se = 4.0%
P.I. 154+93.31 Line "B"
LINE "B"
N67°19'28"E
A
P
P
.
P
.
L
.
APP. EXIST. R/W
&
P.L.
APP. EXIST. R/W
&
P.L.
APPROXIMATE LOCATION OF
OVERHEAD LINES
Str. No. 13
100 Lft. of 72"x60"
Box Structure
+68 Lt.,
MSE WALL
MSE WALL
MSE WALL
MSE WALL
L
I
N
E
"
P
R
T
4
"
P.I. 155+32.21 "PRT4" =
O.P.O.T. 154+91.48 "B", 41.98' Lt.
CURVE DATA
Δ = 19°46'52"R = 1075.75'T = 187.57'L = 371.40'E = 16.23'
P.I. 155+32.21 Line "PRT4"
P.C. 153+44.64 "PRT4"
LINE "PRT4" N 67°19'13" E
N
4
7
°
3
2
'
3
6
"
E
SEE SHEET NO. 78 FOR GRADING PLAN
P.T. 157+16.04 "PRT4"
585
590
595
600
605
610
615
620
625
630
585
590
595
600
605
610
615
620
625
630
151+00
591.6
606.32
591.6
607.61
152+00
591.5
608.98
591.2
610.39
153+00
591.5
611.81
591.9
613.22
154+00
592.5
614.63
593.3
616.05
155+00
593.0
617.46
591.8
618.87
156+00
591.3
620.29
590.7
621.68
157+00
590.6
622.83
590.4
623.69
158+00
590.4
624.27
590.2
624.55
159+00
590.3
624.55
589.8
624.25
160+00
589.7
623.67
589.7
622.80
161+00
589.9
621.64
590.0
620.21
162+00
590.1
618.73
590.1
617.25
163+00
590.1
615.78
586.4
614.30
164+00
587.8
612.82
589.1
611.34
165+00
589.0
609.86
588.7
608.38
166+00
588.4
606.90
+
2
.
8
3
%
-
2
.
9
6
%
P.V.I. 158+80.00
ELEV = 628.20
V.C. = 500'
PROPOSED PROFILE GRADE
EXISTING GROUND
ALONG LINE "B"
GRADE OF SPL. DITCH, RT.
+0.20%
+ 19.5
595.25
-
2
.
8
2
%
-0.28%
+ 40.5
593.66
+ 00.0
586.35
+ 00.0
585.50
-0.17%
1
.4
4
%
GRADE OF SPL. DITCH, LT.
(PLOTTED 10' ABOVE DATUM)
STR. NO. 13
STR. NO. 13
GRADE OF SPL. DITCH, RT.
-
2
.
9
6
%
593.73
+ 40.5
586.05
+ 00.0
585.65
+ 35.0
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
58
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
CONCRETE, SIDEWALK, 4 IN.F
HMA SHOULDERJ
FULL DEPTH HMA PAVEMENTK
FULL DEPTH HMA TRAILT
WIDENING WITH HMA, TYPEW
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 151+00.00 TO 166+00.00 LINE ''B''
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:09 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_B_50_02.D
WG
PRIN
T D
ATE: 9/18/17
155+
00
160+
00
165+
00
Silgan Plastics Corp
Keyser, Warren& Doris A
Otte, GlennaSEC. 29, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Keyser, Warren& Doris A
Silgan Plastics Corp
Otte, Glenna
Con
rail
(Lou
isvi
lle a
nd
Indi
ana
Rai
lroa
d)
ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
LIMITS OF PAVING
EXCEPTION
+19.50
+40.50
W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. RT. & LT. (SEE PREVIOUS SHEET)
W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. RT. & LT. (SEE NEXT SHEET)
BRIDGE RAILING &
+35.06
+24.33
+24.94
+35.67
+99.94
+60.06
TRANSITIONS REQ'D.
RT. & LT.
GUARDRAIL TRANSITION
TYPE "TGB" REQ'D. RT. & LT.
GUARDRAIL TRANSITION
TYPE "TGB" REQ'D. RT. & LT.
847.25 LFT. OF MSE WALL REQ'D. RT. & LT. (SEE MSE WALL DETAIL SHEETS)948.26 LFT. OF MSE WALL REQ'D. RT. & LT. (SEE MSE WALL DETAIL SHEETS)
+46.00
+14.00
+74.94
25'-0" OF W-BEAM GUARDRAIL @
3'-1
1
2
" POST SPACING REQ'D. RT. & LT.
+85.06
25'-0" OF W-BEAM GUARDRAIL @
3'-1
1
2
" POST SPACING REQ'D. RT. & LT.
1
4
'
1
0
'
1
2
'
1
4
'
K
14'
14'
12'
K
T
T
10'
11.8'
1
1
.
7
'
Jackson - 00359
Des. No. 1601943
SEE BRIDGE PLANS FOR DETAILS.
TO BE BUILT IN COMBINATION
WITH ROAD CONTRACT.
346 SYS. OF SODDING FOR DITCHES REQ'D., LT. & RT.
+40.5
+00.0
SODDING FOR DITCHES REQ'D., LT.
(SEE NEXT SHEET)
+35.0
SODDING FOR DITCHES
REQ'D., RT.
(SEE NEXT SHEET)
+00.0
For Inf
ormati
on O
nly
P.C. 168+04.16 "B"
L
I
N
E
"
B
"
N
6
7
°
1
9
'
2
8
"
E
N
6
7
°
1
9
'
2
8
"
E
CURVE DATA
Δ = 62°03'49" LT.R = 2000.00'T = 1203.23'L = 2166.43'E = 334.04'Se = 3.0%
P.I. 180+07.39 Line "B"
S
E
C
T
I
O
N
L
I
N
E
A
P
P
.
P
.
L
.
A
P
P
.
P
.
L
.
Str. No. 14
110 Lft. of 96"x48"
Box Structure
+40 Lt.,
MSE WALL
MSE WALL
P.I. 169+45.77 "PRT4" =
O.P.O.T. 169+03.67 "B", 23.39' Lt.
CURVE DATA
Δ = 5°41'33"R = 1977.36'T = 98.31'L = 196.45'E = 2.44'
P.I. 169+45.77 Line "PRT4"
P.I. 170+60.48 "PRT4"=
O.P.O.C. 170+20.00 "B", 25.83' Lt.
P.I. 172+38.23 "PRT4"=
O.P.O.C. 172+00.00 "B", 45.00' Lt.
L
I
N
E
"
P
R
T
4
"
L
I
N
E
"
B
"
N
52°22'4
9" E
N
53°11'4
8" E
P.I. 174+33.73 "PRT4"=
O.P.O.C. 174+00.00 "B", 45.00' Lt.
P.I. 173+36.07 "PRT4" =
O.P.O.T. 173+00.00 "B", 42.55' Lt.
P.I. 175+27.30 "PRT4" =
O.P.O.T. 174+95.29 "B", 37.97' Lt.
+52 Lt.,
STR. NO. 15A
Inlet Type "E-7"
and 33' of 12" Pipe
Req'd.
Str. No. 15B
34 Lft. of 24" Pipe
with 2 End Sections
Req'd.
+24 Lt.,
Str. No. 15C
25 Lft. of 12" Pipe
with 2 End Sections
Req'd.
+75 Lt.,
P.C. 168+47.46 "PRT4"
P.R.C. 170+43.92 "PRT4"
P.T. 170+76.18 "PRT4"
P.C. 175+16.86 "PRT4"
P.T. 175+37.72 "PRT4"
570
575
580
585
590
595
600
605
610
570
575
580
585
590
595
600
605
610
166+00
588.4
606.90
588.5
605.42
167+00
588.8
603.94
588.9
602.46
168+00
589.0
600.98
589.1
599.50
169+00
589.5
598.03
589.3
596.55
170+00
588.9
595.07
588.5
593.72
171+00
588.3
592.62
588.0
591.79
172+00
588.1
591.21
588.0
590.88
173+00
587.7
590.81
587.8
590.96
174+00
588.2
591.12
588.5
591.29
175+00
588.5
591.45
588.6
591.62
176+00
588.8
591.78
589.0
591.94
177+00
589.2
592.11
589.1
592.27
178+00
589.2
592.44
589.0
592.60
179+00
589.0
592.76
588.8
592.93
180+00
588.8
593.09
588.7
593.26
181+00
588.6
593.38
+0.33%
P.V.I. 171+60.00
ELEV = 590.33
V.C. = 320'
PROPOSED PROFILE GRADE
EXISTING GROUND
ALONG LINE "B"
GRADE OF SPL. DITCH, RT.
(PLOTTED 10' BELOW DATUM)
GRADE OF SPL. DITCH, LT.
STR. NO. 14
STR. NO. 14
1
.4
4
%
-
1
.8
7
%
+0.30%
+
0.97%
+ 62.8
586.60
+ 88.0
587.58
+ 61.3
590.36
+ 50.0
590.12
-
1
.
9
5
%
+0.3
5%
-0.39%
589.27
+ 61.3
586.28
+ 14.2
589.56
+ 50.0
STR. NO. 15A
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
59
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
CONCRETE, SIDEWALK, 4 IN.F
HMA SHOULDERJ
FULL DEPTH HMA PAVEMENTK
FULL DEPTH HMA TRAILT
WIDENING WITH HMA, TYPEW
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 166+00.00 TO 181+00.00 LINE ''B''
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:09 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_B_50_02.D
WG
PRIN
T D
ATE: 9/18/17
170+
00
175+
00
180+
00
Fenneberg, Alfred F &Mildred A Fenneberg t/c
Monroe, Lawrence A -Life Estate& Marcia J Monroe
Otte, Glenna
SEC. 29, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
SEC. 28, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Fenneberg, Alfred F &Mildred A Fenneberg t/c
ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
847.25 LFT. OF MSE WALL REQ'D. RT. & LT.
(SEE MSE WALL DETAIL SHEETS)
+61.25
818.75 LFT. OF W-BEAM GUARDRAIL
@ 6'-3" POST SPACING REQ'D. RT.
1137.50 LFT. OF W-BEAM GUARDRAIL @ 6'-3" POST SPACING REQ'D. LT.
+03.81
GUARDRAIL END TREATMENT
TYPE "OS" REQ'D., RT.
+25.78
GUARDRAIL END TREATMENT
TYPE "OS" REQ'D., LT.
1
4
'
1
4
'
1
2
'
1
0
'
K
T
T
K
J
J
1
4
' 1
4
'
6
'
6
'
1
2
'
K
J
J
T
704 SYS. OF SODDING FOR DITCHES REQ'D., LT.
+62.8
553 SYS. OF SODDING FOR DITCHES REQ'D., RT.
+14.2 For
Inform
ation
Only
P.C. 193+43.08 "B"
P.T. 189+70.59 "B"
N 5°15'39" ELINE "B"
N5°15'39"E
A
PP. P.L.
A
P
P
. P
.L
.
A
P
P
. P
.L.
A
P
P
. P
.L.
A
P
P
. P
.L.
S
E
C
T
IO
N
LIN
E
APPROXIMATE LOCATION OF
OVERHEAD LINES
Str. No. 16A
109 Lft. of 24" Pipe
with 2 End Sections
Req'd.
+00 Lt.,
Str. No. 16B
103 Lft. of 18" Pipe
with 2 End Sections
Req'd.
+88 Lt.,
CURVE DATA
Δ = 41°57'34"R = 1962.00'T = 752.34'L = 1436.83'E = 139.30'
P.I. 182+90.06 Line "PRT4"
P.I. 182+90.06 "PRT4" =
O.P.O.T. 182+38.26 "B", 101.30' Rt.
L
I
N
E
"
P
R
T
4
"
LINE "PRT4"
N5°15'39"E
L
I
N
E
"
B
"
580
585
590
595
600
605
610
615
580
585
590
595
600
605
610
615
181+00
588.6
593.38
588.7
593.43
182+00
588.0
593.40
589.4
593.29
183+00
589.7
593.10
589.8
592.83
184+00
591.3
592.52
593.8
592.21
185+00
595.3
591.90
597.3
591.60
186+00
597.9
591.29
595.3
590.98
187+00
591.7
590.68
588.3
590.37
188+00
588.3
590.06
586.8
589.75
189+00
586.4
589.44
586.3
589.14
190+00
586.2
588.83
586.2
588.52
191+00
586.1
588.24
585.6
587.99
192+00
585.6
587.78
585.7
587.61
193+00
586.0
587.49
586.2
587.40
194+00
586.0
587.33
585.5
587.26
195+00
585.4
587.20
585.6
587.13
196+00
585.7
587.06
P.V.I. 182+00.00
ELEV = 593.75
V.C. = 300'
-0.6
1%
PROPOSED PROFILE GRADE
EXISTING GROUND
ALONG LINE "B"
+0.30%
-1
.2
6
%
GRADE OF SPL. DITCH, LT.
(PLOTTED 20' ABOVE DATUM)
GRADE OF SPL. DITCH, RT.
STR. NO. 16A
STR. NO. 16A
STR. NO. 16B
STR. NO. 16B
-0.30%
-0.6
0%
-0.2
6%
-1
.3
1
%
591.02
+ 00.0
584.73
+ 81.6
+ 21.9
588.09
+ 90.0
588.91
+ 93.9
583.83
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
60
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
CONCRETE, SIDEWALK, 4 IN.F
HMA SHOULDERJ
FULL DEPTH HMA PAVEMENTK
FULL DEPTH HMA TRAILT
WIDENING WITH HMA, TYPEW
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 181+00.00 TO 196+00.00 LINE ''B''
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:09 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_B_50_02.D
WG
PRIN
T D
ATE: 9/18/17
185+
00
190+
00
195+
00
Ruddick,James F. &Sherrye R.
Fenneberg, Alfred F &Mildred A Fenneberg t/c
Parkland Inc
Surenkamp, MariettaSEC. 28, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
SEC. 21, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Parkland Inc
Fenneberg, Alfred F &Mildred A Fenneberg t/c
ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
1
4
'
1
4
'
6
'
6
'
1
2
'
T
K
J
J
14'
14'
6'
6'
12'
K
J
J
T
392 SYS. OF SODDING FOR DITCHES REQ'D., RT.
+00.0
+93.9For
Inform
ation
Only
P.T. 201+11.79 "B"
LINE "B"
N1°30'54"W
CURVE DATA
Δ = 6°46'34" LT.R = 6500.00'T = 384.80'L = 768.71'E = 11.38'Se = NC
P.I. 197+27.88 Line "B"
P.I. 197+27.88 "B"
APP. P.L.
APP. P.L.
APP. P.L.
APP. P.L.
LINE "PRT4"
N1°30'54"W
P.I. 197+29.60 "PRT4" =
O.P.O.T. 197+27.43 "B", 26.69' Lt.
P.O.T. 209+99.47 "PRT4"=
O.P.O.T. 210+00.00 "B", -38.00' Lt.
CURVE DATA
Δ = 6°46'34"R = 6462.00'T = 382.55'L = 764.22'E = 11.31'
P.I. 197+29.60 Line "PRT4"
STR. NO. 17
570
575
580
585
590
595
600
605
570
575
580
585
590
595
600
605
196+00
585.7
587.06
585.7
587.00
197+00
585.6
586.93
585.7
586.86
198+00
586.0
586.80
586.0
586.73
199+00
586.1
586.66
586.3
586.59
200+00
586.1
586.53
586.0
586.46
201+00
586.1
586.39
586.4
586.33
202+00
586.7
586.26
586.9
586.19
203+00
586.6
586.13
586.1
586.06
204+00
585.5
585.99
585.1
585.92
205+00
585.0
585.85
584.7
585.76
206+00
584.5
585.65
584.3
585.53
207+00
584.4
585.39
584.4
585.23
208+00
583.9
585.05
583.5
584.85
209+00
582.8
584.64
581.9
584.44
210+00
580.8
584.23
579.4
584.04
211+00
578.3
583.98
-0.13%
-0.4
2%
P.V.I. 206+60.00
ELEV = 585.64
V.C. = 400'
PROPOSED PROFILE GRADE
EXISTING GROUND
ALONG LINE "B"
GRADE OF SPL. DITCH, LT.
(PLOTTED 20' ABOVE DATUM)
GRADE OF SPL. DITCH, RT.
-
4
.
5
5
%
-0.26%
+ 00.0
573.36
+ 91.9
578.27
-0.30%
-
6
.
3
8
%
578.49
+ 60.0
573.52
+ 38.0
STR. NO. 17
STR. NO. 17
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
61
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
CONCRETE, SIDEWALK, 4 IN.F
HMA SHOULDERJ
FULL DEPTH HMA PAVEMENTK
FULL DEPTH HMA TRAILT
WIDENING WITH HMA, TYPEW
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 196+00.00 TO 211+00.00 LINE ''B''
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:09 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_B_50_02.D
WG
PRIN
T D
ATE: 9/18/17
200+
00
205+
00
210+
00
Surenkamp, Marietta
Parkland Inc
Thompson, Mark A & Kathy A (Trustees)Mark & Kathy Thompson Rev Trust
SEC. 21, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Parkland Inc
ALL TOPOGRAPHY DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "B" EXCEPT AS NOTED.
K
J
J
T
14'
14'
6'
6'
12'
78 TONS OF REVETMENT RIPRAP
AND 81 SYS. OF GEOTEXTILE
FOR DITCHES
REQ'D., LT.
+60.0
+38.0
+91.9
+00.0
109 TONS OF
REVETMENT RIPRAP
AND 112 SYS. OF
GEOTEXTILE FOR
DITCHES REQ'D., RT.
For Inf
ormati
on O
nly
+58.2
5,
35.5
1'
TR
EE
+78.1
9,
105.7
1'
PW
P
+66.2
8,
139.9
0'
PW
P
4.6'
460 SYS OF SODDING FOR DITCHES REQ'D, LT.
REQ'D, RT.GEOTEXTILE FOR DITCHESRIPRAP AND XXX SYS OFXXX TONS OF REVETMENT
858 SYS OF SODDING FOR DITCHES REQ'D, RT.
62
1" = 50'
1' = 5'
STA 211+00.00 TO STA 225+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 210
+00.0
0 "B"
MA
TC
HLIN
E -
ST
A 225
+00.0
0 "B"
570
580
590
600
570
580
590
600
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
600' V.C.
ELEV. 594.81
P.V.I. 220+00.00"B"
300' V.C.
ELEV. 583.50
P.V.I. 211+75.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
575
585
595
575
585
595
1:5
0
2:3
2:5
4
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
21000-
22500.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
210
+00
215
+00
220
+00
225
+00
LINE "B"
CURVE DATA
P.C. 211+19.75 "B"
P.I. 217+00.29 "B"
P.T. 222+77.75 "B"
P.C. 223+37.56 "B"
E = 25.87'
L = 1158.00'
T = 580.54'
R = 6500.00'
P.I. = 217+00.29 "B"
CULVERT #17
T
T
J
J
J
J
K
K
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
581.50
+50.00
4' BOTTOM DITC
H LT. @
S=2.558%
4' BOTTOM DITCH LT. @ S=0.311%
4' BOTTOM DITCH LT. @ S=0.405%
PLOTTED 1
0' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=0.300%
4' BOTTOM DITCH RT. @ S
=1.829%
573.36
+80.00
576.96
+00.00
587.02
+50.00
-0.300%
-0.416%
1.371%
CULVERT #17
+50.0
+38.0
+50.0
+00.0
573.52
+38.00
582.82
+75.00
PLOTTED 10' ABOVE DATUM
S=-4.542%
DITCH RT. @
4' BOTTOM
@ S=3.6
01%
4' BOTTOM
DITCH
RT.
210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+00 225+00
580.8
580.1
578.6
579.1
580.5
581.5
580.4
582.2
583.3
584.7
585.7
587.0
587.9
588.7
589.2
590.2
591.1
591.1
590.4
590.6
591.0
591.0
590.9
590.4
590.2
590.3
590.4
590.3
590.0
590.0
590.1
584.2
3
584.0
4
583.9
8
584.0
7
584.3
1
584.7
0
585.2
3
585.9
0
586.5
8
587.2
7
587.9
6
588.6
4
589.3
3
590.0
1
590.7
0
591.3
5
591.9
3
592.4
4
592.8
8
593.2
5
593.5
6
593.7
9
593.9
5
594.0
5
594.0
7
594.0
3
593.9
1
593.7
6
593.6
1
593.4
6
593.3
1
Parkland Inc.
Parkland Inc.
Sandra K. Monroe & Marcia J. Monroe (1/2 interest)
Greg Hoevener & Lori Ann Hoevener (1/2 interest)
Robert D. Snider
P.C. 211+19.75 "PRT4"
PRC211+73.38 "PRT4"
P.I. 211+98.46 "PRT4"
PCC212+97.40 "PRT4"
P.C. 212+46.48 "PRT4"
P.T. 212+22.52 "PRT4"
P.I. 211+46.57 "PRT4"
E = 3.10'
L = 49.14'
T = 25.08'
R = 100.00'
P.I. = 211+98.46 "PRT4"
CURVE DATA CURVE DATA
P.I. 212+72.51 "PRT4"
CURVE DATA
E = 3.33'
L = 50.92'
T = 26.03'
R = 100.00'
P.I. = 212+72.51 "PRT4"
E = 0.05'
L = 53.63'
T = 26.81'
R = 6538.00'
P.I. = 211+46.57 "PRT4"
P.I. 217+98.36 "PRT4"
CURVE DATA
P.T. 222+97.38 "PRT4"
P.C. 223+57.19 "PRT4"
LINE "PRT4"
E = 19.06'
L = 999.97'
T = 500.95'
R = 6574.00'
P.I. = 217+98.36 "PRT4"
For Inf
ormati
on O
nly
+84.8
2,
124.4
5'
PW
P
+92.7
7,
108.7
1'
GU
Y
WIR
E
+31.1
6,
121.4
8'
TR
EE
+58.3
6,
126.6
1'
TR
EE
+98.5
3,
138.2
2'
TR
EE
+32.3
5,
118.3
0'
BU
SH
+15.1
8,
126.4
5'
BU
SH
+52.4
3,
138.0
6'
TR
EE
+59.8
8,
122.7
7'
TR
EE
+08.2
8,
126.5
0'
TR
EE
+63.9
1,
128.5
3'
TR
EE
+33.9
5,
115.4
4'
TR
EE
+15.2
1,
113.1
6'
TR
EE
+79.9
5,
110.9
5'
TR
EE
+32.7
6,
109.8
4'
TR
EE
+56.7
3,
106.8
1'
TR
EE
+52.2
4,
125.1
5'
TR
EE
+10.4
2,
106.7
0'
TR
EE
+48.2
7,
115.5
4'
TR
EE
+78.7
9,
139.8
8'
TR
EE
+43.2
6,
137.0
8'
TR
EE
+64.1
3,
144.4
7'
TR
EE
+04.4
4,
144.0
3'
TR
EE
+61.9
3,
138.3
4'
TR
EE
+23.6
9,
152.8
8'
BU
SH
+31.7
5,
153.2
9'
BU
SH
+43.5
7,
153.5
8'
BU
SH
+49.5
2,
153.6
4'
BU
SH
+21.3
2,
152.0
9'
TR
EE
+44.5
6,
113.7
1'
ELE
CT
RIC
ME
TE
R
M
M
M
M
M
M
M
M
M
MMM
M
M
63
1" = 50'
1' = 5'
STA 225+00.00 TO STA 240+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 225
+00.0
0 "B"
MA
TC
HLIN
E -
ST
A 240
+00.0
0 "B"
610
600
590
580
610
600
590
580
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
200' V.C.
ELEV. 591.06
P.V.I. 232+50.00"B"
300' V.C.
ELEV. 593.31
P.V.I. 240+00.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
585
605
595
585
605
595
1:5
0
2:3
3:2
7
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
22500-
24000.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
225
+00
230
+00
235
+00
240
+00
LINE "B"
CURVE DATA
E = 57.21'
L = 1718.46'
T = 864.27'
R = 6500.00'
P.I. = 232+01.83 "B"
P.I. 232+01.83 "B"
+63 "B", STR. NO. 113
K
K
J
J
J
J
T
T
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
589.37
+25.00
587.50
+30.00
4' BOTTOM DITCH RT. @ S=-0.120%
4' BOTTOM DITCH RT. @ S=0.222%
589.27
+00.00
-0.300%0.300%
4' BOTTOM DITCH LT. @ S=0.405%
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH LT. @ S=0.209%
PLOTTED 10' ABOVE DATUMPLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH LT. @ S=-0.500%
587.71
+00.00
225+00 226+00 227+00 228+00 229+00 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00
590.1
590.2
590.0
590.0
590.1
589.9
589.9
589.9
589.3
588.9
589.2
589.2
589.4
589.6
589.7
590.2
590.5
590.6
590.4
590.6
590.4
590.2
589.9
589.9
589.7
589.6
589.5
590.0
590.3
591.0
591.7
593.3
1
593.1
6
593.0
1
592.8
6
592.7
1
592.5
6
592.4
1
592.2
6
592.1
1
591.9
6
591.8
1
591.6
6
591.5
1
591.3
6
591.2
5
591.2
1
591.2
5
591.3
6
591.5
1
591.6
6
591.8
1
591.9
6
592.1
1
592.2
6
592.4
1
592.5
6
592.7
1
592.8
6
592.9
6
592.9
7
592.8
8
BE
EC
HW
OO
D
LN
SYCAMORE RD
SYCAMORE RD
Sandra K. Monroe & Marcia J. Monroe (1/2 interest)
Greg Hoevener & Lori Ann Hoevener (1/2 interest)
Robert D. Snider
Iris E. Fischer
John A., Sr. & Earl & Edna McCammon
Brian J. D'arcoCarol Ann Bobb
Delbert & Hgerian Fields
Joanne R. Marshall
The Revocable Trust of
as Trustee of
Joanne R. Marshall
Donald Gene Combs
Joyce Hamblen
Tim Hamblen &
Thomas William Money,
Tony L. Beatty
Sandra K. Monroe & Marcia J. Monroe (1/2 interest)
Greg Hoevener & Lori Ann Hoevener (1/2 interest)
P.C. 223+57.19 "PRT4"
E = 46.53'
L = 1542.01'
T = 774.72'
R = 6426.00'
P.I. = 231+31.91 "PRT4"
CURVE DATA
P.I. 231+31.91 "PRT4" PRC238+99.19 "PRT4"
P.I. 239+23.54 "PRT4"
P.T. 239+46.95 "PRT4"
P.C. 239+74.28 "PRT4"
P.I. 239+99.59 "PRT4"
LINE "PRT4"
CURVE DATA CURVE DATA
E = 2.92'
L = 47.76'
T = 24.34'
R = 100.00'
P.I. = 239+23.54 "PRT4"
E = 3.15'
L = 49.59'
T = 25.31'
R = 100.00'
P.I. 239+99.59 "PRT4"
For Inf
ormati
on O
nly
+25.1
8,
97.4
1'
PW
P
+32.1
8,
84.0
2'
PW
P
+57.4
4,
104.1
5'
PW
P
+08.4
5,
99.6
5'
GU
Y
WIR
E
+44.5
9,
82.4
7'
GU
Y
WIR
E
+55.5
0,
83.7
2'
GU
Y
WIR
E
+59.7
2,
73.0
5'
CO
NT
RO
L
POIN
T
+48.0
4,
30.9
7'
TR
EE
+50.8
3,
13.7
2'
TR
EE
+52.3
5,
8.7
4'
TR
EE
+54.0
0,
3.9
7'
TR
EE
+54.5
2,
9.1
5'
TR
EE
+67.6
5,
6.8
6'
CO
NT
RO
L
POIN
T
+90.2
8,
8.0
2'
BU
SH
+97.2
2,
13.6
6'
BU
SH
+07.4
5,
15.9
5'
BU
SH
+30.4
9,
33.6
7'
TR
EE
+14.6
1,
34.9
2'
TR
EE
+66.4
0,
24.3
8'
TR
EE
+75.4
5,
39.4
6'
LIG
HT
PO
LE
+32.0
5,
20.2
9'
CO
NT
RO
L
POIN
T
+92.3
3,
25.9
1'
TR
EE
+95.3
8,
32.9
2'
TR
EE
+42.0
6,
54.5
0'
BU
SH
+52.9
6,
51.5
6'
BU
SH
+60.7
9,
53.7
1'
BU
SH
+64.5
9,
57.7
8'
BU
SH
+69.4
1,
57.8
0'
BU
SH
+78.1
3,
57.6
4'
BU
SH
+32.4
5,
12.4
8'
PW
P
+09.6
9,
41.8
8'
PW
P
+21.4
7,
14.1
0'
SIG
N
+30.3
2,
31.3
4'
BO
X
+32.2
2,
32.0
2'
BO
X
+34.3
0,
32.8
2'
BO
X
+96.4
0,
74.8
2'
TR
EE
+49.2
8,
85.8
6'
TR
EE
+74.7
6,
53.9
7'
TR
EE
+05.1
7,
46.1
2'
TR
EE
+34.9
3,
37.7
1'
MA
NH
OLE
+46.8
1,
46.9
1'
LIG
HT
PO
LE
+52.3
7,
40.6
9'
MA
NH
OLE
+70.1
3,
39.1
1'
MA
NH
OLE
+52.3
6,
34.6
7' IN
LE
T
+24.1
9,
62.5
3'
BU
SH
+78.9
6,
45.6
3'
PW
P
+82.7
2,
114.6
8'
PW
P
+31.2
1,
96.5
2'
TR
EE
+46.2
7,
64.6
8'
PW
P
+43.7
9,
54.1
3'
MA
NH
OLE
+39.5
7,
55.0
0'
TR
AFFIC
SIG
NA
L
PO
LE
+10.3
9,
38.9
1' IN
LE
T
+09.5
3,
26.8
0' IN
LE
T
+11.7
2,
26.7
3' IN
LE
T
+52.0
9,
45.9
1'
TR
AFFIC
SIG
NA
L
PO
LE
+57.6
8,
54.5
1'
MA
NH
OLE
+41.2
6,
51.6
1'
LIG
HT
PO
LE
+31.8
5,
39.2
0'
BU
SH
+67.7
6,
47.6
3'
TR
EE
+74.8
3,
42.5
3'
PW
P
+39.0
5,
29.2
4' IN
LE
T
+35.2
2,
37.0
5' IN
LE
T+
29.7
3,
26.7
7'
MA
NH
OLE
+50.3
6,
49.6
0'
BU
SH
+77.4
0,
51.7
1'
SIG
N
+62.5
7,
40.6
2'
SIG
N
+81.1
7,
40.3
4' IN
LE
T
+27.7
5,
48.3
2'
TR
EE
+06.1
2,
70.5
1'
PO
ST
EASEMENT40' PERPETUAL DRAINAGE
EASEMENT40'PERPETUAL DRAINAGE P
OO
L
M
M
M
M
M
MM
MM
CB
S
S
S
3.5'
334 SYS OF SODDING FOR DITCHES REQ'D, LT.
DITCHES REQ'D, LT.250 SYS OF SODDING FOR
406 SYS OF SODDING FOR DITCHES REQ'D, RT.
842 SYS OF SODDING FOR DITCHES REQ'D, RT.
64
1" = 50'
1' = 5'
STA 240+00.00 TO STA 256+00.00 "B"
PLAN & PROFILE SHEET
MA
TC
HLIN
E -
ST
A 240
+00.0
0 "B"
580
590
600
580
590
600
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 16, T-6-N, R-6-E
E 54760.95
N 105610.72
STA 251+61.54 "B"
END PROJECT
LINE "B" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "B" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
300' V.C.
ELEV. 593.31
P.V.I. 240+00.00"B"
300' V.C.
ELEV. 590.25
P.V.I. 243+60.00"B"
150' V.C.
ELEV. 592.00
P.V.I. 249+00.00"B"
JACKSON COUNTY
JACKSON TWP.
SEC. 21, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 16, T-6-N, R-6-E
ELEV. = 595.07
STA 251+61.54 "B"
END PROJECT
585
575
595
605
575
585
595
605
P.T. 249+88.58
LINE "B"
EAST 54759.7483
NORTH 105437.7688
78.1
0'
corner post
Fence
32.9
9'
36.3
3'
"PRIVATE DRIVE"
CL SignT
CAPPED REBAR
HOUSE #511
SW COR
SJCA
x x
P.O.T. 255+87.87
LINE "B"
EAST 54763.9215
NORTH 106037.0410
STRAIN POLE
NW BOLT
CL MANHOLE
MAG NAIL
20.8
7'
57.6
0'
72.2
9'
STRAIN POLE
NE BOLT
1:5
0
2:3
3:5
7
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
24000-
25500.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
240
+00
245
+00
250
+00
255
+00
LINE "B"
CURVE DATA
E = 11.65'
L = 777.60'
T = 389.26'
R = 6500.00'
P.I. = 246+00.25 "B"
P.T. 240+56.02 "B"
P.C. 242+10.98 "B"
P.I. 246+00.25 "B"
P.T. 249+88.58 "B"
CULVERT #20
T
T
K
K
K
J
J
J
R
STA. 255+61.72 "B"
BEGIN PROJECT
PROPOSED GRADE LINE "B"
ALONG LINE "B"
EXISTING GROUND
594.04
+60.00
591.16
+00.00
588.61
+80.00
585.71
+66.00
588.00
+00.00
4' BOTTOM DITCH LT. @ S=-0.861% 4' BOTTOM DITCH LT. @ S=1.358
%
4' BOTTOM DITCH LT. @ S=0.576%
@ S=1.79
9%4' BOTTOM DITCH LT
.
PLOTTED 10' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH RT. @ S=1.003%
4' BOTTOM DITCH RT. @ S=-0.577%
585.13
+60.00
594.06
+60.00
590.55
+00.00
-0.850%
0.324%
1.174%
CULVERT #20
+80.0
+66.0
+60.0
+00.0
+60.0
+00.0
+60.0
PLOTTED 10' ABOVE DATUM
PLOTTED 10' ABOVE DATUM
4' BOTTOM DITCH LT. @ S=-0.500%
586.63
+00.00
4' BOTTOM DITCH RT. @ S=1.350%
240+00 241+00 242+00 243+00 244+00 245+00 246+00 247+00 248+00 249+00 250+00 251+00 252+00 253+00 254+00 255+00
591.7
591.5
591.6
592.1
592.3
590.1
587.8
585.8
586.8
588.3
589.1
589.7
590.0
590.1
590.2
590.3
590.8
591.0
591.4
591.7
592.5
593.5
594.3
595.1
595.1
594.6
593.5
592.3
590.4
588.8
587.7
588.2
592.8
8
592.6
9
592.4
1
592.0
4
591.6
1
591.2
2
590.9
2
590.7
2
590.6
2
590.6
1
590.7
1
590.8
7
591.0
3
591.1
9
591.3
5
591.5
1
591.6
8
591.8
6
592.1
6
592.6
0
593.1
7
593.7
6
594.3
5
594.9
4
4TH STREET RD
N
HIL
LC
RE
ST
DR
ALLE
Y
US50/
TIP
TO
N
ST
Pablo TomasRichard A. & Vickie L. Lewis
Sandra K. Monroe & Marcia J. Monroe (1/2 interest)
Greg Hoevener & Lori Ann Hoevener (1/2 interest)
Robert P. Vondielingen
Robert P. Vondielingen
Robert P. & Theresa F. VonDielingen
Nathan K. Smith & Jason M. Smith
Stephen D. & Lisa B. Hoene
Robert P. Vondielingen
Development Co., LLC
Hampton & Hampton
Carolyna Ivy
Teresa Guadarrama
Dionicio Castelan & PCM Enterprises, Inc.
Robert W. & Willadean D. ToppePatricia Louise Baxter
Revocable Trust Agreement of
Patricia Louise Baxter
Revocable Trust Agreement of
PCC240+23.86 "PRT4"P.C. 242+18.56 "PRT4"
P.I. 244+85.00 "PRT4"
P.O.T. 248+62.72 "PRT4"
PCC247+51.13 "PRT4"
P.T. 247+70.20 "PRT4"
P.I. 247+60.69 "PRT4"
LINE "PRT4"
CURVE DATA CURVE DATA
E = 5.43'
L = 532.57'
T = 266.43'
R = 6538.00'
P.I. = 244+85.00 "PRT4"
E = 0.46'
L = 19.06'
T = 9.56'
R = 100.00'
P.I. = 247+60.69 "PRT4"
For Inf
ormati
on O
nly
COMMERCIAL BUILDINGAP
P.
SE
CTIO
N
LIN
E
FOR ROUNDABOUT INFORMATIONSEE INTERSECTION DETAILS
GV
M
M
M
MM
F
F
F
WV
W
21+
96.03, 30.41'
N 99307.28 F
T
E 43232.47 F
T 18
+99.32, 35.37'
JACKSON COUNTY
JACKSON TWP.
SEC. 30, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 25, T-6-N, R-5-E
MA
TC
HLIN
E -
ST
A 415
+00.0
0 "T1"
STA 301+00.00 "PRA" TO STA 415+00.00 "T1"
PLAN & PROFILE SHEET 65
N/A
1" = 50'
JACKSON COUNTY
JACKSON TWP.
SEC. 24, T-6-N, R-5-E
JACKSON COUNTY
JACKSON TWP.
SEC. 19, T-6-N, R-6-E
580
570
560
580
570
560
LINE "PRA" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "PRA" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
415
+00
P.O.T. 58+30.97 "B"
P.O.T. 304+46.00 "PRA" =
Seymour Aviation Commission
Commission
Aviation
Seymour
Chickamauga Properties, Inc.
Max & Connie Pollert
G
AV
E
G
AV
E
1ST AVE
AIRPORT RD.
Education
Board of
CULVERT #2
100' V.C.
ELEV. 567.32
P.V.I. 302+50.00 "PR-A"
120' V.C.
ELEV. 568.36
P.V.I. 305+75.00 "PR-A"
120' V.C.
ELEV. 567.74
P.V.I. 307+00.00 "PR-A"
150' V.C.
ELEV. 569.10
P.V.I. 309+00.00 "PR-A"
E 43236.89
N 98449.09
STA. 302+08.38 "PR-A"
BEGIN CONSTRUCTION
555
585
575
565
555
585
575
565
568.15
+75.00570.28
+30.92
"PR-A"
STA. 301+52.38
CONSTRUCTION
BEGIN INCIDENTAL
STA. 312+00.00 "PR-A"
BEGIN CONSTRUCTION
STA. 312+92.31 "PR-A"
BEGIN INCIDENTAL CONSTRUCTION
E 43236.89
N 98449.09
STA. 302+08.38 "PR-A"
BEGIN CONSTRUCTION
STA. 301+52.38 "PR-A"
BEGIN INCIDENTAL CONSTRUCTION
Commission
Seymour Aviation
G & S Leasing
P.O.T. 14+35.93 "G"
P.O.T. 304+54.41 "PRA" =
STA. 312+00.00 "PR-A"
BEGIN CONSTRUCTION
STA. 312+92.31 "PR-A"
BEGIN INCIDENTAL CONSTRUCTION
1:5
0
2:3
4:5
2
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
30100-
41500.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
K
15
15
15
15
T T
K
K
K
15 K
15 KK
K
ALONG LINE "PRA"
EXISTING GROUND
PROPOSED GRADE LINE "PR-A"
-0.500% 0.682% -0.283% 0.005%
567.6
567.4
567.3
567.3
567.4
567.4
567.5
567.6
567.5
567.8
567.9
568.2
568.3
568.1
568.4
568.6
568.5
568.5
568.5
568.5
568.5
568.6
567.5
9
567.5
7
568.0
7
568.8
2
569.5
7
570.2
4
569.4
9
568.7
9
568.2
9
567.9
9
567.9
1
568.0
8
568.4
2
568.7
4
568.9
2
568.9
4
568.8
2
568.6
8
568.5
3
568.5
4
302+00301+00 303+00 304+00 305+00 306+00 307+00 308+00 309+00 310+00 311+00 312+00
LIN
E "G"
305
+00
310
+00
P.C.
306
+82.8
0
P.T.
308
+83.3
3
P.I.
312
+00.0
0
P.I.
307
+83.4
0
P.I.
309
+50.3
1
P.C.
309
+01.7
3
P.T.
309
+98.5
9
E = 5.05'
L = 200.53'
T = 100.60'
R = 1000.00'
P.I. = 307+83.40
E = 2.35'
L = 96.86'
T = 48.58'
R = 500.00'
P.I. = 309+50.31
E = 43195.26
N = 99439.30
P.I. = 312+00.00
CURVE DATA CURVE DATA CURVE DATA
P.C. 404+91.32
P.T. 406+06.88
P.C. 406+08.26
P.T. 406+74.99
P.C. 409+96.71
P.T. 410+47.64P.I. 406+41.94
P.I. 410+22.20
LINE "PRT1"
P.I. 405+56.52
E = 19.38'
L = 115.56'
T = 65.20'
R = 100.00'
P.I. = 405+56.52
E = 2.82'
L = 66.74'
T = 33.68'
R = 200.00'
P.I. = 406+41.94
CURVE DATA CURVE DATA
E = 0.65'
L = 50.94'
T = 25.49'
R = 500.00'
P.I. = 410+22.20
CURVE DATA
For Inf
ormati
on O
nly
+89.9
2,
96.4
2'
TR
EE
+73.9
3,
57.7
8'
PW
P
+93.1
8,
59.2
5'
PW
P
+00.8
4,
59.3
8'
PW
P
+16.0
6,
61.0
3'
PW
P
+31.3
3,
60.1
3'
PW
P
+62.3
1,
59.8
6'
PW
P
+45.6
8,
63.8
3'
PW
P
+38.9
8,
53.3
2'
MA
NH
OLE
+43.5
6,
51.0
6'
FIB
ER
OP
TIC
MA
RK
ER
+86.9
9,
62.8
0'
FIR
E
HY
DR
AN
T
+93.5
3,
58.9
2'
FIB
ER
OP
TIC
MA
RK
ER
+87.8
3,
65.9
2'
WA
TE
R
VA
LV
E
+93.5
3,
60.3
4'
MA
NH
OLE
+51.5
2,
57.8
7'
FIB
ER
OP
TIC
MA
RK
ER
+59.8
6,
57.7
6'
FIB
ER
OP
TIC
MA
RK
ER
+55.0
8,
58.4
9'
MA
NH
OLE
+57.1
9,
58.6
3'
MA
NH
OLE
+46.1
0,
68.9
0'
WA
TE
R
VA
LV
E
+43.0
0,
64.0
3'
CO
NT
RO
L
POIN
T
+81.6
7,
48.9
5'
TB
M
#1
+55.7
1,
49.3
1'
TB
M
#2
+40.5
9,
6.8
4'
35
MP
H
SP
EE
D
SIG
N
+42.5
0,
41.5
3'
35
MP
H
SP
EE
D
SIG
N
+42.9
1,
178.1
4'
TR
EE
+15.5
4,
138.1
6'
TR
EE
+31.9
9,
120.8
2'
TR
EE
+94.4
9,
108.0
5'
TR
EE
+62.5
5,
177.3
2'
TR
EE
+96.7
8,
180.9
4'
TR
EE
+31.2
9,
170.6
9'
TR
EE
+37.6
8,
177.7
5'
TR
EE
+46.5
1,
174.1
4'
TR
EE
+13.2
6,
144.6
9'
TR
EE
+99.3
4,
106.8
9'
TR
EE
+03.1
0,
124.3
4'
TR
EE
+11.6
0,
117.2
5'
TR
EE
+38.5
6,
123.4
9'
TR
EE
+35.7
3,
106.3
6'
TR
EE
+25.6
0,
84.6
6'
TR
EE
+20.9
4,
93.8
2'
TR
EE
+20.8
0,
102.5
0'
TR
EE
+20.5
2,
105.6
9'
TR
EE
+54.3
4,
93.6
2'
TR
EE
+55.3
3,
81.5
9'
TR
EE
+03.4
4,
138.7
3'
TR
EE
+28.3
9,
186.1
6'
TR
EE
+29.4
9,
67.8
4'
TR
EE
+68.2
8,
15.2
5'
PW
P
+67.3
5,
49.2
2'
PW
P
+62.4
8,
18.9
0'
PW
P
+59.8
2,
18.0
7'
PW
P
+55.3
5,
18.0
1'
PW
P+
52.9
2,
49.3
3'
PW
P
+01.4
8,
75.3
4'
PW
P
+58.5
0,
48.5
2'
PW
P
+73.1
9,
18.7
7'
PW
P
+46.0
7,
14.3
4'
PW
P
+07.3
6,
18.4
6'
PW
P
+61.3
1,
16.8
6'
PW
P
+39.0
7,
110.0
0'
PW
P
+55.5
0,
63.2
0'
CO
NT
RO
L
POIN
T
+70.3
4,
42.6
5' IN
LE
T
+93.6
9,
104.4
9'
BO
X
+03.4
4,
60.2
6'
GU
Y
WIR
E
+03.0
4,
55.8
7'
GU
Y
WIR
E
+39.2
0,
68.7
6'
GU
Y
WIR
E
+40.4
4,
74.3
6'
GU
Y
WIR
E
+39.3
2,
80.2
9'
GU
Y
WIR
E
+58.2
2,
14.1
4'
MO
NU
ME
NT
+09.4
1,
51.7
4'
GU
Y
WIR
E+
10.2
7,
51.1
4'
GU
Y
WIR
E
+12.6
1,
51.3
4'
GU
Y
WIR
E
+18.6
3,
51.3
3'
GU
Y
WIR
E
+41.1
8,
111.6
4'
PO
ST
+48.6
1,
111.5
8'
PO
ST
+48.0
8,
118.3
0'
PO
ST
+40.9
3,
118.1
2'
PO
ST
+40.9
2,
122.0
9'
PO
ST
+98.9
4,
12.5
1'
ST
RE
ET
SIG
N
+96.3
3,
13.2
3'
ST
OP
SIG
N
FF
F
F
M
F
F
FF
WV
WV
GRASS
GRASS
GRASS
ASPHALT
GRASS ASPHALT
MA
TC
HLIN
E -
ST
A 415
+00.0
0 "T1"
66
N/A
1" = 50'
MA
TC
HLIN
E -
ST
A 428
+00.0
0 "T1"
JACKSON COUNTY
JACKSON TWP.
SEC. 24, T-6-N, R-5-E
JACKSON COUNTY
JACKSON TWP.
SEC. 19, T-6-N, R-6-E
LINE "T1" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "T1" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
STA 415+00.00 TO STA 428+00.00 "T1"
PLAN SHEET
415
+00
1:5
0
2:3
5:5
4
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
41500-
42800.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
Max & Connie Pollert
Thomas R. Bollinger (5/16 Interest)
Richard A. Temple
Chickamauga Properties, Inc.
Juan Mateo Tomas Juan
Nicolas Tomas Baltazar &
Juan Mateo Tomas Juan
Nicolas Tomas Baltazar &
CO
LO
NIA
L
DR
315
+00
315
+00
315
+00
P.O.T.
315
+00.0
0
415
+00
420
+00
425
+00
LINE "PRT1"
For Inf
ormati
on O
nly
+00.4
8,
70.4
5'
NO
TR
UC
KS
ALL
OW
ED
SIG
N
+60.4
3,
49.5
3'
ST
RE
ET
SIG
N
+80.8
3,
97.7
6'
TR
EE
+29.6
7,
16.4
3'
PW
P
+79.4
7,
14.7
7'
PW
P+
80.6
9,
14.9
4'
PW
P
+03.5
2,
15.6
7'
PW
P+
04.7
3,
15.0
1'
GAS
MA
RK
ER
+16.8
8,
15.7
6'
PW
P
+94.1
9,
76.9
1'
PW
P
+15.9
5,
49.0
7'
PW
P
+13.5
4,
49.3
8'
PW
P
+44.1
1,
45.9
4'
PW
P
+11.0
2,
14.7
6'
PW
P
+84.4
0,
48.2
8'
PW
P
+44.4
8,
14.3
4'
PW
P
+43.7
1,
13.6
9'
PW
P
+92.9
5,
14.9
1'
PW
P
+26.4
4,
119.5
7'
SIG
N
+93.8
1,
64.9
8'
GU
Y
WIR
E
+93.5
5,
66.7
5'
GU
Y
WIR
E
+42.6
5,
16.8
2'
GU
Y
WIR
E
+44.4
9,
16.6
9'
GU
Y
WIR
E+
50.7
9,
16.5
4'
GU
Y
WIR
E
+19.7
9,
12.2
3'
FIB
ER
OP
TIC
MA
RK
ER
+19.7
1,
14.5
6'
FIB
ER
OP
TIC
MA
RK
ER
+11.5
7,
20.9
3'
CO
NT
RO
L
POIN
T
+15.8
7,
17.3
6'
SIG
N
+57.0
4,
52.8
7'
SIG
N
+60.8
0,
19.5
5'
CO
NT
RO
L
POIN
T
+74.0
5,
48.7
3'
GU
Y
WIR
E
+64.4
5,
16.8
8'
ST
OP
SIG
N
+55.3
5,
94.5
4'
TR
EE
+45.2
6,
92.1
5'
TR
EE
+12.6
6,
90.8
9'
TR
EE
+30.5
2,
158.0
6'
TR
EE
+65.3
3,
234.7
1'
TR
EE
+72.0
7,
233.2
4'
TR
EE
+69.7
5,
188.1
6'
TR
EE
+67.0
8,
198.9
9'
TR
EE
+68.7
7,
176.9
4'
TR
EE
+67.4
0,
142.5
1'
TR
EE
+72.1
0,
130.1
1'
TR
EE
+66.7
8,
119.3
3'
TR
EE
+42.7
4,
204.7
0'
TR
EE
+61.1
8,
225.3
1'
TR
EE
+69.0
3,
199.4
8'
TR
EE
+32.7
7,
124.2
4'
TR
EE
+44.1
1,
111.2
7'
TR
EE
+93.7
0,
133.6
3'
FL
AG
PO
LE
+33.0
4,
93.6
2'
PO
ST
+25.6
2,
61.5
5'
PW
P
+11.2
4,
60.2
6'
PW
P
+98.6
2,
60.6
4'
PW
P
+84.9
7,
61.3
5'
PW
P
+93.5
7,
61.6
9'
PW
P
+23.0
4,
61.5
7'
PW
P
+64.0
0,
61.4
3'
PW
P
+90.6
8,
93.8
2'
PW
P
+50.7
3,
166.7
3'
PW
P
+69.5
8,
59.7
5'
PW
P
+69.9
0,
59.1
9'
PW
P
+22.2
7,
116.4
5'
PW
P
+57.0
2,
195.4
6'
LIG
HT
PO
LE
+08.1
8,
185.5
0'
CA
TC
H
BASIN
+38.0
7,
185.0
0'
CA
TC
H
BASIN
+68.5
7,
186.3
1'
CA
TC
H
BASIN
+97.6
8,
187.1
9'
CA
TC
H
BASIN
+80.4
3,
157.8
1'
LIG
HT
PO
LE
+19.6
3,
227.8
4'
LIG
HT
PO
LE
+41.1
9,
227.3
3'
LIG
HT
PO
LE
+49.1
0,
227.4
4'
LIG
HT
PO
LE
+94.7
1,
92.4
9'
GU
Y
WIR
E
+95.2
5,
88.9
6'
GU
Y
WIR
E
+29.9
1,
98.8
6'
GU
Y
WIR
E+
30.2
1,
97.7
6'
GU
Y
WIR
E
+84.2
7,
120.7
7'
SIG
N
+75.4
5,
80.8
4'
SIG
N
+74.9
4,
76.7
8'
SIG
N
+75.3
3,
72.5
8'
SIG
N
+56.0
6,
5.5
4'
SIG
N
+56.6
4,
5.0
8'
SIG
N
+45.5
0,
44.0
2'
SIG
N
+45.2
9,
43.8
0'
SIG
N
+37.2
0,
6.7
2'
GAS
MA
RK
ER
+70.7
9,
8.6
7'
GAS
MA
RK
ER
+65.1
4,
8.6
4'
GAS
MA
RK
ER
+13.0
3,
4.2
7'
GU
AR
DR
AIL
+64.1
9,
4.6
3'
GU
AR
DR
AIL
+59.1
9,
67.7
1'
GU
AR
DR
AIL
+52.4
9,
45.1
1'
GU
AR
DR
AIL
+42.7
0,
58.3
8'
PW
P
+00.4
8,
70.4
5'
SIG
N
+54.0
2,
48.9
7'
FIB
ER
OP
TIC
MA
RK
ER
+13.7
5,
55.4
8'
MA
NH
OLE
+97.1
4,
59.2
6'
MA
NH
OLE
+92.3
3,
57.6
1'
MA
NH
OLE
+91.8
9,
57.9
2'
MA
NH
OLE
+96.7
2,
59.2
2'
MA
NH
OLE
+88.6
6,
58.8
2'
TE
LE
PH
ON
E
BO
X
+58.3
5,
50.3
0'
MA
NH
OLE
+23.3
9,
60.1
4'
TE
LE
PH
ON
E
BO
X
+48.3
2,
78.8
8'
TE
LE
PH
ON
E
BO
X
+47.6
1,
74.5
7'
TE
LE
PH
ON
E
BO
X
+10.5
9,
53.3
7'
FIB
ER
OP
TIC
MA
RK
ER
+38.2
8,
46.4
4'
MA
NH
OLE
+65.0
3,
42.4
6'
MA
NH
OLE
+10.1
4,
52.6
3'
FIB
ER
OP
TIC
MA
RK
ER
+95.9
1,
46.7
0'
TB
M
#1
+83.4
7,
6.4
7'
TB
M
#2
+87.6
8,
40.7
6'
35
MP
H
SP
EE
D
SIG
N
+85.1
5,
4.1
9'
35
MP
H
SP
EE
D
SIG
N
+60.4
3,
49.5
3'
ST
RE
ET
SIG
N
+17.5
5,
71.0
0'
NO
TR
UC
KS
ALL
OW
ED
SIG
N
+42.9
6,
70.0
6'
NO
TR
UC
KS
ALL
OW
ED
SIG
N
+64.1
7,
79.1
0'
ST
OP
SIG
N
+07.4
7,
41.6
9'
35
MP
H
SP
EE
D
SIG
N
F
FF
TB
TB
F
CB
CB
CBCB
F
FF
F
F
F
F
36
+03.9
3,
0.0
1'
46
+87.8
8,
54.4
8'
44
+90.75, 21.
72'
48
+78.27, 31.
47'
ASPHALT
GRASS
GRASS
ASPHALT
GRASS
GRASS
GRAVELGRASS
GRASS
SUBSTATION
ELECTRIC
67
N/A
1" = 50'
MA
TC
HLIN
E -
ST
A 428
+00.0
0 "T1"
JACKSON COUNTY
JACKSON TWP.
SEC. 24, T-6-N, R-5-E
JACKSON COUNTY
JACKSON TWP.
SEC. 19, T-6-N, R-6-E
LINE "T1" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "T1" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
MA
TC
HLIN
E -
ST
A 441
+00.0
0 "T1"
STA 435+00.00 TO STA 450+00.00 "T1"
PLAN SHEET
1:5
0
2:3
6:3
0
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
42800-
44100.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
TTTT
TTAIRPORT RD.
SC
HLETE
R
RD.
Kocolene Marketing, LLC
Seymour Housewares Corporation
Steven D. & Michael W. Hackman (1/2 interest)
Pauline K. Hackman (1/2 interest)
(1/2 interest)
Michael W. Hackman
Steven D. &
(1/2 interest)
Pauline K. Hackman
of Indiana, Inc.
Public Service Company
Mc
DO
NA
LD
ST
RE
ET
RD
430
+00
435
+00
440
+00
P.I.
436
+85.6
5
LINE "PRT1"
P.I. = 436+85.65
CURVE DATA
For Inf
ormati
on O
nly
+23.7
8,
73.4
3'
SIG
N
+34.6
4,
16.1
9'
GAS
VA
LV
E
+04.4
5,
4878.5
4'
LIG
HT
PO
LE
+12.1
0,
4866.2
7' IN
LE
T
+01.8
2,
4816.2
9' IN
LE
T
+58.3
0,
4755.0
6'
SIG
N
+23.2
6,
93.0
7'
TR
EE
+22.7
6,
137.7
8'
TR
EE
+53.6
6,
140.6
3'
TR
EE
+16.4
6,
142.3
6'
TR
EE
+02.0
1,
64.5
4'
TR
EE
+72.7
0,
145.5
0'
TR
EE
+86.4
6,
130.3
0'
TR
EE
+91.0
9,
94.8
9'
TR
EE
+23.6
4,
148.3
7'
TR
EE
+36.4
4,
70.9
7'
TR
EE
+39.0
2,
61.1
1'
TR
EE
+19.8
8,
177.6
1'
TR
EE
+19.8
8,
177.6
1'
TR
EE
+17.0
7,
64.5
1'
PW
P
+01.4
0,
65.4
0'
PW
P
+39.0
1,
64.7
4'
PW
P
+64.7
8,
59.4
8'
PW
P
+13.7
7,
37.7
6'
PW
P
+89.1
7,
37.6
3'
PW
P
+37.5
4,
36.8
1'
PW
P
+52.2
5,
13.7
5'
PW
P
+78.6
3,
13.7
2'
PW
P
+16.0
6,
47.5
6'
PW
P
+13.7
0,
53.5
4'
PW
P
+25.8
9,
53.4
6'
PW
P
+74.1
1,
87.7
8'
PW
P
+42.4
7,
67.3
8'
PW
P
+50.8
1,
63.8
9'
PW
P
+52.6
4,
50.0
6'
PW
P
+54.6
3,
66.4
1'
PW
P+
55.5
0,
66.2
8'
PW
P
+20.3
7,
48.2
1'
PW
P
+64.3
9,
7.8
9'
SIG
N
+04.9
6,
64.6
2'
GU
Y
WIR
E
+07.3
1,
64.0
9'
GU
Y
WIR
E
+08.6
5,
64.1
7'
GU
Y
WIR
E
+65.1
0,
155.3
8'
GU
Y
WIR
E
+57.2
8,
83.8
8'
MA
NH
OLE
+65.8
3,
83.8
4'
LIG
HT
PO
LE
+03.7
6,
57.6
5'
TE
LE
PH
ON
E
BO
X
+38.4
9,
66.1
3'
TE
LE
PH
ON
E
BO
X
+57.0
2,
66.2
6'
TE
LE
PH
ON
E
BO
X
+56.3
9,
77.7
9'
PO
ST
+47.8
4,
104.3
5'
GU
AR
DR
AIL
+09.7
1,
48.8
6'
GU
AR
DR
AIL
+13.1
9,
151.8
8'
SIG
N
+10.8
8,
163.2
4'
MA
NH
OLE
+24.1
2,
65.8
0'
GU
Y
WIR
E
+26.3
7,
66.1
9'
GU
Y
WIR
E
+27.3
1,
65.5
0'
GU
Y
WIR
E
+41.4
4,
71.1
2'
ELE
CT
RIC
BO
X
+24.3
4,
43.7
9'
GU
Y
WIR
E
+34.3
2,
4.3
5'
PW
P
+44.8
3,
15.3
5'
MO
NU
ME
NT
+32.4
3,
103.2
1'
PO
ST
+66.3
6,
105.0
0'
PO
ST
+40.7
4,
138.5
1'
PO
ST
+21.9
9,
21.5
8'
MA
NH
OLE
+27.9
7,
24.8
6'
MO
NU
ME
NT
+79.7
5,
10.2
6'
GU
AR
DR
AIL
+89.4
2,
8.4
8'
MA
NH
OLE
+84.3
3,
28.8
9'
TR
AFFIC
SIG
NA
L
PO
LE
+12.8
1,
42.3
1'
LIG
HT
PO
LE
+14.2
9,
42.0
7'
ELE
CT
RIC
ME
TE
R
+96.7
3,
166.3
7'
PW
P
+46.8
2,
4.8
8'
GU
Y
WIR
E
+11.1
9,
9.0
9'
MA
NH
OLE
+44.8
2,
13.0
2'
MO
NU
ME
NT
+53.6
9,
10.5
6'
MA
NH
OLE
+73.7
0,
21.7
8'
ELE
CT
RIC
BO
X
+84.2
5,
35.4
5'
MO
NU
ME
NT
+84.6
1,
32.7
3'
MA
NH
OLE
+78.0
2,
18.3
6'
TR
AFFIC
MA
NH
OLE
+43.3
3,
9.7
1'
TB
M
#1
+27.3
4,
4.0
2'
TR
AFFIC
MA
NH
OLE
+72.9
8,
151.9
5'
TR
EE
+08.7
9,
16.9
7'
ST
OP
SIG
N
+56.7
2,
239.7
2'
TR
EE
+28.4
4,
116.5
3'
BU
SH
+34.1
2,
117.1
8'
BU
SH
+45.1
8,
107.0
4'
BU
SH
+54.3
8,
110.4
0'
BU
SH
+63.0
7,
112.8
6'
BU
SH
+71.7
0,
115.3
5'
BU
SH
+75.7
7,
117.6
2'
BU
SH
+75.9
1,
122.8
1'
BU
SH
+75.2
7,
124.6
3'
BU
SH
+74.1
4,
128.6
8'
BU
SH
+74.7
3,
135.6
9'
BU
SH
+72.6
5,
206.5
0'
BU
SH
+74.9
6,
200.5
3'
BU
SH
+76.1
8,
195.3
1'
BU
SH
+76.9
3,
191.8
1'
BU
SH
+99.3
1,
133.5
8'
BU
SH
+96.9
7,
127.8
2'
BU
SH
+93.1
2,
122.1
3'
BU
SH
+95.2
7,
113.7
8'
BU
SH
+01.8
8,
109.6
0'
BU
SH
+03.1
5,
113.7
9'
BU
SH
+07.3
9,
107.4
6'
BU
SH
+70.8
8,
178.3
6'
BU
SH
+73.6
0,
178.6
7'
BU
SH
+73.1
5,
170.3
2'
BU
SH
+76.9
3,
171.5
1'
BU
SH
+25.2
6,
199.4
1'
BU
SH
+25.0
1,
195.4
4'
BU
SH
+11.8
8,
194.2
9'
BU
SH
+13.0
2,
163.9
3'
BU
SH
+12.8
3,
158.1
3'
BU
SH
+31.2
8,
120.5
4'
BU
SH
+34.2
4,
121.1
7'
BU
SH
+39.0
9,
118.5
3'
BU
SH
+48.2
6,
118.6
5'
BU
SH
+68.0
9,
127.7
5'
BU
SH
+55.7
8,
90.0
3'
BU
SH
+26.3
8,
172.0
9'
BU
SH
+69.4
0,
163.4
8'
BU
SH
+99.3
1,
186.5
8'
BU
SH
+09.8
3,
187.1
3'
BU
SH
+17.4
5,
186.6
9'
BU
SH
+37.3
8,
187.7
4'
BU
SH
+78.8
7,
172.5
7'
TR
EE
+16.9
6,
93.3
4'
TR
EE
+74.4
1,
175.0
6'
TR
EE
+49.5
5,
160.8
7'
TR
EE
+00.0
6,
88.4
5'
TR
EE
+57.3
3,
133.7
3'
TR
EE
+18.7
4,
233.2
0'
PW
P
+48.3
9,
146.4
1'
PW
P
+77.2
6,
62.8
1'
PW
P
+05.3
9,
2.0
6'
PW
P
+43.6
3,
71.7
2'
PW
P
+20.1
9,
60.8
8'
PW
P
+19.8
7,
60.3
7'
PW
P
+73.1
1,
61.0
0'
PW
P
+21.8
1,
5.5
1'
SIG
N
+05.3
6,
80.2
0'
SIG
N
+93.3
0,
69.3
8'
SIG
N
+90.8
5,
183.1
8'
TR
EE
+16.0
7,
59.8
5'
GU
Y
WIR
E
+25.6
1,
59.7
7'
GU
Y
WIR
E
+37.9
6,
60.3
1'
GU
Y
WIR
E
+41.2
5,
59.8
8'
GU
Y
WIR
E
+41.2
5,
59.8
8'
GU
Y
WIR
E
+12.0
9,
66.6
4'
LIG
HT
PO
LE
+51.6
8,
60.1
5'
TE
LE
PH
ON
E
BO
X
+83.1
9,
62.0
2'
TE
LE
PH
ON
E
BO
X
+86.7
6,
70.3
1'
PO
ST
+86.9
0,
75.1
2'
PO
ST
+24.3
0,
62.2
1'
TE
LE
PH
ON
E
BO
X
+39.8
4,
118.2
3'
BO
X
+80.6
4,
53.2
9'
FIB
ER
OP
TIC
MA
RK
ER
+84.8
2,
53.0
0'
FIB
ER
OP
TIC
MA
RK
ER
+19.5
1,
46.8
4'
MA
NH
OLE
+83.1
2,
60.1
2'
PW
P
+81.9
1,
54.7
9'
BO
X
+71.6
2,
2.1
4'
GU
AR
DR
AIL
+36.4
9,
1.6
6'
GU
Y
WIR
E
+36.3
7,
1.4
7'
GU
Y
WIR
E
+36.4
3,
0.3
9'
GU
Y
WIR
E
+36.5
6,
47.6
5'
MA
NH
OLE
+52.4
1,
57.7
8'
CLE
AN
OU
T
+27.2
2,
61.6
3'
TE
LE
PH
ON
E
BO
X
+54.6
0,
67.7
6'
SIG
N
+53.2
1,
60.9
0'
WA
TE
R
ME
TE
R
+53.3
1,
61.0
7'
WA
TE
R
ME
TE
R
+26.6
9,
164.2
1'
FL
AG
PO
LE
+87.7
2,
11.5
5' IN
LE
T
+45.1
2,
2.9
8'
WA
TE
R
VA
LV
E
+45.7
9,
2.4
6'
FIR
E
HY
DR
AN
T
+11.7
1,
1.3
6'
SIG
N
+79.6
7,
2.0
9'
GU
AR
DR
AIL
+64.5
7,
78.3
7'
SIG
N
+03.5
5,
56.2
9' IN
LE
T
+59.8
2,
71.8
7'
GU
Y
WIR
E
+66.0
7,
72.6
1'
GU
Y
WIR
E
+71.3
5,
72.4
7'
GU
Y
WIR
E
+77.9
9,
72.5
2'
GU
Y
WIR
E
+84.3
9,
72.4
1'
GU
Y
WIR
E
+90.5
5,
72.6
2'
GU
Y
WIR
E
+96.1
8,
72.4
7'
GU
Y
WIR
E
+80.6
3,
103.2
3'
CO
NT
RO
L
POIN
T
+71.1
6,
187.1
4'
CO
NT
RO
L
POIN
T
+74.5
5,
233.9
0' IN
LE
T
+74.2
0,
150.3
0' IN
LE
T
+15.8
5,
94.5
1'
TR
AFFIC
SIG
NA
L
PO
LE
+76.7
9,
14.7
9'
CO
NT
RO
L
POIN
T
+14.5
0,
128.2
4'
TE
LE
PH
ON
E
PO
LE
+56.3
6,
5.3
4'
GU
Y
WIR
E
+64.7
8,
5.2
7'
GU
Y
WIR
E
+72.8
7,
5.4
7'
GU
Y
WIR
E
+77.4
0,
5.1
1'
GU
Y
WIR
E
+01.0
9,
6.3
9'
FIB
ER
OP
TIC
MA
RK
ER
+35.4
0,
6.4
4' IN
LE
T
+77.8
7,
1.9
4'
SIG
N
+08.5
1,
15.9
0'
35
MP
H
SP
EE
D
SIG
N
+17.8
8,
61.1
0'
ST
OP
SIG
N
GV
F
F
EM
FF
TB
TB
TB
TB
TB
F
TB
TB
TB
M
M
F
W
W
W WW
WV
WV
S
54
+38.11, 34.68'
59
+94.99, 58.28'
N 10
3354.70
FT
E 4310
3.68 F
T 59
+48.08, 40.64'
BUILDING
COMMERCIAL
ASPHALT
GRASS
GRASS
ASPHALT ASPHALT ASPHALT
ASPHALT
GRASS
GRASS
ASPHALT
GRASS
FOUNTAIN
GRASS
GRAVEL
GRASSGRASS
CONC
ASPH
COMMERCIAL BUILDING
SAMPLE BUILDINGS
JACKSON COUNTY
JACKSON TWP.
SEC. 24, T-6-N, R-5-E
JACKSON COUNTY
JACKSON TWP.
SEC. 19, T-6-N, R-6-E
LINE "T1" EXCEPT AS NOTED
ALL R/W DESCRIBED FROM
FROM LINE "T1" EXCEPT AS NOTED
ALL TOPOGRAPHY DESCRIBED
1" = 50'
N/A
68
MA
TC
HLIN
E -
ST
A 441
+00.0
0 "T1"
STA 441+00.00 TO STA 453+00.00 "T1"
PLAN SHEET
STA. 452+53.37 "T1"
END CONSTRUCTION
1:5
0
2:3
7:0
2
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP
44100-
45300.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
C
HMA SHOULDERJ
K
F CONCRETE, CURB & GUTTER
22
26 NURSERY SODDING
TYPE
CONCRETE CENTER CURB,
O
R MILL & RESURFACE
T
S SAW CUT
FULL DEPTH HMA TRAIL
U UNDERDRAIN, 6"
15
PCCP FOR APPROACHES, 9 IN.
SIDEWALK, CONCRETE, 4 IN.
FULL DEPTH HMA PAVEMENT
COMPACTED AGGREGATE NO. 53
14 CONCRETE ROLLED CURB
27 SEEDING
TRUCK APRON17
13 CONCRETE CURB 6"
TTTT
TTTTTT
U.S.
HW
Y.
50
U.S.
HW
Y.
50
AIRPORT RD.
CO
RP
OR
ATE
WA
Y
KIM
BE
RL
Y
ST.
Kevana Properties, LLC
John R. Moore
Insurance Company, Inc.
United Farm Bureau Mutual The Peoples Bank
John Richey, Inc.
John Richey, Inc.
Vernon & Wanda Melton
Indiana
State of
445
+00
450
+00
P.I.
449
+30.7
1
P.I.
450
+31.4
4
LINE "PRT1"
P.I. = 449+30.71 P.I. = 450+31.44
CURVE DATA CURVE DATA
For Inf
ormati
on O
nly
SEE INTERSECTION DETAILS FOR ROUNDABOUT INFORMATION
STA 7+20.00 TO STA 13+00.00 "SR-11"
PLAN & PROFILE SHEET
1" = 50'
N/A
570
580
590
600600
570
580
590
600600
Seymour Aviation Commission
Seymour Aviation Commission
Indian Creek Acres, L.L.C. Indian Creek Acres, L.L.C.
LIN
E "B"
E=48296.48'
N=97429.20'
STA. 103+00.00 "SR-11"
END CONSTRUCTION
ELEV. = 584.62
STA. 103+00.00 "SR-11"
END CONSTRUCTION
NO CURVE
ELEV. 584.59
P.V.I. 102+50.00 "SR-11"
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 28, T-6-N, R-6-E
JACKSON COUNTY
JACKSON TWP.
SEC. 29, T-6-N, R-6-E
466.54
+54.54
440.46
+15.07
69
STA. 103+92.32 "SR-11"
END INCIDENTAL CONSTRUCTION
STA. 103+92.32 "SR-11"
END INCIDENTAL CONSTRUCTION
=48310.18'
N=96850.15'
STA. 97+20.00 "SR-11"
BEGIN CONSTRUCTION
STA. 96+64.77 "SR-11"
CONSTRUCTION
BEGIN INCIDENTAL
ELEV. = 586.50
STA. 97+20.00 "SR-11"
BEGIN CONSTRUCTION
STA. 96+64.77 "SR-11"
CONSTRUCTION
BEGIN INCIDENTAL
P.I. 94+62.06
P.O.T. 94+62.06
P.I. 108+24.72
P.O.T. 108+24.72
1:5
0
2:3
8:3
5
PM
9/
18/
2017
W:\
Sey
mour\
2015-
161
Sey
mour -
Southern
Bypass\
Desig
n\
Public Inform
atio
n
Meetin
g\
2017-
09-
20\
PP-
SR
11.d
gn
DEPARTMENT OF TRANSPORTATION
INDIANA
DESIGN ENGINEER DATE
DESIGNED:
CHECKED: CHECKED:
DRAWN:
HORIZONTAL SCALE
VERTICAL SCALE
SURVEY BOOK
CONTRACT PROJECT
of
SHEETS
DESIGNATION
BRIDGE FILE
FOR APPROVAL
RECOMMENDED
indot.t
bl
PD
F
Color.pltcfg
RE
VISIO
N
3.0
1600743
1600743
HDP LWR
HDPRSHR-40004
P.T.
111
+19.9
8 "B"
+116 "P
RT3",
ST
R.
NO. 113
0.139%
-0.437% 0.059%
100+00 101+00 102+00 103+00 104+00
586.6
586.8
586.9
586.8
586.6
586.1
585.5
585.1
584.8
584.6
584.6
584.6
584.6
586.5
4
586.6
1
586.6
8
586.7
7
586.9
1
587.0
6
586.3
1
585.5
9
585.0
8
584.8
0
584.5
9
584.6
2
97+00 98+00 99+00
SR11/ WALNUT ST
SR11/ WALNUT ST
105
+00
LINE "SR-11"
95
+00
For Inf
ormati
on O
nly
140+
00
P.I. 17+92.23 "PR-O"
138+
00
139+
00
140+
00
141+
00
142+
00
143+
00
C.R. 340
APP. P.L.
APP. EXIST. R/W & P.L.
APP. EXIST. R/W & P.L.
APP. EXIST. R/W
&
P.L.
APP. EXIST. R/W
&
P.L.
APP. EXIST. R/W & P.L.
APP. EXIST. R/W & P.L.
L
I
N
E
"
O
-
1
"
L
I
N
E
"
O
-
2
"
P.O.T. 16+44.02 "O-2"=
O.P.O.T. 22+47.50 "PR-O", 4.02' Lt.
SEE GEOMETRIC DETAIL
P.O.T. 15+44.81 "O-1"=
O.P.O.T. 15+44.81 "PR-O", 2.22' Rt.
SEE GEOMETRIC DETAILS
LINE "PR-O"
N1°09'16"W
LINE "PR-O"
N1°18'28"W
BEGIN INCIDENTAL CONSTRUCTION
P.O.T. 14+17.00 "PR-O"
END INCIDENTAL CONSTRUCTION
P.O.T. 23+47.50 "PR-O"
P.O.T. 18+92.19 "PR-O"=
P.O.T. 140+40.30 "B"
Str. No. 11B
114 Lft. of 15" Pipe
with 2 End Sections
Req'd.
+22 Rt.,
Str. No. 11C
141 Lft. of 15" Pipe
with 2 End Sections
Req'd.
+43 Rt.,
P.O.T. 15+44.81 "PR-O"
BEGIN CONSTRUCTION
N = 96361.57'
E = 50969.40'
P.O.T. 22+47.50 "PR-O"
END CONSTRUCTION
N = 97064.09'
E = 50954.02'
580
585
590
595
600
605
610
615
580
585
590
595
600
605
610
615
12+00 13+00 14+00 15+00
595.2
16+00
595.3
595.2
17+00
595.1
595.1
18+00
595.3
595.0
19+00
594.8
594.8
20+00
594.9
594.9
21+00
594.9
595.0
22+00
595.0
594.9
23+00
594.4
594.1
24+00
594.4
594.6
25+00 26+00 26+48
SEE PROFILE LINE "O-2" ON
ALIGNMENT PROFILE SHEET
FOR PROPOSED GRADE
SEE PROFILE LINE "O-1" ON
ALIGNMENT PROFILE SHEET
FOR PROPOSED GRADE
EXISTING GROUND ALONG "PR-O"
594.09
+ 24.6
592.53
+ 14.3
-0.5
4%
-0.10%
+0.4
9%
592.77
+ 69.8
592.69
+ 50.0
593.65
+ 47.5
GRADE OF SPL. DITCH, LT.
(PLOTTED 10' ABOVE DATUM)
GRADE OF SPL. DITCH, RT.
STR. NO. 12
STR. NO. 12
ELEV. = 595.24
"PR-O"STA. = 15+44.81,
BEGIN CONSTRUCTION
-0.330%
+ 24.6
593.27
+ 14.3
592.31
+0.100%
+0.7
10%
+0.100%
+0.7
10%
+ 69.8
592.17
+ 50.0
592.25
+ 47.5
593.65
GRADE OF SPL. DITCH, RT.
GRADE OF SPL. DTICH, LT.
(PLOTTED 10' ABOVE DATUM)
STR. NO. 11
STR. NO. 11
ELEV. = 595.00
"PR-O"STA. = 22+47.50,
END CONSTRUCTION
PROJECT
INDIANADEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE
1600743
70
1600743
R-40004
SURVEY BOOK
DESIGNATION
BRIDGE FILE
CONTRACT
HORIZONTAL SCALE
VERTICAL SCALE
of
SHEET
DATEDESIGN ENGINEER
FOR APPROVAL
RECOMMENDED
CHECKED:
DESIGNED: DRAWN:
CHECKED:
145
1" = 50'
1" = 5'
R.D.S. K.R.U.
L.L.C.L.L.C.
STA. 12+00.00 TO STA. 26+50.00 LINE "PR-O"
PLO
T SCALE: 1:1 ED
IT D
ATE: 7/12/11 - 10:21 AM
ED
ITED
BY: KU
PSH
AW
D
RAW
IN
G FILE: P:\516043-1 BU
RKART\ACAD
\06 PLAN
PRO
F\RD
_PLAN
PRO
FILE SH
EET_O
_50_01.D
WG
PRIN
T D
ATE: 9/18/17
SEC. 29, T6N, R6E
JACKSON TWP.
JACKSON COUNTY
Rust Farms, LLC
Silgan Plastics CorpRennekmap, Paul D & Angela DGillaspy - Rennekamp
Rennekmap, Paul D & Angela DGillaspy - Rennekamp
Ru
st F
arm
s, L
LC
ALL TOPOGRAPHY DESCRIBED FROM LINE "PR-O" EXCEPT AS NOTED.
ALL R/W DESCRIBED FROM LINE "PR-O" EXCEPT AS NOTED.
CURVE DATA
P.I.
=
R =
PROPOSED PROFILE AND ELEVATIONS FOR LINE "PR-O" THROUGH ROUND-A-BOUT AREA ARE FOR DESIGN PURPOSES ONLY
SEE SPOT ELEVATION DETAILS
15+
00
20+
00
25+
00
17+92.23 "PR-O"
0°09'12" LT.
No Curve Run
For Inf
ormati
on O
nly