Information-Technology RTF Sub-Committee May 7 , 2013. Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency. Meeting Topics. IT Sub-Committee Overview (Mira ) Green Grid Forum Summary (Corban Lester) Market segmentation overview (PECI) - PowerPoint PPT PresentationTRANSCRIPT
Slide 1
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Information-Technology RTF Sub-CommitteeMay 7, 2013
Mira Vowles, P.E., CEM Emerging Technology Project ManagerBPA Energy Efficiency
Slide 2
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Meeting Topics
1. IT Sub-Committee Overview (Mira)
2. Green Grid Forum Summary (Corban Lester)
3. Market segmentation overview (PECI)
4. NEEA’s Data Center Market Study (Geoff)
Plus if time allows:
• DRAFT Measure Survey (Mira)
• IT Research Projects(all)
• Topic suggestions for future meetings (all)
Slide 3
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
IT Sub-Committee
1. Sub-Committee of the Regional Technical Forum (RTF)
2. Purpose: develop and recommend data center measures with
a) high consensus methodology to estimate and verify electrical savings
b) specification for cost effective installations that ensures persistent savings
3. Minutes and presentations are posted at: http://rtf.nwcouncil.org/subcommittees/it/meetings.htm
Slide 4
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
IT Sub-Committee DRAFT Work Plan
Goal: to develop and recommend Information Technology (IT) measures to the Regional Technical Forum (RTF).
Proposed first steps:
1. Prioritize measure focus,
2. Review baseline studies and
3. Review other research.
Slide 5
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Green Grid Forum Summary
Corban Lester Program Development Manager, Lockheed Martin
Chairman, Utility Task Force, The Green Grid
Slide 6
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Market Segmentation Overview
Scott SchuetzPECI CIO
Slide 7
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
NEEA Data Center Market Study
Geoff Wickes
Slide 8
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Next Meeting: 6/4/13 at 1:30 pm
Potential topics:
• ETO Data Center Baseline Study
• IT Research Projects(all)
• Topic suggestions for future meetings (all)
Slide 9
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Data Center Characterization Survey
Slide 10
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Data Center Characterization Survey
Slide 11
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Data Center Characterization Survey
Slide 12
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Data Center Characterization Survey
Slide 13
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Measure Survey
Less than 5
5 - 10
10 - 20
More than 20
0% 20% 40% 60% 80% 100% 120%
Mid-tier data centers
Server-rooms
Slide 14
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N
Measure Survey
Airflow managment
Reducing IT loads
Cooling system improvement projects
Back-up power, data-center projects
Energy STAR labeled data center projects
DC power circuit data center projects
0% 20% 40% 60% 80% 100% 120%
More than 20
10 - 20
5 - 10
Less than 5