Page 1: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

INFORMATIONAL REPORT

HUANCAYO - HUANCAVELICARAILWAY

Page 2: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

LOCATION

The Huancayo – Huancavelica Railway is located in the central highlands of Peru, and provides transportation services between the capitals of the Junín and Huancavelica Regions.

The railway passes through the districts of Huancayo, Chilca, Huancán, Huayucachi, Viques, and Cullhuas in the Junín Region; and Ñahuimpuquio, Mariscal Cáceres, Izcuchaca, Pilchaca, Cuenca, Acoria, Yauli and Huancavelica in the Huancavelica Region.

It begins at the Chilca Station (in Huancayo), at an altitude of 3,240 meters above sea level (m.a.s.l.). From there, it descends to the Mariscal Cáceres Station, which sits at 2,819 m.a.s.l., and then ascends again to Huancavelica, at 3,680 m.a.s.l., the highest point on the line.

1.- Chilca Pk 1+3002.- Manuel Tellería Pk 44+3003.- Izcuchaca Pk 67+6004.- Mariscal Cáceres Pk 76+7605.- Acoria Pk 94+7006.- Yauli7.- Huancavelica Pk 128+200

CHILCA

MANUEL TELLERIA

IZCUCHACA

MARISCAL CÁCERES

ACORIA

YAULI

HUANCAVELICA

JunínHUANCAYO

Huancavelica

Huayucachi

Viques

Paccha-Soccos

ChancaRetama

Ingahuasi

Huarisca

Parco

Pilchaca

Cuenca

Aguas Calientes

Larmenta

PallcahuaycoChunca

Ccocha

Huayas (Bandera)

Silva

Troya

Pomaccoria

Parcacancha

Junín

Huancavelica

The longitudinal profile includes slopes that exceed 3% at some points. The steepest slopes are concentrated along the stretch between the Mariscal Cáceres and Acoria stations.

The railway follows a winding route, which includes radii of less than 100 m in some cases. It crosses over 15 bridges and through 38 tunnels, with 7 stations and 20 train stops.

Pk 112+470

Railway

Station

Stops

Page 3: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

RAILWAYDIAGRAM P.K. 0+000

P.K. 0+250

P.N. Jr. Ica

P.K. 0+200

E.V.

P.N. Av.

Huancavelica

P.K. 1+622

P.K. 1+300

P.K. 8+800Huayucachi

P.K. 11+200Víquez

P.K. 15+200

18

6.6

0 m

22

6.5

5 m

P.K. 19+800Paccha Soccos

P.K. 22+800Chanca

Casa Blanca

13

2.7

0 m

20

5.0

8 m

P.K. 25+600Retama

P.K. 30+300Ingahuasi

83

.90

m

15

4.2

0 m

P.K. 25+450

P.K. 30+663

E.V.

P.K. 0+000

E.V.

P.K. 6+000

P.K. 17+300

P.K. 17+400

0

P.K. 28+325

Huancayo Station

Tunnel nº 1

Tunnel nº 2

Chilca Station

Tunnel nº 3

Yard 2

Chanchasbridge

Yard 1

P.K. 38+390

P.K. 38+355

P.K. 71+940

P.K. 71+140

P.K. 78+870

P.K. 79+419

Manuel TelleríaStation

Izcuchaca Station

Mariscal Cáceres Station

Tunnel nº 4

Tunnel nº 5

Tunnel nº 6

Tunnel nº 7

Tunnel nº 8

Tunnel nº 9

Tunnel nº 10

Tunnel nº 11

Tunnel nº 12

Tunnel nº 13

Acostandobridge

Tambillobridge

Chinchebridge

P.K. 34+800

88

.00

m

12

7.4

0 m

Huarisca

P.K. 34+900?

P.K. 37+000Parco

30

0.4

1 m

23

5.7

0 m

E.V.

P.K. 44+300

P.K. 44+402

P.K. 44+529

P.K. 52+000Pilchaca

P.K. 57+200Cuenca

26

0.0

0 m

34

3.0

0 m

Aguas Calientes

P.K. 61+200

P.K. 61+140

P.K. 43+800

33

7.0

0 m

40

7.4

0 m

E.V.

P.K. 67+500

P.K. 67+600

P.K. 65+700Larmenta

91

.30

m

16

7.0

0 m

E.V.

P.K. 76+760

P.K. 76+400

P.K. 77+213

P.K. 51+253

P.K. 68+776

P.K. 79+000

P.K. 45+565

P.K. 46+640

P.K. 48+700

P.K. 51+400

Page 4: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

MINIMUM INTERVENTIONS

The construction, repair, and upgrade works for the Huancayo-Huancavelica Railway cover necessary technical aspects, such as:

Proposing and implementing mitigation measures for geotechnical problems at critical points along the railway and/or slope and embankment stabilization problems.

Constructing a longitudinal drainage system and upgrading the transversal drainage along the entire railway.

Increasing the load capacity of the railway to 20 tons per axle.

Replacing the rails 49S (49 EI) profile rails.

Replacing the railway ballast.

Expanding the tunnel clearances.

Building new bridges.

Replacing all of the existing railway switches, in accordance with the new rail type.

Replacing the wooden sleepers with concrete sleepers. Any existing concrete sleepers in good condition will be maintained.

Installing parallel safety fences in urban areas to prevent accidents.

Installing automatic safety barriers, as well

as lighted and acoustic signage, at existing crossings.

Improving accessibility and comfort for users at stations and train stops.

Building a modern yard/shop, in accordance with the needs of the new rolling stock.

Implementing the signage, safety, and communications system.

Implementing the Operations Control Center (OCC).

These interventions will guarantee a safe, efficient, and comfortable passenger and cargo transportation service.

E.V.

E.V.

E.V.

¿?

Túnel nº26

Túnel nº24

21

7.0

0 m

28

1.0

0 m

Antapam

pa

P.K. 83+400Chunca

Ccocha

P.K. 82+900

P.K. 81+000Pallcahuayco

21

4.0

0 m

14

2.0

0 m

Estación AcoriaP.K. 94+700

P.K. 96+289

Chunca

P.K. 98+500Huayas

P.K. 101+700

Silva

P.K. 104+400Troya

23

1.6

0 m

18

0.0

0 m

Estación YauliP.K. 112+470

P.K. 117+500Parcacancha

P.K. 121+200

Pomaccoria

53

7.0

0 m

42

2.7

2 m

P.K. 128+200

Ctra. Los Incas

P.K. 84+562 Puente Ychu nº1

P.K. 92+725

P.K. 94+625

Puente Habaschacra

Puente Acoria

P.K. 101+356 Puente Ychu nº2

P.K. 109+389 P.K. 110+540 P.K. 111+503

Puente Ambato

Puente Ambatito

Puente Yauli Chico

P.K. 114+403 Puente Matipacana

P.K. 119+100 Puente Condorsenja

P.K. 122+208

P.K. 125+234

Puente Pomachaca

Puente Huaylacucho

P.K. 80+980 Túnel nº14

P.K. 81+250

P.K. 81+820

Túnel nº15

Túnel nº14

Túnel nº16

P.K. 83+700

P.K. 84+250 P.K. 84+845 P.K. 85+100 P.K. 88+300 P.K. 89+800 P.K. 90+630

Túnel nº17

Túnel nº23Túnel nº22

Túnel nº20

Túnel nº19

Túnel nº21

P.K. 103+345

P.K. 103+745

P.K. 114+200 P.K. 114+300

Túnel nº27

Túnel nº28

Túnel nº29 P.K. 116+100

P.K. 116+300

P.K. 118+000

P.K. 119+700

P.K. 119+750

P.K. 120+400

P.K. 120+700

Túnel nº30

Túnel nº31

Túnel nº32

Túnel nº33Túnel nº34

Túnel nº35

P.K. 122+300 P.K. 122+930 P.K. 123+500

Túnel nº36

Túnel nº37

Túnel nº38

P.K. 88+060

Túnel nº18

Estación Huancavelica

Túnel nº25

P.K. 104+700

Tunnel nº 14

Tunnel nº 15

Tunnel nº 16

Tunnel nº 17

Tunnel nº 18Tunnel nº 19

Tunnel nº 20Tunnel nº 21

Tunnel nº 22Tunnel nº 23

Acoria Station

Yauli Station

Huancavelica Station

Tunnel nº 24

Tunnel nº 25

Tunnel nº 26

Tunnel nº 27

Tunnel nº 28

Tunnel nº 29

Tunnel nº 30Tunnel nº 31

Tunnel nº 32

Tunnel nº 33Tunnel nº 34

Tunnel nº 35

Tunnel nº 36

Tunnel nº 37

Tunnel nº 38

Ychu nº1bridge

Habaschacrabridge

Acoriabridge

Ychu nº2bridge

Ambatobridge

Ambatitobridge

Yauli Chicobridge

Matipacanabridge

Condorsenjabridge

Pomachacabridge

Huaylacuchobridge

Page 5: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

MINIMUM CRITERIAFOR THE PROJECT DESIGN

PARAMETERS FOR THE SIZING OF CIVIL WORKS GEOMETRIC ROUTE LAYOUT

The current route layout will be maintained, with slight lateral displacements in those stretches where the new drainage system must be built for the level sections.

CIVIL WORKS

The main activities to be performed are as follows:

SLOPES

Upper slopes:

Construction of drainage ditches with a trapezoidal cross-section at the top of the slope, with concrete lining.

Construction of drainage ditches with a triangular or rectangular cross-section at the foot of the slope, with concrete lining.

Removal of unstable blocks and/or stones on the slope.

Slope protection with rockfill, rip rap retaining wall, or gabion walls.

Lower slopes:

Construction of rockfill, with extended protection using gabion walls, where necessary.

Construction of platform walls along certain stretches of the railway.

Maximum travel speed: 96 km/hr. (for passengers)64 km/hr. (for cargo)

Maximum axle load: 20 tons

Tunnel clearance: In accordance with the National Railway Regulations

Sizing of level section: As per American Railway Engineering and Maintenance-of-Way Association (AREMA)

Sizing of superstructure: As per American Railway Engineering and Maintenance-of-Way Association (AREMA)

Sizing of buildings: As per the National Building Regulations

Page 6: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

BRIDGES

The existing bridges will be replaced with new structures, designed for a COOPER E-80 loading system.

RAILWAY SYSTEMS AND SUBSYSTEMS

SUPERSTRUCTURE

Complete replacement of existing rails with rails with a 49S (49EI) profile, using any concrete sleepers in good condition.

Replacement of existing wooden sleepers with new concrete sleepers.

Replacement of railway switches, in accordance with the new rails to be installed.

Installment of new ballast and reuse of existing ballast as sub-ballast (after being cleaned and sieved).

Replacement of joining and fastening elements and support plates along the railway, including joint bars, elastic clips, pads, etc.

DRAINAGE

Recovery of the railway drainage system, including both longitudinal and transversal drainage works.

TUNNELS

Expansion of tunnel clearances, in accordance with the National Railway Regulations.

Inside tunnels:

Removal of unstable blocks

Longitudinal drainage ditches

Installation of anchor bolts

Triple-twisted mesh on frames

Construction of the longitudinal drainage system (ditches), and upgrading of the transversal drainage system along the railway

Renovation of the railway’s superstructure for a load of 20 tons/axle

Slope protectionand stabilization

At tunnel mouths:

Clearing of vegetation

Rockfall protection mesh

Cut-and-cover tunnel with frame and cover

Transversal canals and drainage

Page 7: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

SIGNAGE, COMMUNICATION, AND TELECOMMUNICATIONS SYSTEMS

Repair of the telecommunications system.

Supply and installment of signage along the railway.

Implementation of the Operations Control Center (OCC).

Lighted and acoustic protection and signage at crossings.

STATIONS

Adaptation of stations to facilitate access for persons with limited mobility.

Increase in length of station platforms, as necessary.

Adaptation of station platform heights.

Installation of enclosures along the railway to prevent accidents and separate it from surrounding urban areas.

Installation of fire protection system, in accordance with Peruvian Technical Standard (NTP) 350.043-1.

Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and replacement of lighting systems.

Improvement of passenger access at train stops.

Reconstruction of the old Ccocha Train Stop at P.K. 88+060 on the railway.

ROLLING STOCK

Supply of new rolling stock, which shall be compatible with the railway characteristics, including operating altitude, radii, tunnel clearances, and grades.

Below are the minimum requirements for the railway passenger and cargo transportation service.

ROLLING STOCK

Provision of rolling stock

TYPE UNITS

Locomotives 2

DMU Railcars 5

Passenger Cars 3

Freight Cars 5

Page 8: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

TRAINFREQUENCY

PER DIRECTIONITINERARY STOPS TIME

Directpassenger railcar

2Chilca -

HuancavelicaNo stops 2h 42min

Passengerrailcar with

stops3

Chilca -Huancavelica

All stops(at stations)

2h 50min

Passengerrailcar with

stops 1

Chilca -Huancavelica

All stops (at stations + train stops)

3h 02min

Mixed train 1Chilca -

Huancavelica

All stops (at stations + train stops)

3h 50min

MANDATORY INVESTMENTS

The future Concessionaire will be responsible for:

The preparation of the Final Engineering Studies (FESs) for the Works and their corresponding Semi-Detailed Environmental Impact Assessment.

The preparation of the Final Engineering Study (FES) for the Rolling Stock.

The implementation of the Works and provision of the new Rolling Stock.

The operation and maintenance of the railway infrastructure.

Compliance with the system’s Service Levels.

RATES

Above all, the Huancayo-Huancavelica Railway is intended to be accessible for all. For many residents of the towns and villages through which it passes, it is the only affordable and reliable means of transportation available to them. During the concession, the rates shall be approved by the Ministry of Transportation and Communications.

OPERATING MODEL

TRAVEL TIMES

RAILWAY YARD

Complete remodeling of the facilities, including a new maintenance and repair workshop adapted to the needs of the new rolling stock.

CONSTRUCTION TRANCHES

Tranche 1: Includes the Works from the Chilca-side gate of the Huancayo Station up to and including the Mariscal Cáceres Station.

Tranche 2: Includes the Works from the Mariscal Cáceres Station to the Huancavelica Station.

CHILCA

MANUEL TELLERIA

IZCUCHACA

MARISCAL CÁCERES

ACORIA

YAULI

HUANCAVELICA

JunínHUANCAYO

Huancavelica

Huayucachi

Viques

Paccha-Soccos

ChancaRetama

Ingahuasi

Huarisca

Parco

Pilchaca

Cuenca

Aguas Calientes

Larmenta

PallcahuaycoChunca

Ccocha

Huayas (Bandera)

Silva

Troya

Pomaccoria

Parcacancha

Junín

Huancavelica

Railway

Station

Stops

Page 9: INFORMATIONAL REPORT HUANCAYO - HUANCAVELICA · Standard (NTP) 350.043-1. Upgrading of waiting areas in stations: construction and/or repair of restrooms and platform furniture, and

Proinversión Perú

Proinversión Perú

Proinversión Perú

Proinversión Perú

www.proinversion.gob.pe/fhh