Infoworks CS to ICM The 1’s and 2’s of conversion www.wsc.nsw.gov.au Presentation by Tim Bell 26 th November 2015

Upload: phamphuc

Post on 04-Jan-2017

410 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Infoworks CS to ICM

Infoworks CS to ICM The 1’s and 2’s of conversion

www.wsc.nsw.gov.au

Presentation by Tim Bell 26th November 2015

Page 2: Infoworks CS to ICM

Overview

• Wingecarribee Shire

• Water & Sewer Networks

• Water & Sewer Modelling Progress

• Conversion from CS to ICM

• Summary

Page 3: Infoworks CS to ICM

Wingecarribee Shire

• 110 km from Sydney’s CBD • Population approx 47,000 • Average annual growth rate 0.3% • Rich biodiversity • Large areas of high conservation value • Important catchment area for water supply to

Sydney, Wollongong and North Shoalhaven • High tourism expenditure

To create and nurture a vibrant and diverse community growing and working in harmony with our urban, agricultural and natural environment.

Council’s Vision

Page 4: Infoworks CS to ICM

Water Network

3 Water Treatment Plants 16 Booster Pump stations

29 reservoirs 2 water sources

668 km water mains 17894 connections

45 bulk flow meters

Below: Photo of Wingecarribee Reservoir & WTP in background. Source: Water NSW

Page 5: Infoworks CS to ICM

Water Network

3 Water Treatment Plants 16 Booster Pump stations

29 reservoirs 2 water sources

668 km water mains 17894 connections

45 bulk flow meters

Below: Photo of Wingecarribee Reservoir & WTP in background. Source: Water NSW

Page 6: Infoworks CS to ICM

Sewer Network

- 6 Sewer Treatment Plants

- 73 Pump stations

- 496 km gravity mains

- 89 km rising mains

- 9478 manholes

- 15320 service lines

Below: Panoramic photo of Bundanoon STP

Page 7: Infoworks CS to ICM

Sewer Network

- 6 Sewer Treatment Plants

- 73 Pump stations

- 496 km gravity mains

- 89 km rising mains

- 9478 manholes

- 15320 service lines

Below: Panoramic photo of Bundanoon STP

Page 8: Infoworks CS to ICM

Water Modelling Progress

• Full system model build • High level calibration

completed • Fire Flow determinations

• Models built for parts of network

• In-house building of small networks for practice

• Operational investigations

• System master plan • Network performance

now and into future • Capital works

improvement plan

• Continuous improvement and updates of model

• In-house network investigations

• Pressure Management planning & design project

• Detailed calibration • Continuous improvement • Development assessments • Water quality simulations

2010 2011 2012 2013-2014

2015 & Beyond

Page 9: Infoworks CS to ICM

Sewer Modelling Progress

• Bowral flow containment assessment complete

• Moss Vale Model Build • Bundanoon Model Build

• Infoworks CS purchased • Modelling specifications • Model built for Bowral

(main town, high I/I) • Flow monitoring works

completed in Bowral

• Moss Vale calibration completed

• Several major development impact assessments

• Flow monitoring & rain gauging in Moss Vale and Bundanoon

• Minor development impact assessments

• Bundanoon model calibration • Berrima & Mittagong model

builds • Flow containment

assessments remaining areas

2012 2013 2014 2015 Future

Page 10: Infoworks CS to ICM

Conversion from CS to ICM

Page 11: Infoworks CS to ICM

Conversion from CS to ICM

Page 12: Infoworks CS to ICM

Conversion from CS to ICM

• Number of Changes between CS and ICM

• Migration process

• New user interface – menu bar

• Explorer window

• Version management

• GIS layer control

• Theme management

Page 13: Infoworks CS to ICM

Migration Process

• Simple process to migrate from CS to ICM

• Open Infoworks CS Admin

Page 14: Infoworks CS to ICM

Migration Process

• Simple process to migrate from CS to ICM

• Open Infoworks CS Admin

• Export to cs2icm migration file

Page 15: Infoworks CS to ICM

Migration Process

• Simple process to migrate from CS to ICM

• Open Infoworks CS Admin

• Export to cs2icm migration file

• Import migration file into ICM

Page 16: Infoworks CS to ICM

Migration Process

• Import complete

Page 17: Infoworks CS to ICM

Menu Bar

• Most icons similar to CS

• Some minor changes

Page 18: Infoworks CS to ICM

Menu Bar – Grid Windows

Holding control still allows you to open the grid

window with only the current selection from the

geoplan.

Page 19: Infoworks CS to ICM

Menu Bar – Create / Edit objects

Page 20: Infoworks CS to ICM

Explorer Window

Infoworks CS

1

2

3

Page 21: Infoworks CS to ICM

Explorer Window

Infoworks ICM

1 2 3

Page 22: Infoworks CS to ICM

Explorer Window

Infoworks ICM

1

Page 23: Infoworks CS to ICM

Explorer Window

Infoworks ICM

2

Page 24: Infoworks CS to ICM

Explorer Window

Infoworks ICM

3

Page 25: Infoworks CS to ICM

Version Management

Infoworks CS Infoworks ICM

Page 26: Infoworks CS to ICM

Version Management

Infoworks ICM

Page 27: Infoworks CS to ICM

Version Management

Version Control – Show commit history

Page 28: Infoworks CS to ICM

Version Management

Commit history – Version details

Page 29: Infoworks CS to ICM

Version Management

Commit details – next and previous

Page 30: Infoworks CS to ICM

GIS Layer Control

Infoworks CS

Page 31: Infoworks CS to ICM

GIS Layer Control

Infoworks CS

Page 32: Infoworks CS to ICM

GIS Layer Control

Infoworks ICM

Page 33: Infoworks CS to ICM

GIS Layer Control

CS - Old

Page 34: Infoworks CS to ICM

GIS Layer Control

ICM - New

Page 35: Infoworks CS to ICM

Theme Management

Infoworks CS Infoworks ICM

Page 36: Infoworks CS to ICM

Theme Management

CS Themes

Page 37: Infoworks CS to ICM

Theme Management

Which looks like…

Page 38: Infoworks CS to ICM

Theme Management

ICM Themes

Page 39: Infoworks CS to ICM

Theme Management

ICM Themes

Page 40: Infoworks CS to ICM

Theme Management

ICM Themes – Pipe Diameters

Page 41: Infoworks CS to ICM

Theme Management

ICM Themes – Turn on Surcharge State

Page 42: Infoworks CS to ICM

Theme Management

ICM Themes with Pipe Diameters & Surcharge State

Page 43: Infoworks CS to ICM

One last tip!

Page 44: Infoworks CS to ICM

Summary

• Number of improvements in ICM from CS

• Menus, Explorer, Version control, GIS layers, Themes

• Faster and less processing time

• Scratched the surface of new functionality

• Future direction

• Move from Jet engine to dedicated SQL server database

• Remote & concurrent simulations

• Water quality & H2S simulations